ML110250471

From kanterella
Revision as of 23:52, 13 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Susquehanna, Unit 2 - Technical Requirements Manual
ML110250471
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 01/14/2011
From:
Susquehanna
To: Gerlach R M
Document Control Desk, Office of Nuclear Reactor Regulation
References
028401, 2011-2403
Download: ML110250471 (52)


Text

Jan. 17, 2011 HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2011-2403 USER INFORMATION:

Name: GERLACH*ROSE M EMPL#:028401 CA#:0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 01/14/2011 LOCATION:

USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.TRM2. -TECHNICAL REQUIREMENTS MANUAL UNIT 2'REMOVE MANUAL TABLE OF CONTENTS ADD MANUAL TABLE OF CONTENTS DATE: 01/12/2011 DATE: 01/13/2011 CATEGORY: ID: TEXT REMOVE: DOCUMENTS 2.2 REV: 9 TYPE: TRM2 ADD: REV: 10 CATEGORY: ID: TEXT REMOVE: DOCUMENTS 3.3.6 REV:2 TYPE: TRM2 ADD: REV: 3 CATEGORY:

DOCUMENTS ID: TEXT B3.3.6 ADD: REV: 4 REMOVE: REV:3 TYPE: TRM2 Iko0of CATEGORY:

DOCUMENTS TYPE: TRM2 ID: TEXT LOES REMOVE: REV:65 ADD: REV: 66 CATEGORY:

DOCUMENTS TYPE: TRM2 ID: TEXT TOC ADD: REV: 19 REMOVE: REV:l8 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 0 Procedure Name TEXT LOES Title: LIST OF EF]1/13/2011 Rev Issue Date 66 01/13/2011 FECTIVE SECTIONS Change ID Change Number TEXT TOC Title: 19 01/13/2011 TABLE OF CONTENTS TEXT 1.1 0 11/19/2002 Title: USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005 Title: PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 10 01/13/2011 Title: PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4 05/23/2008 Title: APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1 11/09/2007 Title: REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT 3.1.2 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8 05/14/2009 Title: CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)LDCN 4712 Page 1 of 15 Report Date: 01/14/11 Page 1 of .15 Report Date: 01/14/11 SSES MANUAL Manual Name: TRE2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 Title: INSTRUMENTATION TEXT 3.3.2 Title: INSTRUMENTATION TEXT 3.3.3 Title: INSTRUMENTATION TEXT 3.3.4 Title: INSTRUMENTATION TEXT 3.3.5 Title: INSTRUMENTATION TEXT 3.3.6 Title: INSTRUMENTATION TEXT 3.3.7 Title: INSTRUMENTATION TEXT 3.3.8 Title: INSTRUMENTATION TEXT 3.3.9 Title: INSTRUMENTATION TEXT 3.3.10 Title: INSTRUMENTATION TEXT 3.3.11 Title: INSTRUMENTATION TEXT 3.3.12 0 11/19/2002 RADIATION MONITORING INSTRUMENTATION 2 11/09/2007 SEISMIC MONITORING INSTRUMENTATION 2 11/09/2007 METEOROLOGICAL MONITORING INSTRUMENTATION 6 07/09/2010 TRM POST-ACCIDENT MONITORING INSTRUMENTATION 0 11/19/2002 THIS PAGE INTENTIONALLY LEFT BLANK 3 01/13/2011 TRM ISOLATION ACTUATION INSTRUMENTATION 1 11/09/2007 MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1 10/22/2003 TRM RPS INSTRUMENTATION 3 05/14/2009 LPRM UPSCALE ALARM INSTRUMENTATION 1 12/14/2004 REACTOR RECIRCULATION PUMP MG SET STOPS 1 10/22/2003 MVP ISOLATION INSTRUMENTATION 0 04/16/2009 Title: WATER MONITORING INSTRUMENTATION Page 2. of 15 Report Date: 01/14/11 Page 2 of .15 Report Date: 01/14/11 SSES MANUAL.Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 Title: REACTOR TEXT 3.4.2 Title: REACTOR TEXT 3.4.3 Title: REACTOR TEXT 3.4.4 Title: REACTOR TEXT 3.4.5 Title: REACTOR TEXT 3.4.6 Title: REACTOR TEXT 3.5.1 1 04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1 04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1 11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1 04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 0 07/20/2010 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1 02/04/2005 Title: ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007 Title: ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002 Title: ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002 Title: CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002 Title: CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION 0 TEXT 3.6.3 0 11/19/2002 Title: CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page -of .15 Report Date: 01/14/11 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0 11/19/2002 Title: CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3. 7.1 Title: PLANT TEXT 3.7.2 Title: PLANT TEXT 3.7.3.1 Title: PLANT TEXT 3.7.3.2 Title: PLANT TEXT 3.7.3.3 Title: PLANT TEXT 3.7.3.4 Title: PLANT TEXT 3.7.3.5 Title: PLANT TEXT 3.7.3.6 Title: PLANT TEXT 3.7.3.7 Title: PLANT TEXT 3.7.3.8 Title: PLANT TEXT 3.7.4 Title: PLANT 0 11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN 0 11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL 2 04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3 04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3 04/16/2009 SYSTEMS C02 SYSTEMS 2 04/16/2009 SYSTEMS HALON SYSTEMS 2 04/16/2009 SYSTEMS FIRE HOSE STATIONS 2 04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1 04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 9 09/21/2010 SYSTEMS FIRE DETECTION INSTRUMENTATION 1 04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 15 Report Date: 01/14/11 Page 4 of .15 Report Date: 01/14/11 SSES MAflTAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 Title: PLANT TEXT 3.7.5.2 Title: PLANT TEXT 3.7.5.3 Title: PLANT TEXT 3.7. 6 Title: PLANT 0 11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0 11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1 04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 2 06/27/2008 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 7 12/03/2010 Title: PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006 Title: PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004 Title: PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)TEXT 3.7.11 Title: PLANT SYSTEMS 1 10/02/2009 TEXT 3.8.1 2 02/04/2005 Title: ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007 Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION

-CONTINUOUS TEXT 3.8.2.2 2 12/14/2004 Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION

-AUTOMATIC page 5 of 15 Report Date: 01/14/11 SSES MANUJAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3. 8.3 Title: ELECTRICAL TEXT 3.8.4 Title: ELECTRICAL TEXT 3.8.5 Title: ELECTRICAL TEXT 3.8.6 Title: ELECTRICAL TEXT 3.8.7 1 04/05/2010 POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES 1 02/04/2005 POWER 24 VDC ELECTRICAL SUBSYSTEM 0 11/19/2002 POWER DEGRADED VOLTAGE PROTECTION 0 11/19/2002 POWER EMERGENCY SWITCHGEAR ROOM COOLING 2 10/22/2009 Title: BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002 Title: REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002 Title: REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002 Title: REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006 Title: MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007 Title: MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010 Title: MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)TEXT 3.11.1.1 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION 0 Page ~ of 15 Report Date: 01/14/11 Page6 of 15 Report Date: 01/14/11 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 Title: RADIOACTIVE TEXT 3.11.1.3 Title: RADIOACTIVE TEXT 3.11.1.4 Title: RADIOACTIVE TEXT 3.11.1.5 Title: RADIOACTIVE TEXT 3.11.2.1 Title: RADIOACTIVE TEXT 3.11.2.2 Title: RADIOACTIVE TEXT 3.11.2.3 Title: RADIOACTIVE FORM TEXT 3.11.2.4 Title: RADIOACTIVE TEXT 3.11.2.5 Title: RADIOACTIVE TEXT 3.11.2.6 Title: RADIOACTIVE TEXT 3.11.3 Title: RADIOACTIVE TEXT 3.11.4.1 Title: RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1 04/26/2006 LIQUID EFFLUENTS DOSE 1 04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1 12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2 05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3 04/26/2006 DOSE RATE 1 04/26/2006 DOSE -NOBLE GASES 1 04/26/2006 DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0 11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3 11/14/2006 VENTILATION EXHAUST TREATMENT SYSTEM 4 09/16/2009 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1 04/26/2006 TOTAL DOSE 3 04/26/2006 MONITORING PROGRAM Page 2 of 15 Report Date: 01/14/11 Page 7 of .15 Report Date: 01/14/11 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2 04/26/2006 Title: RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002 Title: LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008 Title: LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002 Title: LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 Title: 0 09/27/2003 ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 Title: TEXT 4.3 Title: TEXT 4.4 Title: TEXT 4.5 Title: TEXT 4.6 Title: TEXT 4.7 Title: ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0 09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0 09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 1 12/18/2008 CONTROLS PROCEDURES

& PROGRAMS 0 09/27/2003 CONTROLS REPORTING REQUIREMENTS 0 09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0 09/27/2003 CONTROLS TRAINING Page ~. of 15 Report Date: 01/14/11 Page 8 of .15 Report Date: 01/14/11 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 4 05/23/2008 Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 1 11/09/2007 Title: REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT B3.1.2 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002 Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)TEXT B3.3.1 Title: INSTRUMENTATION TEXT B3.3.2 Title: INSTRUMENTATION TEXT B3.3.3 Title: INSTRUMENTATION TEXT B3.3.4 Title: INSTRUMENTATION TEXT B3.3.5 Title: INSTRUMENTATION TEXT B3.3.6 Title: INSTRUMENTATION 0 11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 1 11/09/2007 BASES SEISMIC MONITORING INSTRUMENTATION 2 11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 4 07/09/2010 BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION 2 11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 4 01/13/2011 BASES TRM ISOLATION ACTUATION INSTRUMENTATION Pages of i~. Report Date: 01/14/11 Page 9 of 15 Report Date: 01/14/11 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 Title: INSTRUMENTATION TEXT B3.3.8 Title: INSTRUMENTATION TEXT B3.3.9 Title: INSTRUMENTATION TEXT B3.3.10 Title: INSTRUMENTATION TEXT B3.3.11 Title: INSTRUMENTATION TEXT B3.3.12 1 11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1 10/22/2003 BASES TEM RPS INSTRUMENTATION 3 05/14/2009 BASES LPRM UPSCALE ALARM INSTRUMENTATION 2 08/09/2010 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1 10/22/2003 BASES MVP ISOLATION INSTRUMENTATION 0 04/16/2009 Title: WATER MONITORING INSTRUMENTATION TEXT B3.4.1 Title: REACTOR TEXT B3.4.2 Title: REACTOR TEXT B3.4.3 Title: REACTOR TEXT B3.4.4 Title: REACTOR TEXT B3.4.5 Title: REACTOR TEXT B3.4.6 Title: REACTOR 0 11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1 04/16/2009 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 1 11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0 11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0 11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS 0 07/20/2010 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Page i~ of 15 Report Date: 01/14/11 Page 10 of 15 Report Date: 01/14/11 SSES MANUAL* Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 Title: ECCS AND RC TEXT B3.5.2 Title: ECCS AND RC TEXT B3.5.3 Title: ECCS AND RC TEXT B3.6.1 Title: CONTAINMENT TEXT B3.6.2 Title: CONTAINMENT INDICATION TEXT B3.6.3 Title: CONTAINMENT TEXT B3.6.4 Title: CONTAINMENT TEXT B3.7.1 Title: PLANT SYSTE]TEXT B3.7.2 Title: PLANT SYSTEI TEXT B3.7.3.1 Title: PLANT SYSTEI TEXT B3.7.3.2 Title: PLANT SYSTEI TEXT B3.7.3.3 Title: PLANT SYSTE1 I 0 11/19/2002 C BASES ADS MANUAL INHIBIT 1 11/09/2007 C BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION 1 11/09/2007 IC BASES LONG TERM NITROGEN SUPPLY TO ADS 0 11/19/2002 BASES VENTING OR PURGING 0 11/19/2002 BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION 1 04/19/2007 BASES SUPPRESSION POOL ALARM INSTRUMENTATION 1 12/14/2004 BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES 0 11/19/2002 IS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ES BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL 3 06/15/2010 IS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM 2 04/26/2006 ES BASES SPRAY AND SPRINKLER SYSTEMS 0 11/19/2002 ES BASES C02 SYSTEMS V M M M M Page 11 of 15 Report Date: 01/14/11 Page 11 0 f 15 Report Date: 01/14/11 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4 Title: PLANT TEXT B3.7.3.5 Title: PLANT TEXT B3.7.3.6 Title: PLANT TEXT B3.7.3.7 Title: PLANT TEXT B3.7.3.8 Title: PLANT TEXT B3.7.4 Title: PLANT TEXT B3.7.5.1 Title: PLANT TEXT B3.7.5.2 Title: PLANT TEXT B3.7.5.3 Title: PLANT TEXT B3.7.6 Title: PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1 04/26/2006 HALON SYSTEMS 1 04/26/2006 FIRE HOSE STATIONS 1 04/26/2006 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0 11/19/2002 FIRE RATED ASSEMBLIES 1 01/12/2004 FIRE DETECTION INSTRUMENTATION 0 11/19/2002 SOLID RADWASTE SYSTEM 0 11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0 11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0 11/19/2002 LIQUID HOLDUP TANKS 2 06/27/2008 ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008 Title: PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION ( TEXT B3.7.8 3 Title: PLANT SYSTEMS BASES SNUBBERS 06/21/2007 Page 12. of 15 Report Date: 01/14/11 Page 12 of .15 Report Date: 01/14/11 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 1 12/14/2004 Title: PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004 Title: PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT 33.7.11 2 04/14/2010 Title: STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010 Title: ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 Title: ELECTRICAL CONTINUOUS TEXT B3.8.2.2 Title: ELECTRICAL AUTOMATIC 0 11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD 1 09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION

-PROTECTION

-TEXT B3.8.3 0 11/19/2002 Title: ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002 Title: ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002 Title: ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005 Title: ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 1 06/15/2009 Title: BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.Title: 1 0 11/19/2002 REFUELING OPERATIONS BASES DECAY TIME Page 13. of .i~5. Report Date: 01/14/11 Page 13 of 15 Report Date: 01/14/11 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 11/19/2002 Title: REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002 Title: REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 Title: MISCELLANEOUS BASES SEALED 11/19/2002 SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007 Title: MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002 Title: MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)TEXT B3.11.1.1 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.1.3 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.1.4 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.1.5 Title: RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.2.1 Title: RADIOACTIVE EFFLUENTS ( TEXT B3.11.2.2 Title: RADIOACTIVE EFFLUENTS 0 11/19/2002 BASES LIQUID EFFLUENTS DOSE 0 11/19/2002 BASES LIQUID WASTE TREATMENT SYSTEM 0 11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0 11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING 1 12/14/2004 BASES DOSE RATE 0 11/19/2002 I BASES DOSE -NOBLE GASES Page ~A of 15 Report Date: 01/14/11 Page 14 of .15 Report Date: 01/14/11 SSES MANUJAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 Title: RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4 Title: RADIOACTIVE.EFFLUENTS TEXT B3.11.2.5 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.2.6 Title: RADIOACTIVE EFFLUENTS INSTRUMENTATION 0 11/19/2002 BASES DOSE,- IODINE, TRITIUM, AND RADIONUCLIDES IN 0 11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 4 11/14/2006 BASES VENTILATION EXHAUST TREATMENT SYSTEM EFFLUENT MONITORING 1 BASES 01/27/2004 RADIOACTIVE GASEOUS TEXT B3.11.3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 3 07/09/2010 Title: RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 Title: LOADS CONTROL PROGRAM 1 BASES 10/04/2007 CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010 Title: LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002 Title: LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15. of 15 Report Date: 01/14/11 Page 15 of .15 Report Date: 01/14/11 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE 1.0 US E A N D A PP LIC A TIO N ............................................................................

1.0-1 1.1 D efinitio ns ..............................

.....................................................

T R M /1.0-2 2.0 PLA NT PR O G RA M S ...................................................................................

2.0-1 2 .1 P lant P rogram s ......................................................................................

2 .0-1 2.2 Instrument Trip Setpoint Table .....................................................

TRM/2.0-5 3.0 A P P LIC A B ILITY .................................................................................

T R M /3.0-1 3.0 (TRO) -TR for Operation (TRO) Applicability

...............................

TRM/3.0-1 3.0 (TRS) -TR Surveillance (TRS) Applicability

..................................

TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS ..................................................

TRM/3.1-1 3.1.1 Alternate Rod Injection

.................................................................

TRM/3.1-1 3.1.2 C R D H ousing S upport ...........................................................................

3.1-4 3.1.3 Control Rod Block Instrumentation

........................................................

3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve .................................................................................

T R M /3.1-9 3.2 CORE OPERATING LIMITS REPORT ........................................................

3.2-1 3.2.1 Core Operating Limits Report ................................................................

3.2-1 3.3 INSTRUMENTATION

.........................................................................

TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation

...........................................

TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation

.............................................

TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation

...................................

TRM/3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation

............................

TRM/3.3-9 3.3.5 Section Not Used ..........................................................................

TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation

.................................

TRM/3.3-13

3.3.7 Turbine

Overspeed Protection System .........................................

TRM/3.3-17

3.3.8 Section

Not Used ..........................................................................

TRM/3.3-19 3.3.9 OPRM Instrumentation

.................................................................

TRM/3.3-21 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops .........................................................................

TRM/3.3-22 3.3.11 MVP Isolation Instrumentation

......................................................

TRM/3.3-24 3.3.12 Water Monitoring Instrumentation

.................................................

TRM/3.3-26

3.4 REACTOR

COOLANT SYSTEM ..........................................................

TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry

.......................................................

3.4-1 3.4 .2 N ot U sed .........................................................................................

T R M /3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors ....................................

3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit ............................

TRM/3.4-12

3.4.5 Reactor

Vessel Material Surveillances Program ...........................

TRM/3.4-13

3.4.6 Reactor

Recirculation Single Loop Operation (SLO)Flow Rate Restriction

....................................................................

TRM/3.4-14 SUSQUEHANNA-UNIT2 TRM/TOC-1 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA

-UNIT 2 TRM / TOC-1 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC ......................................

TRM/3.5-1 3.5.1 ADS Manual Inhibit .......................................................................

TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation

............................

3.5-3 3.5.3 Long Term Nitrogen Supply to ADS ......................................................

3.5-6 3.6 C O N TA IN M E N T ..........................................................................................

3.6-1 3.6.1 VENTING or PURGING .........................................................................

3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ica tio n ...............................................................................................

3 .6 -3 3.6.3 Suppression Pool Alarm Instrumentation

...............................................

3.6-4 3.6.4 Primary Containment Closed System Boundaries

........................

TRM/3.6-7 3.7 PLANT SYSTEMS ..............................................................................

TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown)

............................

TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level .........................................

3.7-3 3.7.3.1 Fire Suppression Water Supply System .......................................

TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems .......................................................

TRM/3.7-8 3.7.3.3 C02 systems ................................................................................

TRM/3.7-12 3.7.3.4 Halon Systems .............................................................................

TRM/3.7-16 3.7,3.5 Fire Hose Stations ........................................................................

TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses .............................

TRM/3.7-22 3.7.3.7 Fire Rated Assemblies

..................................................................

TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation

......................................................

TRM/3.7-26

3.7.4 Solid

Radwaste System ................................................................

TRM/3.7-34 3.7,5.1 Main Condenser Offgas Hydrogen Monitor ...........................................

3.7-37 3.7.5.2 Main Condenser Explosive Gas Mixture .......................................

TRM/3.7-38 3.7,5.3 Liquid Holdup Tanks ..............................

TRM/3.7-39 3.7,6 ESSW Pumphouse Ventilation

..........................

....................................

3.7-40 3.7,7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation

...........................................................

TRM/3.7-41 3.7,8 S nubbers ......................................................................................

T R M /3.7-43 3.7,9 Control Structure HVAC ................................................................

TRM/3.7-49 3.7,10 Spent Fuel Storage Pools (SFSPs) ..............................................

TRM/3.7-51 3.7,11 Structural Integrity

.........................................................................

TRM/3.7-54

3.8 ELECTRICAL

POWER .......................................................................

TRM/3.8-1 3.8,1 Primary Containment Penetration Conductor Overcurrent Protective Devices ........................................................................

TRM/3.8-1 3.8,2.1 Motor Operated Valves Thermal Overload Protection

-C ontinuous

...................................................................................

T R M /3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection

-A utom atic ......................................................................................

T R M /3.8-11 3.8,3 Diesel Generator (DG) Maintenance Activities

.............................

TRM/3.8-13 SUSQUEHANNA

-UNIT 2 TRM /TOC-2 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE 3.8.4 24VDC Electrical Power Subsystem

.............................................

TRM/3.8-15

3.8.5 Degraded

Voltage Protection

.......................................................

TRM/3.8-21

3.8.6 Emergency

Switchgear Room Cooling ..................................................

3.8-24 3.8.7 Battery Monitoring and Maintenance Program ..............................

TRM/3.8-26

3.9 REFUELING

OPERATIONS

........................................................................

3.9-1 3 .9 .1 D ecay T im e ...........................................................................................

3 .9-1 3.9 .2 C om m unications

....................................................................................

3.9-2 3.9.3 R efueling P latform .................................................................................

3.9-3 3.10 MISCELLANEOUS

.............................................................................

TRM/3.10-1 3.10.1 Sealed Source Contamination

......................................................

TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation

..........................

3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ....................

TRM/3.10-7 3.10.4 Section Not Used ..........................................................................

TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS

..............................................................

TRM/3.1 1-1 3.11.1 Liquid Effluents

.............................................................................

T R M /3. 11-1 3.11.1.1 Liquid Effluents Concentration

......................................................

TRM/3.11-1 3.11.1.2 Liquid Effluents Dose ...................................................................

TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System ..................................................

TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation

............................

3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation

...............

TRM/3.11-13 3.11.2 Gaseous Effluents

........................................................................

TRM/3.11-17 3.11.2.1 Dose Rate ...................

........ ..................

TRM/3.11-17 3.11.2.2 Dose -Noble Gases .....................................................................

TRM/3.11-20 3.11.2.3 Dose -Iodine, Tritium, and Radionuclides in Particulate Form ...........................................................................

T R M /3.11-21 3.11.2.4 Gaseous Radwaste Treatment System ........................................

TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System .........................................

TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation .............................................................................

T R M /3.11-25 3.11.3 T otal D ose ....................................................................................

T R M /3.11-33 3.11.4 Radiological Environmental Monitoring

.........................................

TRM/3.11-35 3.11.4.1 Monitoring Program ......................................................................

TRM/3.11-35 3.11.4.2 Land Use Census .........................................................................

TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program ............................................

TRM/3.11-47 3.12 LOADS CONTROL PROGRAM ..........................................................

TRM/3.12-1 3.12.1 Crane Travel -Spent Fuel Storage Pool .......................................

TRM/3.12-1 3.12.2 Heavy Loads Requirements

.........................................................

TRM/3.12.3 3.12.3 Light Loads Requirements

............................................................

TRM/3.12-5 SUSQUEHANNA-UNIT2 TRM / TOC-3 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA

-UNIT 2 TRM / TOC-3 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE 4.0 ADMINISTRATIVE CONTROLS .............................

4.0-1 4 .1 O rg a n izatio n ..........................................................................................

4 .0-1 4.2 Reportable Event Action ........................................................................

4.0-2 4 .3 S afety Lim it V iolation .............................................................................

4 .0-3 4.4 Procedures and Programs .....................................................................

4.0-4 4.5 Reporting Requirements

........................................................................

4.0-5 4.6 Radiation Protection Program ................................................................

4.0-7 4 .7 T ra in in g ..................................................................................................

4 .0 -8 SUSQUEHANNA

-UNIT 2 TRM / TOC-4 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE B 3.0 (TRO) -TR for Operation (TRO) Applicability

......................................

B 3.0-1 B 3.0 (TRS) -TR Surveillance (TRS) Applicability.........................................

B 3.0-9 B 3.1.1 Alternate Rod Injection

................................................................

TRM/B 3.1-1 B 3.1.2 CRD Housing Support .........................................................................

B 3.1-4 B 3.1.3 Control Rod Block Instrumentation

..............................................

TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve ........................................................................

TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR) .................................................

B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation

..........................................

TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation

.............................................

TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation

..................................

TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation

...........................

TRM/B 3.3-4 B 3.3.5 Section Not Used .........................................................................

TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation

................................

TRM/B 3.3-10 B 3.3.7 Turbine Overspeed Protection System ........................................

TRM/B 3.3-14 B 3.3.8 Section Not Used .........................................................................

TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation

................................................................

TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops ........................................................................

TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation

.....................................................

TRM/B 3.3-22 B 3.3.12 Water Monitoring Instrumentation

................................................

TRM/B 3.3-24 B 3.4.1 Reactor Coolant System Chemistry

.....................................................

B 3.4-1 B 3.4.2 N ot U sed ......................................................................................

T R M /B 3.4-2 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit ...........................

TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program ..................................

B 3.4-6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)Flow Rate Restriction

....................................................................

TRM/B3.4-7 B 3.5.1 A D S M anual Inhibit ..............................................................................

B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation

..................

TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS ....................................................

B 3.5-4 B 3.6.1 VENTING or PURGING ...............................................................

TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ic a tio n .............................................................................................

B 3 .6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation

.............................................

B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries

.......................

TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)

...................................

B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level .......................................

B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System ......................................

TRM/B 3.7-3 SUSQUEHANNA

-UNIT 2 TRM /TOC-5 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE B 3.7.3.2 Spray and Sprinkler Systems ......................................................

TRM/B 3.7-5 B 3.7.3.3 C02 Systems ..............................................................................

TRM/B 3.7-7 B 3.7.3.4 Halon Systems ............................................................................

TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations .......................................................................

TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................

TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies

.................................................................

TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation

.....................................................

TRM/B 3.7-14 B 3.7.4 Solid Radwaste System ...............................................................

TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor .........................................

B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture ..............................................

B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks ...........................................................................

B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation

....................................................

TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation

..........................................................

TRM/B 3.7-22 B 3.7.8 Snubbers .....................................................................................

TRM/B 3.7-24 B 3.7.9 Control Structure HVAC ...............................................................

TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools ............................................................

TRM/B 3.7-33 B 3.7.11 Structural Integrity

........................................................................

TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices .......................................................................

TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection

-C ontinuous

.................................................................................

T R M /B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection

-A utom atic .....................................................................................

T R M /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities

............................

TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem

............................................

TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection

......................................................

TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling ........................................

TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program .............................

TRM/B 3.8-18 B .3 .9 .1 D ecay T im e .........................................................................................

B 3.9-1 B 3.9.2 Communications

..................................................................................

B 3.9-2 B 3.9.3 Refueling Platform ...............................................................................

B 3.9-3 B 3.10.1 Sealed Source Contamination

.............................................................

B 3.10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation

........................

B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ...................

TRM/B 3.10-4 B 3.10.4 Section Not Used .........................................................................

TRM/B 3.10-6 B 3.11.1.1 Liquid Effluents Concentration

.............................................................

B 3.11-1 B 3.11.1.2 Liquid Effluents Dose .........................................................................

B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System .........................................................

B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation

..........................

B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation

..............

TRM/B 3.11-10 SUSQUEHANNA

-UNIT 2 TRM /TOC-6 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)PPL Rev. 19 SECTION B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B 3.12 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Dose Rate ....................................................................................

TRM/B 3.11-12 Dose -Noble Gases ............................................................................

B 3.11-16 Dose -Iodine, Tritium, and Radionuclides in Particulate Form ..................................................................................

B 3.11-18 Gaseous Radwaste Treatment System .......................................

TRM/B 3.11-20 Ventilation Exhaust Treatment System ........................................

TRM/B 3.11-21 Radioactive Gaseous Effluent Monitoring Instrumentation

............................................................................

TRM/B 3.11-24 T ota l D o se ...........................................................................................

B 3 .1 1-2 6 Monitoring Program .....................................................................

TRM/B 3.11-28 Land Use Census ................................................................................

B 3.11-34 Interlaboratory Comparison Program ...........................................

TRM/B 3.11-36 LOADS CONTROL PROGRAM ...................................................

TRM/B 3.12-1 Crane Travel -Spent Fuel Storage Pool .....................................

TRM/B 3.12-1 Heavy Loads Requirements

........................................................

TRM/B 3.12-2 Light Loads Requirements

...........................................................

TRM/B 3.12-3 TRM2 Text TOC 1/12/2011 SUSQUEHANNA

-UNIT 2 TRM / TOC-7 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 3.1 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page 3.3-6 Page TRM 3.3-7 Page 3.3-8 01/07/2011 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 04/15/2009 05/15/2008 01/07/2011 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 04/14/2008 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/17/2009 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 3.2 3.3 SUSQUEHANNA

-UNIT 2 TRM / LOES-1 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.4 Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-11a Page TRM /3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Pages TRM / 3.3-15 and TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Page TRM / 3.4-14 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 06/30/2010 10/31/2007 06/30/2010 03/30/2001 01/07/2011 12/14/1998 01/07/2011 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 07/15/2010 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.5 3.6 SUSQUEHANNA

-UNIT 2 TRM / LOES-2 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM /3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-40a Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/2006 01/13/2010 11/30/2005 11/16/2001 09/16/2010 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 11/29/2010 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA

-UNIT 2 TRM / LOES-3 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 03/25/2010 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 06/10/2010

3.9 REFUELING

OPERATIONS Pages 3.9-1 through 3.9-3 3.10 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12'Page TRM /3.11-13 Page TRM /3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 SUSQUEHANNA

-UNIT 2 TRM / LOES-4 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA

-UNIT 2 TRM / LOES-5 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B 3.3-8 Page TRM / B 3.3-9 Pages TRM / B 3.3-10 through TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3-19d and TRM / B 3.3-19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 10/31/2007 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/31/2007 06/30/2010 10/31/2007 01/07/2011 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 04/17/2009 03/27/2007 08/03/2010 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA

-UNIT 2 TRM / LOES-6 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.4 B 3.5 B 3.6 B 3.7 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Page TRM / B 3.4-7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-1 Oa through TRM / B 3.7-1 Ia Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 07/15/2010 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 SUSQUEHANNA

-UNIT 2 TRM / LOES-7 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA

-UNIT 2 TRM / LOES-7 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.8 B.3.9 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Page TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 06/07/2007 10/05/2006 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/28/2009 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a SUSQUEHANNA

-UNIT 2 TRM / LOES-8 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA

-UNIT 2 TRM / LOES-8 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages TRM / B 3.11-31 and TRM / B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Page TRM / B 3.12-2 Page TRM / B 3.12-3 TRM2 text LOES.doc 1/1212011 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 06/30/2010 08/31/1998 06/30/2010 08/31/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 SUSQUEHANNA

-UNIT 2 TRM / LOES-9 EFFECTIVE DATE 01/07/2011 Instrument Trip Setpoint Program PPL Rev. 10 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications.

Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements.

Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.

Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.Reference NDAP-QA-1104 Setpoint Change Control SUSQUEHANNA

-UNIT 2 TRM / 2.0-5 EFFECTIVE DATE 04/02/1999 Instrument Trip Setpoint Program 2.2 PPL Rev. 10 TABLE 2.2-1 (Page 1 of 8)INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT 2.2.1 Reactor Protection 2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux -< 120/125 divisions of full scale High 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron Flux -_ 18% of RATED THERMAL POWER High (Setdown)2.2.1.3 3.3.1.1 Average Power Range Monitor, Simulated 0.55 W + 58.7%Thermal Power -High Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Simulated 0.55 (W- AW) + 5 8.7%(b)Thermal Power -High Single Loop Operation 2.2.1.5 3.3.1.1 Average Power Range Monitor, Simulated

< 113.5% of RATED THERMAL Thermal Power -High Flow Clamp POWER 2.2.1.6 3.3.1.1 Average Power Range Monitor, Neutron Flux- 118% of RATED THERMAL High POWER 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure-High 1087 psig 2.2.1.8 3.3.1.1 Reactor Vessel Water Level -Low, Level 3 > 13.0 inches(a)2.2.1.9 3.3.1.1 Main Steam Isolation Valve -Closure < 10% closed 2.2.1.10 This Section Not Used 2.2.1.11 3.3.1.1 Drywell Pressure-High 1.72 psig 2.2.1.12 3.3.1.1 Scram Discharge Volume Water Level -High -_ 65 gallons Level Transmitter 2.2.1.13 3.3.1.1 Scram Discharge Volume Water Level -High -61 gallons Float Switch 2.2.1.14 3.3.1.1 Turbine Stop Valve -Closure < 5.5% closed 2.2.1.15 3.3.1.1 Turbine Control Valve Fast Closure, Trip Oil _> 500 psig Pressure -Low (continued)

See Figure 2.2-1.(b) For single loop operation, the value of AW = 8.7.SUSQUEHANNA

-UNIT 2 TRM / 2.0-6 EFFECTIVE DATE 04/15/2009 Instrument Trip Setpoint Program 2.2 PPL Rev. 10 TABLE 2.2-1 (Page 2 of 8)INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT 2.2.1.16 OPRM Instrumentation 2.2.1.16.1 3.3.1.1 Sp PBA Amplitude Trip See COLR -TRO 3.2 2.2.1.16.2 3.3.1.1 Np PBA Successive Confirmation Count Trip See COLR -TRO 3.2 2.2.1.16.3

[3.3.9] TOL (E) Period Tolerance 0.10 sec 2.2.1.16.4

[3.3.9] fc Conditioning Filter Cutoff Frequency 1.50 Hz 2.2.1.16.5

[3.3.9] Tmin OscillationPeriod Lower Time Limit 1.00 sec 2.2.1.16.6

[3.3.9] Tmax Oscillation Period Upper Time Limit 3.50 sec 2.2.1.16.7

[3.3.9] LPRMmin Minimum LRPMs/Cell Required for 2 Cell Operability 2.2.1.16.8

[3.3.9] S1 Peak Threshold Setpoint/ABA

& GRBA 1.20 2.2.1.16.9

[3.3.9] S2 Valley Threshold Setpoint/ABA

& GRBA 0.85 2.2.1.16.10

[3.3.9] Smax Amplitude Trip SetpointlABA 1.50 2.2.1.16.11

[3.3.9] DR3 Growth Rate Factor Setpoint/GRBA 1.60 2.2.2 Isolation Actuation Instrumentation 2.2.2.1 Primary Containment Isolation 2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level 3 >13.0 inches(a)2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2 > -38.0 inches(a)2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low, > -129 inches(a)Level 1 2.2.2.1.4 3.3.6.1 Drywell Pressure -High < 1.72 psig 2.2.2.1.5 3.3.6.1 SGTS Exhaust Radiation

-High < 23.0 mR/hr 2.2.2.1.6

[3.3.6] Main Steam Line Radiation-High High < 15 x full power background without hydrogen injection (continued)(a) See Figure 2.2-1.SUSQUEHANNA

-UNIT 2 TRM / 2.0-7 EFFECTIVE DATE 05/15/2008 Instrument Trip Setpoint Program 2.2 PPL Rev. 10 TABLE 2.2-1 (Page 3 of 8)INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.2.2 Secondary Containment Isolation 2.2.2.2.1 2.2.2.2.2 2.2.2.2.3 2.2.2.2.4 2.2.2.2.5 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 2.2.2.3 Main Steam Line Isolation Reactor Vessel Water Level -Low Low, Level 2 Drywell Pressure -High Refuel Floor High Exhaust Duct Radiation

-High Railroad Access Shaft Exhaust Duct Radiation

-High Refuel Floor Wall Exhaust Duct Radiation

-High Reactor Vessel Water Level -Low Low Low, Level 1 Main Steam Line Pressure -Low Main Steam Line Flow -High Condenser Vacuum -Low Reactor Building Main Steam Line Tunnel Temperature

-High This Section Not Used This section is not used.Turbine Building Main Steam Tunnel Temperature

-High> -38.0 inches(a)< 1.72 psig< 18 mR/hr< 5 mR/hr< 21 mR/hr 2.2.2.3.1 2.2.2.3.2 2.2.2.3.3 2.2.2.3.4 2.2.2.3.5 2.2.2.3.6 2.2.2.3.7 2.2.2.3.8 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1[3.3.6]>-129 inches(a)> 861 psig< 173 psid> 9.0 inches Hg vacuum_ 177°F< 1971F 2.2.2.4 Reactor Water Cleanup System Isolation 2.2.2.4.1 2.2.2.4.2 2.2.2.4.3 2.2.2.4.4 2.2.2.4.5 2.2.2.4.6 2.2.2.4.7 2.2.2.4.8 2.2.2.4.9 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 Reactor Vessel Water Level -Low Low, Level 2 RWCU A Flow -High RWCU Flow -High RWCU Penetration Area Temperature

-High This section is not used.RWCU Pump Area Temperature

-High This section is not used.RWCU Heat Exchanger Area Temperature-High This section is not used.> -38 inches (a)59 gpm462 gpm131 IF147*1F1471F (continued)(a) See Figure 2.2-1.SUSQUEHANNA

-UNIT 2 TRM / 2.0-8 EFFECTIVE DATE 01/07/2011 Instrument Trip Setpoint Program 2.2 PPL Rev.10 TABLE 2.2-1 (Page 4 of 8)INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.2.5 Reactor Core Isolation Cooling System Isolation 2.2.2.5.1 2.2.2.5.2 2.2.2.5.3 2.2.2.5.4 2.2.2.5.5 2.2.2.5.6 2.2.2.5.7 2.2.2.5.8 2.2.2.5.9 2.2.2.6 2.2.2.6.1 2.2.2.6.2 2.2.2.6.3 2.2.2.6.4 2.2.2.6.5 2.2.2.6.6 2.2.2.6.7 2,2.2.6.8 2,2.2.6.9 2,2.2.7 2,2.2.7.1 2,2.2.7.2 2,2.2.7.3 2,2.3 3.3.6.1 RCIC Steam Line A Pressure -High 3.3.6.1 RCIC Steam Supply Line Pressure -Low 3.3.6.1 RCIC Turbine Exhaust Diaphragm Pressure-High 3.3.6.1 RCIC Equipment Room Temperature

-High 3.3.6.1 RCIC Pipe Routing Area Temperature

-High 3.3.6.1 RCIC Emergency Area Cooler Temperature-High 3.3.6.1 Drywell Pressure -High This section is not used.This section is not used.High Pressure Coolant Injection System Isolation< 138 inches H 2 0> 60 psig< 10.0 psig< 167 0 F_< 167OF_< 167OF< 1.72 psig 3.3.6.1 HPC 3.3.6.1 HPC 3.3.6.1 HPC Higl 3.3.6.1 HPC 3.3.6.1 HPC High 3.3.6.1 HPC 3.3.6.1 Dry\This This Shutdown Cooling/System Isolation 3.3.6.1 Rea 3.3.6.1 Rea[3.3.6] RHF ECCS Actuation I Steam Line A Pressure -High I Steam Supply Line Pressure -Low I Turbine Exhaust Diaphragm Pressure -I Equipment Room Temperature

-High I Emergency Area Cooler Temperature

-I Pipe Routing Area Temperature

-High well Pressure -High section is not used.section is not used.ctor Vessel Water Level -Low, Level 3 ctor Vessel Steam Dome Pressure --High Z Flow -High< 370 inches H 2 0>_ 104 psig_ 10 psig< 167OF< 167oF< 167*F< 1.72 psig> 13.0 inches(a)< 98 psig<25,000 gpm>-129 inches(a)< 1.72 psig_413, 427 psig 2,2.3.1 Core Spray System 2,2.3.1.1 3.3.5.1 2,2.3.1.2 2,2.3.1.3 3.3.5.1 3.3.5.1 Reactor Vessel Water Level -Low Low Low, Level 1 Drywell Pressure -. High Reactor Vessel Steam Dome Pressure -Low injection permissive (continued)

(3) See Figure 2.2-1.SUSQUEHANNA

-UNIT 2 TRM / 2.0-9 EFFECTIVE DATE 01/07/2011 Instrument Trip Setpoint Program 2.2 PPL Rev. 10 TABLE 2.2-1 (Page 5 of 8)INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.3.2 LPCI Mode of RHR System 2.2.3.2.1 3.3.5.1 Reactor Vessel Water Level -Low Low Low, > -129 inches(a)Level 1 2.2.3.2.2 3.3.5.1 Drywell Pressure -High < 1.72 psig 2.2.3.2.3 3.3.5.1 Reactor Vessel Steam Dome Pressure -_ 413, < 427 psig Low, injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure -_> 236 psig, decreasing Low, Recirculation Discharge Valve permissive 2.2.3.3 HPCI System 2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level -Low Low, > -38 inches(a)Level 2 2.2.3.3.2 3.3.5.1 Drywell Pressure -High < 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level -Low > 40.5 inches above tank bottom 2.2.3.3.4 3.3.5.1 Reactor Vessel Water Level -High, Level 8 < 54 inches 2.2.3.4 Automatic Depressurization System (ADS)2.2.3.4.1 3.3.5.1 Reactor Vessel Water Level -Low Low Low, > -129 inches Level 1 2.2.3.4.2 3.3.5.1 Drywell Pressure -High < 1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer <102 seconds 2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure -High _> 135, < 155 psig 2.2.3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump _> 121, 129 psig Discharge Pressure -High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level -Low, Level 3 > 13 inches Confirmatory 2.2.3.4.7 3.3.5.1 ADS Drywell Pressure Bypass Timer < 420 seconds 2.2.3.5 Loss of Power -ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)2.2.3.5.1.1 3.3.8.1 Bus Undervoltage 2 823.2, 856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay >_ 0.4, < 0.6 seconds (continued)(a) See Figure 2.2-1.SUSQUEHANNA

-UNIT 2 TRM / 2.0-10 EFFECTIVE DATE 02/02/2010 Instrument Trip Setpoint Program 2.2 PPL Rev. 10 TABLE 2.2-1 (Page 6 of 8)INSTRUMENTATION SETPOINTS 2.2.3.5.2 2.2.3.5.2.1 2.2.3.5.2.2 2.2.3.5.3 2.2.3.5.3.1 2.2.3.5.3.2 2.2.3.5.3.4 2.2.3.5.4 2.2.3.5.4.1 2.2.3.5.4.2 2.2.3.5.5 2.2.3.5.5.1 2.2.3.5.5.2 2.2.4 SYSTEM/REFERENCE LCO[TRO] TRIP FUNCTION 4.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)3.3.8.1 Bus Undervoltage 3.3.8.1 Time delay 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)3.3.8.1 Bus Undervoltage 3.3.8.1 Time Delay (Non-LOCA) 3.3.8.1 Time Delay (LOCA)480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 65%)[3.8.5] 480V Basis[3.8.5] Time Delay 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 92%)[3.8.5] 480V Basis[3.8.5] Time Delay ATWS Alternate Rod Injection and Recirculation Pump Trip TRIP SETPOINT2641.1, < 2748.9 Volts>_ 2.7, < 3.3 seconds>3829.3, < 3906.7 Volts> 4 minute, 30 seconds< 5 minute, 30 seconds> 9, _< 11 seconds308.9, < 315.1 Volts a 4.5, < 5.5 seconds_ 437.6, < 446.4 Volts> 9, < 11 seconds 2.2.4.1 2.2.4.1 2.2.5 2.2.5.1 2.2.5.2 2.2.6 2.2.6.1 2.2.6.2 2.2.6.3 3.3.4.2i[3.1.1]

3.3.4.2J[3.

1.1]Reactor Vessel, Water Level -Low Low, Level 2 Reactor Vessel Steam Dome Pressure -High> -38 inches(a)< 1135 psig End of Cycle Recirculation Pump Trip 3.3.4.1 Turbine Stop Valve-Closure 3.3.4.1 Turbine Control Valve -Fast Closure Reactor Core Isolation Cooling System Actuation 3.3.5.2 Reactor Vessel Water Level -Low Low, Level 2 3.3.5.2 Reactor Vessel Water Level -High, Level 8 3.3.5.2 Condensate Storage Tank Level -Low< 5.5% closed> 500 psig>-38 inches(a)< 54 inches(a)> 36.0 inches above tank bottom (continued)(a) See Figure 2.2-1.SUSQUEHANNA

-UNIT 2 TRM /2.0-11 EFFECTIVE DATE 11/15/2004 Instrument Trip Setpoint Program 2.2 PPL Rev. 10 TABLE 2.2-1 (Page 7 of 8)INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.7 Control Rod Block 2.2.7.1 Rod Block Monitor 2.2.7.1.1 3.3.2 Low Power Range -Upscale See COLR -TRO 3.2 3.3.2 Intermediate Power Range -Upscale See COLR -TRO 3.2 3.3.2 High Power Range -Upscale See COLR -TRO 3.2 2.2.7.1.2 3.3.2 Low Power Range Setpoint See COLR -TRO 3.2 3.3.2 Intermediate Power Range Setpoint See COLR -TRO 3.2 3.3.2 High Power Range Setpoint See COLR -TRO 3.2 2.2.7.2 APRM 2.2.7.2.1

[3.1.3] Simulated Thermal Power-High

-Two Loop 0.55 W + 54.2%Operation 2.2.7.2.2

[3.1.3] Simulated Thermal Power-High

-Single 0.55 (W -AW) + 54.2%(c) .Loop Operation 2.2.7.2.3

[3.1.3] Simulated Thermal Power-High Clamp < 108% of RATED THERMAL POWER 2.2.7.2.4

[3.1.3] Downscale

> 5% of RATED THERMAL POWER 2.2.7.2.5

[3.1.3] Neutron Flux -High (Setdown)

< 12% of RATED THERMAL POWER 2.2.7.3 Source Range Monitors 2.2.7.3.1

[3.1.3] Upscale _ 2E5 cps 2.2.7.3.2

[3.1.3] Downscale

> 3.0 cps(b)2.2.7.4 Intermediate Range Monitors 2.2.7.4.1

[3.1.3] Upscale < 108/125 divisions of full scale 2.2.7.4.2

[3.1.3] Downscale

>5/125 divisions of full scale 2.2.7.5 Scram Discharge Volume 2.2.7.5.1

[3.1.3] Water Level -High < 35.9 gallons 2.2.7.6 Reactor Coolant System Recirculation Flow 2.2.7.6.1

[3.1.3] Upscale 114%(continued)(b) With a signal-to-noise ratio >_ 2, or within the limits of Figure 2.2-2.(c) For single loop operation, the valve of AW = 8.7.SUSQUEHANNA

-UNIT 2 TRM / 2.0-12 EFFECTIVE DATE 04/15/2009 Instrument Trip Setpoint Program 2.2 PPL Rev. 10 TABLE 2.2-1 (Page 8 of 8)INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.8 CREOASS 2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake _5 mR/hr Radiation Monitor 2.2.8.1.1 3.3.7.1 Reactor Vessel Water Level -Low Low, > -38.0 inches(a)Level 2 2.2.8.1.2 3.3.7.1 Drywell Pressure -High _ 1.72 psig 2.2.8.1.3 3.3.7.1 Refuel Floor High Exhaust Duct Radiation

-< 18 mR/hr High 2.2.8.1.4 3.3.7.1 Railroad Access Shaft Exhaust Duct <5 mR/hr Radiation

-High 2.2.8.1.5 3.3.7.1 Refuel Floor Wall Exhaust Duct Radiation

-21 mR/hr High 2.2.9 Feedwater/Main Turbine Trip System Actuation 2.2.9.1 3.3.2.2 Reactor Vessel Level -High <54.0 inches(a)2.2.10 MVP Isolation 2.2.10.1 [3.3.11] Main Steam Line Radiation-High High < 15 x full power background without hydrogen injection (a) See Figure 2.2-1 SUSQUEHANNA

-UNIT 2 TRM / 2.0-13 EFFECTIVE DATE 11/15/2004 Instrument Trip Setpoint Table PPL Rev. 10 2.2 FIGURE 2. 2-1 REACTOR VESSEL WATER LEVEL SUSQUEHANNA

-UNIT 2 TRM / 2.0-14 EFFECTIVE DATE 11/15/2004 Instrument Trip Setpoint Table 2.2 PPL Rev. 10 Instrument Trip Setpoint Table 2.2 C,)0 Lii z D 0 3 2.8 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0-Acceptable Not Acceptable 1'IE 2 6 10 14 18 22 26 30 Signal-to-Noise Ratio Figure 2.2-2 Minimum SRM Trip Setpoint Versus Signal-to-Noise Ratio SUSQUEHANNA

-UNIT 2 TRM / 2.0-15 EFFECTIVE DATE 11/15/2005 TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 3 3.3 Instrumentation 3.3.6 TRM Isolation Actuation Instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.APPLICABILITY:

As specified in Table 3.3.6-1 ACTIONS-NOTES.1. Penetration flow paths isolated to comply with Action C may be unisolated intermittently under administrative controls.2. Separate Condition entry is allowed for each channel.CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in trip. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable Function 2.a AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Function 2.a B. One or more Functions with B.1 Restore isolation capability.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.

C. Required Action and C.1 Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion compensatory measures for Time of Condition A or B the degraded condition.

not met.SUSQUEHANNA

-UNIT 2 TRM / 3.3-13 EFFECTIVE DATE 01/07/2011 TRM Isolation Actuation Instrumentation PPL Rev. 3 3.3.6 TECHNICAL REQUIREMENT SURVEILLANCE


NOTES------------------------------

1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.

SURVEILLANCE FREQUENCY TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.6.5 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months TRS 3.3.6.6 Perform RESPONSE TIME TEST 24 months on a staggered test basis SUSQUEHANNA

-UNIT 2 TRM / 3.3-14 EFFECTIVE DATE 12/14/1998 PPL Rev. 3 TRM Isolation Actuation Instrumentation

3.3.6 TABLE

3.3.6-1 (Page 1 of 2)PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS ALLOWABLE VALUE". Main Steam Line Isolation a. Turbine Building 1,2,3 2 TRS 3.3.6.2 _ 200OF Main Steam Line TRS 3.3.6.3 Tunnel Temperature -TRS 3.3.6.5-High 2. Primary Containment Isolation a. Main Steam Line 1,2,3 2 TRS 3.3.6.1 < 21 x full power Radiation

-High TRS 3.3.6.2 background without High TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6(a)

3. Shutdown Cooling System Isolation (b)a. RHRFlow-High 3,4,5 1 TRS 3.3.6.1 <26,000 gpm TRS 3.3.6.2 TRS 3.3.6.4 TRS 3.3.6.5 (a) Radiation detectors are exempt from response time testing.(b) Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.SUSQUEHANNA

-UNIT 2 TRM / 3.3-15 EFFECTIVE DATE 01/07/2011 TRM Isolation Actuation Instrumentation PPL Rev. 3 3.3.6 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA

-UNIT 2 TRM / 3.3-16 EFFECTIVE DATE 01/07/2011 TRM Isolation Actuation Instrumentation PPL Rev. 4 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES TRO The TRM Actuation instrumentation automatically initiates closure of appropriate primary containment isolation valves (PCIVs). The function of the PCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs)(Reference 1). The TRM Isolation Actuation Instrument has been relocated from the Technical Specifications because the identified Function is not credited in the plant design basis to mitigate any plant event, but does provide a diverse means to initiate an Isolation Actuation.

The isolation instrumentation includes the sensors, relays, and instruments that are necessary to cause initiation of primary containment and Reactor Coolant Pressure Boundary (RCPB) isolation.

When the setpoint is reached, the sensor actuates, which then outputs an isolation signal to the isolation logic. Monitoring a wide range of independent parameters provides functional diversity.

The input parameters to the isolation logic are: (a) Main steam line radiation, (b) Turbine Building Main Steam Line Tunnel Temperature

-High, and (c) RHR Flow -High.The valves associated with these trip channels are identified in Table B 3.3.6-1.Each of these valves is also associated with other trip channels as identified in LCO Bases B 3.6.1.3.The trips occur after a one second delay. See Tech Spec Basis B 3.3.6-1.(continued)

SUSQUEHANNA

-UNIT 2 TRM / B 3.3-10 EFFECTIVE DATE 01/07/2011 TRM Isolation Actuation Instrumentation PPL Rev. 4 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES (continued)

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.

The ACTIONS are modified by two Notes. Note 1 allows penetration flow path(s) to be unisolated intermittently under administrative controls.

These controls consist of stationing a dedicated operator at the controls of the valve, who is in continuous communication with the control room. In this way, the penetration can be rapidly isolated when a need for primary containment isolation is indicated.

Note 2 is provided to modify the ACTIONS.Condition C applies if the channel is not restored to OPERABLE status or placed in trip, or isolation capability is not restored, within the allowed Completion Time. If inoperable channels should not be placed in trip (e.g., might result in a undesirable transient)

Action C may be intentionally entered as a result of not meeting Required Action A.1 in its required Completion Time. Required Action C.1 requires appropriate compensatory measures be in place within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Examples of appropriate compensatory measures may consist of verifying that diverse isolation functions remain OPERABLE.

Furthermore, isolating the penetration (e.g., as may be required by TS Actions for an inoperability affecting both the TRM Function and a required TS Function) also provides adequate compensatory actions since isolating the affected penetration flow path(s) accomplishes the safety function of the inoperable channels.

If it is not desired to isolate the affected penetration flow path(s) (e.g., as in the case where isolating the penetration flow path(s)could result in a reactor scram or disabling RHR-SDC), alternate compensatory measures should be pursued. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is acceptable due to the fact that these Functions are not assumed in any accident or transient analysis in the FSAR.TRS The TRSs are defined to be performed at the specified Frequency to ensure that the TRM Isolation Actuation Instrumentation Functions are maintained OPERABLE.

TRM Isolation Actuation Instrumentation Surveillances are performed consistent with the Bases for LCO 3.3.6.1 "Isolation Activation Instrumentation." (continued)

SUSQUEHANNA

-UNIT 2 TRM / B 3.3-11 EFFECTIVE DATE 01/07/2011 TRM Isolation Actuation Instrumentation B 3.3.6 PPL Rev. 4 B 3.3.6 TRM Isolation Actuation Instrumentation BASES (continued)

TRS 3.3.6.5 The LOGIC SYSTEM FUNCTIONAL TEST demonstrates the OPERABILITY of the required isolation logic for a specific channel. The system functional testing performed on PCIVs in LCO 3.6.1.3 overlaps this surveillance to provide complete testing of the assumed safety function.

The 24 month Frequency is based on the need to perform portions of this surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the surveillance when performed at the 24 month Frequency.

TRS 3.3.6.6 The response time testing of Function 2.a is per FSAR Table 7.3-29.REFERENCES

1. FSAR Section 7.3.1 2. NRC Inspection and Enforcement Manual, Part 9900: Technical Guidance, Standard Technical Specification Section 1.0 Definitions, Issue dated 12/8/96.SUSQUEHANNA

-UNIT 2 TRM / B 3.3-12 EFFECTIVE DATE 01/07/2011 TRM Isolation Actuation Instrumentation PPL Rev. 4 B 3.3.6 Table B 3.3.6-1 Primary Containment Isolation Valves (Page 1 of 1)Plant systems Valve Number Valve Description Isolation Signal Function No.(Table 3.3.6-1)Nuclear Boiler HV-241 F022A MSIV l.a HV-241F022B MSIV. l.a HV-241 F022C MSIV l.a HV-241F022D MSIV 1.a HV-241 F028A MSIV 1.a HV-241 F028B MSIV 1.a HV-241 F028C MSIV 1.a HV-241F028D MSIV 1.a HV-241F016 MSL Drain Isolation Valve 1.a HV-241 F01 9 MSL Drain Isolation Valve 1.a Reactor HV-243F01 9 Reactor Coolant Sample Valve 2.a Recirculation HV-243F020 Reactor Coolant Sample Valve 2.a RHR HV-251 F022 RHR -Reactor Vessel Head Spray Valve 3.a HV-251 F023 RHR -Reactor Vessel Head Spray Valve 3.a HV-251 F008 RHR -Shutdown Cooling Valve 3.a HV-251F009 RHR -Shutdown Cooling Valve 3.a SUSQUEHANNA

-UNIT 2 TRM / B 3.3-13 EFFECTIVE DATE 01/07/2011