Technical Requirements Manual
ML110250471
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 01/14/2011
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
028401, 2011-2403
Download: ML110250471 (52)


Text

Jan. 17, 2011 HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2011-2403 USER INFORMATION:

Name: GERLACH*ROSE M EMPL#:028401 CA#:0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 01/14/2011 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2. - TECHNICAL REQUIREMENTS MANUAL UNIT 2

'REMOVE MANUAL TABLE OF CONTENTS DATE: 01/12/2011 ADD MANUAL TABLE OF CONTENTS DATE: 01/13/2011 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT 2.2 REMOVE: REV: 9 ADD: REV: 10 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT 3.3.6 REMOVE: REV:2 ADD: REV: 3 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT B3.3.6 ADD: REV: 4 REMOVE: REV:3 Iko0of

CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES REMOVE: REV:65 ADD: REV: 66 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT TOC ADD: REV: 19 REMOVE: REV:l8 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 0 1/13/2011 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 66 01/13/2011

Title:

LIST OF EF]FECTIVE SECTIONS TEXT TOC 19 01/13/2011

Title:

TABLE OF CONTENTS TEXT 1.1 0 11/19/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 10 01/13/2011

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4 05/23/2008

Title:

APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8 05/14/2009

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

LDCN 4712 Report Date: 01/14/11 Page 11 of 15

.15 Report Date: 01/14/11

SSES MANUAL Manual Name: TRE2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2 11/09/2007

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6 07/09/2010

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 3 01/13/2011

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 05/14/2009

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0 04/16/2009

Title:

WATER MONITORING INSTRUMENTATION Report Date: 01/14/11 Page 2.

Page 2 of of 15

.15 Report Date: 01/14/11

SSES MANUAL

. Manual Name:

Manual

Title:

TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.4 2 05/14/2009

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 0 07/20/2010

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION 0 TEXT 3.6.3 0 11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page - of .15 Report Date: 01/14/11

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0 11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3. 7.1 0 11/19/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009

Title:

PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 9 09/21/2010

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 01/14/11 Page 4 Page 4 of of 15

.15 Report Date: 01/14/11

SSES MAflTAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7. 6 2 06/27/2008

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 7 12/03/2010

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 1 10/02/2009

Title:

PLANT SYSTEMS TEXT 3.8.1 2 02/04/2005

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC page 5 of 15 Report Date: 01/14/11

SSES MANUJAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3. 8.3 1 04/05/2010

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0 11/19/2002

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0 11/19/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2 10/22/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.11.1.1

Title:

1 04/26/2006 RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION 0

Report Date: 01/14/11 Page Page6~ of of 15 15 Report Date: 01/14/11

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 3 11/14/2006

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 4 09/16/2009

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM Report Date: 01/14/11 Page 27 of of 15

.15 Report Date: 01/14/11

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS TRAINING Report Date: 01/14/11 8

Page ~. of of 15

.15 Report Date: 01/14/11

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 4 05/23/2008

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0 11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1 11/09/2007

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 4 07/09/2010

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 4 01/13/2011

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Report Date: 01/14/11 Pages Page 9 of of i~.

15 Report Date: 01/14/11

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 1 11/09/2007

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INSTRUMENTATION BASES TEM RPS INSTRUMENTATION TEXT B3.3.9 3 05/14/2009

Title:

INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 2 08/09/2010

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.4.6 0 07/20/2010

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Report Date: 01/14/11 Page i~

10 of of 15 15 Report Date: 01/14/11

SSES MANUAL

  • Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0 11/19/2002

Title:

ECCS AND RC C BASES ADS MANUAL INHIBIT I

TEXT B3.5.2 1 11/09/2007

Title:

ECCS AND RC C BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007

Title:

ECCS AND RC IC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1 04/19/2007

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002

Title:

PLANT SYSTE]VIS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEIMES BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010

Title:

PLANT SYSTEIMIS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEIMES BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002

Title:

PLANT SYSTE1MES BASES C02 SYSTEMS Report Date: 01/14/11 Page 11 Page 11 0off 15 15 Report Date: 01/14/11

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4 1 04/26/2006

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 2 06/27/2008

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION

( TEXT B3.7.8 3 06/21/2007

Title:

PLANT SYSTEMS BASES SNUBBERS Report Date: 01/14/11 Page 12.

Page 12 of of 15

.15 Report Date: 01/14/11

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 1 12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT 33.7.11 2 04/14/2010

Title:

STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 1 06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9. 1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME Report Date: 01/14/11 Page 13.

13 of .i~5.

15 Report Date: 01/14/11

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.11.1.1 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE

( TEXT B3.11.2.2 0 11/19/2002 I

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES Report Date: 01/14/11 Page ~A Page 14 of of 15

.15 Report Date: 01/14/11

SSES MANUJAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE,- IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE.EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4 11/14/2006

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 3 07/09/2010

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 01/14/11 Page 15.

15 of of 15

.15 Report Date: 01/14/11

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 1.0 US E AND APP LIC A TIO N ............................................................................ 1.0-1 1.1 Definitio ns .............................. :..................................................... T R M/1.0-2 2.0 PLA NT PR O G RA MS ................................................................................... 2.0-1 2 .1 Plant P rogram s ...................................................................................... 2 .0-1 2.2 Instrument Trip Setpoint Table ..................................................... TRM/2.0-5 3.0 A P P LIC A BILITY ................................................................................. T R M/3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability ............................... TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability .................................. TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS .................................................. TRM/3.1-1 3.1.1 Alternate Rod Injection ................................................................. TRM/3.1-1 3.1.2 C R D Housing S upport ........................................................................... 3.1-4 3.1.3 Control Rod Block Instrumentation ........................................................ 3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve ................................................................................. T R M/3.1-9 3.2 CORE OPERATING LIMITS REPORT ........................................................ 3.2-1 3.2.1 Core Operating Limits Report ................................................................ 3.2-1 3.3 INSTRUMENTATION ......................................................................... TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation ........................................... TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation ............................................. TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation ................................... TRM/3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation ............................ TRM/3.3-9 3.3.5 Section Not Used .......................................................................... TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation ................................. TRM/3.3-13 3.3.7 Turbine Overspeed Protection System ......................................... TRM/3.3-17 3.3.8 Section Not Used .......................................................................... TRM/3.3-19 3.3.9 OPRM Instrumentation ................................................................. TRM/3.3-21 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops ......................................................................... TRM/3.3-22 3.3.11 MVP Isolation Instrumentation ...................................................... TRM/3.3-24 3.3.12 Water Monitoring Instrumentation ................................................. TRM/3.3-26 3.4 REACTOR COOLANT SYSTEM .......................................................... TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry ....................................................... 3.4-1 3.4 .2 Not Used ......................................................................................... T R M/3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors .................................... 3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit ............................ TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program ........................... TRM/3.4-13 3.4.6 Reactor Recirculation Single Loop Operation (SLO)

Flow Rate Restriction .................................................................... TRM/3.4-14 TRM/TOC-1 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT 2 TRM / TOC-1 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC ...................................... TRM/3.5-1 3.5.1 ADS Manual Inhibit ....................................................................... TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation ............................ 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS ...................................................... 3.5-6 3.6 C O NTA INME NT .......................................................................................... 3.6-1 3.6.1 VENTING or PURGING ......................................................................... 3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Ind ica tio n ............................................................................................... 3 .6-3 3.6.3 Suppression Pool Alarm Instrumentation ............................................... 3.6-4 3.6.4 Primary Containment Closed System Boundaries ........................ TRM/3.6-7 3.7 PLANT SYSTEMS .............................................................................. TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown) ............................ TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level ......................................... 3.7-3 3.7.3.1 Fire Suppression Water Supply System ....................................... TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems ....................................................... TRM/3.7-8 3.7.3.3 C02 systems ................................................................................ TRM/3.7-12 3.7.3.4 Halon Systems ............................................................................. TRM/3.7-16 3.7,3.5 Fire Hose Stations ........................................................................ TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................. TRM/3.7-22 3.7.3.7 Fire Rated Assemblies .................................................................. TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation ...................................................... TRM/3.7-26 3.7.4 Solid Radwaste System ................................................................ TRM/3.7-34 3.7,5.1 Main Condenser Offgas Hydrogen Monitor ........................................... 3.7-37 3.7.5.2 Main Condenser Explosive Gas Mixture ....................................... TRM/3.7-38 3.7,5.3 Liquid Holdup Tanks .............................. TRM/3.7-39 3.7,6 ESSW Pumphouse Ventilation .......................... .................................... 3.7-40 3.7,7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation ........................................................... TRM/3.7-41 3.7,8 S nubbers ...................................................................................... TR M/3.7-43 3.7,9 Control Structure HVAC ................................................................ TRM/3.7-49 3.7,10 Spent Fuel Storage Pools (SFSPs) .............................................. TRM/3.7-51 3.7,11 Structural Integrity ......................................................................... TRM/3.7-54 3.8 ELECTRICAL POWER ....................................................................... TRM/3.8-1 3.8,1 Primary Containment Penetration Conductor Overcurrent Protective Devices ........................................................................ TRM/3.8-1 3.8,2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuous ................................................................................... T R M/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Autom atic...................................................................................... T R M/3.8-11 3.8,3 Diesel Generator (DG) Maintenance Activities ............................. TRM/3.8-13 SUSQUEHANNA - UNIT 2 TRM /TOC-2 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.8.4 24VDC Electrical Power Subsystem ............................................. TRM/3.8-15 3.8.5 Degraded Voltage Protection ....................................................... TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling .................................................. 3.8-24 3.8.7 Battery Monitoring and Maintenance Program .............................. TRM/3.8-26 3.9 REFUELING OPERATIONS ........................................................................ 3.9-1 3 .9 .1 Decay T im e ........................................................................................... 3 .9-1 3.9 .2 C om m unications .................................................................................... 3.9-2 3.9.3 Refueling P latform ................................................................................. 3.9-3 3.10 MISCELLANEOUS ............................................................................. TRM/3.10-1 3.10.1 Sealed Source Contamination ...................................................... TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation .......................... 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) .................... TRM/3.10-7 3.10.4 Section Not Used .......................................................................... TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS .............................................................. TRM/3.1 1-1 3.11.1 Liquid Effluents ............................................................................. T R M/3. 11-1 3.11.1.1 Liquid Effluents Concentration ...................................................... TRM/3.11-1 3.11.1.2 Liquid Effluents Dose ................................................................... TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System .................................................. TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ............................ 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation ............... TRM/3.11-13 3.11.2 Gaseous Effluents ........................................................................ TRM/3.11-17 3.11.2.1 Dose Rate ................... ........ .................. TRM/3.11-17 3.11.2.2 Dose - Noble Gases ..................................................................... TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form ........................................................................... T R M/3.11-21 3.11.2.4 Gaseous Radwaste Treatment System ........................................ TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System ......................................... TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation ............................................................................. T R M/3.11-25 3.11.3 Total D ose .................................................................................... T R M/3.11-33 3.11.4 Radiological Environmental Monitoring ......................................... TRM/3.11-35 3.11.4.1 Monitoring Program ...................................................................... TRM/3.11-35 3.11.4.2 Land Use Census ......................................................................... TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program ............................................ TRM/3.11-47 3.12 LOADS CONTROL PROGRAM .......................................................... TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool ....................................... TRM/3.12-1 3.12.2 Heavy Loads Requirements ......................................................... TRM/3.12.3 3.12.3 Light Loads Requirements ............................................................ TRM/3.12-5 TRM / TOC-3 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT 2 TRM / TOC-3 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 4.0 ADMINISTRATIVE CONTROLS ............................. 4.0-1 4 .1 O rg a n izatio n .......................................................................................... 4 .0-1 4.2 Reportable Event Action ........................................................................ 4.0-2 4 .3 S afety Lim it Violation ............................................................................. 4 .0-3 4.4 Procedures and Programs ..................................................................... 4.0-4 4.5 Reporting Requirements ........................................................................ 4.0-5 4.6 Radiation Protection Program ................................................................ 4.0-7 4 .7 Tra ining .................................................................................................. 4 .0-8 SUSQUEHANNA - UNIT 2 TRM / TOC-4 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability ...................................... B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability......................................... B 3.0-9 B 3.1.1 Alternate Rod Injection ................................................................ TRM/B 3.1-1 B 3.1.2 CRD Housing Support ......................................................................... B 3.1-4 B 3.1.3 Control Rod Block Instrumentation .............................................. TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve ........................................................................ TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR) ................................................. B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation .......................................... TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation ............................................. TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation .................................. TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation ........................... TRM/B 3.3-4 B 3.3.5 Section Not Used ......................................................................... TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation ................................ TRM/B 3.3-10 B 3.3.7 Turbine Overspeed Protection System ........................................ TRM/B 3.3-14 B 3.3.8 Section Not Used ......................................................................... TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation ................................................................ TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops ........................................................................ TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation ..................................................... TRM/B 3.3-22 B 3.3.12 Water Monitoring Instrumentation ................................................ TRM/B 3.3-24 B 3.4.1 Reactor Coolant System Chemistry ..................................................... B 3.4-1 B 3.4.2 Not Used ...................................................................................... T RM/B 3.4-2 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit ........................... TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program .................................. B 3.4-6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)

Flow Rate Restriction .................................................................... TRM/B3.4-7 B 3.5.1 ADS Manual Inhibit .............................................................................. B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation .................. TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS .................................................... B 3.5-4 B 3.6.1 VENTING or PURGING ............................................................... TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indicatio n ............................................................................................. B 3 .6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation ............................................. B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries ....................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown) ................................... B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level ....................................... B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System ...................................... TRM/B 3.7-3 SUSQUEHANNA - UNIT 2 TRM /TOC-5 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.7.3.2 Spray and Sprinkler Systems ...................................................... TRM/B 3.7-5 B 3.7.3.3 C02 Systems .............................................................................. TRM/B 3.7-7 B 3.7.3.4 Halon Systems ............................................................................ TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations ....................................................................... TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................ TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies ................................................................. TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation ..................................................... TRM/B 3.7-14 B 3.7.4 Solid Radwaste System ............................................................... TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ......................................... B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture .............................................. B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks ........................................................................... B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation .................................................... TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation .......................................................... TRM/B 3.7-22 B 3.7.8 Snubbers ..................................................................................... TRM/B 3.7-24 B 3.7.9 Control Structure HVAC ............................................................... TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools ............................................................ TRM/B 3.7-33 B 3.7.11 Structural Integrity ........................................................................ TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices ....................................................................... TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuous ................................................................................. T RM/B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Autom atic ..................................................................................... T RM/B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities ............................ TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem ............................................ TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection ...................................................... TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling ........................................ TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program ............................. TRM/B 3.8-18 B .3.9 .1 D ecay Tim e ......................................................................................... B 3.9-1 B 3.9.2 Communications .................................................................................. B 3.9-2 B 3.9.3 Refueling Platform ............................................................................... B 3.9-3 B 3.10.1 Sealed Source Contamination ............................................................. B 3.10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation ........................ B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ................... TRM/B 3.10-4 B 3.10.4 Section Not Used ......................................................................... TRM/B 3.10-6 B 3.11.1.1 Liquid Effluents Concentration ............................................................. B 3.11-1 B 3.11.1.2 Liquid Effluents Dose ......................................................................... B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System ......................................................... B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation .......................... B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation .............. TRM/B 3.11-10 SUSQUEHANNA - UNIT 2 TRM /TOC-6 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.11.2.1 Dose Rate .................................................................................... TRM/B 3.11-12 B 3.11.2.2 Dose - Noble Gases ............................................................................ B 3.11-16 B 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form .................................................................................. B 3.11-18 B 3.11.2.4 Gaseous Radwaste Treatment System ....................................... TRM/B 3.11-20 B 3.11.2.5 Ventilation Exhaust Treatment System ........................................ TRM/B 3.11-21 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation ............................................................................ TRM/B 3.11-24 B 3.11.3 Tota l D o se ........................................................................................... B 3 .1 1-2 6 B 3.11.4.1 Monitoring Program ..................................................................... TRM/B 3.11-28 B 3.11.4.2 Land Use Census ................................................................................ B 3.11-34 B 3.11.4.3 Interlaboratory Comparison Program ........................................... TRM/B 3.11-36 B 3.12 LOADS CONTROL PROGRAM ................................................... TRM/B 3.12-1 B.3.12.1 Crane Travel - Spent Fuel Storage Pool ..................................... TRM/B 3.12-1 B.3.12.2 Heavy Loads Requirements ........................................................ TRM/B 3.12-2 B.3.12.3 Light Loads Requirements ........................................................... TRM/B 3.12-3 TRM2 Text TOC 1/12/2011 SUSQUEHANNA - UNIT 2 TRM / TOC-7 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC TABLE OF CONTENTS 01/07/2011 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM / 1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Page TRM / 2.0-6 04/15/2009 Page TRM / 2.0-7 05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 04/15/2009 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 04/14/2008 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 through TRM / 3.1-5 08/31/1998 Page TRM / 3.1-6 03/27/2007 Page TRM / 3.1-7 04/15/2009 Page TRM / 3.1-8 03/27/2007 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 08/31/1998 Pages TRM / 3.2-2 through TRM / 3.2-54 04/17/2009 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Pages TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page 3.3-6 08/31/1998 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / 3.3-9 and TRM / 3.3-9a 06/30/2010 Page TRM / 3.3-10 10/31/2007 Pages TRM / 3.3-11 and TRM / 3.3-11a 06/30/2010 Page TRM /3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1998 Pages TRM / 3.3-15 and TRM / 3.3-16 01/07/2011 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 04/15/2009 Page TRM / 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM / 3.3-21d 03/27/2007 Page TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 Pages TRM / 3.3-26 and TRM / 3.3-27 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM / 3.4-12 04/17/2009 Page TRM / 3.4-13 03/31/2006 Page TRM / 3.4-14 07/15/2010 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Page TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 01/21/2000 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7-13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM /3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 and TRM / 3.7-26 08/02/1999 Page TRM / 3.7-27 10/31/2007 Page TRM / 3.7-28 11/29/2006 Page TRM / 3.7-29 01/13/2010 Page TRM / 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRM / 3.7-32 09/16/2010 Page TRM / 3.7-33 10/05/2002 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Page TRM / 3.7-40 02/14/2005 Page TRM / 3.7-40a 06/20/2008 Page TRM / 3.7-41 09/04/2008 Page TRM / 3.7-42 08/31/1998 Pages TRM / 3.7-43 through TRM / 3.7-45 10/05/2006 Page TRM / 3.7-46 06/07/2007 Page TRM / 3.7-47 11/29/2010 Page TRM / 3.7-48 06/07/2007 Page TRM / 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 Page TRM / 3.7-54 04/01/2009 Page TRM / 3.7-55 09/25/2009 Page TRM / 3.7-56 04/01/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 03/25/2010 Page TRM / 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Page TRM / 3.8-28 05/28/2009 Page TRM / 3.8-29 10/20/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM / 3.10-5 and TRM / 3.10-6 03/27/2007 Page TRM / 3.10-7 06/10/2010 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998

'Page TRM /3.11-13 04/12/2007 Page TRM /3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 03/27/2007 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Pages TRM / B 3.3-2 and TRM / B-3.3-2a 10/31/2007 Pages TRM / B 3.3-3 and TRM / B 3.3-3a 10/31/2007 Page TRM / B 3.3-4 06/30/2010 Page TRM / B 3.3-5 05/30/2006 Page TRM / B 3.3-6 06/30/2010 Page TRM / B 3.3-7 10/31/2007 Page TRM / B 3.3-8 06/30/2010 Page TRM / B 3.3-9 10/31/2007 Pages TRM / B 3.3-10 through TRM / B 3.3-13 01/07/2011 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 through TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 03/27/2007 Pages TRM / B 3.3-19a and TRM / B 3.3-19b 03/27/2007 Page TRM / B 3.3-19c 04/17/2009 Pages TRM / B 3.3-19d and TRM / B 3.3-19e 03/27/2007 Pages TRM / B 3.3-20 and TRM / B 3.3-21 08/03/2010 Page TRM / B 3.3-22 10/22/2003 Page TRM / B 3.3-23 05/16/2003 Pages TRM / B 3.3-24 and TRM / B 3.3-25 04/07/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Page TRM / B 3.4-7 07/15/2010 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 and TRM / B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/29/2007 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM / B 3.7-3 06/10/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Pages TRM / B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Pages TRM / B 3.7-1 Oa through TRM / B 3.7-1 Ia 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Pages TRM / B 3.7-14a and TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 02/14/2005 Page TRM / B 3.7-21a 06/20/2008 Pages TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Pages TRM / B 3.7-24 through TRM / B 3.7-29 10/05/2006 TRM / LOES-7 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 2 2 TRM / LOES-7 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.7-30 06/07/2007 Pages TRM / B 3.7-30a and TRM / B 3.7-30b 10/05/2006 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 and TRM / B 3.7-37 04/01/2009 Page TRM / B 3.7-38 09/25/2009 Page TRM / B 3.7-39 04/01/2009 Page TRM / B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-20 11/29/2006 Pages TRM / B 3.8-21 through TRM / B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/27/2007 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 TRM / LOES-8 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 2 2 TRM / LOES-8 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 66 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Page TRM / B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 06/30/2010 Pages TRM / B 3.11-31 and TRM / B 3.11-32 08/31/1998 Page TRM / B 3.11-33 06/30/2010 Pages TRM / B 3.11-34 and TRM / B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Page TRM / B 3.12-2 11/29/2010 Page TRM / B 3.12-3 02/05/1999 TRM2 text LOES.doc 1/1212011 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 01/07/2011

Instrument Trip Setpoint Program PPL Rev. 10 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements. Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.

Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.

Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.

Reference NDAP-QA-1104 Setpoint Change Control SUSQUEHANNA - UNIT 2 TRM / 2.0-5 EFFECTIVE DATE 04/02/1999

Instrument Trip Setpoint Program PPL Rev. 10 2.2 TABLE 2.2-1 (Page 1 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT 2.2.1 Reactor Protection 2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux - < 120/125 divisions of full scale High 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron Flux - _ 18% of RATED THERMAL POWER High (Setdown) 2.2.1.3 3.3.1.1 Average Power Range Monitor, Simulated 0.55 W + 58.7%

Thermal Power - High Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Simulated 0.55 (W- AW) + 5 8 .7 %(b)

Thermal Power - High Single Loop Operation 2.2.1.5 3.3.1.1 Average Power Range Monitor, Simulated < 113.5% of RATED THERMAL Thermal Power - High Flow Clamp POWER 2.2.1.6 3.3.1.1 Average Power Range Monitor, Neutron Flux-

  • 118% of RATED THERMAL High POWER 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure- High

See Figure 2.2-1.

(b)For single loop operation, the value of AW = 8.7.

SUSQUEHANNA - UNIT 2 TRM / 2.0-6 EFFECTIVE DATE 04/15/2009

Instrument Trip Setpoint Program PPL Rev. 10 2.2 TABLE 2.2-1 (Page 2 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT 2.2.1.16 OPRM Instrumentation 2.2.1.16.1 3.3.1.1 Sp PBA Amplitude Trip See COLR - TRO 3.2 2.2.1.16.2 3.3.1.1 Np PBA Successive Confirmation Count Trip See COLR - TRO 3.2 2.2.1.16.3 [3.3.9] TOL (E)Period Tolerance 0.10 sec 2.2.1.16.4 [3.3.9] fc Conditioning Filter Cutoff Frequency 1.50 Hz 2.2.1.16.5 [3.3.9] Tmin OscillationPeriod Lower Time Limit 1.00 sec 2.2.1.16.6 [3.3.9] Tmax Oscillation Period Upper Time Limit 3.50 sec 2.2.1.16.7 [3.3.9] LPRMmin Minimum LRPMs/Cell Required for 2 Cell Operability 2.2.1.16.8 [3.3.9] S1 Peak Threshold Setpoint/ABA & GRBA 1.20 2.2.1.16.9 [3.3.9] S2 Valley Threshold Setpoint/ABA & GRBA 0.85 2.2.1.16.10 [3.3.9] Smax Amplitude Trip SetpointlABA 1.50 2.2.1.16.11 [3.3.9] DR3 Growth Rate Factor Setpoint/GRBA 1.60 2.2.2 Isolation Actuation Instrumentation 2.2.2.1 Primary Containment Isolation 2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level 3 >13.0 inches(a) 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2 > -38.0 inches(a) 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low, > -129 inches(a)

Level 1 2.2.2.1.4 3.3.6.1 Drywell Pressure - High < 1.72 psig 2.2.2.1.5 3.3.6.1 SGTS Exhaust Radiation - High < 23.0 mR/hr 2.2.2.1.6 [3.3.6] Main Steam Line Radiation- High High < 15 x full power background without hydrogen injection (continued)

(a)See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-7 EFFECTIVE DATE 05/15/2008

Instrument Trip Setpoint Program PPL Rev. 10 2.2 TABLE 2.2-1 (Page 3 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.2.2 Secondary Containment Isolation 2.2.2.2.1 3.3.6.2 Reactor Vessel Water Level - Low Low, > -38.0 inches(a)

Level 2 2.2.2.2.2 3.3.6.2 Drywell Pressure - High < 1.72 psig 2.2.2.2.3 3.3.6.2 Refuel Floor High Exhaust Duct Radiation - < 18 mR/hr High 2.2.2.2.4 3.3.6.2 Railroad Access Shaft Exhaust Duct < 5 mR/hr Radiation - High 2.2.2.2.5 3.3.6.2 Refuel Floor Wall Exhaust Duct Radiation - < 21 mR/hr High 2.2.2.3 Main Steam Line Isolation 2.2.2.3.1 3.3.6.1 Reactor Vessel Water Level - Low Low Low, >-129 inches(a)

Level 1 2.2.2.3.2 3.3.6.1 Main Steam Line Pressure - Low > 861 psig 2.2.2.3.3 3.3.6.1 Main Steam Line Flow - High < 173 psid 2.2.2.3.4 3.3.6.1 Condenser Vacuum - Low > 9.0 inches Hg vacuum 2.2.2.3.5 3.3.6.1 Reactor Building Main Steam Line Tunnel _ 177°F Temperature - High 2.2.2.3.6 This Section Not Used 2.2.2.3.7 This section is not used.

2.2.2.3.8 [3.3.6] Turbine Building Main Steam Tunnel < 1971F Temperature - High 2.2.2.4 Reactor Water Cleanup System Isolation 2.2.2.4.1 3.3.6.1 Reactor Vessel Water Level - Low Low, > -38 inches (a)

Level 2 2.2.2.4.2 3.3.6.1 RWCU A Flow - High *59 gpm 2.2.2.4.3 3.3.6.1 RWCU Flow - High *462 gpm 2.2.2.4.4 3.3.6.1 RWCU Penetration Area Temperature - High *131 IF 2.2.2.4.5 This section is not used.

2.2.2.4.6 3.3.6.1 RWCU Pump Area Temperature - High *147*1F 2.2.2.4.7 This section is not used.

2.2.2.4.8 3.3.6.1 RWCU Heat Exchanger Area Temperature- *1471F High 2.2.2.4.9 This section is not used.

(continued)

(a)See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-8 EFFECTIVE DATE 01/07/2011

Instrument Trip Setpoint Program PPL Rev.10 2.2 TABLE 2.2-1 (Page 4 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.2.5 Reactor Core Isolation Cooling System Isolation 2.2.2.5.1 3.3.6.1 RCIC Steam Line A Pressure - High < 138 inches H2 0 2.2.2.5.2 3.3.6.1 RCIC Steam Supply Line Pressure - Low > 60 psig 2.2.2.5.3 3.3.6.1 RCIC Turbine Exhaust Diaphragm Pressure < 10.0 psig

- High 2.2.2.5.4 3.3.6.1 RCIC Equipment Room Temperature - High < 167 0F 2.2.2.5.5 3.3.6.1 RCIC Pipe Routing Area Temperature - High _<167OF 2.2.2.5.6 3.3.6.1 RCIC Emergency Area Cooler Temperature- _<167OF High 2.2.2.5.7 3.3.6.1 Drywell Pressure - High < 1.72 psig 2.2.2.5.8 This section is not used.

2.2.2.5.9 This section is not used.

2.2.2.6 High Pressure Coolant Injection System Isolation 2.2.2.6.1 3.3.6.1 HPC I Steam Line A Pressure - High < 370 inches H 2 0 2.2.2.6.2 3.3.6.1 HPC I Steam Supply Line Pressure - Low >_104 psig 2.2.2.6.3 3.3.6.1 HPC I Turbine Exhaust Diaphragm Pressure - _*10 psig Higl 2.2.2.6.4 3.3.6.1 HPC I Equipment Room Temperature - High < 167OF 2.2.2.6.5 3.3.6.1 HPC I Emergency Area Cooler Temperature - < 167oF High 2.2.2.6.6 3.3.6.1 HPC I Pipe Routing Area Temperature - High < 167*F 2.2.2.6.7 3.3.6.1 Dry\well Pressure - High < 1.72 psig 2,2.2.6.8 This section is not used.

2,2.2.6.9 This section is not used.

2,2.2.7 Shutdown Cooling/System Isolation 2,2.2.7.1 3.3.6.1 Rea ctor Vessel Water Level - Low, Level 3 > 13.0 inches(a) 2,2.2.7.2 3.3.6.1 Rea ctor Vessel Steam Dome Pressure --High < 98 psig 2,2.2.7.3 [3.3.6] RHFZ Flow -High <25,000 gpm 2,2.3 ECCS Actuation 2,2.3.1 Core Spray System 2,2.3.1.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, >-129 inches(a)

Level 1 2,2.3.1.2 3.3.5.1 Drywell Pressure -. High < 1.72 psig 2,2.3.1.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low _413, *427 psig injection permissive (continued)

(3)See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-9 EFFECTIVE DATE 01/07/2011

Instrument Trip Setpoint Program PPL Rev. 10 2.2 TABLE 2.2-1 (Page 5 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.3.2 LPCI Mode of RHR System 2.2.3.2.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, > -129 inches(a)

Level 1 2.2.3.2.2 3.3.5.1 Drywell Pressure - High < 1.72 psig 2.2.3.2.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - _ 413, < 427 psig Low, injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure - _>236 psig, decreasing Low, Recirculation Discharge Valve permissive 2.2.3.3 HPCI System 2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low, > -38 inches(a)

Level 2 2.2.3.3.2 3.3.5.1 Drywell Pressure - High < 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level - Low > 40.5 inches above tank bottom 2.2.3.3.4 3.3.5.1 Reactor Vessel Water Level - High, Level 8 < 54 inches 2.2.3.4 Automatic Depressurization System (ADS) 2.2.3.4.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, > -129 inches Level 1 2.2.3.4.2 3.3.5.1 Drywell Pressure - High < 1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer <102 seconds 2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure - High _>135, < 155 psig 2.2.3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump _>121, *129 psig Discharge Pressure - High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 > 13 inches Confirmatory 2.2.3.4.7 3.3.5.1 ADS Drywell Pressure Bypass Timer < 420 seconds 2.2.3.5 Loss of Power - ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)

2.2.3.5.1.1 3.3.8.1 Bus Undervoltage 2 823.2, *856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay >_0.4, < 0.6 seconds (continued)

(a) See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-10 EFFECTIVE DATE 02/02/2010

Instrument Trip Setpoint Program PPL Rev. 10 2.2 TABLE 2.2-1 (Page 6 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.3.5.2 4.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)

2.2.3.5.2.1 3.3.8.1 Bus Undervoltage Ž2641.1, < 2748.9 Volts 2.2.3.5.2.2 3.3.8.1 Time delay >_2.7, < 3.3 seconds 2.2.3.5.3 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)

2.2.3.5.3.1 3.3.8.1 Bus Undervoltage >3829.3, < 3906.7 Volts 2.2.3.5.3.2 3.3.8.1 Time Delay (Non-LOCA) > 4 minute, 30 seconds

< 5 minute, 30 seconds 2.2.3.5.3.4 3.3.8.1 Time Delay (LOCA) > 9, _<11 seconds 2.2.3.5.4 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 65%)

2.2.3.5.4.1 [3.8.5] 480V Basis Ž308.9, < 315.1 Volts 2.2.3.5.4.2 [3.8.5] Time Delay a 4.5, < 5.5 seconds 2.2.3.5.5 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 92%)

2.2.3.5.5.1 [3.8.5] 480V Basis _ 437.6, < 446.4 Volts 2.2.3.5.5.2 [3.8.5] Time Delay > 9, < 11 seconds 2.2.4 ATWS Alternate Rod Injection and Recirculation Pump Trip 2.2.4.1 3.3.4.2i[3.1.1] Reactor Vessel, Water Level - Low Low, > -38 inches(a)

Level 2 2.2.4.1 3.3.4.2J[3. 1.1] Reactor Vessel Steam Dome Pressure - High < 1135 psig 2.2.5 End of Cycle Recirculation Pump Trip 2.2.5.1 3.3.4.1 Turbine Stop Valve-Closure < 5.5% closed 2.2.5.2 3.3.4.1 Turbine Control Valve - Fast Closure > 500 psig 2.2.6 Reactor Core Isolation Cooling System Actuation 2.2.6.1 3.3.5.2 Reactor Vessel Water Level - Low Low, >-38 inches(a)

Level 2 2.2.6.2 3.3.5.2 Reactor Vessel Water Level - High, Level 8 < 54 inches(a) 2.2.6.3 3.3.5.2 Condensate Storage Tank Level - Low > 36.0 inches above tank bottom (continued)

(a)See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM /2.0-11 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Program PPL Rev. 10 2.2 TABLE 2.2-1 (Page 7 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.7 Control Rod Block 2.2.7.1 Rod Block Monitor 2.2.7.1.1 3.3.2 Low Power Range - Upscale See COLR - TRO 3.2 3.3.2 Intermediate Power Range - Upscale See COLR - TRO 3.2 3.3.2 High Power Range - Upscale See COLR - TRO 3.2 2.2.7.1.2 3.3.2 Low Power Range Setpoint See COLR - TRO 3.2 3.3.2 Intermediate Power Range Setpoint See COLR - TRO 3.2 3.3.2 High Power Range Setpoint See COLR - TRO 3.2 2.2.7.2 APRM 2.2.7.2.1 [3.1.3] Simulated Thermal Power-High - Two Loop 0.55 W + 54.2%

Operation 2.2.7.2.2 [3.1.3] Simulated Thermal Power-High - Single 0.55 (W - AW) + 54.2%(c) .

Loop Operation 2.2.7.2.3 [3.1.3] Simulated Thermal Power-High Clamp < 108% of RATED THERMAL POWER 2.2.7.2.4 [3.1.3] Downscale > 5% of RATED THERMAL POWER 2.2.7.2.5 [3.1.3] Neutron Flux - High (Setdown) < 12% of RATED THERMAL POWER 2.2.7.3 Source Range Monitors 2.2.7.3.1 [3.1.3] Upscale _ 2E5 cps 2.2.7.3.2 [3.1.3] Downscale > 3.0 cps(b) 2.2.7.4 Intermediate Range Monitors 2.2.7.4.1 [3.1.3] Upscale < 108/125 divisions of full scale 2.2.7.4.2 [3.1.3] Downscale >5/125 divisions of full scale 2.2.7.5 Scram Discharge Volume 2.2.7.5.1 [3.1.3] Water Level - High < 35.9 gallons 2.2.7.6 Reactor Coolant System Recirculation Flow 2.2.7.6.1 [3.1.3] Upscale 114%

(continued)

(b)With a signal-to-noise ratio >_2, or within the limits of Figure 2.2-2.

(c)For single loop operation, the valve of AW = 8.7.

SUSQUEHANNA - UNIT 2 TRM / 2.0-12 EFFECTIVE DATE 04/15/2009

Instrument Trip Setpoint Program PPL Rev. 10 2.2 TABLE 2.2-1 (Page 8 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO] TRIP FUNCTION TRIP SETPOINT 2.2.8 CREOASS 2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake _5 mR/hr Radiation Monitor 2.2.8.1.1 3.3.7.1 Reactor Vessel Water Level - Low Low, > -38.0 inches(a)

Level 2 2.2.8.1.2 3.3.7.1 Drywell Pressure - High _ 1.72 psig 2.2.8.1.3 3.3.7.1 Refuel Floor High Exhaust Duct Radiation - < 18 mR/hr High 2.2.8.1.4 3.3.7.1 Railroad Access Shaft Exhaust Duct <5 mR/hr Radiation - High 2.2.8.1.5 3.3.7.1 Refuel Floor Wall Exhaust Duct Radiation - *21 mR/hr High 2.2.9 Feedwater/Main Turbine Trip System Actuation 2.2.9.1 3.3.2.2 Reactor Vessel Level - High <54.0 inches(a) 2.2.10 MVP Isolation 2.2.10.1 [3.3.11] Main Steam Line Radiation- High High < 15 x full power background without hydrogen injection (a)See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-13 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Table PPL Rev. 10 2.2 FIGURE 2. 2-1 REACTOR VESSEL WATER LEVEL SUSQUEHANNA - UNIT 2 TRM / 2.0-14 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Table PPL Rev. 10 2.2 Instrument Trip Setpoint Table 2.2 3

2.8 2.6 2.4 2.2 2

C,) 1.8 0

Lii 1.6 1.4 -Acceptable z 1.2 D

0 1

0.8 0.6 1'IE Not Acceptable 0.4 0.2 0

2 6 10 14 18 22 26 30 Signal-to-Noise Ratio Figure 2.2-2 Minimum SRM Trip Setpoint Versus Signal-to-Noise Ratio SUSQUEHANNA - UNIT 2 TRM / 2.0-15 EFFECTIVE DATE 11/15/2005

TRM Isolation Actuation Instrumentation PPL Rev. 3 3.3.6 3.3 Instrumentation 3.3.6 TRM Isolation Actuation Instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.

APPLICABILITY: As specified in Table 3.3.6-1 ACTIONS

-NOTES.

1. Penetration flow paths isolated to comply with Action C may be unisolated intermittently under administrative controls.
2. Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in trip. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable Function 2.a AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Function 2.a B. One or more Functions with B.1 Restore isolation capability. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.

C. Required Action and C.1 Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion compensatory measures for Time of Condition A or B the degraded condition.

not met.

SUSQUEHANNA - UNIT 2 TRM / 3.3-13 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation PPL Rev. 3 3.3.6 TECHNICAL REQUIREMENT SURVEILLANCE


NOTES------------------------------

1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.

SURVEILLANCE FREQUENCY TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.6.5 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months TRS 3.3.6.6 Perform RESPONSE TIME TEST 24 months on a staggered test basis SUSQUEHANNA - UNIT 2 TRM / 3.3-14 EFFECTIVE DATE 12/14/1998

TRM Isolation Actuation Instrumentation PPL Rev. 3 3.3.6 TABLE 3.3.6-1 (Page 1 of 2)

PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS ALLOWABLE VALUE

". Main Steam Line Isolation

a. Turbine Building 1,2,3 2 TRS 3.3.6.2 _ 200OF Main Steam Line TRS 3.3.6.3 Tunnel Temperature -TRS 3.3.6.5

- High

2. Primary Containment Isolation
a. Main Steam Line 1,2,3 2 TRS 3.3.6.1 < 21 x full power Radiation - High TRS 3.3.6.2 background without High TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6(a)
3. Shutdown Cooling System Isolation (b)
a. RHRFlow-High 3,4,5 1 TRS 3.3.6.1 <26,000 gpm TRS 3.3.6.2 TRS 3.3.6.4 TRS 3.3.6.5 (a) Radiation detectors are exempt from response time testing.

(b) Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.

SUSQUEHANNA - UNIT 2 TRM / 3.3-15 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation PPL Rev. 3 3.3.6 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 TRM / 3.3-16 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation PPL Rev. 4 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES TRO The TRM Actuation instrumentation automatically initiates closure of appropriate primary containment isolation valves (PCIVs). The function of the PCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs)

(Reference 1). The TRM Isolation Actuation Instrument has been relocated from the Technical Specifications because the identified Function is not credited in the plant design basis to mitigate any plant event, but does provide a diverse means to initiate an Isolation Actuation.

The isolation instrumentation includes the sensors, relays, and instruments that are necessary to cause initiation of primary containment and Reactor Coolant Pressure Boundary (RCPB) isolation. When the setpoint is reached, the sensor actuates, which then outputs an isolation signal to the isolation logic. Monitoring a wide range of independent parameters provides functional diversity. The input parameters to the isolation logic are:

(a) Main steam line radiation, (b) Turbine Building Main Steam Line Tunnel Temperature - High, and (c) RHR Flow - High.

The valves associated with these trip channels are identified in Table B 3.3.6-1.

Each of these valves is also associated with other trip channels as identified in LCO Bases B 3.6.1.3.

The trips occur after a one second delay. See Tech Spec Basis B 3.3.6-1.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.3-10 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation PPL Rev. 4 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES (continued)

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. The ACTIONS are modified by two Notes. Note 1 allows penetration flow path(s) to be unisolated intermittently under administrative controls. These controls consist of stationing a dedicated operator at the controls of the valve, who is in continuous communication with the control room. In this way, the penetration can be rapidly isolated when a need for primary containment isolation is indicated. Note 2 is provided to modify the ACTIONS.

Condition C applies if the channel is not restored to OPERABLE status or placed in trip, or isolation capability is not restored, within the allowed Completion Time. If inoperable channels should not be placed in trip (e.g., might result in a undesirable transient) Action C may be intentionally entered as a result of not meeting Required Action A.1 in its required Completion Time. Required Action C.1 requires appropriate compensatory measures be in place within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Examples of appropriate compensatory measures may consist of verifying that diverse isolation functions remain OPERABLE. Furthermore, isolating the penetration (e.g., as may be required by TS Actions for an inoperability affecting both the TRM Function and a required TS Function) also provides adequate compensatory actions since isolating the affected penetration flow path(s) accomplishes the safety function of the inoperable channels. If it is not desired to isolate the affected penetration flow path(s) (e.g., as in the case where isolating the penetration flow path(s) could result in a reactor scram or disabling RHR-SDC), alternate compensatory measures should be pursued. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is acceptable due to the fact that these Functions are not assumed in any accident or transient analysis in the FSAR.

TRS The TRSs are defined to be performed at the specified Frequency to ensure that the TRM Isolation Actuation Instrumentation Functions are maintained OPERABLE. TRM Isolation Actuation Instrumentation Surveillances are performed consistent with the Bases for LCO 3.3.6.1 "Isolation Activation Instrumentation."

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.3-11 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation PPL Rev. 4 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES (continued)

TRS 3.3.6.5 The LOGIC SYSTEM FUNCTIONAL TEST demonstrates the OPERABILITY of the required isolation logic for a specific channel. The system functional testing performed on PCIVs in LCO 3.6.1.3 overlaps this surveillance to provide complete testing of the assumed safety function. The 24 month Frequency is based on the need to perform portions of this surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the surveillance when performed at the 24 month Frequency.

TRS 3.3.6.6 The response time testing of Function 2.a is per FSAR Table 7.3-29.

REFERENCES 1. FSAR Section 7.3.1

2. NRC Inspection and Enforcement Manual, Part 9900: Technical Guidance, Standard Technical Specification Section 1.0 Definitions, Issue dated 12/8/96.

SUSQUEHANNA - UNIT 2 TRM / B 3.3-12 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation PPL Rev. 4 B 3.3.6 Table B 3.3.6-1 Primary Containment Isolation Valves (Page 1 of 1)

Plant systems Valve Number Valve Description Isolation Signal Function No.

(Table 3.3.6-1)

Nuclear Boiler HV-241 F022A MSIV l.a HV-241F022B MSIV. l.a HV-241 F022C MSIV l.a HV-241F022D MSIV 1.a HV-241 F028A MSIV 1.a HV-241 F028B MSIV 1.a HV-241 F028C MSIV 1.a HV-241F028D MSIV 1.a HV-241F016 MSL Drain Isolation Valve 1.a HV-241 F01 9 MSL Drain Isolation Valve 1.a Reactor HV-243F01 9 Reactor Coolant Sample Valve 2.a Recirculation HV-243F020 Reactor Coolant Sample Valve 2.a RHR HV-251 F022 RHR - Reactor Vessel Head Spray Valve 3.a HV-251 F023 RHR - Reactor Vessel Head Spray Valve 3.a HV-251 F008 RHR - Shutdown Cooling Valve 3.a HV-251F009 RHR - Shutdown Cooling Valve 3.a SUSQUEHANNA - UNIT 2 TRM / B 3.3-13 EFFECTIVE DATE 01/07/2011