ML20304A158

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual
ML20304A158
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 10/13/2020
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML20304A158 (23)


Text

Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2020-16626 USER INFORMATION:

GERLACH*ROSEY M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY M 10/13/2020 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS ROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF RRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 09/22/2020 ADD MANUAL TABLE OF CONTENTS DATE: 10/12/2020 CATEGORY: DOCUMENTS TYPE: TRMl

Page 2 of 2 ID: TEXT 3.1.4 ADD: REV: 1 REMOVE: REV:0 CATEGORY: DOCUMENTS TYPE: TRMl ID : TEXT B3 . 1. 4 REMOVE: REV: 0 ADD: REV: 1 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL .

Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 16 of 16 Report Date: 10/13/20

. SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3 .11. 2. 1 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3 . 11. 2 . 2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3 .11.2. 3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.ll.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3 . 11. 2 . 5 5 07/03/2013

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 2 09/08/2016

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3 . 11. 3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3 . 11. 4 . 1 5 03/05/2015

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3 .11.4. 2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.ll.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Page 15 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name : TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 1 03/12/2019

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOORCE CONTAMINATION TEXT B3.10.2 1 03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 2 10/17/2019

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 1 04/17/2008

Title:

INTENTIONALLY LEFT BLANK TEXT B3 .11.1. 1 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3 . 11. 1. 2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID *EFFLUENTS DOSE TEXT B3 .11.1. 3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3 . 11. 1. 4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.l.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Page 14 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8 4 01/31/2014

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 3 03/05/2019

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 11/01/2018

Title:

STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.l O 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTE;CTION TEXT B3.8.6 3 03/05/2019

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 16 Report Date: 10/13/20

SSES MANUAL Manual Na.me : TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL 1JNIT 1 TEXT B3.7.3.3 1 01/03/2019

Title:

PLANT SYSTEMS BASES CO2 SYSTEMS TEXT B3.7.3.4 4 06/19/2019

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 12 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL DNIT 1 TEXT B3.4.6 3 01/03/2019

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.l 2 03/17/2020

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT B3.5.2 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT B3.5.3 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 4 02/16/2017

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name : TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANOAL UNIT 1 TEXT B3.3.6 6 03/05/2019

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 2 11/10/2015

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INTENTIONALLY LEFT BLANK TEXT B3.3.9 4 01/03/2019

Title:

OPRM INSTRUMENTATION TEXT B3.3.10 3 08/09/2010

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.ll 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 1 04/02/2019

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009

Title:

INTENTIONALLY LEFT BLANK TEXT B3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 10 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name : TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 5 03/05/2015

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3 .1.1 2 04/29/2014

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI} INSTRUMENTATION TEXT B3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3 .1. 3 4 12/18/2017

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.l.4 1 10/12/2020

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCOMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.l 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT {COLR}

TEXT B3.3.l 1 01/31/2014

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7 06/29/2017

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM} INSTRUMENTATION TEXT B3.3.5 2 11/09/2007

Title:

INTENTIONALLY LEFT BLANK Page 9 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1 5 03/05/2015

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM~ TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 1 01/03/2019

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 1 01/03/2019

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Page 8 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT l TEXT 3.11.l.l 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3 . 11. l. 2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3 . 11. 1. 3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10/09/2012

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3 .11.1.5 3 03/05/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3 . 11. 2 .1 4 03/12/2019

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3 . 11. 2 . 6 8 06/29/2017

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3 .11.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE Page 7 of 16 Report Date: 10/13/20

SSES MANCJAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 4 01/28/2020

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3 .8.4 0 11/18/2002

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2 03/05/2019

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING 3.8.7 1 06/15/2009

Title:

BATI'ERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 1 03/12/2019

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 3 06/19/2019

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 3 10/17/2019

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2 04/17/2008

Title:

INTENTIONALLY LEFT BLANK Page 6 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name: TRMl r

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1 1 03/05/2015

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 5 03/05/2015

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 3 03/05/2019

Title:

PLANT SYSTEMS CONTROL STRUCTORE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 1 11/01/2018

Title:

STRUCTURAL INTEGRITY TEXT 3.8.l 3 04/22/2020

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC Page 5 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002,

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (OHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 5 02/13/2020

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 4 05/'.16/2016

Title:

PLANT SYSTEMS CO2 SYSTEMS TEXT 3.7.3.4 2 04/16/2009

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 13 12/18/2017

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM INTENTIONALLY LEFT BLANK TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3 .4.4 2 04/17/2008

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT 3.5.2 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT 3.5.3 1 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 3 01/03/2019

Title:

SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0 11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 11 06/29/2017

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 5 03/05/2019

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015

Title:

INSTRUMENTATION MAIN TURBINE OVER.SPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION INTENTIONALLY LEFT BLANK TEXT 3.3.9 3 04/17/2008

Title:

OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 2* 04/02/2019

Title:

WATER MONITORING INSTRUMENTATION Page 2 of 16 Report Date: 10/13/20

SSES MANUAL Manual Name: TRMl J:/-~\

'i ) Manual

Title:

TECHNICAL REQUIREMENTS MANUAL ONIT 1 Table Of Contents Issue Date: 10/12/2020 Procedure Name Rev Issue Date Change ID Change Nmnber TEXT LOES 96 01/03/2019

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 27 03/05/2019

Title:

TABLE OF CONTENTS TEXT 1.1 1 01/31/2014

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 2 04/28/2015 ~~

Title:

PLANT PROGRAMS AND SETPOINTS PLANT P R O O ~ ~

\

.,~

  • r

"~----- /

TEXT 2.2 TEXT 3.0 10

Title:

PLANT PROGRAMS AND SETPOINTS 6

iofJ'p 01/~ey 06/,1~8 SETPOINT TABLE

Title:

TEXT 3.1.1 APPLICABILITY vv

-W'0PERA~J (TRO) APPLICABILITY & SURVEILLANCE (TRS) 11/09/2007

Title:

REACTIVITY CO~OI:i ST-EMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (A\\"AR~ iN~UMENTATION TEXT 3 .1. 2 ~\:.___V O 11/18/2002 SUPPORT TEXT 3 .1. 3 6 12/18/2017

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3 .1.4 1 10/12/2020

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.1 20 04/07/2020

Title:

CORE OPERATING LIMIST REPORT (COLR)

Page 1 of 16 Report Date: 10/13/20

Control Rod Scram Accumulators Instrumentation and Check Valve Rev. 1 3.1.4 3.1 Reactivity Control Systems 3.1 .4 Control Rod Scram Accumulators Instrumentation and Check Valve TRO 3.1.4 Each control rod scram accumulator's monitoring instrumentation and check valve shall be OPERABLE.

APPLICABILITY: MODES 1 and 2 when associated Scram Accumulator is OPERABLE.

MODE 5 when needed to support LCO 3.9.5 ACTIONS


NOTE Separate condition entry is allowed for each accumulator.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Restore check valve to Prior to entering accumulator check OPERABLE status. MODE 2.

valve(s) inoperable.

B. Loss of RDCS or the 8.1 Perform TS SR 3.1.5.1 on all 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 4-rod display. scram accumulators.

AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.

AND 8.2 Verify all scram accumulators 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> free of water.

AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.

SUSQUEHANNA - UNIT 1 TRM / 3.1-9

Control Rod Scram Accumulators Instrumentation and Check Valve Rev. 1 3.1.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. -------NOTE C. 1 Perfomi TS SR 3.1.5.1 on 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> This condition does not affected scram accumulator(s).

apply during perfomiance AND of accumulator charging.

Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.

One or more accumulator pressure detector(s)/alann(s) ihoperable for reasons other than Condition B.

D. One or more accumulator 0.1 Verify affected scram 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> leak detector(s) accumulator(s) free of water.

inoperable for reasons AND other than Condition B.

Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.

E*. Required Action and E.1 Declare the affected scram Immediately associated Completion accumulator(s) inoperable.

Time of Condition A, B, C or D not met or scram accumulator pressure undetermined.

SUSQUEHANNA - UNIT 1 TRM / 3.1-9a

Control Roa Scram Accumulators Instrumentation and Check Valve Rev. 1 3.1.4 TECHNICAL REQUIREMENT SURVEILLANCE


NOTE---------------------

When an accumulator pressure detector(s)/alarm(s) or accumulator leak detector(s) is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided the outage time is monitored.

SURVEILLANCE FREQUENCY TRS 3.1.4.1 Perform a CHANNEL FUNCTIONAL TEST of the leak 24 months detectors.

TRS 3.1.4.2 Perform a CHANNEL CALIBRATION of the pressure 24 months detectors; verify a pressure detector alarm setpoint of ~

940 psig on decreasing pressure.

TRS 3.1.4.3 Verify that each individual accumulator check valve 24 months maintains the associated accumulator pressure above the alarm set point for greater than or equal to 1O minutes with no control rod drive pump operating.

SUSQUEHANNA - UNIT 1 TRM / 3.1-10

Control Rod Scram Accumulators Instrumentation and Check Valve Rev. 1 B 3.1.4 B 3.1 REACTIVITY CONTROL SYSTEMS B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve BASES TRO The scram accumulator stores sufficient energy to fully insert a control rod at lower vessel pressures. At higher vessel pressures the accumulator pressure is assisted or supplemented by reactor vessel pressure. The accumulator is hydraulic cylinder with a free-floating piston. The piston separates the water on top from the nitrogen below. A check valve in the accumulator charging line prevents loss of water pressure in the event supply pressure is lost.

During normal plant operation, the accumulator piston is seated at the bottom of its cylinder. Loss of nitrogen decreases the nitrogen pressure, which actuates a pressure switch and sounds an alarm in the control room.

To ensure that the accumulator is always able to produce a scram, it is continuously monitored for water leakage. A float type level switch actuates an alarm if water leaks past the piston barrier and collects in the accumulator instrumentation block.

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.

Increasing the TS Surveillance Requirement for each affected Scram Accumulator from once every 7 days to once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> will perform required Action 8.1 or C.1. Blowing down each affected scram accumulator once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to verify it is free of moisture will perform required Action B.2 or 0.1.

When Condition B applies, a completion time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is granted for initial performance of the Required Actions. This allows reasonable time for restoration of failed systems before testing takes place.

Entry into Condition C is not required for performance of accumulator charging since the required action results in accumulator charging.

When Condition C or D applies, a completion time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is granted for initial performance of the Required Actions. This allows reasonable time for restoration of failed instrumentation before testing takes place.

SUSQUEHANNA - UNIT 1 TRM / B 3.1-8

Control Rod Scram Accumulators Instrumentation and Check Valve Rev.1 B 3.1.4 BASES TRS The TRSs are defined to be performed at the specified Frequency to ensure that the Scram Accumulator Instrumentation and check valves are maintained OPERABLE.

The Surveillances are modified by a Note to indicate that when accumulator pressure detectors/alam,s or accumulator leak detectors are placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to one hour provided the outage time is monitored. Upon completion of the Surveillance or expiration of the one-hour allowance, whichever is less, the detector/alam, must be returned to OPERABLE status or the applicable Condition(s) entered and Required Action(s) taken.

TRS 3.1.4.3 This test is intended to measure the ability of the accumulator check valve maintain the pressure necessary to insert the control rod after shutdown of the CRD charging water pump. The 10 minute period is to test the system's ability to maintain sufficient pressure from an initial value of> 1100 psig to

< 1150 psig.

REFERENCES 1. FSAR SECTION 4.6.1.1 SUSQUEHANNA - UNIT 1 TRM / B 3.1-Ba