|
---|
Category:E-Mail
MONTHYEARML22235A7862022-08-23023 August 2022 Acceptance Review: Exemption Request from 10 CFR 20, Appendix G, LLW Shipping Investigation Requirements ML21181A1882021-06-30030 June 2021 E-mail from S. Johnston, Holtec, to A. Snyder and F. Bower, NRC - Oyster Creek Nuclear Generating Station - Readiness Status for ISFSI Only Inspection ML21175A2092021-06-24024 June 2021 E-mail from A. Sterdis to P. Longmire - Oyster Creek Nuclear Generating Station: ISFSI-only Physical Security Plan (Stating Implementation Intent) ML21162A3602021-06-11011 June 2021 E-mail Response from the State of New Jersey Regarding the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21162A1172021-06-11011 June 2021 E-mail to HDI: Acceptance Review - FOF Exemption ML21168A0172021-06-10010 June 2021 E-mail from HDI: RAI Response ML21161A2572021-06-0707 June 2021 State Consultation: ISFSI-only Physical Security Plan (Email Response) ML21175A0712021-06-0202 June 2021 Issuance of Request for Additional Information: Oyster Creek Nuclear Generating Station. Request for Amendment to Technical Specifications ML21148A0562021-05-27027 May 2021 E-mail to State of New Jersey Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21132A3182021-05-12012 May 2021 E-Mail from V. Gubbi, DEP to Z. Cruz, NRC - Oyster Creek Nuclear Generating Station - State of New Jersey Response to the Pending Revision to the Defueled Technical Specifications to Reflect Independent Spent Fuel Storage Installation Only ML21132A0312021-05-11011 May 2021 E-mail to State of New Jersey Informing of the Pending Revision to the Physical Security Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21119A1422021-04-28028 April 2021 E-mail to State of New Jersey Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21113A0742021-04-23023 April 2021 Acceptance Review Email - April 20, 2021 Oyster Creek Request for Exemption from 10 CFR Part 73 Requirements Due to Covid ML21099A0382021-04-0808 April 2021 Email from Z. Cruz to A. Sterdis - Request for Additional Information - HDI Request for Approval of Oyster Creek Nuclear Generating Station Independent Spent Fuel Storage Installation Facility Only Emergency Plan ML21085A4872021-03-26026 March 2021 E-mail from Z. Cruz to A. Sterdis - Acceptance Review: Oyster Creek Nuclear Generating Station - Request for Approval of Independent Spent Fuel Storage Installation Only Permanently Defueled Technical Specifications ML21064A2432021-03-0505 March 2021 Email from Z. Cruz to A. Sterdis Acceptance Review_ Oyster Creek Nuclear Generating Station - Request for Approval of Independent Spent Fuel Storage Installation Facility Only Emergency Plan and Emergency Action Level Scheme ML21064A2392021-03-0202 March 2021 E-mail from Z. Cruz to A. Sterdis Acceptance Review - Oyster Creek Nuclear Generating Station - Request for Approval of Independent Spent Fuel Storage Installation Only Physical Security Plan ML20345A1462020-12-0909 December 2020 E-mail - Response to Request for Additional Information: HDI Request for One-Time Exemption from Part 73, Appendix B FOF Requirements ML20335A3112020-11-30030 November 2020 Request for Additional Information Regarding Request for a one-time Exemption from Part 73, Appendix B Requirements for Oyster Creek Nuclear Generating Station ML20332A1472020-11-24024 November 2020 Acceptance Review: November 20 2020 Exemption Request from 10 CFR Part 73 Appendix B Requirements for Oyster Creek ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20279A5082020-10-0505 October 2020 Email to Holtec - Response to Notification of Oyster Creek Onsite Property Insurance Coverage ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20134H8742020-05-12012 May 2020 Request for Additional Information Regarding Request for Temporary Exemption from Part 73, Appendix B Requirements ML20133J9182020-05-11011 May 2020 Acceptance Review Email - Oyster Creek Request for Exemption from Part 73 Qualification Requirements ML20120A0252020-04-22022 April 2020 NRR E-mail Capture - (External_Sender) Oyster Creek Sea Turtle Handling and Conservation Recommendation Obligations NRC-2019-0073, Response from NEIMA Local Community Advisory Board Questionnaire 10-30-2019 R Discenza2019-10-30030 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-30-2019 R Discenza ML19344C8022019-10-20020 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-20-2019 a Dressler ML19344C8002019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 W Mcmullin ML19344C7982019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 M Noto ML19344C7992019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 s Feldman ML19344C7932019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 C Bischoff ML19344C7962019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 G Adams ML19344C7912019-10-0808 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-08-2019 J Branciforte ML19344C7902019-10-0808 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-08-2019 Anonymous ML19344C7892019-10-0505 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-05-2019 P Dressler ML19263D1222019-09-20020 September 2019 for Your Action Request for Additional Information Hdi Oyster Creek PSDAR ML19214A0452019-08-0202 August 2019 NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation ML19182A3422019-07-0101 July 2019 Transaction ML19178A0702019-06-26026 June 2019 Email to State of New Jersey - Oyster Creek - Request Comments on Proposed Amendment to Remove Reference to the Oyster Creek Cyber Security Plan and Update License Condition 2.C.(4) in the Renewed Facility License ML19196A3422019-06-20020 June 2019 Email: Courtesy Notice on the Issuance of the Oyster Creek License Transfer and Exemption (Sierra Club) ML19196A3342019-06-20020 June 2019 Email: Courtesy Notice on the Issuance of the Oyster Creek License Transfer and Exemption ML19162A2242019-06-11011 June 2019 NRC to NMFS, NRC Responses to NMFS Requests for Additional Information for Oyster Creek ESA Section 7 Consultation NRC-2018-0237, Comment from Paul Dressler of the Concerned Citizens for Lacey Coalition, Regarding the Oyster Creek Nuclear Plant License Transfer Application2019-06-0707 June 2019 Comment from Paul Dressler of the Concerned Citizens for Lacey Coalition, Regarding the Oyster Creek Nuclear Plant License Transfer Application ML19155A1182019-06-0404 June 2019 Incoming E-mail from State of New Jersey on the Oyster Creek Exemption for Reduced Insurances and Use of Decommissioning Trust Fund for Spent Fuel Management and Site Restoration ML19155A1192019-06-0404 June 2019 State of New Jersey Comments - Oyster Creek Conforming Amendment Associated with the Oyster Creek Generating Station License Transfer Application ML19154A0582019-05-31031 May 2019 E-mail Response from State of New Jersey Dated May 31, 2019, Notification-and-Request-Oyster Creek License Transfer Application L-2018-LLM-0002 ML19158A2912019-05-30030 May 2019 NRR E-mail Capture - Oyster Creek ESA Consultation: Information Requests from NMFS ML19158A2772019-05-28028 May 2019 NRR E-mail Capture - Oyster Creek ESA Consultation: Information Requests from NMFS ML19148A4392019-05-24024 May 2019 NMFS to NRC, Requests for Additional Information to Support Oyster Creek Reinitiated Section 7 Consultation 2022-08-23
[Table view] Category:Letter
MONTHYEARIR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24089A2492024-03-29029 March 2024 Reply to Notice of Violation EA-2024-024 L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24085A7902024-03-28028 March 2024 – Preapplication Readiness Assessment of the License Termination Plan ML24081A2882024-03-21021 March 2024 Request Preliminary Review and Feedback on Chapter 6 of the Draft License Termination Plan ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 ML24033A3272024-02-0202 February 2024 Request Preliminary Review and Feedback on Chapter 5 of the Draft License Termination Plan ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) 2024-09-05
[Table view] |
Text
From: "Jill Lipoti" <Jill.Lipoti@dep.state.nj.us>
To: <ARB@nrc.gov>
Date: 01/12/2007 12:50:49 PM
Subject:
Fwd: Letter to NRC >>> Jill Lipoti 1/11/2007 4:30 PM >>> Randy: I want to go on record with a letter saying that we are hiring outside experts to help us with looking at the issue of corrosion of the OC drywell. As you know, we thought the NRC was thorough in investigating the issue before restart, but we reserved judgement with regard to license renewal. I've drafted a letter. It is attached.
I wanted to send it prior to the ACRS subcommittee meeting. Last time I drafted a letter, you looked at it from the point of view of the sensitivity of NRC to certain words, phrases, etc. Can you just give me an honest read of the attached letter? I don't want to raise eyebrows, and I just want to focus on the fact that we are hiring an outside expert. I'm worried that I may have said something unintentionally that could be construed as criticizing NRC. Thanks. Jill Mail Envelope Properties (45A7CA5A.OBE
- 15 : 41150)
Subject:
Fwd: Letter to NRC Creation Date 01/12/2007 12:49:10 PM From: "Jill Lipoti" <Jill.Lipoti@dep.state.nj .us> Created By: Jill.Lipoti@dep.state.nj .us Recipients Ill-c.gov kpl_po.KP-DO ARB (A Randolph Blough) Post Office kp 1 jo .KP-D 0 Route Ilrc.gov Files Size Date & Time MESSAGE 875 01/12/2007 12:49:10 PM Oyster Creek Drywell Corrosion - Expert Review.doc Mime.822 38500 261 12 Options Expiration Date:
None Priority:
Standard ReplyRequested:
No Return Notification:
None Concealed
Subject:
No Security:
Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled I I Division of Environmental Safety and Health P.O. Box 424 Trenton, New Jersey 08625-0424 Phone: (609) 633-7964 Fax: (609) 777-1330 January 16,2007 Dr. Pao-Tsin Kuo Acting Director Division of License Renewal U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0-1 1 F1 11 555 Rockville Pike Rockville, MD 20852
Subject:
Oyster Creek Drywell Corrosion - Expert Review
Dear Dr. Kuo:
During the recently concluded Oyster Creek refueling outage, AmerGen Energy Corporation, LLC, an Exelon company (AmerGen), as part of its license renewal process, performed extensive inspections of the drywell. During this time, NRC inspectors from Region 1 were on site conducting an inspection of aging management program implementation related to AmerGen's license renewal application. The State of New Jersey Bureau of Nuclear Engineering (BNE) participated in the NRC inspection, as an observer, as specified by the current Memo of Understanding (MOU) between the Department of Environmental Protection (DEP) and the NRC. As required by this MOU, the BNE is restricted from making information relating to an ongoing NRC inspection public, The NRC scheduled the exit meeting for this inspection for January 11,2007. . I am writing to inform you of the BNE's intention to hire an independent expert in the field of corrosion mechanisms. This expert will review and comment on the technical report prepared by AmerGen, which represents its bases for concluding that Oyster Creek could restart from the outage and continue to operate for the extended period of license renewal. The bases for our concerns is that during the outage inspections, water was unexpectedly discovered inside the drywell resulting in the saturation of the lower portion of the metal drywell shell which is embedded under the concrete floor located at the bottom of the drywell.
The water was initially removed but reappeared, indicating a saturated condition. Also found during this inspection was a glass object, described by AmerGen and NRC as a soda bottle, partially embedded in the drywell concrete floor. Apparently the object was there since original construction. This discovery of the foreign object raised the issue of other possible voids in the concrete floor which could exacerbate corrosion of the drywell shell. NRC Information Notice 2004-09 identifies the consequences of similar concerns at other plants.
I personally participated along with BNE, NRC and Oyster Creek management and staff in daily briefings during the outage as these events unfolded. AmerGen prepared a detailed technical report discussing the ultrasonic thickness measurements and water intrusion finding as its bases justifying restart of Oyster Creek fiom the refueling outage.
This technical report was finalized only a day or two prior to restart. The BNE has completed its review of the report and has concerns over the bases on which AmerGen concluded that the water inside the drywe11 would not result in corrosion of the concrete embedded portions of the drywell shell over the extended period of operation if license renewal is granted. BNE has decided to solicit the assistance of an outside expert in the field of corrosion to review AmerGen's technical bases for this conclusion. DEP plans to bring the findings of this outside review to NRC's attention for consideration in license renewal. Should you have any questions or need additional information, please contact me directly at (609) 633-7964 or Mr. Kent Tosch, Manager of the Bureau of Nuclear Engineering, at (609) 984-7701. Sincerely yours, Jill Lipoti, Ph.D. Director c: Graham B. Wallis, Chairman, ACRS Richard Lopriori, Exelon Samuel Collins, Regional Administrator, NRC Region 1 A. Randolf Blough, Director, Division of Reactor Safety, NRC Region 1 Richard Conte, Chief, Engineering Branch, NRC Region 1 Nancy MacNamara, State Liaison Officer