ML22363A100
ML22363A100 | |
Person / Time | |
---|---|
Site: | Susquehanna ![]() |
Issue date: | 12/07/2022 |
From: | Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2022-17234 | |
Download: ML22363A100 (1) | |
Text
.LJt::L..
U / 1 L.UL.L.
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2022-17234 USER INFORMATION:
GERLACH*ROSEY M Address: NUCSA2 Phone#:
542-3194 EMPL#: 028401 CA#:
0363 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSEY M 12/07/2022 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON I
THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID !S THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS AR.oM THE; HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF
,alfRRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRMl -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 12/05/2022 ADD MANUAL TABLE OF CONTENTS DATE: 12/06/2022 CATEGORY: DOCUMENTS TYPE: TRMl of 2
LJt::L..
U /,
L.U.GL.
ID:
TEXT 2.2 REMOVE:
REV:10 ADD:
REV: 11 Page 2
ANY DISCREPANCIES, WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIE,W THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
SSES MANUAL Manual Name:
TRMl anual Title : TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:
12/06/2022 Procedure Name TEXT LOES Rev 96
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 28 Title : TABLE OF CONTENTS TEXT 1.1 1
Issue Date 01/03/20 1 9 05/13/2022 01 /31/20 14
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 2
04/28/2015
Title:
PLANT PROGRAMS AND TEXT 2.2 11 12/06/2 022
Title:
PLANT PROGRAMS AND TEXT 3.0 7
3 Change ID TRIP SETPOINT TABLE Change Number Title : TECHNICAL REQUIREMENT FO OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY TEXT 3.1. 1
Title:
REACTIVITY CONTR INJECTI ON (
TEXT 3. 1.2
Title:
REACTIVIT TEXT 3.1. 3 11/09/2007 ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INSTRUMENTATION 0
11/18/2002 CONTROL ROD DRIVE (CRD) HOUSING SUPPORT 6
12/18/2017
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1. 4 1
10/12/2020
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
CHECK VALVE TEXT 3.2.1 21 03/29/2022 Title : CORE OPERATING LIMIST REPORT (COLR)
Page 1 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl lanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0
11/18/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 11 06/29/2017
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/18/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK
'EXT 3. 3. 6 5
03/05/2019
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 4
01/17/2022
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION INTENTIONALLY LEFT BLANK TEXT 3.3.9 3
04/17/2008
Title:
OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 2
04/02/2019
Title:
WATER MONITORING INSTRUMENTATION Page 2 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl
.tanual
Title:
TECHNICAL REQUIREMENTS MANUAL DNIT 1 TEXT 3.4.1 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM INTENTIONALLY LEFT BLANK TEXT 3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2
04/17/2008
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS
.'EXT 3. 4. 6,
3 05/13/2022
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 2
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT 3.5.2 2
-03 / 05/2019
~
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT 3.5.3 1
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTRO~ AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 3
01/03/2019
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3. 6. 3 0
11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl
!anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 J
TEXT 3.6.4 0
11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0
11/18/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (URS) AND GROUND WATER LEVEL TEXT 3.7.3.1 6
04/21/2022
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3
04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS
'EXT 3. 7. 3. 3 4
05/16/2016
Title:
PLANT SYSTEMS CO2 SYSTEMS TEXT 3.7.3.4 2
04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2
04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2
04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1
04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 13 12/18/2017
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1
04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl
.ranu~l
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1 1
03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0
11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1
, 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3
06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING
- EXT 3.7.8 5
03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 3
03/05/2019
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1
11/01/2018
Title:
STRUCTURAL INTEGRITY TEXT 3.8.1 3
04/22/2020
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 3
06/23/2021
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5 of 16 Report Date: 12/06/22
(
SSES MANUAL Manual Name:
TRMl tanual
Title:
TECFJNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 4
01/28/2020
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3. 8. 4 0
11/18/2002
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2*
03/05/2019
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2
02/25/2021
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM
'EXT 3. 9.1 0
11/18/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 1
03/12/2019
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 3
06/19/2019
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 4
10/05/2022
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2
04/17/2008
Title:
INTENTIONALLY LEFT BLANK Page 6 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl
.tanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3. 11. 1. 1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3. 11. 1. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3. 11. 1. 4 2
10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3. 11. 1. 5 3
03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
."'EXT 3.11.2.1 4
03/12/2019 Title1 RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
NOBLE GASES TEXT 3. 11. 2. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3. 11. 2. 4 0
11/18/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3. 11. 2. 5 4
07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 8
06/29/2017
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE Page 7 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl 1
{anual
Title:
TECHlHCAL REQUIREMENTS MANUAL UNIT 1 TEXT 3. 11. 4. 1 6
01/03/2022
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11. 4. 2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3. 11. 4. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS
'EXT 3.12. 3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1 0
08/31/1998
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 1
01/03/2019
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 1
01/03/2019
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1
12/18/2008
Title:
ADMINIS~TIVE CONTROLS PROCEDURES & PROGRAMS I
TEXT 4.5 1
07/01/2021 Title,: ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.6 0
08/31/1998
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Page 8 of* 16 Report Date: 12/06/22
SSES MANUAL Manual Namez TRMl
.tanual Titlez TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0
08/31/1998
Title:
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 6
03/18/2021
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.l.l 2
04/29/2014.
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.l.2 0
11/19/2002
Title:
REACTIVITY, CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.l.3 4
12/18/2017
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION
'EXT B3.1. 4 1
10/12/2020
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMOLATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.l 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
- TEXT B3.3.l 1
01/31/2014
\\
Title:
INSTROMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2
03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3
- 3.
12/18/2008
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7
06/29/2017
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2
11/09/2007
Title:
INTENTIONALLY LEFT BLANK Page 9 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl tanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 6
03/05/2019
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 4
01/17/2022
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INTENTIONALLY LEFT BLANK TEXT B3.3.9 4
01/03/2019
Title:
OPRM INSTRUMENTATION TEXT B3. 3.10*
3 os/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS
'EXT B3.3.ll 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 1
04/02/2019
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.l 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1
04/16/2009
Title:
INTENTIONALLY LEFT BLANK TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0
l_l/19 /2 0 02
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND 'ROD LINE LIMIT TEXT B3.4.5 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 10 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl
.tanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 4
05/13/2022
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1 2
03/17/2020
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYS~M ADS MANUAL INHIBIT r
TEXT B3.5.2 2
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION
\\'
TEXT B3.5.3 2
03/05/2019
Title:
ECCS RPV WATER INVEN1'ORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING
.'EXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2
04/17/2008
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UBS) GROUND WATER LEVEL TEXT B3.7.3.1 4
02/16/2017
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl tanual
Title:
TECHNICAL REQUIREMENTS MANUAL TIN IT 1 TEXT B3.7.3.3 1
01/03/2019
Title:
PLANT SYSTEMS BASES CO2 SYSTEMS TEXT B3.7.3.4 4
06/19/2019
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1
04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS' TEXT B3.7.3.6 1
04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0
11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES
'EXT B 3. 7. 3. 8 3
09/27/2012
Title:
PLANT SYSTEMS BASES 'FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0
11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l 0
11/19/2002
,Title: PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3
\\
0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS
\\
TEXT B3.7.6 4
06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2
01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 12 of 16 Report Date: 12/06/22
SSES MANUAL Manual* Name:
TRMl
.tanual
Title:
TECHNICAL REQUIREMENTS MANUAL DNIT 1 TEXT B3.7.8 4
01/31/2014
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 3
03/05/2019
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004 Titlez PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.ll 2
11/01/2018
Title:
STRUCTURAL INTEGRITY TEXT B3.8.l 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE
.'EXT B3.8.2.l DEVICES 0
11/19/2002
Title:
ELECTRICAL CONTINUOUS POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
f
(
TEXT B3.8.2.2 2
06/23/2021
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0
11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVI,TIES TEXT B3.8.4 0
11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3
03/05/2019
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 3
02/25/2021
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl Ianual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 I
TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME I
TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 1
03/12/2019
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.l 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION I
TEXT B3.10.2 1
03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION
'EXT B3.10. 3 3
10/05/2022
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 1
04/17/2008
Title:
INTENTIONALLY LEFT BLANK TEXT B3.ll.l.l O
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3. 11. 1. 2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ll.1.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYS'TEM TEXT B3.11.1. 4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.ll.l.5 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Page 14 of 16 Report Date: 12/06/22
SSES MANUAL Manual Name:
TRMl
.Ianual
Title:
TECIDIICAL REQUIREMENTS MANUAL DNIT 1 TEXT B3.ll.2.l 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11. 2. 2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE'- NOBLE GASES TEXT B3.ll.2.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.ll.2.4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B 3. 11. 2. 5 5
07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM
.'EXT B3.ll.2.6 2
09/08/2016 Title; RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3. 11. 3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3. 11. 4. 1 6
01/03/2022
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.ll.4.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.ll.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.l 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1
12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Page 15 of 16 Report Date: 12/06/22
TRMl tanual
Title:
TECHNICAL REQUIREMENTS MANUAL' UNIT 1 TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS
/
r Page 16 of 16 Report Date: 12/06/22
Rev. 11 Instrument Trip Setpoint Program 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements.
Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.
Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.
Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.
Reference:
MFP-QA-1220, Engineering Change Process Handbook SUSQUEHANNA - UNIT 1 TRM /2.0-5
Rev. 11 22.1 2.2.1.1 2.2.1.2 2.2.1.3 2.2.1.4 2.2.1.5 2.2.1.6 2.2.1.7 2.2.1.8 2.2.1.9 2.2.1.10 2.2.1.11 2.2.1.12 2.2.1.13 2.2.1.14 2.2.1.15 SYSTEM/REFERENCE LCO [TROJ Reactor Protection 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 (a) See Figure 2.2-1 Instrument Trip Setpoint Program 2.2 TABLE 2.2-1 (Page 1 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION Intermediate Range Monitor, Neutron Flux -
High Average Power Range Monitor, Neutron Flux - High (Setdown)
Average Power Range Monitor, Simulated Thermal Power - High, Two Loop Operation Average Power Range Monitor, Simulated Thermal Power - High, Single Loop Operation Average Power Range Monitor, Simulated Thetmal Power - High, Clamp Average Power Range Monitor, Neutron Flux -
High Reactor Vessel Steam Dome Pressure - High Reactor Vessel Water Level - Low, Level 3 Main Steam Isolation Valve - Closure This Section Not Used Drywell Pressure - High Scram Discharge Volume Water Level -
High - Level Transmitter Scram Discharge Volume Water Level -
High - Float Switch Turbine Stop Valve - Closure Turbine Control Valve Fast Closure, Trip Oil Pressure - Low TRIP SETPOINT
~ 120/125 divisions of full scale s 18% of RATED 11-IERMAL PO'NER 0.55 W + 58. 7%
0.55 0/V-11\\/v) + 58.7%Cbl s 113.5% of RATED THERMAL POI/I/ER s 118% of RATED THERMAL POWER s 1087 psig
~ 13.0 inches<2>
s 10"/4 closed
- s: 1.72 pslg s 65 gallons s 61 gallons s 5.5% closed
~500 psig Cbl For Single loop operation, the value of 11W = 8.7 SUSQUEHANNA - UNIT 1 TRM /2.0-6
Rev. 11 Instrument Trip Setpoint Program
.2.2 2.2.1.16 2.2.1..16.1 2.2.1.162 2.2.116.3 2.2.1.16.4 2.2.1.16.5 2.2.1.16.6 2.2.1.16.7 2.2.1.1.6.8 2.2.1.16.9 2.2.1.16.10 2.21.16.11 SYSTEM/REFERENCE LCO [fRO]
OPRM Instrumentation 3.3.1.1 3.3.1.1
[3.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
[3 3.9]
TABLE 2.2-1 (Page 2 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION Sp PBA Amplttude Trip Np PBA Successive Confinnat1on Count Trip TOL (E) Pencxi Tolerance fc Conditioning Filter Cutoff Frequency Tmi OSCIilation Period Lower Time Limit Tmax Oscillation Period Upper llme Limit LPRMmin Minimum LRPMs/Cell Required for Cell Operability 81 Peak Threshold Setpoint/ABA & GRBA S2 Valley Threshold. Setpoint/ABA & GRBA Smax Amplitude Tnp Setpolnt/ABA DR3 Growth Rate Factor Setpolnt/GRBA 2.2.2 2.2.2.1 2.22.1.1 2.2.21 2 2.2.2.1.3 Isolation ActuatJon Instrumentation Primary Containment Isolation 2.2.2.1.4 2.2.2.1.5 2.2.2.1.6 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1
[3.3.6]
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 Reactor Vessel Water Level Low, Level 3 Reactor Vessel Water Level Low Low, Level 2 Reactor Vessel Water Level Low Low Low, Level 1 Drywell Pressure - High SGTS Exhaust Radiation - High Main Steam Line Radiation - High High TRM / 2.0-7 TRIP SETPOINT See COLR - TRO 3.2 See COLR - iRO 32 0.10 sec 1.50 Hz 1.00 sec 3.50 sec 2
1.20 0.85 1.50 1.60
~ 13.0 inches(aJ
~ -38.0 ihches(aJ
~ -129 lnches(QJ
- .
- :; 1.72 psig
- ,; 23.0 mR/hr
- .
- :; 15 x full power background without hydrogen injection
~*
Rev. 11 Instrument Trip Setpoint Program 2.2 2.2.2.2 2.2.2.2.1 2.2.22.2 2.2.2.2.3 2.2.2.2.4 2.2.2.2.5 2.2.2.3 2.2.2.3.1 2.2.2.3.2 2.2.2.3.3 2.2.2.3.4 2.2.2.3.5 2.2.2.3.6 2.2.2.3.7 2.2.2.3.8 2.2.2.4 2.2.2.4.1 2.2.2.4.2 2.2.2.4.3 2.2.2.4.4 2.2.2.4.5 2.2.2.4.6 2.2.2.4.7 2.2.2.4..8 2.2.2.4.9 SYSTEM/REFERENCE LCO [fRO]
TABLE 2.2-1 (Page 3 of 8)
INSTRUMENTATION SETPOI NTS TRIP !=UNCTION Secondary Containment Isolation 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 Reactor Vessel Water Level - Low Low, Level 2 Drywell Pressure - High Refuel Floor High Exhaust Duct Radiation -
High Railroad Access Shaft Exhaust Duct Radiation -
High Refuel Floor Wall Exhaust Duct Radiation -
High Maih Steam Line Isolation 3.3.6.1 3 3.6.1 3.3.6.1 3.3.6.1 3.3 6.1
[3.3.6]
Reactor Vessel Water Level - Low Low Low, Level 1 Main Steam Line Pressure - Low Main Steam Line Flow - High Condenser Vacuum - Low Reactor Building Main Steam Line Tunnel Tempen:rture-High This Section Not Used This Section is not used.
Turbine Building Main Steam Tunnel Temperature - High Reactor Water Cleanup System Isolation 3.3.61 3.3:6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 Reactor Vessel Water Level - Low Low, Level2 RWCU I),. Flow - High RWOU Flow - High RWCU Penetration Area Temperature - High This Sectlon is not used.
RWCU Pump Area Temperature - High ThisSection Is not used.
RWCU Heat Exchanger Area Temperature -
High This Section is not used.
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-8 TRIP SETPOINT
~ -38.0 lnches<e>
s 1.n psig s 18 mR/hr s 5 mR/hr s 21 mR/hr
~ -129 inches(aJ
~ 861 pslg s 173 psld
~ 9.0 inches Hg vacuum s 177°F s 197°F
~ -38 inches(a) s 59 gpm s462 gpm s 131°F s 147°F
- 147°F
Rev. 11 Instrument Trip Setpoint Program 2.2 2.2.2.5 2.2.2.5.1 2.2.2.5.2 2.2.2.5.3 2 2.2.5.4 2.2.2.5.5 2.2.2 5.6 2.2.2.5.7 2.2.2.5.8 2.2.2.5.9 2.2.2.6 2.2.2.6.1 2.2.2.6.2 2.2.2.6.3 2.2.2.6.4 2.2.2.6.5 2.2.2.6.6 2.226.7 2.2.2.6.8 2.2.2.6.9 2.2.2.7 2.2.2.7.1 2.2.2.7.2 2.2.2.7.3
- 2.2.3 2.2.3.1 2.2.3.1.1 2.2.3.1.2 2.2.3.1.3 SYSTEM/REFERENCE LCO [TRO]
TABLE 2.2-1 (Page 4 of 8)
INSTRUMENTATION SETPOINTS IBIP FUNCTION Reactor Core Isolation Cooling System Isolation 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 RCIC Steam Line!!.. Pressure - High RCIC Steam Supply Line Pressure - Low
~CIC Turoine Exhaust Diaphragm Pressure -
High RCIC Equipment Room Temperature - High RCIC Pipe Routing Area Temperature - High RCIC Emergency Area Cooler Temperature -
High Drywell Pressure - High This section Is not used.
This section Is not used.
High Pressure Coolant Injection System Isolation 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 HPCI Steam Line!!.. Pressure - High HPCI Steam Supply Line Pressure - Low HPCI Turbine Exhaust Diaphragm Pressure -
High HPCI Equipment Room Temperature - High HPCI Emergency Area Cooler Temperature -
High HPCI Pipe Routing Area Temperature - High Drywall Pressure - High This section is not used.
This section is not used.
Shutdown Cooling/System Isolation 3.3.6.1 3.3.6.1
[3.3.6]
ECCS Actuation Core Spray System 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 Reactor Vessel Stealil Dome Pressure - High RHR Flow - High Reactor Vessel Water Level - Low Low Low, Level 1 Drywall Pressure - High Reactor Vessel Steam Dome Pressure - Low injection permissive (a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-9 TRIP SETPOINT
- S 188 inches H:zO
- ,; 60 pslg
- S 10.0 pslg
- S 167°F
- S 167°F
- S 167°F
- S 1.72 psIg
- S 370 inches HzO
- ,; 104 psig
- S 10 pslg
- S 167°F
- S 1.72 pslg
- ,; 13.0 inches(e)
- S 98 psig
- S 25,000 gpm
- ,; -129 inches(a)
- S 1.72 pslg
- ,; 396.5,
- S 428.5 pslg
Rev. 11 Instrument Trip Setpoint Program 2.2 2.2.32 2.2.3.2.1 2 2.3.2.2 2.2.32.3 2.2.32.4 2.2.3.3 22.3.3.1 2.2.3.3.2 2.2.3.3.3 2.2.3.3.4 2.2.3.4 2.2.3.4.1 2.2.3.4.2 22.3.4.3 2.2.3.4.4 2.2 3.4.5 2.2.3.4.6 2.2.3.4.7 2.2.3.5 2.2.3.5.1 2.2.3.5.1.1 2.2.3 5.1.2 SYSTEM/REFERENCE LCO [fRO]
TABLE 2.2-1 (Page 5 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION LPCI Mode of RHR System 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 HPCISystem 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level 1 Drywall Pressure - High Reactor Vessel Steam Dome Pressure - Low, Injection permissive Reactor Vessel Steam Dome Pressure - Low, Recirculation Discharge Valve permissive Reactor Vessel Water Level - Low Low, Level2 Drywall Pressure - High Condensate Storage Tank Level - Low Reactor Vessel Water Level - High, Level 8 Automatic Depressurlzatlon System (ADS) 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 3.3 5.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level 1 Drywall Pressure - High ADS Timer Core Spray Pump Discharge Pressure - High Low Pressure Coolant Injection Pump Discharge Pressure - High Reactor Vessel Water Level - Low, Level 3 Confirmatory ADS Drywell Pressure Bypass Timer Loss of Power - ECCS Actuation 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)
3.3.8.1 3.3.8.1 Bus Undervoltage Time delay (a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-10 TRIP SETPOINT
- e: -129 lnches(a) s 1.72 psig
~ 396.5, s 428.5 psig
~ 236 pslg, decreasing
~ -38 inches(a) s 1.72 psig
- e: 40.5 Inches above tank bottom s54 lnchas z -129 inches s 1.72 psig s 1 02 seconds
~ 135, s 155 pslg
~ 121, s 129 pslg z 13 lnches s 420 seconds
~ 823.2, s 856.8 Volts
- e: 0.4, s 0.6 seconds
Rev. 11 Instrument Trip Setpoint Program 2.2 2.2.3.5.2 2.2.3.5.2.1 2.2.3.5.2.2 2.2.3.5.3 2.2.3.5.3.1 2.2.3.5.3.2 2.2.3.5.3.4 2.2.3.5.4 2 2.3.5.4.1 2.2.3 5.4.2 2.2.3.5.5 2.2.3.5.5.1 2.2.3.5.5 2 2.2.4 2.2.4.1 2.2.4.1 2.2.5 2 2.5.1 2.2.5.2 2.2.6 2.2.6.1 2.2.6.2 2.2 6.3 SYSTEM/REFERENCE LCO [fRO]
TABLE 2.2-1 (Page 6 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION 4.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)
3.3.8.1 3.3.8.1 Bus Undervoltage 11me delay 4.16kV ESS Bus Undervoltage (Degraded Voltage,< 93%)
3.3.8.1 3.3.8.1 3.3.8.1 Bus Undervoltage 11me Delay (Non-LOCA)
Time Delay (LOCA) 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 65%)
[3.8.5]
[3.8.5]
480V Basis 11me Delay 480V ESS Bus 08565 Undervoltage (Degraded Voltage, < 92%)
[3.8.5]
[3.8.5]
480V Basis llme Delay ATWS Alternate Rod Injection and Recirculation Pump Trip 3.3.4.2/{3.1.1]
3.3.4.2/[3.1.1]
Reactor Vessel, Water Level - Low Low, Level 2 Reactor Vessel Steam Dome Pressure - High End of Cycle Rearculation Pump Trip 3.3.4.1 3.3.4.1 Turbine stop Valve-Closure Turbine Control Valve - Fast Closure Reactor Core Isolation Cooling System Actuation 3.3.5 2 3.3.5.2 3.3.5.2 Reactor Vessel Water Level - Low Low, Level 2 Reactor Vessel Water Level - High, Level 8 Condensate Storage Tank Level-Low (al See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-11 TRIP SETPOINT
~ 2641.1, s 2748.9 Volts
~ 2.7, s 3.3 seconds
~ 3829.3, s 3906.7 Volts
~ 4 minute, 30 seconds s 5 minute, 30 seconds 2 9, s 11 seconds
~ 308.9, s 315.1 Volts 2 4.5, s 5.5 seconds
~ 437.6, s 446.4 Volts 2 9, s 11 seconds 2 -38 inches(a) s 1135 psig s 5.5% closed
~ 500 psig
~ -38 inches{a) s 54 inches{a)
~ 36.0 inches above tank bottom
Rev. 11 Instrument Trip Setpoint Program 2.2 2.2.7 2.2.7.1 2.2.7.1.1 2.2.7.1.2 2.2.7.2 2.2.7.2.1 22.7.2.2 2.2.7.2.3 2.2.72.4 2.2.72.5 2.2.7.3 2.2.7.3.1 2.2.7 3.2 2.2.7.4 2.2.7.4.1 2.2.7.4 2 2.2.7.5 2.2.7.5.1 2.2.7.6 2.2.7.6.1 SYSTEM/REFERENCE LCO [fRO]
Control Rod Block Rcx:I Block Monitor 3.3.2 3.3.2 3.3.2 3.3.2 3.3.2 3.3.2 APRM
[3.1.3]
[3.1.31 0
[3.1.3]
[3.1.3]
[3.1.3]
Source Range Monitors
[3.1.3]
[3.1.3]
TABLE 2.2-1 (Page 7 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION Low Power Range - Upscale Intermediate Power Range - Upscale High Power Range - Upscale Low Power Range Setpoint Intermediate Power Range Setpoint High Power Range Setpolnt Slmi.Jlated Thermal Power-High - Two Loop Operation Simulated Thermal Power-High - Single Loop Operation Simulated Thermal Power-High - Clamp Downscale Neutron Flux - High (Setdown)
Upscale Downscale Intermediate Range Monitors
[3.1.3]
[3.1.3]
Upscale Downscale Scram Discharge Volume
[3.1.3]
Water Level - High Reactor Coolant System Recirculation Flow
[3.1.3]
Upscale (bl Wrth a signal-to-noise ratio ~ 2, or within the limits of Figure 2.2-2.
(c) For single loop operation, the value of ll.W = 8..7 SUSQUEHANNA - UNIT 1 TRM / 2.0-12 TRIP SETPOINT See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 32 See COLR TRO 3.2 See COLR TRO 32 0.55W + 54.2%
0.55 (:N-b.W) + 54.2% (cl s 108% of RATI:D THERMAL POWER
~ 5% of RATED THERMAL POWER s 12% of RATI:D THERMAL POWER s2E5 cps
~ 3.0 cps(bl s 108/125 divisions of full scale
~ 5/125 divisions offull scale s 35.9 gallons 114%
Rev. 1.1 SYSTEM/REFERENCE LCO [TRO]
2.2.8 CREOASS 2.2.8.1 3.3.7.1 2.2.8.1.1 3.3.7.1 2.2.8.1.2 3.3.7.1 2.2.8.1.3 3.3.7..1 2.2.8.1.4 3.3.7.1 2.2.8.1.5 3.3.7.1 Instrument Trip Setpoint Program 2.2 TABLE 2.2-1 (Page 8 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION Main Control Room Outside Air Intake Radiation Monitor ReactorVessel Water Level - Low Low, Level 2 Drywall Pressure - High Refuel Floor High Exhaust Duct Radiation - High Rallroad Access Shaft Exhaust Duct Radiation
-High Refuel Floor Wall Exhaust Duct Radiation - High TRIP SErPOINT
~5 mR/hr 2 -38.0 lnches<0>
~ 1.72 pslg
~ 18 mR/hr
~ 5 mR/hr
~ 21 mR/hr 2.2.9 2.2.9.1 Feedwater/Maln Turbine Trip System Actuation 3.3.2.2 22.10 MVP Isolation 2.2.10.1
[3.3.11]
(al See Figl!re 2.2-1 SUSQUEHANNA - UNIT 1 Reactor Vassal Laval - High Main Steam Line Radiation - High High TRM /2.0-13
~ 54.0 lnchas<8l
~ 15 x full power background without hydrogen injaci:lon
Rev. 11 BOTTOM ClF STEAM DRYER SKIRT FEED 498. ~-~,
WATER e50 RECIRC 161, ~---1 OUTLET 1:50 ttJZZLE 100
- 50 FIGURE 2. 2-1 1:50 Instrument Trip Setpoint Program 2.2 WATER LEVEL IOENCLATlRE 1£IlifT ABOVE Nil VESSEL ZERO READING
<IN.)
(8)
- 591, :s
+54 (7)
~:s
+39 (4)
~.:s
+30 (3)
~:s
+13 (2) 489. 5
-38
( 1) 398. 5
-129
-129
< 1) INITIATE RHR, CS START DIES£1..
a>>f'TRIBUTE TD ADS CLOSE MSIY' S NDTE*
SCALE IN INCHES ABOVE VESSEL ZERD REACTOR VESSEL WATER LEVEL SUSQUEHANNA - UNIT 1 TRM / 2.0-14
Rev. 11 3
2.8 2.6 2.4 2.2 2
1.8
(/)
0..
(.)
1.6 w
~ 1.4
~
- )
1.2 0
(.)
1
- i!:
0:::,
0.8
(/)
0.6 0.4 0.2 0
\\
\\
\\
\\
\\
2 lnstrumer,t Trip Setpoint Program 2.2 Instrument Trip Setpoint Table 2.2
\\
~
6 Acceptable I'-- ---------
Not Acceptable 10 14 18 22 Signal-to-Noise Ratio Figure 2.2-2 26 30 Minimum SRM Trip Setpoint Versus Signal~to-Noise Ratio SUSQUEHANNA - UNIT 1 TRM / 2.0-15