.M.U~.
V..:> 1 L.UL..L MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2021-11982 USER INFORMATION:
GERLACH*ROSEY M Address: NUCSA2 Phone#:
542-3194 EMPL#:028401 CA#:
0363 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSEY M 08/03/2021 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS
-ROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF
~RRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 06/23/2021 ADD MANUAL TABLE OF CONTENTS DATE: 08/02/2021 CATEGORY: DOCUMENTS TYPE: TSB2 of 2
ID:
TEXT 3.6.3.2 REMOVE :
REV: 3 ADD:
REV: 4 Page 2
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
SSES MANUAL Manual Name:
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date:
08/02/2021 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 138 01/03/2019 Titl:e: LIST OF EFFECTIVE SECTIONS TEXT TOC 25 03/05/2019
Title:
TABLE OF CONTENTS TEXT 2.1.l 6
03/31/2021
Title:
SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1.2 l
TEXT 3.0 TEXT 3.1.l TEXT 3.1.2 11/16/2016 TEXT 3.1.4 5
11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1. 5 2
11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1. 6 5
03/31/2021
Title:
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Page 1 of 8
Report Date: 08/02/21
SSES MANUAL Manual Name:
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.1.7 4
11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1. 8 4
11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 6
03/31/2021
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)
TEXT 3.2.2 5
03/31/2021
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3 4
03/31/2021
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR TEXT 3.3.1.1 6
11/16/2016
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3. 3. 1. 2 4
01/23/2018
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 4
11/16/2016
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 3
11/16/2016
Title:
INSTRUMENTATION FEEDWATER -
MAIN TURBINE HIGH WATER LEVEL TRIP.INSTRUMENTATION TEXT 3.3.3.1 9
11/16/2016
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION TEXT 3.3.3.2 2
11/16/2016
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 2
11/16/2016
Title:
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION
- Page 2 of 8
Report Date: 08/02/21
SSES MANUAL Manual Name:
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2 1
11/16/2016
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 7
03/05/2019
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 3
03/18/2021
Title:
REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION TEXT 3.3.5.3 0
03/05/2019
Title:
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION (PREVIOUSLY TEXT 3.3.5.2 REVISION 1)
TEXT 3.3.6.1 9
03/05/2019
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 6
03/05/2019
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 4
03/05/2019
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 5
03/18/2021
Title:
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 1
11/16/2016
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 6
03/31/2021
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 4
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 3
01/13/2012
Title:
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
Page 3 of 8
Report Date: 08/02/21
SSES MANUAL Manual Name:
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.4.4 1
11/16/2016
Title:
REACTOR COOLANT.SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 3
03/10/2010
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 5
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 3
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.~.8 3
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM HOT SHUTDOWN TEXT 3.4.9 2
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM COLD SHUTDOWN TEXT 3.4.10 6
05/14/2019
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 1
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 7
03/31/2021
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 6
03/18/2021
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 6
03/05/2019 Page 4
Title:
EMERGENCY CORE_ COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING of 8
Report Date: 08/02/21
SSES MANUAL Manual Name:
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3. 6. 1. 1 6
11/16/2016
Title:
PRIMARY CONTAINMENT TEXT 3.6.1.2 2
11/16/2016
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3. 6. 1. 3 19 03/18/2021
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3.6.1.4 2
11/16/2016
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 2
11/16/2016
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 1
11/16/2016
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 3
11/16/2016
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 2
03/05/20;1..9
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 2
11/16/2016
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 1
11/16/2016
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1
Title:
CONTAINMENT SYSTEMS TEXT 3.6.3.2 2
4 06/13/2006 INTENTIONALLY LEFT BLANK 08/02/2021
Title:
CONTAINMENT' SYSTEMS DRYWELL AIR FLOW SYSTEM Page 5 of 8
Report Date: 08/02/21
SSES MANUAL Manual Name~
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.3.3 3
09/29/2017
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 17 12/16/2020
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 14 03/05/2019
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 7
03/05/2019
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 8
03/03/2020
Title:
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTI.MATE HEAT SINK (UHS)
TEXT 3.7.2 4
03/03/2020
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 4
03/05/2019
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS)' SYSTEM TEXT 3.7.4 2
03/05/2019
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 2
11/16/2016
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 4
11/16/2016
Title:
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7
- 2.
11/16/2016
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8 1
11/16/2016
Title:
MAINE TURBINE PRESSURE REGULATION SYSTEM Page 6 of 8
Report Date: 08/02/21
SSES MANUAL Manual Name:
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.8.1 16 05/26/2021
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES -
OPERATING TEXT 3.8.2 2
03/18/2021
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES -
SHUTDOWN TEXT 3.8.3 7
08/07/2019
Title:
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3.8.4 4
11/16/2016
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES -
OPERATING TEXT 3.8.5 2
03/05/2019
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES -
SHUTDOWN TEXT 3.8.6 2
11/16/2016
Title:
ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3. 8. 7.
7 09/04/2019
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS -
OPERATING TEXT 3.8.8 2
03/05/2019
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS -
SHUTDOWN TEXT 3.9.1 1
11/16/2016
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 2
11/16/2016
Title:
REFUELING OPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 1
11/16/2016
Title:
REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 0
11/18/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION Page 7 of 8
Report Date: 08/02/21
SSES MANUAL Manual Name::
TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.9.5 1
11/16/2016
Title:
REFUELING OPERATIONS CONTROL ROD OPERABILITY -
REFUELING TEXT 3.9.6 2
11/16/2016
Title:
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 1
11/16/2016
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) -
HIGH WATER LEVEL TEXT 3.9.8 1
11/16/2016
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR)
LOW WATER LEVEL TEXT 3.10.1 2
03/05/2019
Title:
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 1
11/16/2016
Title:
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 1
11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL. ROD WITHDRAWAL -
HOT SHUTDOWN TEXT 3.10.4 1
11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL -
COLD SHUTDOWN TEXT 3.10.5 1
11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL -
REFUELING TEXT 3.10.6 1
11/16/2016
Title:
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL -
REFUELING TEXT 3.10.7 2
03/31/2021
Title:
SPECIAL OPERATIONS CONTROL ROD TESTING -
OPERATING TEXT 3.10:8 4
03/31/2021
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST -
REFUELING Page 8 of 8
Report Date: 08/02/21
Rev.4 Drywell Air Flow System B 3.6.3.2 B 3.6 CONTAINMENT SYSTEMS B 3.6.3.2 Drywell Air Flow System BASES BACKGROUND APPLICABLE SAFETY ANALYSES The Drywell Cooling fans in low speed ensure a uniformly mixed post accident primary containment atmosphere (Ref. 1 ), thereby minimizing the potential for local hydrogen burns due to a pocket of hydrogen above the flammable concentration.
The Drywell Cooling fans are an Engineered Safety Feature and are designed to withstand a loss of coolant accident (LOCA) in post accident environments without loss of function. The system consists of three required pairs of fans with each pair consisting of two independent fans. The three.
required Drywell Cooling fan pairs are as follows:
- a. Drywell Unit Cooler fans 2V414A/2V414B;
- b. Drywell Unit Cooler fans 2V416A/21V416B;
- c.
Recirculation fan 2V418A/2V418B.
The fans are initiated manually since flammability limits would not be reached until several days after a LOCA. Each fan in a pair is powered from a separate emergency power supply. Since one fan in each pair can provide 100% of the mixing requirements, the system will provide its design function with a worst case single active failure.
The Drywell Cooling fans provide the capability for reducing the local hydrogen concentration to approximately the bulk average concentration following a Design Basis Accident (OBA).
Reference 2 no longer defines a design basis hydrogen source term and therefore no design basis analysis calculates hydrogen generation as a function of time. See Reference 3 for a detailed discussion for hydrogen generation.
Although natural circulation phenomena reduces the gradient concentration differences in containment, a containment mixing system provides further means of preventing local hydrogen gas buildups in containment post-accident.
The Drywell Cooling fans satisfy Criterion 3 of the NRC Policy Statement.
(Ref. 4)
SUSQUEHANNA - UNIT 2 3.6-75
BASES LCO APPLICABILITY Rev. 4 Drywell Air Flow System B 3.6.3.2 Three required Drywell Cooling fan pairs must be OPERABLE in low speed to ensure operation of at least one fan in each of the required pairs in the event of a worst case single active failure. The three required Drywell Cooling fan pairs are as follows:
- a. Dry.veil Unit Cooler fans 2V414A/2V414B;
- b. Drywell Unit Cooler fans 2V416A/2V416B;
- c. Recirculation fan 2V418A/2V418B.
Operation with at least one fan in each required pair provides the capability of controlling the bulk hydrogen concentration in primary containment without exceeding the flammability limit.
In MODES 1 and 2, the three Drywell Cooling fan pairs ensure the capability to prevent localized hydrogen concentrations above the flammability limit of 4.0 v/o in drywell, assuming a worst case single active failure.
In MODE 3, both the hydrogen production rate and the total hydrogen produced after a LOCA would be less than that calculated for the OBA LOCA. Also, because of the limited time in this MODE, the probability of an accident requiring the Drywell Cooling fans is low. Therefore, the Drywell Cooling fans are not required in MODE 3.
In MODES 4 and 5, the probability and consequences of a LOCA are reduced due to the pressure and temperature limitations in these MODES.
Therefore, the Drywell Cooling fans are not required in these MODES.
ACTIONS A.1 With one required Drywell Cooling fan in one or more pairs inoperable, the inoperable fan must be restored to OPERABLE status within 30 days. In this Condition, the remaining OPERABLE fan is adequate to perform the hydrogen mixing function. However, the overall reliability is reduced because a single failure in the OPERABLE fan could result in reduced hydrogen mixing capability. The 30 day Completion Time is based on the availability of the second fan, the low probability of the occurrence of a LOCA that would generate hydrogen in amounts capable of exceeding the flammability limit, and the amount of time available after the event for operator action to prevent exceeding this limit.
SUSQUEHANNA - UNIT 2 3.6-76
BASES ACTIONS (continued) 8.1 and B. 2 Rev. 4 Drywell Air Flow System B 3.6.3.2 With two required Drywell Cooling fans in one or more pairs inoperable, the ability to perform the hydrogen control function via alternate capabilities must be verified by administrative means within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The alternate hydrogen control capabilities are provided by the containment nitrogen purge system.
The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time allows a reasonable period of time to verify that a loss of hydrogen control function does not exist. In addition, the alternate hydrogen control system capability must be verified once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter to ensure its continued availability. Both the initial verification and all subsequent verifications may be performed as an administrative check by examining logs or other information to determine the availability of the alternate hydrogen control system. It does not mean to perform the Surveillances needed to demonstrate OPERABILITY of the alternate hydrogen control system. If the ability to perform the hydrogen control function is maintained, continued operation is permitted with two Drywell Cooling fans in one or more pairs inoperable for up to 7 days. Seven days is a reasonable time to allow two Drywell Cooling fans in one or more pairs to be inoperable because the hydrogen control function is maintained and because of the low probability of the occurrence of a LOCA that would generate hydrogen in amounts capable of exceeding the flammability limit.
C.1 If any Required Action and associated Completion Time cannot be met, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.6.3.2.1 REQUIREMENTS Operating each required Drywell Cooling fan in low speed from the control room for ::::: 15 minutes ensures that each subsystem is OPERABLE and that all associated controls are functioning properly. Since required fans are operated at high speed during normal operations this SR ensures the low speed motor circuits operate. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
SUSQUEHANNA - UNIT 2 3.6-77
BASES REFERENCES
- 1. FSAR 9.4.5
- 2. Regulatory Guide 1.7, Revision 3.
- 3. FSAR, Section 6.2.5.
Rev.4 Drywell Air Flow System 8 3.6.3.2
- 4. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 2 3.6-78
BASES Rev. 4 Drywell Air Flow System B 3.6.3.2 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 3.6-79