Transmittal of Technical Requirements Manual
ML22123A058
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/22/2022
From: Gerlach R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML22123A058 (22)


Text

.M._lJ.L. L.L.1 L.VL.L.

Page 1 of 2

  • MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2022-5606 USER INFORMATION:

GERLACH*ROSEY M EMPL#: 028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY M 04/22/2022 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS OM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF

  • RORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 03/29/2022 ADD MANUAL TABLE OF CONTENTS DATE: 04/21/2022 CATEGORY: DOCUMENTS TYPE: TRMl

fi,l-).1.. L.L. 1 L.UL.L.

Page 2 of 2 ID: TEXT 3.7.3.1 REMOVE: REV: 5 ADD: REV: 6 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .

SSES MANUAL

  • Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 04/21/2022 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 96 01/03/2019

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 27 03/05/2019

Title:

TABLE OF CONTENTS TEXT 1.1 1 01/31/2014

Title:

USE AND APPLICATION DEFINITIONS TEXT 2 . 1 2 04/28/2015

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS

  • TEXT 2.2 10 01/31/2014

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3 . 0 7 03/18/2021

Title:

TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY TEXT 3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3 . 1.2 0 11/18/2002 Title; REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1 . 3 6 12/18/2017

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 1 10/i2/2020

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3 . 2.1 21 03/29/2022

Title:

CORE OPERATING LIMIST REPORT (COLR)

Page 1 of 16 Report Date: 04/21/22

SSES MANUAL Manual Name: TRMl Manual Titl e: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3 . 1 0 11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 11 06/29/2017

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3 . 3 . 5 0 11/18/2002

Title:

INSTRUMENTATION THIS . PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 5 03/05/2019

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 4 01/17/2022

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECT I ON SYSTEM TEXT 3 . 3.8 1 10/22/2003

Title:

INSTRUMENTATION INTENTIONALLY LEFT BLANK TEXT 3 . 3 . 9 3 04/17/2008

Title:

OPRM INSTRUMENTATION CONFI GURATION TEXT 3 . 3 . 10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3 . 3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3 . 12 2 04/02/2019 Page 2

Title:

WATER MONITORING INSTRUMENTATION of 16 Report Date: 04/21/22

SSES MANUAL

  • Manual Name: TRMl.

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM INTENTIONALLY LEFT BLANK TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008

Title:

-REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS

  • TEXT 3.4.6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT 3.5.2 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT 3.5.3 1 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 3 01/03/2019

Title:

SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 16 Report Date: 04/21/22

SSES MANUAL Manual Name : TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN*

TEXT 3.7.2 0 11/18/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 6 04/21/2022

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 4

Title:

PLANT SYSTEMS CO2 SYSTEMS TEXT 3.7.3.4 2 05/16/2016 04/16/2009

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 13 12/18/2017

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 16 Report Date: 04/21/22

SSES MANUAL

  • Manual Name: TRMl.

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1 1 03/05/2015

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 ,3 06/04/2012

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION

  • TEXT 3.7.8 MONITORING

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 5

3 03/05/2015 03/05/2019

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSP.S)

TEXT 3.7.11 1 11/01/2018

Title:

STRUCTURAL INTEGRITY TEXT 3.8.1 3 04/22/2020

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007 Title*: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS 06/23/2021 TEXT 3.8.2.2 3

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC Page 5 of 16 Report Date: 04/21/22

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 4 01/28/2020

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002

Title:

.ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 11/14/2013 Tltle: ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2 03/05/2019

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2 02/25/2021

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3. 9*. 1 0 11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 1 03/12/2019

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 3 06/19/2019

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 3 10/17/2019

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2 04/17/2008

Title:

INTENTIONALLY LEFT BLANK Page 6 of 16 Report Date: 04/21/22 .

SSES MANUAL

  • Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREME_NTS MANUAL UNIT 1 TEXT 3. 11. 1. 1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3 . 11.1. 2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3:11.1.4 2 10/09/2012

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3 . 11. 1. 5 3 03/05/2015

Title:

RADIOACTIVE EFFLUEN~S RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION

  • TEXT 3.11.2.1 4 03/12/2019

Title:

RADIOACTIVE EFF~UENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3 . 11. 2 . 5 4 07/03/2013

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 8 06/29/2017

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006

  • Page 7

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE

. of 16 Report Date: 04/21/22

SSES MANUAL Manual Name.: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3 .11. 4 .1 6 01/03/2022

Title:

RADIOACTIVE EFFLUENTS MON_ITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3 . 11 . 4 . 3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT **

TEXT 4.1 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4 .2 1 01/03/2019

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 1 01/03/2019

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 1 07/01/2021

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.6 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Page 8 of 16 Report Date: 04/21/22

SSES MANUAL

  • Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 6 03/18/2021

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.l.l 2 04/29/2014

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 4 12/18/2017

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION

  • TEXT B3.l.4 1 10/12/2020

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION TEXT B3.2.1 AND CHECK VALVE 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 1 01/31/2014

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7 06/29/2017

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007

  • Page 9

Title:

INTENTIONALLY LEFT BLANK of 16 Report Date: 04/21/22

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 6 03/05/2019

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 4 01/17/2022

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INTENTIONALLY LEFT BLANK TEXT B3.3.9 4 01/03/2019

Title:

OPRM INSTRUMENTATION TEXT B3.3.10 3 08/09/2010

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.ll 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 1 04/02/2019

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.l 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009

Title:

INTENTIONALLY LEFT BLANK TEXT B3.4.3 1 ll/0~/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 10 of 16 Report Date: 04/21/22

SSES MANUAL

  • Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 3 01/03/2019

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.l 2 03/17/2020

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT B3.5.2 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER. INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT B3.5.3 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING

  • TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION TEXT B3.6.3 INDICATION 2 04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3 . 7 .. 3 . 1 4 02/16/2017

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006

  • Page 11

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS of 16 Report Date: 04/21/22

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANVAL UNIT 1 TEXT B3.7.3.3 1 01/03/2019

Title:

PLANT SYSTEMS BASES CO2 SYSTEMS T~XT B3.7.3.4 4 06/19/2019

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HY9RANT HOSE" HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID .HOLDUP TANKS TEXT B3.7.6 4 06/04/2013

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 12 of 16 Report Date: 04/21/22

SSES MANUAL

  • Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8 4 01/31/2014

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 3 03/05/2019

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE* POOLS TEXT B3.7.11 2 11/01/2018

Title:

STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 2 06/23/2021

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD_ PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3 03/05/2019

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 3 02/25/2021

  • Page 13

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM of 16- Report Date: 04/21/22

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 1 03/12/2019

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALEp SOURCE CONT_AMINATION TEXT B3.10.2 1 03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 2 10/17/2019

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 1 04/17/2008

Title:

INTENTIONALLY LEFT BLANK TEXT B3.ll.l.l 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3 . 11. 1. 2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3 .11.1. 3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3 . 11. 1. 4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.ll.1.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Page 14 of 16. Report Date: 04/21/22

.. SSES MANUAL

  • Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.ll.2.l 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.ll.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.ll.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.ll.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATME~T SYSTEM TEXT B3.ll.2.5 5 07/03/2013

Title:

RADIOACTIVE EFFLUENTS BASES .VENTILATION EXHAUST TREATMENT SYSTEM

  • TEXT B3.ll.2.6 2 09/08/2016

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE-GASEOUS EFFLUENT MONITORING TEXT B3.ll.3 INSTRUMENTATION 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.ll.4.l 6 01/03/2022

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.ll.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.ll.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.l 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3 . 1.2 . 2 1 12/03/2010

  • Page 15

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS of 16 Report Date: 04/21/22

SSES MANUAL Manual Name: TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 16 of 16 Report Date: 04/21/22

Fire Suppression Water Supply System Rev. 6 3.7.3.1 3.7.3 -Fire Protection 3.7.3.1 Fire Suppression Water Supply System TRO 3.7.3.1 Two Fire Suppression Water Supply Subsystems shall be OPERABLE APPLICABILITY: At all times ACTIONS


NOTE--------------------------------------------------

T he provisions of TRO 3.0.4 are not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. One fire suppression A.1 Restore the inoperable fire 7 days water supply subsystem suppression water supply inoperable subsystem to OPERABLE status OR A.2 Establish an alternate fire 7 days suppression water supply subsystem .

B. Both fire suppression 8 .1 Establish an alternate fire 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> water supply subsystems suppression water supply inoperable subsystem AND 8.2 Restore an inoperable fire 7 days suppression water supply subsystem to OPERABLE status

  • SUSQUEHANNA - UNIT 1 TRM / 3.7-4

Fire Suppression Water Supply System Rev. 6 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE


NOTE--------------------------------------------------------------

When a system is placed in an inoperable status solely for the performance of required Surveillances, entry into associated Conditions and required Actions may be delayed up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

SURVEILLANCE FREQUENCY TRS 3.7.3.1.1 Verify the minimum contained fire suppression water 7 days supply volume.

TRS 3.7 .3.1.2 Verify that the overall diesel driven (0P511) and/or 31 days backup diesel driven (0P592) fire pump diesel engine starting battery bank and charger battery voltage is greater than or equal to 12 volts.

TRS 3.7.3.1.3 Verify that the diesel driven fire pump (0P511) and/or 31 days

  • TRS 3.7 .3.1.4 backup diesel driven (0P592) diesel engine starting battery bank pilot cell specific gravity, corrected to 77°F, is greater than or equal to 1.200.

Verify that the diesel driven (0P511) and/or backup 31 days diesel driven (0P592) fire pump diesel engine starting battery bank electrolyte level of each pilot cell is above the plates.

TRS 3.7 .3.1.5 Start the electric motor driven fire pump (0P512) and 31 days operate it for at least 15 minutes on recirculation flow.

TRS 3.7 .3.1.6 Verify that each manual , power operated or automatic 92 days valve, in the fire suppression water supply system flow path is in its correct position . For those valves required for alignment of an alternate fire water supply source to support this TRO, this TRS need only be performed when those valves are aligned for fire water supply .

  • SUSQUEHANNA - UNIT 1 TRM / 3.7-5

Fire Suppression Water Supply System

    • Rev. 6 TECHNICAL REQUIREMENT SURVEILLANCE (continued)

SURVEILLANCE FREQUENCY 3.7.3.1 TRS 3.7.3.1 .7 Verify the diesel driven (0P511) and/or backup diesel 31 days driven (0P592) fire pump fuel storage tank contains at least 250 gallons of fuel.

TRS 3.7.3.1 .8 Start the diesel driven (0P511) and/or backup diesel 31 days driven (0P592) fire pump from ambient conditions and operate for greater than or equal to 30 minutes on recirculation flow.

TRS 3.7.3.1.9 Verify that a sample of the diesel driven (0P511) 92 days and/or backup diesel driven (0P592) fire pump diesel fuel from the fuel storage tank is within the acceptable limits when checked for viscosity, water and sediment.

    • TRS 3.7.3.1.10 TRS 3.7.3.1.11 This TRS is not used Cycle each fire suppression water supply system testable valve in the flow path through at least one complete cycle of full travel.

12 months TRS 3.7 .3.1.12 Perform a system flush of the fire suppression water 12 months supply system , including the onsite and backup fire water supply systems and fire department connections.

TRS 3.7.3.1.13 Perform a system functional test of the fire 18 months suppression water supply system , including the onsite and backup fire water supply systems.

TRS 3.7.3.1.14 This TRS is not used .

  • SUSQUEHANNA - UNIT 1 TRM / 3.7-6

Fire Suppression Water Supply System Rev. 6 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE (continued)

SURVEILLANCE FREQUENCY TRS 3.7.3.1.15 Verify that fire pump 0P511 develops at least 18 months 2500 gpm at a system head of 140 psig and pump 0P512 develops at least 2500 gpm at a system head of 137 psi. Verify that the backup diesel driven fire pump (0P592) develops at least 2500 gpm at a system head of 140 psig.

TRS 3.7 .3.1.16 Verify that the diesel driven (0P511) and/or backup 18 months diesel driven (0P592) fire pump diesel engine battery bank cells and battery racks show no visual indication of physical damage or abnormal deterioration.

TRS 3.7.3.1.17 Verify that each fire pump starts to maintain the fire 18 months suppression water supply system pressure greater than or equal to: 100 psig .

  • TRS 3.7.3.1 .18 Verify that the diesel driven (0P511) and/or backup diesel driven (0P592) fire pump diesel engine starting battery bank Terminal connections are clean , tight, free of corrosion and coated with anti-corrosion material.

18 months TRS 3.7.3.1.19 Perform diesel driven (0P51-1) and/or backup diesel 18 months driven (0P592) fire pump diesel engine inspection .

TRS 3.7.3.1.20 Perform a fire suppression water supply system flow 3 years test, including the onsite and backup fire water supply system .

  • SUSQUEHANNA - UNIT 1 TRM / 3.7-7