Timothy S. Rausch PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3445 Fax 570.542.1504 tsrausch@pplweb.com JUL 3 1 2009 PP

  • TM U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 FOURTEEN REFUELING OUTAGE OWNER'S ACTIVITY REPORT PLA-6523 Docket No. 50-388 The attached report is for the Susquehanna Unit 2 Fourteenth Refueling Outage, which is the first Unit 2 refueling outage for the 2"d Inspection Period of the 3 Inspection Interval for Unit 2.

The report was prepared and submitted in accordance with the requirements of ASME Code Case N-532-4.

By copy of this letter, we are transmitting the Owner's Activity Report to the Commonwealth of Pennsylvania.

If you have any questions, please contact Mr. Christopher K. Hoffman, Acting Manager -

Nuclear Regulatory Affairs at (610) 774-4043.

Sincerely,

Attachment:

Unit 2 Fourteenth Refueling Outage Owner's Activity Report copy: NRC Region I R. Janati, DEP/BRP F. W. Jaxheimer, NRC Sr. Resident Inspector B. K. Vaidya, NRC Project Manager Commonwealth of Pennsylvania k)cp Q e4ý

Susquehanna Form OAR-1 Owner's Activity Report Report Number OAR-i1-203 Plant Susquehanna Steam Electric Station, 769 Salem Blvd., Berwick, PA. 18603 Unit No. 2 Commercial service date February 12, 1985 Refueling outage no. 14 (if applicable)

Current Inspection Interval 3rd (1st, 2nd, 3rd, 4th, other)

Current Inspection Period 2nd (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 1998 Edition through the 2000 Addenda Date and Revision of inspection plans December 18, 2007, Revision 3 Edition and Addenda of Section XI applicable to replair/ replacement activities, if different than the inspection plans N/A Code Cases used: N-532-4 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of Refueling Outage 14 conform to the requirements of Section XI.

Signed Gen. Manager- Nuclear Engineering Date 7.-a) -'4

( Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the Undersigned; holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of PENNSYLVANIA and employed by OneCIS Insurance Co. of Lynn, MA have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/ replacement activities and evaluations described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

71 uII L~

Commissions 0A 9S"-I ,4/ itJ PA d,3(7;2 Inspector's inature /y National Board, State, Province, and Endorsements Date " -(

Susquehanna TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATIONS FOR CONTINUED SERVICE Examination Category and Item number Item Description Evaluation Description None Page 1 of I

Susquehanna TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan number I Pipe Support Replaced 4/23/2009 09-264-916175-039 DCA202-H3 mechanical snubber due to test failure 1 Pipe Support Replaced 5/1/2009 09-248-916020-047 DBA205-H16 mechanical snubber due to test failure Pipe Support Replaced 5/4/2009 09-262-1047920-053 DBA205-H 17 mechanical snubber due to test failure Form R-2 Report of Alteration:

06-247-780077-006 Rerate of Feedwater Heater 2E 1.05A 06-247-780080-007 Rerate of Feedwater Heater 2E.105B 06-247-780082-008 Rerate of Feedwater Heater 2EI 05C Page 1 of I