ML21070A181

From kanterella
Jump to navigation Jump to search
Transmittal of Technical Requirements Manual
ML21070A181
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 02/26/2021
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21070A181 (30)


Text

.t't::J.J * .L.O 1 .L.U,L..l.

Page 1 of 2 MANUAL HARD COPY OISTRIBUTION DOCUMENT TRANSMITTAL 2021-3093 USER INFORMATION:

GERLACH*ROSEY M EMPL#: 028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY M 02/26/2021 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS a1<0M THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF

~ORS.

ATTENTION: __ "REP_!-,A~~ directi~ns_<?-~_E_?t affect t~~- ~~!~- of Contents, _Therefore no __ _

TOC will be issued with the updated material.

TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 02/22/2021 ADD MANUAL TABLE OF CONTENTS DATE: 02/25/2021 CATEGORY: DOCUMENTS TYPE: TRMl

C C:lJ

  • L. 0 1 L. V L. .L Page 2 of 2 ID: TEXT 3.8.7 ADD: REV: 2 REMOVE: REV:1 CATEGORY: DOCUMENTS TYPE: TRMl ID: TEXT B3.8.7 '

ADD: REV: 3 REMOVE: REV:2 ANY DISCREPANCIES WITH THE MATER~AL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGE;S AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .

J

'SSES MANUAL Manual Name: TRMl

Title:

  • TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 02/25/2021 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 96 01/03/2019

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 27 03/05/2019

Title:

TABLE OF CONTENTS TEXT 1.1 1 . 01/31/2014

Title:

USE AND APPLICATION DEFINITIONS

  • t TEXT 2.1 2 0 4/28/2015 '~ ~:; , _.;*

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROG~. 1...: ~ ~

TEXT 2.2 10

{.

Title:

PLANT PROGRAMS AND SET:OI~S ~ . P SETPOINT TABLE TEXT 3.0 Titlez TECHNICAL .b RAT~~N (TRO) APPLICABILITY

~:~;

& SURVEILLANCE (TRS)

,A!'PLICABILITY TEXT 3.1.1 11/09/2007 I

,, Titlez REACTIVITY co~~o ICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (A S 1 ATION

'l*;;

TEXT 3 .1. 2 . ;;,-~

.J+,~ -

':~ 11/18/2002 Titlez REACTIVI *: co~ L SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT

'11' '

~1',_:...,_-t_. . ;,,:

TEXT 3.1.3 6 12/18/2017

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3 .1.4 1 10/12/2020

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.1 20 04/07/2020 Titlez CORE OPERATING LIMIST REPORT (COLR)

Page 1 of 16 Report Date: 02/26/21

SSES MANUAL Manual Name: TRMl

'!anual--Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1-TEXT 3.3.1 0 11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007 Titlez INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 11 06/29/2017 Titlez INSTROMEN'rATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 5 03/05/2019

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION INTENTIONALLY LEFT BLANK TEXT 3.3.9 3 04/17/2008

Title:

OPRM INSTRUMENTATION CONFIGORATION TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION 04/02/2019 TEXT 3.3.12 2

Title:

WATER MONITORING INSTRUMENTATION Page 2 of l 16 Report Date: 02/26/21

SSES MANUAL Manual Name: TRMl MANDA.Ii UNIT 1 tr11ual

Title:

, TECHNICAL REQUIREMENTS TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM INTENTIONALLY LEFT BLANK TEXT 3.4.3 1 ll/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS l'

TEXT 3.4.4 2* 04/17/2008

' 1 -

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLQW AND ROD LINE LIMIT TEXT 3.4.5 1 04/2 6 ,?-2 0 06 Ti_5le: REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS

~ 3.4.6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT 3.5.2 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT 3.5.3 1 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 ll/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 3 ~ 01/03/2019

Title:

SUPPRESSION-CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 ;1.1/18/2002 Page 3

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION of 16 ', Report Date:

r 02/26/21 I

SSES MANUAL Manual Name: TRMl

( '!anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT r TEXT 3.6.4 0 11/18/2002

Title:

~ONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (OHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 5 02/13/2020

Title:

PLANT SYSTEMS F,IRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS i:'EXT 3.7.3.3

)

4

Title:

PLANT SYSTEMS CO2 SYSTEMS TEXT 3.7.3.4 2

Title:

PLANT SYSTEMS HALON SYSTEMS 05/16/2016 04/16/2009 TEXT 3.7.3.5 2 04/16/2009

.I

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006

Title:

PLANJ:' SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 13 12/18/2017

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION (

1 04/26/2006 TEXT 3.7.4

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 16 Report Date: 02/26/21

SSES MANUAL Manual Names TRMl r u a l

Title:

TECHNICAL REQUIREMENTS MANUAL-UNIT-1 TEXT 3.7.5.1 1 03/05/2015

Title:

PLANT SYSTEMS MAIN CO~ENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE qAS MIXTORE TEXT 3.7.5.3 1 04/26/2006 J

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012

\

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING

~ T 3.7.8 5 03/05/2015

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 3 03/05/2019

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 1 11/01/2018

Title:

STRUCTURAL I~GRITY TEXT 3.8.1 3 04/22/2020 r

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS 1

TEXT 3. 8. 2. 2 2 1'2/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

  • AUTOMATIC Page 5 of 16 Report Date: 02/26/21

SSES MANUAL Manual Names TRMl

'!anual Titles TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 4 01/28/2020 Titles ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2 03/05/2019

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2 02/25/2021

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM 1:EXT 3.9.1 TEXT 3.9.2 0

0 11/18/2002 Titles REFUELING / OPERATIONS DECAY TIME 11/18/2002

Title:

REFUELING OPERATIONS COMMONICATIONS TEXT 3.9.3 1 03/12/2019 Titles REFUELING OPERATIONS REFUELING PLATFORM TEXT 3,10.l 1 04/26/2006

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 ( 3 06/19/2019 Titles MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 3 10/17/2019

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2 04/17/2008

\

Title:

INTENTIONALLY LEFT BLANK Paga 6 of 16 Report Date: 02/26/21

SSES MANUAL Manual Name: TRMl

Title:

TECHNICAL REQUIREMENTS MANUAL DNIT 1 TEXT 3 . 11. 1. 1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3 . 11. 1. 2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3 . 11. 1. 3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3 . 11. 1. 4 2 10/09/2012

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 3 03/05/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION EXT 3.11.2.1 4 03/12/2019

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3 . 11. 2 . 2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLID~S IN PARTICTILATE FORM TEXT 3 . 11. 2 . 4 0 11/18/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3 . 11. 2 . 6 8 06/29/2017

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006 Page 7

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE of 16 Report Date: 02/26/21

SSES MANUAL Manual Name: TRMl

'lanual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

  • TEXT 3.11.4.1 5 03/05/2015

Title:

RADIOACTIVE EFFLUENTS "MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002 Titlez LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS

~EXT 3 .12. 3 0 11/19/2002 Titlez LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 1 01/03/2019

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 1 01/03/2019

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/1998 Titl~: ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6

/

0 08/31/1998 Page 8

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM of 16 Report Date: 02/26/21

SSES MANUAL Manual Name: TRMl r u a l

Title:

TECHNICAL REQUIRE~S MANUAL UNIT 1 TEXT 4.7 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 5 03/05/2015

Title:

APPLICABILITY BASEp TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY

\

TEXT B3.l.l 2 04/29/2014

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.l.2 11/19/2002 I

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.l.3 4 12/18/2017

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION

~EXT B3.1.4 1 10/12/2020

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK-VALVE TEXT B3.2.l 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.l 1 01/31/2014 ritle: INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011 -

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2608

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7 06/29/2017

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEX-T B3 . 3 . 5 2 11/09/2007 Page 9

Title:

INTENTIONALLY LEFI' BLANK of 16 Report Date: 02/26/21

SSES MANUAL Manual Name: TRMl

'\lanual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 6 03/05/2019

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTOATION INSTRUMENTATION TEXT B3.3.7 2 11/10/2015

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INTENTIONALLY LEFT BLANK TEXT B3.3.9 4 01/03/2019

Title:

OPRM INSTRUMENTATION TEXT B3.3.10 3 08/09/2010

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PlJMP MG SET STOPS

':'EXT B3 . 3 . 11 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 1 04/02/2019

Title:

WATER MONITORING INSTRUMENTATION c TEXT B3.4.1 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009

Title:

INTENTIONALLY LEFI' BLANK TEXT B3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 - 0 11/19/2002

\

Ti-tle: REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 10 of 16 Report Date: 02/26/21

SSES MANUAL Manual Name I TRMl I

1r u a l

Title:

TECHNICAL -REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6, 3 01/03/2019

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.l 2 03/17/2020

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT B3.5.2 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT B3.5.3 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING EXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002

Title:

PLANI' SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (DHS) GROUND WATER LEVEL TEXT B3.7.3.l 4 02/16/2017

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006 Page 11

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS of 16 I

Report Date: 02/26/21

SSES MANUAL Manual Name: TRMl

'l!anual

Title:

TECHNICAL REQUIREMENTS MANUAL DNIT 1 TEXT B3.7.3.3 1 01/03/2019

Title:

PLANT SYSTEMS BASES CO2 SYSTEMS TEXT B3.7.3.4 4 06/19/2019

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.S 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES tEXT B3.7.3.8 3 09/27/2012

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008 Page 12

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION of MONITORING INSTRUMENTATION 16 Report Date: 02/26/21

SSES MANUAL Manual Name: TRMl

Title:

TECHNICAL REQUIREMENTS -MANUAL UNIT 1 TEXT B3.7.8 4 01/31/2014

Title:

PLANT SYSTEMS BASES SNOBBERS TEXT B3.7.9 )

3 03/05/2019

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 11/01/2018

Title:

STRUCTURAL INTEGRITY TEXT B3.B.1 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES

.EXT B3.8.2.l 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS -

TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.B.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3 03/05/2019

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 3 02/25/2021 TEXT B3.8.7

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 16 Report Date: 02/26/21

SSES MANUAL Manual Name: TRMl

'\1'.anual

Title:

  • TECHNICAL REQUIREMENTS MANUAL UNIT "1.

TEXT B3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 1 03/12/2019

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.l 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006

Title:

MISCELLANEOUS BASES SHOTDOWN MARGIN TEST RPS INSTRUMENTATION

':'EXT B3.10.3 TEXT B3 .10 -4

.. - . \

Title:

INTENTIONALLY LEFI' BLANK 2

1 10/17/2019

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

I 04/17/2008 TEXT B3 .11.1.1 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION I

TEXT B3 . 11 . 1. 2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3 .11.1. 3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3-ll.1.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3 _11.1. 5 0 11/19/2002 Page 14

Title:

RADIOACTIVE EFFLUENTS BASES RADIO~CTIVE LIQUID PROCESS MONITORING of INSTRUMENTATION 16 Report Date: 02/26/21

r SSES MANUAL Manual Name: TRMl

, r u a l -Title: TECHNICAL REQUIREMENTS -MANUAL UNIT 1 TEXT B3.ll.2.l 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.ll.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.ll.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICOLATES FORM TEXT B3.ll.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM

\__

TEXT B3.ll.2.5 5 07/03/2013

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM

.EXT B3.ll.2.6 2 09/08/2_016

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION --

TEXT B3.ll.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3 . 11. 4 . 1 5 03/05/2015

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.ll.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.ll.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.l 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010 Page 15

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS of 16 Report Date: 02/26/21

SSES MANUAL Manual Name z TRMl

~ual

Title:

TECHNICAL-REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0 _ll/19/2002 Titles LOADS CONTROL PROGRAM BASES LIGIIT LOADS REQUIREMENTS Page 16 v

0~ 16 Report Date: 02/26/21

Battery Monitoring and Maintenance Program Rev. 2 3.8.7

  • 3.8 3.8.7 ELECTRICAL POWER Battery Monitoring and Maintenance Program TRO 3.8.7 Battery cell parameters for the Class 1E 250 V batteries and Class 1E 125 V batteries shall be within limits.

APPLICABILITY: When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS


*-------NOTE------*-------~-

Separate Condition entry is allowed for each battery.

CONDITION REQUIRED ACTION COMPLETION TIME

  • A. One or more batteries with one or more battery

.c~II pa~m!3t~n:; oot within Category A limits.

A.1 Verify pilot cell electrolyte level and float voltage meet TaQle 3.8.7-1 Category B limits.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND A.2 Verify battery cell 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> parameters meet Table 3.8.7-1 Category B AND limits.

Once per 7 days thereafter AND A.3 Restore battery cell 31 days parameters to Category A limits of Table 3.8.7-1.

8. Required Action A 1 or 8.1 Enter TS 3.8.6. Immediately A.2 and associated Completion Time for Condition A not met.

SUSQUEHANNA - UNIT 1 TRM / 3.8-26

Battery Monitoring and Maintenance Program Rev.2 3.8.7

  • ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action A.3 and C.1 Declare associated battery Immediately associated Completion inoperable.

Time for Condition A not met.

D. Entry into TS 3.8.6 D.1 Apply equalizing charge to 31 days Condition C with battery/or affected cell.

electrolyte level below the top of the plates. AND Verify affected cell meets Table 3.8.7-1 Category A and B limits for float voltage and temperature .

  • SUSQUEHANNA - UNIT 1 TRM / 3.8-27

Battery Monitoring and Maintenance Program Rev.2 3.8.7

  • ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Required Action D.1 and E.1 Declare associated battery Immediately associated Completion inoperable.

Time for Condition D not met.

OR One or more batteries on one 125 VOC electrical power subsystem or on one 250 voe electrical power subsystem with average electrolyte temperature less than the Table 3.8.7-1 Category 8 Limits.

OR

  • One or more batteries on one 125 voe electrical power subsystem or on one 250 voe electrical power subsystem with connection resistance

~ 100.0 E-6 ohms for any single connection or the calculated average resistance for the battery is> 50.0 E-6 ohms .

  • SUSQUEHANNA - UNIT 1 TRM / 3.8-28

Battery Monitoring and Maintenance Program Rev. 2 3.8.7

  • TECHNICAL REQUIREMENT-SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.8. 7 .1 Verify for each terminal and connector 92 days No visible corrosion OR
a. s 50.0 E-6 ohms; OR
b. s 100.0 E-6 ohms with the calculated average resistance for the battery< 50.0 E-6 ohms.

TRS 3.8.7.2 Verify average electrolyte temperature (minimum of 10% 92 days of cells) is within Table 3.8.7-1 Category A limits.

TRS 3.8.7.3 Verify the average of the specific gravity (corrected for 48 months temperature) of all the connected cells is> 1.195 and no cell more than 0.020 below the average.

TRS 3.8.7.4 Verify battery cells, cell plates, and racks show no visual 48 months indication of physical damage or abnormal deterioration that could potentially degrade battery performance.

TRS 3.8.7.5 Verify the battery connection resistance is: 48 months

a. < 100.0 E-6 ohms for any single connection;
b. The calculated average resistance for the battery is

< 50.0 E-6 ohms .

  • SUSQUEHANNA - UNIT 1 TRM / 3.8-29

Battery Monitoring and Maintenance Program Rev. 2 3.8.7

  • Table 3.8.7-1 (page 1 of 1)

Battery/Battery Cell Parameter Requirements CELL PARAMETER CATEGORY A: CATEGORYB:

LIMITS FOR EACH ALLOWABLE LIMITS FOR CONNECTED CELL EACH CONNECTED CELL Electrolyte Level c:: Minimum level indication Above top of plates, and mark1 and not overflowing s 1/4 inch above maximum level indication markCa)

Float Voltage ~ 2.13 V ~2.07V Cell Temperature  ::2: 60 Degrees F .~ 60 Degrees F (a) It is acceptable for the electrolyte level to temporarily increase above the specified maximum

  • level during and immediately following equalizing charges provided it is not overflowing .
  • SUSQUEHANNA - UNIT 1 TRM / 3.8-30

Battery Monitoring and Maintenance Program Rev. 3 B 3.8.7

  • B 3.8 B 3.8.7 ELECTRICAL POWER Battery Monitoring and Maintenance Program BASES BACKGROUND This TRO delineates the limits on electrolyte temperature, electrolyte level, float voltage, and specific gravity for the Unit 1 DC electrical power 0

subsystems batteries and comprises the Battery Monitoring and Maintenance Program" as required under Technical Specification 5.5.13. A discussion of these batteries and their OPERABILITY requirements is provided in the Bases for Technical Specification LCO 3.8.4, "DC Sources-Operating," and LCO 3.8.5, "DC Sources-Shutdown."

APPLICABLE The initial conditions of Design Basis Accident (OBA) and transient SAFETY ANALYSES analyses in FSAR, Chapter 6 (Ref. 1) and Chapter 15 (Ref. 2), assume Engineered Safety Feature systems are OPERABLE. The DC electrical power subsystems provide normal and emergency DC electrical power for the diesel generators (DGs), emergency auxiliaries, and control and switching during all MODES of operation .

The OPERABILITY of the DC subsystems is consistent with the initial assumptions of the accident analyses and is based upon meeting the

  • assign-basis of the unit. This incluaes maintaining DC sources identified in Technical Specification Table 3.8.4-1 OPERABLE during accident conditions, in the event of:
a. .An assumed loss of all offsite AC or all onsite AC power; and
b. A worst case single failure.

Since battery cell parameters support the operation of the DC electrical power subsystems, they satisfy Criterion 3 of the NRG Policy Statement (Ref. 3). .

TRO Battery cell parameters must remain within acceptable limits to ensure availability of the required DC power to shut down the reactor and maintain it in a safe condition after an anticipated operational occurrence or a postulated OBA.

Electrolyte limits are conservatively established, allowing continued DC electrical system function even with Category A limits not met.

  • SUSQUEHANNA - UNIT 1 TRM / B 3.8-18

Battery Monitoring .and Maintenance Program Rev. 3 B 3.8.7 BASES APPLICABILITY The battery cell parameters are required solely for the support of the associated DC electrical power subsystem. Therefore, battery cell pa~meters are required to be within required limits only when the associated DC power source is required to be OPERABLE. Refer to the Applicability discussions in Technical Specification Bases for LCO 3.8.4 and LCO 3.8.5.

ACTIONS A Note has been added to provide clarification that, for the purpose of this TRO, separate Condition entry is allowed for each battery. This is acceptable, since the Required Actions for each Condition provide appro-priate compensatory actions for each inoperable battery. Complying with ,

the Required Actions may allow for continued operation, and subsequent inoperable batteries are governed by subsequent Condition entry and application of associated Required Actions.

A.1, A.2, and A.3 Wrth parameters of one or more cells in one or more batteries not within Category A limits but within the Category B limits specified in

  • Table 3.8.7-1, the battery is degraded but there is still sufficient capacity to perform the intended function. Therefore, the affected battery is not required to be considered inoperable solely as a result of Category A limits not met and continued operation is permitted for a limited period. "

The pilot cell electrolyte level and float voltage are required to be verified to meet the Category B limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (Required Action A 1). This check provides a quick indication of the status of the remainder of the battery cells. One hour provides time to inspect the electrolyte level and to confirm the float voltage of the pilot cell. One hour is considered a reasonable amount of time to perform the required verification.

Verification that the Category B limits are met (Required Action A.2) provides assurance that during the time needed to restore the parameters

,. to the Category A limits, the battery is still capable of performing its intended function. A period of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is allowed to complete the initial verification because average temperature measurement must be obtained for the battery. Taking into consideration both the time required to perform the required verification and the assurance that the battery cell parameters are not severely degraded, this time is considered reasonable

  • SUSQUEHANNA- UNIT 1 TRM / B 3.8-19

Battery Monitoring and Maintenance Program Rev. 3 83.8.7

  • BASES ACTIONS (continued)

A 1, A.2, and A.3 (continued)

Verification of the average temperature of the battery within the design bases ensures operability. The verification is repeated at 7-day intervals until the parameters are restored to Category A limits.

Continued operation is only permitted for 31 days before battery cell parameters must be restored to within Category A limits. Taking into consideration that, while battery capacity is degraded, sufficient capacity exists to perform the intended function and to allow time to fully restore the battery cell parameters to normal limits, this time is acceptable for operation prior to declaring the DC batteries inoperable.

8.1 Failure to complete the checks required for Act.ions A 1 or A2 require immediate action. Entry into Technical Specification 3.8.6 must be entered immediately.

C.1

  • When any battery parameter is outside the Category B limit for any connected cell, sufficient capacity to supply the maximum expected load requirement is not ensured and the corresponding DC electrical power-*- -

subsystem must be declared inoperable. Additionally, other potentially extreme conditions, such as not completing the Required Action A3 within the required Completion Time also are cause for immediately declaring the associated DC electrical power subsystem inoperable.

D.1 Cells that have been discovered with electrolyte level below the top of the plates are equalized and tested IAW Technical Specification 5.5.13.

Required Action E.1 is to ensure that under extreme conditions, such as failure to complete the required Action D.1 within the required completion time, average electrolyte temperature falling below 60° F, or intercell connections found not within required connection resistance also are cause for immediately declaring the associated battery inoperable .

  • SUSQUEHANNA - UNIT 1 TRM / B 3.8-20

Battery Monitoring and Maintenance Program Rev. 3 B 3.8.7

  • BASES TRS TRS 3.8.7.1 The quarterly inspection for visible corrosion at the terminal and connector is consistent with IEEE-450. The "ORD condition is to ensure, if there is visible corrosion, intercell connection resistance is not impacted.

TRS 3.8.7.2 The quarterly inspection of average electrolyte temperature is consistent with IEEE-450 recommendation to check 10% of the connected cells.

Lower than normal temperatures act to inhibit or reduce battery capacity.

This TRS ensures that the operating temperatures remain within an acceptable operating range. This limit is based on manufacturer's recommendations and battery sizing calculations.

TRS 3.8.7.3 IEEE-450 (Ref. 4) recommends a check of specific gravity every year. The Frequency of the TRS is acceptable because other administrative controls ensure adequate battery performance between performances of

  • TRS 3.8.7.3 and aligns performance of TRS 3.8.7.3 with refueling outage intervals.
  • Toe limit specified for specific gravity for each connected cell is no more * --

than 0.020 below the average of all connected cells with the temperature corrected average;;:.: 1.195. These values are based on manufacturer's recommendations for the minimum required value. The minimum specific gravity value required for each cell ensures that the effects of a highly charged or newly installed cell do not mask overall degradation of the battery.

Specific gravity gradients produced during the recharging process may result in delays of several days until the specific gravity stabilizes.

However, a minor battery recharge (such as equalizing charge that does not follow a deep discharge) does not produce specific gravity gradients that are significant

  • SUSQUEHANNA - UNIT 1 TRM / B 3.8-21

Battery Monitoring and Maintenance Program Rev. 3 8 3.8.7

  • BASES TRS (continued)

TRS 3.8.7.4 Visual inspection of the battery cells, cell plates, and battery racks provides an indication of physical damage or abnormal deterioration that could potentially degrade battery performance. The presence of physical damage or deterioration does not represent a failure of the TRS, provided an evaluation determines that the physical damage or deterioration does not affect the OPERABILITY of the battery (its ability to perform its design function). The Frequency of the TRS is acceptable because other administrative controls ensure adequate battery performance between performances of TRS 3.8.7.4 and aligns performance of TRS 3.8.7.4 with refueling outage intervals.

TRS 3.8.7.5 The connection resistance limits for this TRS must be below the limits specified in the TRS. The calculated average resistance limit ensure that the total voltage drop across the battery connections is consistent to those assumed in the battery calculations, while the upper limit for battery resistance prevents the possibility of battery damage due to overheating of

  • the connections .

The Frequency of this TRS is acceptable because other administrative controls-ensure adequate battery performance between performances of TRS 3.8.7.5 and aligns performance of TRS 3.8.7.5 with refueling outage intervals.

Table 3.8.7-1 This table delineates the limits on electrolyte level, float voltage, and temperature for two different categories. The meaning of each category is discussed below.

Category A defines the normal parameter limits for each connected cell.

The term uconnected cell" excludes any battery cell that may be jumpered out.

  • SUSQUEHANNA - UNIT 1 TRM / B 3.8-22

Battery Monitoring and Maintenance Program Rev. 3 B 3.8.7

  • BASES TRS (continued)

Table 3.8.7-1 (continued)

The Category A limits specified for electrolyte level are based on manufacturer's recommendations and are consistent with the guidance in IEEE-450 (Ref. 4), with the extra1/4 inch allowance above the high water level indication for operating margin to account for temperature and charge effects. In addition to this allowance, footnote (a) to Table 3.8.7-1 permits the electrolyte level to be above the specified maximum level during equalizing charge, provided it is not overflowing. These limits ensure that the plates suffer no physical damage, and that adequate electron transfer capability is maintained in the event of transient conditions. IEEE-450 (Ref. 4) recommends that electrolyte level readings should be made only after the battery has been at float charge for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

The Category A limit specified for float voltage is ; : ,; 2.13 V per cell.

This value is based on the recommendation of IEEE-450 (Ref. 4) which states that prolonged operation of cells below 2.13 V can reduce the life expectancy of cells.

Category B defines the limits for each connected cell. These values, although reduced, provide assurance that sufficient capacity exists to perform the intended function and maintain a margin of safety. When any battery parameter is outside the Category B limits, the assurance of

- ---*sufficient capacity described above no longer *exists,* and Technical--

  • Specification 3.8.6 must be entered immediately.

The Category B limit specified for electrolyte level (above the top of the plates and not overilowing) ensures that the plates suffer no physical damage and maintain adequate electron transfer capability. The Category B allowable limit for voltage is based on IEEE-450 (Ref. 4), which states that a cell voltage of 2.07 V or below, under float conditions and not caused by elevated temperature of the cell, indicates internal cell problems and may require cell replacement.

  • SUSQUEHANNA - UNIT 1 TRM / B 3.8-23

Battery Monitoring and Maintenance Program Rev. 3 B 3.8.7

  • BASES REFERENCES 1. FSAR, Chapter 6
2. FSAR, Chapter 15
3. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132)
4. IEEE standard 450-1995
  • SUSQUEHANNA - UNIT 1 TRM / B 3.8-24