ML17093A668
| ML17093A668 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/27/2017 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17093A668 (87) | |
Text
{{#Wiki_filter:MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2017-3391 USER INFORMATION: GERLACH*ROSEY M Address: NUCSA2 Phone#: 542-3194 EMPL#: 028401 CA#: 0363 TRANSMITTAL INFORMATION: TO: GERLACH*ROSEY M 03/27/2017 LOi:ATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2) ~'I Page 1 THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS. r'.rENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no x: will be issued with the updated material. TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 03/21/2017 ADD MANUAL TABLE OF CONTENTS DATE: 03/26/2017 CA~rEGORY: DOCUMENTS TYPE : TRM2 ID: TEXT 3.2.1 REMOVE: REV: 12 ADD: REV: 13 of 2
CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES ADD: REV: 93 REMOVE: REV: 92 <.I I Page 2 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX. of 2
. ~ SSES MAmJAL Manual Name : TRM2 lanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 03/26/2017 Procedure Name Rev Issue Date Change ID Change Number TEXT LOEB 93 03/26/2017
Title:
LIST OF EFFECTIVE SECTIONS //,,.,---..._ \\ ""'(, ) \\ 25 05/10/2016 TEXT TOC
Title:
TABLE OF CONTENTS /) <" ) /' / /"> '..,.,,/ TEXT 1.1 0 11/19/2002
Title:
USE AND APPLICATION DEFINITIONS <"'-,/, /"-.... v' ' \\.,/,// /" / TEXT 2.1 ,....** / "" *... / > I I ',,j/ 02 04 2005 / 1 '**./
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS"-...,/;- /--.._,.., '/ /' I,.- '* '" °"**, TEXT 2.2 11 { ( \\ './ 01/31/201,4 \\ ) ,/*-., \\ '-J /
Title:
PLANT PROGRAMS AND SETPOINTS I.NS'FRUMENT_T*RIP SETPOINT TABLE / ( ,l
- l._.
..,..,.'-.......? //*. (_ / TEXT 3.0 6./ '" 03/'0,5{2015 { /'- "
- ,/
Title:
APPLICABILITY TECHNIClµ'.i<REQTJJRE,MENT FOR OPERATION (TRO) APPLICABILITY './ ,.,r----_:~..,,
- ........... v-._j11;09;2001 TEXT 3.1.1
Title:
REACTIVITY CONTROL S¥STEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD J. I \\ '* / INJECTION (ATWStARI~ INSTRUMENTATION ..---. \\ \\-...__) ) TEXT 3.1. 2 / r*v'> '-...... __ _.,/ 0 11/19/2002 I I -~
Title:
REACTIVITY\\CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT \\ I '-.....__...* I TEXT 3.1.3 4 05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1. 4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 13 03/26/2017
Title:
CORE OPERATING LIMITS REPORT (COLR) Page 1:. of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2
- ~~anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 10 10/17/2016
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK \\'EXT 3.3.6 4 04/29/2014
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1 03/05/2015
Title:
WATER MONITORING INSTRUMENTATION Page~ of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2 ~anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) TEXT 3.4.4 2 05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS rnxT 3.4. 6 1 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.l 1 02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Pagel of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2 ~anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0 11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT*3.7.1 0 11/19/2002
Title:
- PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 5 02/16/2017
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS ~EXT 3.7.3.3 4 05/16/2016
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 11 09/27/2012
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Page! of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2 ~anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.l 1 03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION rnxT 3.7.8 9 03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2 04/29/2014
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS) TEXT 3.7.11 1 10/02/2009
Title:
PLANT SYSTEMS TEXT 3.8.1 3 06/20/2012
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION - CONTINUOUS TEXT 3.8.2.2 2 12/14/2004 Page.?_
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION - AUTOMATIC of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2 ~~anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3 2 06/20/2012
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2 .12/14/2006
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2 10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002 I
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) TEXT 3.11.1.l 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page _§_ of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2 danual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.l.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3. 11. 1. 4 2 10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3. 11. 1. 5 3 03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE rEXT 3. 11. 2. 2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES \\ TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3. 11. 2. 4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 7 10/17/2016
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 4 03/05/2015
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM Page]_ of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2
- ~anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3. 11. 4. 3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.l 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS ri:'EXT 4.1 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING Page.§. of 15 Report Date: 03/27/17 I
SSES MANUAL Manual Name: TRM2 ~anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 6 03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.l.l 2 04/29/2014
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.l.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.l.3 3 04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.l.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE rEXT B3.2.1 0 11/19/2002 a
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR) TEXT B3.3.l 1 01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 6 10/17/2016
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 5 01/31/2014
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page~ of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2 £;,~anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2
- ~--:=:**
TEXT B3.3.7 2 11/10/2015
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3 05/14/2009
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3 02/22/2012
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.ll 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION '"rEXT B3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.l 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.4.6 1 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Page lQ of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2 ~anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.l 0 11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION rnxT B3. 6. 3 1 04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM I~STRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.l 4 02/16/2017
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS Page 11 of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2 '1anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4 2 04/29/2014
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION ':'EXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 4 01/31/2014
Title:
PLANT SYSTEMS BASES SNUBBERS Page 12 of 15 Report Date: 03/27/17
SSES MANUAL Manual Name : TRM2 ranual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2 12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.l 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.l 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION - CONTINUOUS ~EXT B3. 8. 2. 2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION - AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3 06/20/2012
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.l 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page 1l_ of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2 ~anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) 1'EXT B3.ll.l.l 1 05/10/2016
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3. 11. 1. 2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ll.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1. 4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.ll.l.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.ll.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.ll.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES Page 14 of 15 Report Date: 03/27/17
SSES MANUAL Manual Name: TRM2 1anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.ll.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.ll.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5 07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11. 2. 6 2 09/08/2016
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11. 3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE rnxT B3.11. 4.1 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.ll.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.l 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15 of 15 Report Date: 03/27/17
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 93 . LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section .Title Effective Date TOG TABLE OF CONTENTS 04/28/2016 1.0 USE AND APPLICATION 1.1 Definitions 10/04/2002 2.0 PLANT PROGRAMS 2.1 Plant Programs 06/25/2002. 2.2 Instrument Trip Setpoint Table 01/21/2014 3.0 APPLICABILITY 3.0 Technical Requirement for Operation (TRO) Applicability 02/19/2015 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 Anticipated Transient Without Scram Alternate Rod Injection 10/31/2007 (ATWS-ARI) Instrumentation 3.1.2 Control Rod Drive (CRD) Housing Support - 08/31 /1998 3.1.3 Control Rod Block Instrumentation 04/15/2009 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve 02/ 18/1.999 3.2 CORE OPERA TING LIMITS REPORT 3.2.1 Core Operating Lim,its Report 03/16/2017 3.3 INSTRUMENTATION 3.3.1 Radiation Monitoring Instrumentation
- 07/16/1999 3.3.2 Seismic Monitoring Instrumentation 03/10/2011 3.3.3 Meteorological Monitoring Instrumentation 10/31/2007 3.3.4 TRM Post-Accident Monitoring Instrumentation 10/31/2007.
3.3.5 Section Not Used
- 10/31/2007 3.3,6 TRM Isolation Actuation. Instrumentation 04/11/2014 3.3.7 Main Turbine Overspeed Protection System 11/04/2015 3.3.8 Section Not Used 10/22/2003 3.3.9 OPRM Instrumentation Configuration 03/27/2007 3.3.10 Reactor Recirculation Pump MG Set Stops 12/03/2004 3.3.11 MVP Isolation Instrumentation 10/2212003 3.3.12 Water Monitoring Instrumentation*
02/19/2015 3.4 REACTOR COOLANT SYSTEM 3.4.1 Reactor Coolant System Chemistry 03/31/2006 3.4.2 Not Used 04/02/2009 3.4.3 High/Low Pressure Interface Leakage Monitors 10/31/2007 3.4.4 Reactor Recirculation* Flow and Rod Line Limit 04/1-7/2009 3.4.5 Reactor Vessel Materials 03/31/2006 3.4.6" Reactor Recirculat~on Single Loop Operation (SLO) Flow Rate Restriction 04/24/2013 SUSQUEHANNA - UNIT 2 TRM I LOES-1 EFFECTIVE DATE 03/16/2017 _
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 93 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date 3.5 EMERGENCY CORE co:ouNG AND RC!C 3.5.1 ADS Manual Inhibit 01/28/2005 3.5.2 ECCS and RCIC System Monitoring Instrumentation 10/31/2007 3.5.3 Long Term Nitrogen Supply to ADS 08/31/1998 3.6 CONTAINMENT 3.6.1 Venting or Purging 08/31/1998 3.6.2 Suppression Chamber-to-Orywell Vacuum Breaker Position Indication 04/16/2014 3.6.3 Suppr.ession Pool Alarm Instrumentation 01/07/2002 3.6.4 Primary Containment Closed System Boundaries 12/31/2002 3.7 PLANT SYSTEMS 3.7.1 Emergency Service Water System (ESW) Shutdown 07/29/1999 3.7.2 Ultimate Heat Sink (UHS) and Ground Water Level. 08/31/1-998 3.7.3.1 Fire Suppression Water Supply System 01/26/2017 3.7.3.2 Spray and Sprinkler Systems 04/07/2009 3.7.3.3 C02 Systems. 05/09/2016 3.7.3.4 Halon Systems 08/02/1999 3.7.3.5 Fire Hose Station 08/02/1999 3.7.3.6 Yard Fire Hydrants and Hydrant Hose t-Jouses 08/02/1999. . 3.7.3.7 Fire Rated Assemblies 03/31/2006. 3.7.3.8 Fire.Detection Instrumentation 09/25/2012 3.7.4 Solid Radwaste System 03/31/2006 3.7.5.1 Main Condenser Offgas Hydrogen Monitor 02/19/2015 '3.7.5.2 Main Condenser Offgas Explosive Gas Mixture - 08/31/1998 3.7'.5.3 Liquid Holdup Tanks 03/31/2006 3.7.6 ESSW Pumphouse Ventilation 05/24/201~ 3.7.7 -Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation 09/04/2008 3.7.8 Snubbers _ 02/19/2015 3.7.9 Control Structure HVAC 08/16/2006. 3.7.10 Spent Fuel Storage Pools (SFSPs) 12/03/2004 3-.7.11 Structural Integrity 09/25/2009 SUSQUEHANNA - UNIT 2 TRM/ LOES~2 EFFECTIVE DATE 03/16/2017
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 93 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date 3.8 ELECTRICAL POWER 3.8.1 Primary Containment Penetration Conductor Overcurrent 06/12/2012 Protective Devices 3.8.2.1 . Motor Operated Valves (MOV) Thermal Overload Protection - Continuous 10/31/2007 3.8.2.2 Motor Operated Valves (MOV) Thermal Overload Protection - Automatic 12/03/2004 3.8.3 Diesel Generator (DG) Maintenance Activities 06/12/2012 3.8.4 24 VDC Electrical Pow~r Subsystem 01/28/2005 3.8.5 Degraded Voltage Protection 11/07/2013 3.8.6 Emergency Switchgear Room Cooling 06/11/2012 3;8.7 Battery Monitoring and Maintenance Program 10/20/2009 3.9 REFUELING OPERATIONS 3.9.1 Decay Time 08/31/1998 3.9.2 Communications 08/31/1998 3.9.3 Refueling Platform 08/31/19.98 3.10 MISCELLANEOUS 3.10.1 Sealed Source -Contamination 03/31/2006 3.10.2 Shutdown Margin Test RPS Instrumentation 0312712007 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) 06/10/2010 3.11 RADIOACTIVE EFFLUENTS 3.11.1.1 Liquid Effluents Concentration 03/31/2006 3.11.1.2 Liquid Effluents Dose 03/31/2006 3.11.1.3 Liquid Waste Treatment System 03/31/2006 3.11.1.4 Liquid Radwaste Effluent Monitoring lnstru.mentation 10/09/2012 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation 02/19/2015 3.11.2.1 Radioactive Effluents Dose Rate 03/21/2006 3.11.2.2 Dose - Noble Gases 03/31/2006 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form 03/31/2006 3.11.2.4 Gaseous Radwaste Treatment System 04/02/2002 3.11.2.5 Ventilation Exhaust Treatment System 06/18.2013 3.11.2.6 Radioactive Gaseous-Effluent Monitoring Instrumentation 10/06/2016 3.11.3 Total Dose 03/31/2006 3.11.4.1 Monitoring Program 02/19/2015 3.11.4.2 Land Use Census 03/31/2006 3.11.4.3 lnterlaboratory Comparison Program 03/31/2006 SUSQUEHANNA - UNIT 2 TRM/LOES-3 EFFECTIVE DATE 03/16/2017
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 93 LIST OF EFFECT/VE.SECTIONS {TECHNICAL REQUIREMENTS MANUAL) Section 3.12 3.12.1 3.12.2 3.12.3 4.0 4.1 4.2 4.3 4.4 4.5 --*i[5.'1 4.5.2 4.5.3 4.6 4.7 Title - LOADS CONTROL PROGRAM Crane Travel - Spent Fuel Storage Pool Heavy Loads Requirements Light Loads Requirements ADMINISTRATIVE CONTROLS _Organization Controls Organization Reportable Event Action Safety Limit Vi9lation Procedures and Programs Reporting Requirements Startup Reports Annual 13.eports Speci~I Reports Radiation Protection Program Training SUSQUEHANNA - UNIT 2 TRM I LOES-4 Effective Date 02/05/1999 03/14/2008 02/05/1999 08/31/1998 08/31/1998 08/31/1997 12/11/2008 08/31/1998 08/31/1998 08/31/1998 08/31/1998 08/31/1998 08/31/1998 EFFECTIVE DATE 03/16/2017
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 93 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date B 3,0 APPLICABILITY BASES B 3."0 Technical Requirement Surveillance (TRS) 02/09/2015 83.1 REACTIVITY CONTROL SYSTEMS BASES B 3.f.1 Anticipated Transient Without Scram Alternate Rod.Injection (ATWS-ARI) I nstrum<?ntation 04/16/2014 B 3.1.2 Control Rod Drive (CRD) Housing Support 08/31/1998 B 3.1.3 Control Rod Bio.ck Instrumentation 03/27/2007 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve ' 02/18/1999 83.2 CORE OPERATING LIMITS BASES B 3.2.1 Core Operating Limits Report (COLR) 08/31/1999 B 3.3 INSTRUMENT BASES B 3.3.1 Radiation Monitoring Instrumentation 01/21/2014 B 3.3.2 Seismic Monitoring Instrumentation 03/10/2011 B 3.3.3 Meteorological Monitoring. Instrumentation 10/31/2007 B 3.3.4 TRM Post-Accident Monitoring Instrumentation 10/06/2016 B 3.3.5 Section Not Used 10/31/2007 B 3.3.6 TRM Isolation Actu.ation Instrumentation 02/21/2014 B 3.3.7 Turbine Overspeed Protection System 11/04/2015 B 3.3.8 Section Not Used 10/.22/2003 B 3.3.9 OPRM Instrumentation 04/17/2009 B 3.3.10 Reactor Recirculation Pump MG Set Stops 02/16/2012 B 3.3.11 MVP Isolation Instrumentation 10/22/2003 B 3.3.12 Water Monitoring Instrumentation 04/07/2009 8 3.4. REACTOR COOLANT SYSTEM BASES B 3.4.1 Reactor Coolant System Chemistry 08/31/1998 B 3.4.2 Not Used 04/01/2009 B 3.4.3 High/Low Pressure Interface Leakage Monitor 10/31/2007 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit 10/15/1999 B 3.4.5 Reactor Vessel Materials 08/31/1999 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction 04/25/2013 B 3.5 ECCS AND RCIC BASES 8 3.5.1 ADS Manual Inhibit 08/31/1998
- B 3.5.2
- ECCS and RCIC System Monitoring Instrumentation 10/31/2007 83.5.3 Long Term Nitrogen Supply to ADS 10/31/2007 SUSQUEHANNA - UNIT 2 TRM/ LOES-5 EFFECTIVE DATE 03/16/2017
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 93 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section B 3.6 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.7 B 3.7.1 13 3.7.2 B 3.7.3.1 B 3.7.3.2 B 3.7.3.3 B 3.7.3.4 B 3.7.3.5 B 3.7.3.6 B 3.7.3.7 B 3.7.3.8 B 3.7.4 B 3.7.5.1 B 3.7.5.2 B 3.7.5.3 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7,.10 B 3.7.11 B 3.8 B 3.8.1 B 3.8.2.1 B 3.8.2.2 B 3.8.3 8'3.8.4 B 3.8.5 B 3.8.6 B 3.8.7 CONTAINMENT BASES Venting or-Purging Supp.ression Chamber-to-Drywell Vacuum Breaker Position Indication* Suppression Poof. Alarm Instrumentation Primai-Y Col)tainment Closed System Boundaries PLANT SYSTEMS BASES Emergency Service Water System (Shutdown) Ultimate Heat Sink (UHS)"Ground Water Level Fire Suppression Water Supply System Spray and Sprinkler Systems C02 Systems . Halon Systems Fire Hose Stations Yard Fire Hydrants and Hydrant Hose Houses Fire Rated Assemblies Fire Detection Instrumentation Solid Radwaste System Main Condenser Offgas Hydrogen Monitor
- Main Condenser Offgas Explosive Gas Mixture Liquid Holdup Tanks ESSW Pumphouse Ventilation Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation Snubbers Control Structure HVAC Spent Fuel Storage Pools Structural Integrity ELECTRICAL POWER BASES Primary Containment Penetration Conductor Overcurrent Protective Devices Motor Operated Valves (MOV) Thermal Overload Protection -
Continuous Motor Operated Valves (MOV) Thermal Overload Protection - Automatic Diesel Generator (DG) Maintenance Activities . 24 VDC Electrica[ Power Subsystem Degraded Voltage Protection Emerg~ncy Switchgear Room Cooling Battery Monitoring and Maintenance Program Effective Date 07/26/2011 08/31/19.98 04/04/2007 1.2/03/2004 08/31/1998 08/31/1998 . 01/26/2017 03/31/2006 08/02/1999 04/11/2014 03/31/2006 08/02/1999 . 09/25/2012 09/25/2012 02/01/1999 08/31/1998 08/31/1998 08/31/1998 '"os12912013 01/30/2008 01/21/2014 11/30/2011 12/03/2004 04/08/2010 03/10/2010 04/02/2002 09/03/2004 08/31/1998 0410212002 11/07/2013 06/11/2012 05/29/2013 SUSQUEHANNA - UNIT 2 TRM I LOES-6 EFFECTIVE DATE 03/16/2017
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 93 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section B.3.9 B 3.9.1 B 3.9.2 B 3.9.3 B 3.10 B 3.1_0.1 B 3.10.2 B 3.10.3 REFUELING OPERATIONS BASES Decay Time Communications Refueling Platform MISCELLANEOUS BASES Sealed Source Contamination Shutdown Margin Test RPS Instrumentation
- Independent Spent Fuel Storage Installation (ISFSI}
B 3.1 ~ . RADIOACTIVE EFFLU.ENTS BASES B 3.11.1.1 Liquid Effluents Concentration B 3.11.1.2 Liquid Effluents Dose B 3.11.1.3 Liquid Waste Treatment System B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation B 3.11.1.5 Radioactive Liquid Process *Monitoring Instrumentation B 3.11.2.1 Dose Rate B 3.11.2.2 Dose - Noble Gases B 3.11.2.3 Dose - Iodine, Tritium, and R<=:idionuclides in Particulate Form B 3.11.2.4 Gaseous Radwaste Treatment System B 3'.11.2.5 Ventilation Exhaust Treatment System B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation B 3.11.3 Total Dose B 3.11.4.1 Monitoring Program. B 3.11.4.2 Land Use Census B 3.11.4.3 lnterlaboratory Comparison Program B.3.12 83.12.1 B 3.12.2 B 3.12.3 LOADS CONTROL PROGRAM BASES Crane Travel - Spent.Fuel Storage Pool Heavy Loads Requirements Light Loads,Requirements Effective Date 08/31/1998 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 04/28/2016 08/31/1998 08/31/1998 08/31/1998 0410712000 02/01/1999 08/31/1998 08/31/1998 04/02/2002 06/18/2013 08/11/2016 08/31/1998 02/19/2015 08/31/1998 02/02/1999 09/19/2007 11/29/2010 . 02/05/1999 SU$QUEHANNA ~ UNIT 2 . TRM I LOES-7 EFFECTIVE DATE 03/16/2017
~' --- Rev. 13 Core Operating L,imits Report (COLR) 3.2.1 3.2 Core Operating Limits Report (COLR) 3.2.1 Core Operating Limits Report (COLR) TRO 3.2.1 The Core Operating Limits specified in the attached COLR shall be met. APPLICABILITY: Specified in the referencec;l Technical Specifications. ACTIONS CONDITION A. Core Operating Limits not met. REQUIRED ACTION A.1 Perform action(s) described in referenced Technical Specification. TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE ~--~--~-~--~----~---~---------~-NOTE---~------------~--~------------- No associated Surveillances. Surveillances are implemented in the applicable Technical Specifications. COMPLETION TIME Specified in referenced Technical Specifications. FREQUENCY N/A SUSQUEHANNA - UNIT 2 TRM / 3.2-1 EFFECTIVE DATE 08/31/1998
Rev. 13 Susquehanna SES Unit 2 Cycle 19 PL-NF-17-001 Rev.. a Page 1of62 CORE OPERATING LIMITS - REPORT SUSQUEHANNA UNIT 2
- TRM/3.2-2 Nuclear Fuels Engineeri_ng March 2017 EFFECTIVE DATE 03/16/2017
Rev. Affected No. Sections Rev.13 PL-NF-17-001 Rev.O Page2 of62 CORE OPERATING LIMITS REPORT REVISION DESCRIPTION INDEX Description/Purpose of Revision 0 ALL Issuance of this COLR is in support of Unit 2 Cycle 19 operation. FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 2 TRM/3.2-3 I EFFECTIVE DATE 03/16/2017
Rev. 13 SUSQUEHANNA STEAM ELECTRIC STATION Unit 2 Cycle 19 CORE OPERA TING LIMITS REPORT Table of Contents PL-NF-17-001 Rev. O Page 3 of 62
1.0 INTRODUCTION
......................................................................................................... 4 2.0 DEFINITIONS............................................................................................................. 5 3.0 SHUTDOWN MARGIN................................................................................................ 6 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGRL..................... 7 5.0 MINIMUM CRITICAL POWER RATIO (MCPR)........................................................... 9 6.0 LINEAR HEAT GENERATION RATE (LHGR)................................ ;............................ 27 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS................................................ :....................................................... 38 8.0 RECIRCULATION LOOPS-SINGLE LOOP OPERATION.........................................40 9.0 POWER I FLOW MAP........................................ :....................................................... 58 10.0 OPRM SETPOINTS.................................................................................................... 60
11.0 REFERENCES
..................................................................................... :...................... 61 SUSQUEHANNA UNIT 2 TRM/3.2-4 EFFECTIVE DATE 03/16/2017
Rev. 13
1.0 INTRODUCTION
PL-NF-17-001 Rev. 0 Page 4 of 62 This COR_E_ OPERATING LIMITS REPORT for Susquehanna Unit 2 Cycl~ 19 is prepared in accordance with the requirements of Susquehanna Unit 2, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRG-approved methods and are established such_ that all applicable limits of the plant safety analysis are met. SUSQUEHANNA UNIT 2 TRM/3.2-5 EFFECTIVE DATE 03/16/2017
Rev. 13 2.0 DEFINITIONS PL-NF-17-001 Rev.a Page 5 of62 Terms used in this COLR but not defined in Section 1.0 of the Techni9al Specifications or Section 1.1 of the Technical Requirements Manual are provided below. 2.1 The* AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified he_ight divided by the total initial weight of uranium per unit length at that height: 2.2 The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height. 2.3 FDLRX *is the r_atio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type. 2.4 LHGRFACr is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFACf multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbm/hr. 2.5 LHGRFACp is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACp multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions. 2.6 MFLCPR is the ratio of the applicable MCPR operating* limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system. for each fuel bundle.
- 2. 7 MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLHGR limit for the applicable fuel bundle type.
2.8 OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated. 2.9 Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.
- 2.1 O Sp is the OPRM trip setpoint for the peak to average OPRM signal.
2.11 Fp is the core flow, in Mlbm I hr, below which the OPRM RPS trip is activated. SUSQUEHANNA UNIT 2 TRM/3.2-6 EFFECTIVE DATE 03/16/2017
Rev. 13 3.0 SHUTDOWN MARGIN 3.1 T~chnical Specification Reference Technical Specification 3.1.1 3.2 Description
- The SHUTDOWN MARGIN shall be equal to or greater than:
a) 0.38°11 Lik/k with the highest worth rod analytically determined b) 0.28% Lik/k with the hig.hest worth rod determined by test PL-NF-17-001 Rev. 0 Page 6 of 62 Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOC) SHUTDOWN MARGIN (SOM) tests must also account for changes.in core reactivity during the cycle. Therefore, the SDM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the caicul'ated value of maximum core reactivity (that is, minimum SOM) during the operating cycle and the calculated BOC core reactivity. If the value of "R" is zero (that is, BOC is the most reactive point in the cycle) no correction to the BOC measured value is required. The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling. SUSQUEHANNA UNIT 2 TRM/3.2-7 EFFECTIVE DATE 03/16/2017
Rev. 13 PL-NF-17-001 Rev.O Page 7 of 62 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1 Techni.cal Specification Refe~:nce Technical Specification 3.. 2.1 4.2 Description The APLHGRs for ATRIUM'-10 fuel shall not exceed the limit shown in Figure 4.2-1. The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Two Loop operation. The APLHGR limits for Single Loop operation are provided in Section 8.0. SUSQUEHANNA UNIT 2 TRM/3.2-8 EFFECTIVE DATE 03/16/2017
======-=-=.--=:-=--=--===- - -*- 7"~{~:!1'.;--=---=:. (/) c (/) 0 c:: f"1i
- r:
)> z z )> c:
- z f-1
-l N 16.0 14.0
- ~ 12.0
- J
- a.s
~& a: c: -l <1>:8*100
- o O> CG.
...,,,.. ct!... ..;:,..... Q) -Clli:: w ~ Q) (.!) N I l..O f"1i rn n -l f-1 f"1i 0 )> -l fTI 0 w - f-l m - N 0 1--' -.....J m C1l
- r:...
CG (!) c:
- i 8.0 6.0 4.0 0
- SSES UNIT 2 CYCLE 19 I
I I I I I I I I J I I I I I I * ~ ---~---l---L---L ___ 1 ___ 1 ___ 1 ___ j ___ 1 ___ j ___ j ___ J ___ J ___ J ___ J ___ J_~_J. __ J_ __ ~L---L---* I l ___ J ___ J ___ J *** Jw __ 1.; 1 1 1 1 1 1 1' '1 11 1l 11 1 11 l 1 l 1 REFERENCE T S 3 2 1 1 1 1 1 l l l l l l l l l I I I I I l I l l l l l I l l I I I I I I I I I I I I I I I I I I I I I II" J D f I I I I I I I I I I I I I I t I I I I I I I I I I I I l I l I I ---f---r---~---~---+---+---+---+---+---t---~---1---i---~---i----1----1----1----r---r---r---r---~---~---+---+---+---f---f---f---1---i---~---~--~ I I I I I I I I I I I I I I I I I I I I I l I I I I I I I i I I I l I I I I I I I I I I I l l l I l l I l l I I I I I I I I I I I I I I I I I I I I I I I t
- I I
I I I I I' I I I I I I I l I I I I l USED IN DETERMINING MAPRAT : I l 0.0, 12.5 ---~---i---i---l 15000, 12.5 1 J----1----1----1----1---..J..--..J..H..j..MM-l--- *---..l---..l----1---
- I I
I t I I I I I I l I I I 21 I II J I I I I I I I I I I I I I I I* I I I I I l I I I I I I I I I I I I I I I I ll I ~ t I I 1
- I 1
1 I r 1 I 1 I I I I I I I I I I l I l I 1 1 I [ I I I I I I I ---r---r---~---+---+---t---+---+-~-+- ---+---i---+---i---~----1----1----1----1----r~-r---+---~---~---t---t---t---t---;---;---+---+---i---~--- r I I I I I I I I I I I I I I I I I f I ~ t l ~ I I t I I I I I l I I I l I I I. I I I I I I I I I I f I I ~ I ~ I t I I I I I l f I I f I I I t 1 1 1 1 1 1 1 r 1 1 1 1 1 a 1 1 J ll 1 1 1 I l l l l l I I I I I I I I I I l l I I I l I l l l I I l ---r---r---r---r---r---r---r---r---1---1---1---1---1---1 ~---,----r---r---r---r---r-~-r---r---r---r---r*--t---1---1---1---1---1---1---1--- I I I I I I I I I I I I I I I I I I I I I r 8 JI I I I JI I I I I l I I l l I I l I I I I I I I I I l I I I I I I
- 0 I
I I J I I I
- 1 I
I I I I I t l I I I I I I I I l I l I I I I t I I I I I 1 I I 1 I I I I I l I I I I I I I I I J II I I i I I i I I I I I I J I I I I I I I I I I I I I l I I I 8 I I I JI I I I I I I I --+---~---~---r---t---t---t---t---i---t---i---i----1---;---~---t----:----t---, --r---r---~---r---t---t---t---t---t---1---i---~---i---~---~--- 1 I I t I I l I I I l I I l I l I l I I I . I I I I I ~ I i ( I I I I i J l l I I I t I l I I l ~ I ~ I t I t I i I I I I I I J I I I I I I l I t ~ l I I ~ J I I I I I I I I J I l J J l l I l I I I I I I I l I I 8 I I t I JI I I I I I I I ---r---r--*r*--r---r---r---~--1--*1-*-1*--1---1---,---,---,---~--,---~---r---r---r---r---r-Jl---r---r---1---1---1---1---,---,---,---,--- 1111111~~t111111~~~11!J1t*~11**1!t 1 1 1 1 1 J 1 s 1 1 1 r l 1 1 1 1 1 1 1 II" 1 J
- 11 I
1 1 1 I
- I*
1 1 1 11;~~t11111:lll~ll~lltll1l1 1 l 11 lll ---r---lL---L,---t---t--*~1---~i---~1--*;---~,---;---;---;---;---1***-t'-*-t**-f"'**-t*--+---t---t--*t*--t---t---+---t---1 ~---4***4***;**-;---;--- I I I II I I I I I I I l I I 1 I JI 8 I I I g I I I I I i i i i i* ! i i ~ ! i i ! i ! ! ! i ! i ! ! i i i ! ! I i ! i 1 1 I I 1 t I I I f I I I I I I I I I t I I '* I t I I I I I I ---~---~---~---~---~~--~---~---~---4---~---~---~---~---~---~---~--4---~---+---~---~---~---~---r---~---+---~--~~---~---~---~---~-- --~--- 1 I I I 1 I t I I I I ~ I l I 1 f I I I I I I I I I I f 1 1 1 1 1 1
- 1 1
1 1 1 1 1 1 1 1 1 1 1
- a 1
1 J 1 n 1 1 1 I I 1 1 ! ! ! ! i ! l !. ! ! !" ! *1 ! i l ! ! i ! I ! ! 1 ! 11 11 ! ! ! I s1000, s.9 I! I I I I I I I I I I I I I I I n I I I I J I I J I I I I. .I ---t---t*-*t**-t*--t---t---t---t---1---1---1---1---1---;----r-*--r*--r*--t--;-~--~---t***t**-t-Mwt**wt*-*t---t---t---1---ll*--1---1---9--*1*** 1 1 1 1 1 1 a 1 1 1 1 1 1 11 1 1 1 1 1 I I 1 I 1 1 o 1 1 1 m
- n.
a 1 I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I J J I I I I I I I I I I ~ I I I I I I I I I I ~ I I I I I I I I
- 1 l*
l l l I I I l I l I I l l l ! I l I l I l l I I ---~---~---~---~---~---~---+---~---~---~--~4---~---~-w-~---.f----l---4---4----~---~---}---~---~---}---}---+---+---~---~---,---4---~---,*---{--* I I I I I I I I I I I I I I I I I I I . I I I I I I I I I I I I I I I I I I t J I 1 I I I I I I I I J I I I I .I I I I I I I l[ I I I I I I J ~ i ~ I J I I I I I I l I I I I I I I ~ I l I 1
- I I
I I I l I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I t J I l f ~ ~ t t I 1 I I t I I .I I I I f I f 10000 20000 30000 40000 50000 Average Planar Exposure {MWD/MTU) AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMIT VERSUS AVERAGE PLANAR EXPOSURE -TWO LOOP OPERATION ATRIUM'-10 FUEL FIGURE 4.2-1 60000 70000
1.,: Rev. 13 5.0 MINIMUM CRITICAL POWER RATIO (MCPR) 5.1 Technical Specification Reference PL-NF-17-001 Rev.a Page 9of62 Technical Specification 3.2.2, 3.3.4.1, 3. 7.6, and 3. 7.8 5.2 Technical Requirements Manual Reference
- Technical Requirements Manual 3.3.7 5.3 Description
- The MCPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM'-1 O) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a) Main Tur~ine Bypass I EOC-RPT I Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-2: Power-Dependent MCPR value determined from BOC to EOC b) Main Turbine Bypass Inoperable Figure 5.2-3: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-4: Power-Dependent MCPR value determined from BOC to EOC c) EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOC to EOC d) Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-8: Power Dependent MCPR value determine_d from BOC to EOC e) One Turbine 9top Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 5.2-9: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-1 O:Power-Dependent MCPR value determined frof!l BOC to EOC SUSQUEHANNA UNIT 2 TRM/3.2-10 EFFECTIVE DATE 03/16/2017
-~--.- Rev. 13 PL-NF-17-001 Rev.o Page 10 of 62 The MCPR limits in Figures 5.2-1 through 5.2-10 are valid for Two Lo_op operation. The MCPR limits for Single Loop operation are provided in Section 8.0. 5.4 Average Scram Time Fraction If the average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented. Determining MCPR ope~ating limits based on interpolation between scram insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures. SUSQUEHANNA UNIT 2 TRM/3.2-11 EFFECTIVE DATE 03/16/2017
Rev. 13 PL-NF-17-001 Rev.a Page 11of62 Main Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 2 TRM/3.2-12 EFFECTIVE DATE 03/16/2017
(/) c 2.2 (/) 0 c: f'T'1
- c 2.1
)>
- z:
z )> c 2.0 z 1-i -l N 1.9 ...... E 1.8
- .i en c:
-l e 1.7
- o Q) a.
3: 0 - w ~ ll. N 0 1.6 l
- s w
1.5 f"T1 11 11 1.4 l 3o, 1.541 _-----=:,*:'1_ -..:--:..:...-=...-__ --_-__ :.- ---=--*-=-- _:;:_- ------==-= - _- --.,-.=.. 7=".-:.-.---=.-=---=:::. __ ;_ --: *=-=-- SSES UNIT 2 CYCLE 19 I LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM . INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME I I I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6;1 AND 3.7.6.2 ,1
- I I
I I USED IN DETERMINING MFLCPR I A ~-- B rn ("') I
REFERENCE:
T.S. 3.2.2 .----...... ~ -l 1-i 1.3 f'T'1 0
- i>
-l rn 1.2* 30 40 ...._____ ------...---... I 108, 1.21 I ~ 50 60 70. 80 90* 100 Total Core Flow (MLB/HR) MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSU~E REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC) FIGURE ?.2-1 110
(/') c (/') 0 c. rn
- r:
)>- z z )>- c :z: 1--1 -I N -I
- a 3
- -
w N I 1-1 ..j:>. rn II II rn n -I 1--1 rn 0 )> -1
- rn 0 w -
1--1 CJ") - N 0 1-1 -.....j ~ E
- J Cl
- =
~ Q) c.. 0 a:
- a.
(.) ~ SSES UNIT 2 CYCLE 19 3.4 LEGEND 3 2 1-+------1---iCURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME
- H23, 3.091 3.0
\\."I 126, 2.951 I 23, 3.04 I\\. CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME CURVE C: CORE POWER :S:: 26% AND CORE FLOW~ 50 MLBM/HR 2.8 126, 2.841 2.6 _ C ---1-------iSAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PERSR3.7.6.1AND3.7.6.2 2.4 2.2 1-------1------1--1USED IN DETERMINING MFLCPR I .____-.------.----.----.-----.--------'r I 26.01, 1.99 I 2.0 I . I 94.46, 1.37 ~... 140,1.701 1.8 l2a.01, 1.891 ~ A 1-L::..:..:..:...:..!......:..:.:..:...J..t--~~~.... =----+--- ---------+--------1--------1--------1 ~ -.._~----- ~- ..... --~Cb-I so, 1.44 I 1.6 140, 1.62 l
I 100, 1.351
...... __ I'm ________ _ B 1.4 l
REFERENCE:
T.S. 3.2.2 I !so, 1.41 L 1.2 1.-___ _J_ ____ L_ ___ ..,...L ____ L_ ___ __i_ ____ L_-=' 8=5=, =1.=39::::11.1~94~.4~6~, ~1.~34~ I 100, 1.32. 30 40 50 60 70 80 90 Core Power(% RATED) MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC} FIGURE 5.2-2 100
- u CD
- <
1: I* ! -... 1 *... I' Rev. 13 Main Turbin.e Bypass Inoperable PL-NF-17-001 Rev. 0 Page 14 of 62 SUSQUEHANNA UNIT 2 TRM/3.2-15 EFFECTIVE DATE 03/16/2017
(/} c (/} 0 c !Tl
- r:
)>
- z::
z )> c z 1--1 -I N -I
- o
w N I 1-l O'l 0 w - 1-1 O'l - N 0 1--' 2.2 2.1 2.0 1.9 ...... E 1.8
- i
- 0) c:
<<l 1.7 <I.I c.. 0 .0::
- a.
(.) 1.6
- iE 1.5 1.4 1.3 1.2 SSES UNIT 2 CYCLE 19 LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE INOPERABLE P.ER SR 3.7.6.1 OR3.7.6.2 I
USED IN DETERMINING MFLCPR 130, 1.741 ~ ~ ~ ' ~ A ~ B -.............. ~ I
REFERENCE:
T.S. 3.7.6 and 3.2.2 I 30. 40 50 60 70 80 90 Total Core Flow (MLB/HR) MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC TO EOC) FIGURE 5.2*3 100 ( I 108, 1.36 I 110
(/) c: (/)
- 0.
c rn
- c
)> z z )> c: z 1-1 _, N
- 0 3:
w N I -.....J rn "Tl "Tl rn n _, 1-1 rn Cl )> rn 0 w O'l N C> -.....J ........ E
- i CJ c:
E Q)
- 0.
0 oc a.. 0
- E 1_/',---:.-.: -::.-=--=----=--== - - -
SSES UNIT 2 CYCLE 19 36 J23, 3.431 3.4 LEGEND \\ \\ CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.2 INSERTION TIME 123, 3.041 126, 3.15 I \\. CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.0 c\\ CURVE C: CORE POWER~ 26% AND CORE FLOW s; 50 MLBM/HR 126, 2.841 2.8 I 2.6 ~ SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 2.4 I I I 2.2 I USED IN DETERMINING MFLCPR I 126.01, 2.031 2.0 ........ ~ ~ 1.8 40, 1.741 A B ISO, 1.541 1.6 1100, 1.541 l
REFERENCE:
T.S. 3.7.6 and 3.2.21 1.4 1.2 20 30 40 50 60 70 80 Core Power(% RATED) MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS INOP~RABLE TWO LOOP OPERATION {BOC to EOC) FIGURE 5.2-4 90 100
SUSQUEHANNA UNIT 2 Rev. 13 EOC-RPT Inoperable TRM/3.2-18 PL-NF-17-001 Rev.O Page 17 of 62 EFFECTIVE DATE 03/16/2017
VI c (/1 0 c rn
- c
)> z z )> c z 1-1 -I N -I
- o 3
w N l I-' "° rn "Tl ..... *e
- J O>
i:::: ':jj Ill Q) Cl. 0 a:: 0.. 0 2 "Tl \\ rn CJ -I 1-1 rn 0 )> -I rn
- a w
I-' O'l N 0 I-' -......J
_---:..=:=_ =-
-=:-:-_!.'::*. - -=----
- =-----=-=-
SSES UNIT 2 CYCLE 19 2.2 LEGEND 2.1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 1.9 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES - ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2. 1.8 I I USED IN DETERMINING MFLCPR 1.7 1.6 130, 1.541 1.5 1.4 ~ A ~ B I.
REFERENCE:
T.S. 3.3.4.1 and 3.2.2 I ---............ ~ 1.3 1.2 30 40 50
--~
I 108, 1.21 I ~ 60 70 80 90 100 110 Total Core Flow (MLB/HR) MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPTINOPERABLE TWO LOOP OPERATION (BOC TO EOC) FIGURE 5.2-5 ""CJ -a m r CO I CD Z ........ TI ex> ;o....... g_ CD ";'I ~<o CJ). 0 I\\) 0
(/) c::: (/) 0 c rn
- c
)>-
- z:
- z:
)>- c :z: 1--1 N
- o 3
- -
w N I N 0 rri "Tl.., rn n 1--1 rn 0 )>- fTl 0 w - f-' O'l - N 0. f-' ~ E
- J m
s:: +:l It!... <!) a. 0 n:: c.. 0
- E SSES UNIT 2 CYCLE 19 3.6 I
I I I 3.4 LEGEND 1-----------1----iCURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.2 H 23, 3.09 I INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME ~ 3.o ~ "" I I I 23, 3.041\\. 26, 2.95 CURVE C: CORE POWER::;; 26% AND CORE FLOW:::.; 50 MLBM/HR t..::::~:::::J-~,d-'"---~.~"-----+--~ 2.8,_ ~ 26, 2.84 11----+---1 c '----.------.-----..,.-----..-------ii----~ 2.6 1-----------1----1 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 I I I I I 2.4 l--~l--1----1--i-~---...____ __ _..._ __ ___,'-----1 USED IN DETERMINING MFLCPR 126.01, 1.991 2.0 1.8 ~ 140,1.701 A 1.6 ~
REFERENCE:
T.S. 3.3.4.1 and 3.2.2! 180, 1.441 1.4 1.2 20 30 40 50 60 70 80 Core Power(% RATED) MCPR OPERATING LIMIT VERSUS CORE POWER . EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC to EOC) FIGURE 5.2-6 194.46, 1.43 L 1100, 1_43 I 90 100
~ ~..
- 1.
Rev. 13 PL-NF-17-001 Rev. 0 Page 20of62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 2 .TRM/3.2-21 EFFECTIVE DATE 03/16/2017
VJ c Vi 0 c:: !Tl
- c
):>
- z:
- z:
)> c z 1-1 -I N -I
- 0 3::
w N I N N 0 w I-' O"l N Cl. f-' -......J ~ E
- J
- 0) c:
~ 0.. 0 ~ a.. (.) ~ SSES UNIT 2 CYCLE 19 2.2 1 I LEGEND 2.1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 1.9 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 I I I I 1.8 USED IN DETERMINING MFLCPR r 1.7 1.6 I 30, 1.541 1.5 1.4 r----.__ -----...___ A -s I
REFERENCE:
T.S.. 3.7.8 and 3.2.21
r----...__
1.3 1.2 30 40 50 I 108, 1.211 r-----.::: 60 70 80 90 100 110 Total Core Flow (MLB/HR) MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOC TO EOC} . FIGURE 5.2~7.
(/) c: Vl 0 c: [Tl
- c
)>
- z
- z
)> c z 1-t -I N E
- i O>
c:
- l:l
-I Ctl....
- o Cll c.
- s: 0 w
0::
- a.
N (..)" I
- ii:
N w [Tl I] '1 rn ("') -I 1-t J"T1 CJ )> -I [Tl 0 w - I-' O"> - N 0 f-' -....J SSES UNIT 2 CYCLE 19 36 I .4 LEGEND 3 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.2 H23, 3.091 INSERTION TIME ~ CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME .0 I 26, 2.95 I I 23 3 04 I'- I CURVE C: CORE POWER :s:; 26% AND CORE FLOW~ 50 MLBM/HR .8 126, 2.841 3 2 r-c I I I 2.6 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND.3.7.6.2
- 26.01, 2.30 :
I I I I .4 USED IN DETERMINING MFLCPR 2 I 40, 2.08 I .2 ~ A ~-.............. .o B 2 2 1.8
- .~
1.6 I so, 1.461 ~
REFERENCE:
T.S. 3.7.8 and 3.2.2! ~ 194.46, 1.37 L 1.4 1.2 20 30 40 50 60 70 80 Core Power.(% RATED) MCPR OPERATING LIMIT VERSUS CORE POWER
- BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOC to EOC)
FIGURE 5.2-8 1100, 1.351 90 100 w
I { ' I',, I~ I 'I Rev. 13 PL-NF-17-001 Rev. O Page 23of62 One TSV or TCV Closed SUSQUEHANNA UNIT 2 TRM/3.2-24 EFFECTIVE DATE 03/16/2017
c..n. c 2.2 c..n 0 c [Tl
- c 2.1
)> z z )> c 2.0 z 1-1 -j N 1.9 ...... E 1.8
- J C) s::
-j ~ 1.7
- 0 Cll 0..
3: Q. w ~ 0... N 0 1.6 I
- i:E N
<.n 1.5 rri 1.4 [Tl n -I 1-i 1.3 rn Cl )> -I rn 1.2 SSES UNIT 2 CYCLE 19 LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERT~ON TIME I-I I I SAFETY ANALYSES ASSUME THAT FOUR BY.PASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3:7.6.2 I I I I I 30, 1.741 USED IN D_ETERMINING MFLCPR r ~ ~ ~ A ~ ~ ---............ ~- I 10s, 1.31 I I
REFERENCE:
T.S. 3.2.2 and TRM 3.3. 7 I 30 40 50 60 70 80 90 Total Core Flow (MLB/HR) MCPROPERATING LIMITVERSUS TOTAL CORE FLOW ONE TSV OR TCV CLOSED*
- TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-9 100
- Operation with one TSV or TCV closed is only supported at power levels ::::75% rated power 110
{/') c::: (/') 0 c: rn
- c
)> z:
- z:
):> 3.6
- 3. 4
- 3. 2 :---123,3.091 c:
- z:
1-i -I
- 3. 0
~ 126, 2.951 I 23, 3.041 '~ N. CJ c:
- 2.
-I f!
- o
(()
- 2.
3: Q. 0 w c::* . c.. 2 0 ~ :E 8 -c I 26, 2.841 6 4 2
- 2. 0 I 26.01, 1.99 I
~....... SSES UNIT 2 CYCLE 19* I I I I LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME CURVE C: CORE POWER~ 26% AND CORE FLOWS 50 MLBM/HR SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 140, 1.70.1 8 I 26.01, 1.89 I A
- 1.
~ "9-a.-~- 6* 175, 1.471 140, 1.621 -~-...,_.. -... _... ____,_ __
- 1.
- 1. 4 1.2 20 1 B
I
REFERENCE:
T.S. 3.2.2 and TRM 3.3.71 30 40 50 60 Core Power(% RATED} MCPR OPERATING LIMIT VERSUS CORE POWER ONE TSV OR TCV CLOSED* TWO LOOP OPERATION (BOC TO EOC) FIGURE 5.2-10 I 75, 1.43 I 70
- Operation with.one TSV or TCV closed is only supported at power levels ::;;75% rated power 80
1 **.:
- ~
"= Rev. 13 Table 5.3-1 PL-NF-17-001 Rev.a Page 26of62 Average Scram Time Fraction Table *For Use With Scram Time Dependent MCPR Operating Limits Control Rod Average Scram Time to Position {seconds} Position 45 0.470 0.520 39 0.630 0.860 25 1.500 1.910 5 2.700 3.440 Average Scram Realistic Maximum Insertion Time Allowable SUSQUEHANNA UNIT 2 TRM/3.2-27 EFFECTIVE DATE 03/16/2017
Rev. 13 6.0 LINEAR HEAT GENERATION RATE (LHGR) 6.1 Technical Specification Reference Technical Specification 3.2.3, 3.3.4.1, 3.7.6, and 3.7.8 6.2 Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 6.3 Description PL-NF-17-001 Rev. O Page 27 of 62 The maximum LHGR for ATRIUM'-10 fuel shall not exceed the LHGR limit determined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and lnoperabl~. To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided in the following figures: a) Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Limit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multiplier b) Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier c) One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 6.2-6: Flow-Dependent LHGR Limit Multiplier Figure 6.2-7: Power-Dependent LHGR Limit Multiplier The LHGR limits and LHGR limit multipliers in Figures 6.2-2 antj 6.2-3 are applicable to EOC-RPT Operable and Inoperable and Backup Pressure Regulator Operable and Inoperable. The LHGR limits and LHGR limit multipliers in Figures.6.2-1 through 6.2-7 are valid for both Two Loop and Single Loop operation. SUSQUEHANNA UNIT 2 TRM/3.2-28 EFFECTIVE DATE 03/16/2017
Vl c Vl 16.0 0 c [Tl
- c
)> z, z )> 14.0 c z 1-i -I - ~ N ~ .!I:: - E 12.0
- J CJ)....
Ctf ~ c -I 0
- o Ctf
-
- s::
Q) 10.0 c w Q) (.!') N I Ctf Q) N
- c l.D ltS 8.0 Cl> c:
- J f"T1
'1 '1 [Tl n 6.0 -I 1-i rn 0 )> -I rn 4.0 0 0 w - I-' m N o* I-' ""-J I I I I SSES UNIT 2 CYCLE 19 I I l I I I I l l I I I I I J I I I I I I I I J I I I l I I I I I l S J l I I -~---~w-~---~--~---~--..s...--.i.--....... --."--~--~---~--~---~--~--~---S-*w~m~~--~--.&--*~---~--~---~--~---~--..J-**~*-..a---~------~---~--~---~--~---~--
- ~::::~:~~::11111~:1111111111111111:::
I I I I J I I a I I I I I I I I I I I I I I I J I I I I I I I I I 8 I I r B I
- : l : : : : f f
~ ~I f t f f I : : : I l I 1 I 1 I 1 1 I I I I l I I I I I I I t I o.o, 13.4H-~--+-+--t--~ 18eo:o. 13.4H---t--+-+-+--t--+-+-
REFERENCE:
T.S. 3.2.3-- I I I I I I I t* ~ I I I I I I I I ~ 111111111:~:~~IJfl~IJ~ f I I J I I I I I I I I I I I lll:lll~~.*:~~:~::11111111 --1---r--1---r--r-r--r--r-r--r---, -~---r--1---r--1---r---r--t---r--1---r--1---r--1---r-- USED IN D ET ERM INI NG FDLRX ! i i l i i i i ! ! ! I ~ I I I ~ I I I I I I 11 I I I I I I ~ l I t l
- l I
I 11 I
- 1
- 1
- 1 1*
11 11 11 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 e 1 1 n 1 1 s 1 r 1 ~ 1 1 a I I I I I I I J 1 I 1 B I J I D I I B 'I I I I --1---r--1---r--i---t---1---t---t--t---r--i---r--i--- ---t---1---t---t--t---r--1---r--i---r--i---t---1---r---t--t---t--i---r--i---r--1---~-- I I I I I I I I I I I I I I l I I I I I I I 11 11: I J I I B I I B B I I I I JI I I l I I I I I I I I I l I I I l I I I I JI II: I a I I JI I I 8 I I I I I I I I II: I J I I I I I I I I I I I I I I I I I I I I I I I I I D I I I I I I I I I I l I I I I I I I I I I I I I I I I I l I I l I I I I I I I I l I I I I I I I I I I l I I J I I I I l I I I I I I I J I I I I I I g --~---~--~---~--~---i--..:..--~---1-.--J---~--~---~--~---~--~---i---l---t-- I --~---~--~---~--~---~--~---i--..:---i--~--~---1-.--J---~--~---~--~---~-- I I l I I I I I I I I I I I I l I I I I I I I I I I I I I I B I I I I I I f i t I I l I I l
- 111~1:11;~::::~;111
,*1111~1111111~~11 I I I I I I I I I I I I I I I I I I I I JI I I ll I J D J I I I I I I I I I 3 --4--~~--i---~--~---t---!---t~-~--t---~--i---~--~---~--i---t---i---t---!---t---!---i--- l---t--~---t---i---t---i---t---i---i---~--i---~--~---t-- 1 I I I I I I I I 11 I I l I I I I I I' I I I I I I J I I a I I I r I I r I I I I ~ I f I I l I I I I t I I I I I I I I I ~ ~ I 1 I I I I ~ I I l I I I I I I I I I I f I I I I l I I I I I I I 1 8 I I I I I 8 I I f I I I I I I l I I I I I I I t I I ~ f J I I f
- 1 1
I f I t I I I I I I I I I I c I I r I r I J I I I I I I I I J I I I I I I I I r I I I I I --~---~--~---r--~---~---i-*-T--"T"*-~---r--~---,....-~---r--,---r--T"*-~--..,---7---r---~---r~-,---r--~---r- --T---r--r--,---~---r--~---r--~---r~- 1 I t I I I I I I ~ I ~ I f ~ I I I I I t 1 I t I I I 1 I I ~ t I I t I I I I I I f I I I I I I I I I I 1 I I I I I I I I I I I I I I ll ~ I I l I I i ! ! I i ! ! i i i i ! i I i i I i i l i' i i i ! ! i i I I I ! ! ! ! ! i I I I ~ l I I I I I
- I I
I I I I I I I I I I I I 1 I I l I I I I K I B I I I --~---L--~---L--~---L--.J---i--...L--i---L--~---L--~---L--~---L--..1..--L---L.--i---L--~---L--~---L--~---L--..L--i---L--i--- -i---L--~---L--~---L-- C I I I t I I I I I I I I I I I I I I I I I I I I I I I I I I I J I I ll I I ~ I I I I I I I f I I I ; I I I I I J I I I I I I I I I I 1 t I I I ~- ~ I I [ I I I I I I l I I I I I I I I I I I I I I I I I I n I I i I I I B. I I t I I I I ~ ~ I I I I l I l I I I I I I I I I I I I I f ~ I 1 ~.---.* _ _.*..___.. _ __, I I I I I l J s I J I I I I I l I I I I I I a I I B I I l I I a I I 7440" 0 7 1 --~---~--~---~--~---~--+.--~--~--~---~--~---~--4---~--~---~--+.--~---f..--~--~--~---~--~---~--~---i--~--~--.+---~---~--~---~--~---r I I I l I I I I I I l t I I I I I l I I I I I I I I I U I I 1 I I 3 I I I I I I I I I I I I I 1 I I l I I I I I I I I I I I I I U I I I I I JI I I D I I I 1 I I I I I I I I I I I I l I I I I I I I I I I U B I I I I 11 I D JI I I I l I I I J II I I I I a I I I I a I a B I I I I a I I I I I I I g JI I l I l I I I I I I I I I I I I I I I I I I I I g I I I i I I l I I I I I J I I I I I I I 1 I I I I U I I I I I I I I I I l l I n B I D I I I l I D II I __ J ___ l __ J ___ L __ J ___ t __ J.. __ 1 __ J. __ 1 ___ L __ 1 ___ t_.J ___ L __ J ___ l ** l.. ** l **.i..~lq_.l..~l---L--J ___ t __ J ___ t __ J. __ 1 __ J. __ 1 ___ L __ J ___ L __ J ___ L __ J ___ l __ I I I I I I I I 11 I I l I I I I I I I I I I I I I I I I I I I I I I I I I D I I K I I I I I I I I I I I I I I I I I I I I I I e i g JI B a 0 I a I I I 1 II I I I I I I I I I JI I I I I I I I I I I J I J H I U I 0 I I I U It I I I D J !I I I II I I I J r: I J f I I I I I I I I I I 1 I I I I I I n I D B. I I I I .!I D I I I I I I I I I J I I I I I I I I I I I l I I I I B I I 0 I D g I I l I .!I I I I I I I 1 I I I I I I I I I I I I I I I I I I I ll I I I I B S I I I I I I I I I I I I t a I I I I I I I I* I l I I I I I I I ll a I I I a B I I I I I I I --4---~--~---~--~---}--.f.--+---}--{---~--{---~--~---~--~---~---I---+--~--+---~--{---~--~---~--~---~---I---+---}--{--~--~~--~--~---}--~---~-- I I I I I I I I I I I I I I I I I I I I I I I I I I l I I I I II I I I "I I I l ~ ~ I I I I I I ~ I I I I I I I I I I I I I I I I f I I I I
- ~
I I ~ I 1 l I I I I I 1 I I I I I I I I I I I I I I I I I I I I 11 I I I I J I I II I I I I I I I I I I I I I I I I I I I I I I I I I I J I I I I I I I I I I I I I I I I I I I l I I I I J I I I I I I I I I I I I I I I I I I I I I I J I I I I I I I I J I I I J I .1 I I I I I I l I I I I I I I I r I n I I I I I J I I D l I I 10000 20000 30000 40000 50000 60000 Pellet Exposure (MWD/MTU) LINEAR HEAT GENERATION RATE LIMIT VERSUS PELLET EXPOSURE ATRIUM'-10 _FUEL FIGURE 6.2-1 70000 80000 lJ -0
- m.
r CQ I CD z I'-'> Tl ~~~ Q_ CD 1 ... < 0 (j). 0 l\\,.')Q-->.
- i
' I',,. I I i Rev. 13 PL-NF-17-001 Rev. o Page 29of62 Main Turbine Bypass. Opera*ble
- SUSQUEHANNA UNIT 2 TRM/3.2-30 EFFECTIVE DATE 03/16/2017
(/) c: (/) .0 c: rn
- c
)>
- z:
z )> c z I-! -j N m '1 "Tl rn n -j I-! rn 0 )> --j m 0 w I-' O"l N 0 I-' -....J Q) -c.
- E
- l a:::
(!)
- c
...J .fol c: Q) "Cl c: Q) c. Q) c
- 5:
0 u:: 1.10 1.00 0.90 0.80 0.70 0.60 0.50 0.40 .SSES UNIT 2 CYCLE.19 I I I 1 I I I I l I I I I I I I I I a I I I* I I I I I I I I I I I I J I I I I I
r-------r------r-------r-~----r-------r------r------r-------r--1 so,* 1.oo 1
--r------r-------r-----~-r------r------- I I I I I I I I I I I I B I I I I I I I l J D I I I l
t---------r--------:---------r-------~--------~-------1--------;--------1------~-:3"!1--------.... ------+--------i-----~-t~------11----~
I R I l I I I I I I i-------.1 r I I s I I I I I I I I I l l l I I I I I l 108, 1.00
~-------~-------~-~-----+.-------+.-------~~-------~-------
~--------~--------~--------~--------+--------~--------.--------
I I I I I I I I I I I 11 II I I I I I I J I I I I I I I l I l l I I I I I I I I l l J I J I I I I I I I I I I I J
r--------:---------:---------r-------;-------
1--------~--------1--------1--------1--------1--------1---~----r--------r--------
J I 1 I I I I I I I l I I J I l ~ I I I I I l I ~ ~ I I I J I J I I I I II. I I ti I I
r--------t--------r------
7"-------;--------1--------~--------1--------1--------1--------1--------t--------t--------t--------
I I I I .I I I I II: I JI I!. JI* I I I J I I I I K I ll D I I I I I I I I 'i II K 11 D I I I I I I I I I I I U I JI I I I
+------
r-------1--------1--------1----~---1--------1--------i---~----1--------1--------t--------t--------t--------t--------
I I I I I I ~ t I ~ I I I I I I I I I I I ll D I I I I
L-------..L--------L-------..l..-------J-----~--J--------J--------J--------l--------l-----~-l----~--l--------l--------l--------l--------
I I I I I I I I I I I I I I 130, 0. 7 5 I l I l I l l I l l I l I I I I I I II I I J I I I I
l---------t-------f.-------f.-------~--------~--------~--------~--------1--------i--------t--------f--------t--------t--------t--------
I I I I f ( I I I I I I i I I I ~ l ~ I I I ~ I I I I I l l (
- 1
( t I l l I I I I I I 1 I'
:--------~-------4---------f.--------~--------~--------~--------~--------~--------4--------~--------~--------~--------~--------~--------
I J I I l I I I I I I I I I I J J I I I I I I I I I I I It I! I J l B l l l I I I I I I 1 I I I J
:---------:--------r--------r--------;--------;------
SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES I I I I I I l l l I I ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
t--------l--------f.---~---f.-------f.-------~------
I I 1 I J I ~~.~~~--,,..--~-~,~~~....,l~~~-~,~~~-,.,~~~--,,.--~~~~.~~~--,1,...-~~~
l-------l ______ j ______ J _______ j__ _____ _J_ _______ j_ _______ j_ ______ J :
REFERENCE:
T.S. : 3.2.3, 3:3.4.1,; and 3'. 7.8 ~- I I I I I I I ~ ~ I ~ ~ ~ ~ I I
t-------t-------t-------+-------~--------Jl--------~--------~--------~--------~--------1 USED JN D ET ERM I NIN G FD LRX ~-
I I I l I It I JI I I I I I I I I D I I I I I I I I R ll I I I I I I I ll ll J I I J I I
t-------:--------:--------:--------1------~-:--------1--------:--------1--------1--------1--------1--------t*-------t--------t--------
f I I t I l I I I f I ~ I l I I I l I l I I I I J I I I f
..J...-------.+-------4--------4--------~--------~-------;--------~--------4--------~--------~--------~--------~--------~--------~--------
I I I I I I I I JI I I I I I I I I I ~ I ~ f I I I I I I I I I I l I I l I I I I I I I 0.30 30 I I I l I I I I I I I I I I 40 50 60 70 80 90 100 110 Total Core Flow (MLB/hr) FLOW DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE ATRIUM'-10 FUEL FIGURE 6.2-2
(./) c: (./) 0 c: [Tl
- c z :z c :z:
f---4 -I N -I
- o 3
w N I w N 1.00 0.90 0.80 0.70 0.60 0.50 0.40 SSES UNIT 2 CYCLE 19 I I I I I I I I I ---~-t--------t--------t-------t-1;-9-4-.4-6.... -,. o-o... I I I I I LEGEND I I I B I I J I I I CURVE A: BASE CURVE
t--------t--------t--------t-----~-~r--~----1 I
- n.
B I CURVE B: CORE POWER s; 26% AND CORE FLOW::; 50 MLBM/HR l i 100, 1.00 I '-----.-----.----....----..----..---~---~---..----..---~--'.-----1--------t----- I ------*t--*---**t****-*** ~ I J ~ I I I I l I I t. I I l I l I l l I I l l l l l
r--------+------.... -------..l..-------~--------~--------~--------~-------~--------~-------
+------+--------*--------*--------
I I I I I I I I I I I I I I I I I I I I I I I I l I I I I I I I I I I I I I . I l I I I I I I A l I I I I I
r-----..... ;---------r-------~-------;--------;--------;--------i-------*
i--------t--------t--------t--~-----t--------~--------
~ I I I ~ I I l J I I t i l
i--------i-------!-------!-------i-------~--------i ------~--------J--------!--------!--------l--------!--------l--------l--------
1 I I I I I ~ t I I I I I I I I
- I I
I I I I I 1 I I l I l I I I I I I I l I I
...... *-------r------------------1--------
_____ J ________ J ________ J--------1--------J--------~--------J--------~--------i--------1-------- i I I I i I I i . i i . i L ~ I I I I I 1 I J I I I l
..-r-------~-------
J...-------~--------i---
1 I I l I I 1 I I I I I I I I I I I I
:--------4--------~-------~-------~---
SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
t _[~~~~~+-----+---+-----+-----1:.
RE~ERE~CE: T.~. 3.2.~, 3.3.~.1, an~ 3.7.8: I l l l l l l I I I I J.. I l I I I I I I 1---- ........................... _____ --------t-------+--------i-------i--------;--------;--------;--------;--- 1~~1~;?.,0 J_~-------~------~--------J ________ J ________ J ________ j ________ J _______ ~T~~~~~T~~~~~~~~~~~-~~~~-------- ~ I I ~ l I I I I I l l I J I l I I I I I I I I I I I I j t I I I I I I I I l ~ --* 13 "'"t -----""t-------""t--------r-------1--------1--------1--------1--------1--------1--------1--------1--------1--------1--------t*------- l I 26 0 *431 I . l I I l I l I. I l I 1' I I 1 I I I I [ I I 1 I I I
--t-------'f-------t--------l--------i--------;--------;-------;--------;--------1--------i--------i--------t--------t--------t--------
I I I 1 I I I IE I I I I I I I I I I I I I I I l B I I I I I I I I I I I I I I I I -123, 0 4.0l---~--------1------.;....!--------~--------+-------i--------~--------~--------~--------~--------!--------!--------i--------i-------- I I I I I I t l I I I I I I l I I l I I I I I I 0.30 20 I I I I I I I I I I I I 30 40 50 60 70 80 90 100 Core Power(% RATED) POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE ATRIUM'-10 FUEL FIGURE 6.2*3
11
- I:,,
[, 1, I l Rev. 13 Main Turbine Bypass Inoperable PL-NF-17-001 Rev.a Page 32of62 SUSQUEHANNA UNIT 2 TRM/3.2-33 EFFECTIVE DATE 03/16/2017
--l
- o 3
- -
w N I w ,+::. 1.10 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 SSES UNIT 2 CYCLE 19 I 3 I I I I I I I I I I I i I I l i I I I l I I l I I I I I I I
r-------r--*----r-------r-----~-r-------,--------,--------;--------r--m*T-------r-------r-------r---11 oo, 1.00 r-------
~ ~ f I I I ~ I I I ~ I I I 1 I I JI I J I I I I I I U J II
- -------r---------r--------r----w***t---**-**1-******-1---------r-------1--------1--------1--------t--------t--------t~-----~-..i~~~~;-~~*
J ~ I I I J I I I' I I I I I J 1 J I I J I I I I I It I . 108 1 00 I J J J II I 1 I I I I I I I J l
l---------l---------1-----~~--1--------~--------~--------{--------~--------{--------{--------+--------: -----?--------+--
~._ I I I I I I I I i I I I I I I I. I. I I I 1 t l 1 I
1-~-------1--------;---------:--------1--------1--------1--------1--------1--------t---
--i--------t--------t--------t--------t-------- 1 . I I I { I ~ I I I I I I
- I I
I I I t I I I I I .--------i---------i--------f.-------f.-------1--------~--------!--------i----- .--------i--------t--------t--------t--------t--------t-------- l I I I l l I ~ I I I I I ~. I I l l I I I f I I I I I I I
+--------.+---------1---------1--~-----~--------~-------
~--------~--------~--------.l--------+--------+--------~--------}--------
~ ~ f I I I I ~ I I t I I I I I I I I I I I I I I II t I ~ I 1 I I I I I I -~-----..;..--------+---------+---------+--------~- W*--~********~********~*****---~--------~--------+--------+--------+--------+--------~------- 1 I I I J J I I I I I I !1
- II I
I J I I i l I I I
t---------r-------;.---
---t---------+--------~-~--~ I I I J I I I I l I I J I I I I SAFETY ANALYSES ASSUME THAT TWO OR.MORE BYPASS VALVES ARE INOPERABLE PER SR 3.7.6.1OR3.7.6.2
- ~*-**
~-------~---*--*~-------1*******-1**--****1*~---*-*1**-----i,... -~~~~~~~~~;~~~~-~~;~~~~~~~;~~-T-*-**1**
...L.--------L~-------1--------J.. _______ J ________ J _______ _J ________ J _______ ~~--------~-----
-+--------~--------+--------+--------+-------- ~ I I I I I I I I I 11 I I I I I I I l I I R I ,.....1~~~~~*~~~~-!-~~~....._~~~~'--~--. 30, 0.60 I I I I. I l I ~ ~
+-------+-------+-------+-------{--------{---------i--------~--------i--------i-------
USED IN D ET ERM IN ING FD LRX -- I l I I I l I 21 i I I l I I l I I I l I l I I I I I ll I I I l !1 l r I J I
~--------4---------1--------~-------~--------~--------~--------~--------~--------4--------~--------4--------~--------i--------i--------
I I I J I I I I I I I I I 8 8 I l I I I l I I l I I I I i l I I I I I t
- I I
I I I l l I ~
~--------n--------.... *------.... --------c--------~--------~~-------~--------~--------~--------+--------+--------+--------+---~----~--------
1 I I ~ I t I I 11 I I I I j J I I I I I I I I I I I J I I 1 I 1 I I I I I I I l 1 ll
i--------+-------l.*-----~+--------i--------{--------~--------~--------i--------i--------i--------t--------t--------+--~-----t--------
1 I 1 1 J I I I I l I I I I I I I I I I I I I I I U K J I ~ I t I ~ I I I I I I I i I
~~--------1---------1--------4--------~--------~--------~----*w**~-*wwWW*w~*-w****-~*-******~*-***--*~-----~--?--------~--------~--------
30 I I I I I I I I I I I l I I I I I I I I I I I I I ll JI I I I J I I I I I I I B I I I I 40 50 60 70 80 Total Core Flow (MLB/HR) FLOW DEPENDENT LHGR LIMIT MUL Tl PLIER MAIN TURBINE BYPASS INOPERABLE ATRIUM'-10 FUEL FIGURE 6.2-4 90 100 110
(,/) c: (/} 0 c: rr1
- c
)>- z :z: )>- c::
- z
~ -I N -I
- o 3
w N I w (J1 ..... c: Cl) "O c: CJ) c. Cl) Cl... Cl) § 0.. 1.10 1.00 SSES UNIT 2 CYCLE 19 LEGEND CURVE A: BASE CURVE CURVE B: CORE POWER~ 26% AND CORE FLOW s; 50 MLBM/HR I I
- l I
I
~--------+--------+--------+--
I I 1 1 94.46, 1.00 I I I I I l I
1--------t--------t--------f-----~-:...+-~~--t I
I I I I I ~ I I I 1*00, 1.00
~------..... ~------
... --~-*-------~--------
~..,......,....~~..,......,.....,....,......,....__,,....._..,......,.........,.....,......,....,.....~,..,......,....,....._.....,...,....._..,......,......,......,....,....._..,....,.....,....._..,..........,..,......,......,.........,...__, I I I I l I I I I I l I I i. i 0.90 -------;---------r--------r--------r*------;--------;--------1--------1--------1--------1------
1--------1--------t*-------r-------
f l I f I I ~ I I I I I I I J I I A I I I I B I I I J I I I II l
1--------:-----p*-i--------;---~----f'o-------~--------~--------~-------
1--------1--------1--------t*-------;--------t--------
I I l I l I I I l I . I I I I I I I I I I l I I o.so
;---------r--------;..--------r-------1--------1--------:
i--------1--------1--------1--------1--------t--------t--------r~-------
i i i i l i i i i l. I J l I I I l I I I I I I l l
~--------~--------~--------~--------~--------+--------+--------+--------+--------*~-------
l I I l l I l l l I i I i I i I I l I I I I I I ~ 0.70 -------1-------1-------
t*------r-- SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES I
I I
+
+/--------~-------+-------+--
ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 l 126.~1,0.6~ j !..._._.l.---~~T:~~~================================::::::==============::::;-'~ 0.60 -------+ ----j-------7-------+-------+-------+--------!------'
REFERENCE:
T.S. 3.2.3 and 3.7.6 --~- I I I l I I 1 I I I
- 1 l
I I I I I I I I J I I I
+ -----t-----*-t*----*-t**---*-t*------,--------1--------1--------1-------t**
US ED IN DETERMINING FD LRX 0.50 23, 0.4 7 I 26, ~.50 Ll-------t------~,l ________ J ________ J ________ j_ _______ J ________ J ________ T ________ _. ________... ________ T ________ T _______ _ I I I I I I I I I I I I I I I I I I I I I I I I I[ J I I ~ l f ~ f t ~ I I I I I
t-_______....,. _______.._ _______ ~--------~~-------~--------~"-------~--------~--------~--------*--------+--------+--------~--------
l 26, o.43 I ! i I i i I I I I i l I t l I I J I I I I l l I I +---~---+-~------7---------r-------+--------i--------i--------i--------i--------i--------i--------i-------t-------t--------t-----~-- I I I I I I I I I I I I I I I 0.40 B ,_..,...._.....1.....__, I I I I I I I I I l I JI I I .l:z3, o.4.o*l---~-------!-------~-------~--~-----,1 ________ j ________ j ________ j ________ ~--------~~-------1i ________ J ________ !--------l-------- l I I I I I .I I J I I l 0.30 20 I ~ I I I ~ I I I I I I t I I I I I I I I I I I I I I I .I I I I I I I I I I I I I ll II 30 40 50 60 70 Core Power(% RATED) POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE ATRIUM'-10 FUEL FIGURE 6.2-5 80 90 100
- o CD
Rev. 13 PL-NF-17-001 Rev.O Page 35 of 62 One TSV or TCV Closed SUSQUEHANNA UNIT 2 TRM/3.2-36 EFFECTIVE DATE 03/16/2017
(/) c: (/) 0 c CTI
- c:
)>
- z:
z )>.- c:
- z:
1--1 -l N -l
- 0
- s::
w N I w "--.I fT1.,., fT1 n -l . 1--1 CTI Cl )> -l fT1 "'5 ~ e::: (!)
- r:
_J i:: Q) "Cl i:: Q) 0.. Q) c 0 u: 1.10 1.00 0.90 0.80 0.70 O.qO 0.50 0.40 SSES UNIT 2 CYCLE 19 I I I I I I I I I I I I I I I I I. I I 8 It I D I I _______ _,_ _______....,. _______......,. _______...,_ _______ ~--------~--------~--------~--------~--------~--------+--------+--------+--------+--------~-------- ( ~ I I I I I ~ ~ I ~ I I l l I I I I I l I 3 I I I I I I ~ l I l
- I f
l t I I I ~ I
7---------t-------;--------;--------1--------~--------~--------;--------1--------i--------i--------t--------t--------t--------t--------
6 JI I II I l l a n I I I R I J I I I ll I I I 8 I J s u I[ I I J I ll I a: I J I I I I m n 108 0 94 l I l I I I I I l I
,--------,---------r--------r-----~-1--------,--------1--------,--------1--------1--------1--------1--------r--------y--------r------
I J I I J 11 I l I I B. I I I I J I I I 1 I I I II 11 II _______..L _______ j_ _______ j_ _______ J_ _______ J ________ J ________ J ________ J ________ J ________ J ________ 1 ________ 1 ________ 1_______ f -------l-------- 1 I I I I I J I I I I I ll J I I I I I I I I I I I s ~ I I I I I I I
:---------t---------r--------:--------~--------~--------~--------~--------i--------1--------*t-------
t--------t--------t--------
1 ~ I I I l I ~ I I ~ I I I I I I I I I I I t I I
1--------~-------..{--------+.-------~--------~--------~--------~--------~-------
1~-------t--------t--------t--------t--------
~ I I l I I I ~ I 11 n B 1 1 I I I ~ I I I i ~ I ~ f I I I I I I l I I I I J I B I I _______...... _______ _.,. _______...... _______.,._ _______ ~--------~--------~-------
~--------~--------~--------~--------~--------~--------~--------
I I I I I I I I I I I I I I ~ I I I I I ~ I I I I f I I I J J I I I a I I B a l I
i---------i--------~--------f..-------i-------
1
i--------~--------i--------i--------t--------t--------t--------t--------t--------
1 ~ I J I I J I I l I I I I t I 1 t I I I I I I ~ I t I J I
r--------.---------i-------
"'1"-------~-------
1 I I I I I I I I I I I I I I I I I I I _______...,_.,_a___
....... --------1--------~--------~---*--*
I I I I I I I I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 I I I I I I I I I I I
1---------1---------1---------1--------;--------;--------1--------i--------1--------;--------t--------t--------t--------t--------t--------
I I I I I I I I I I -:~:_~:!~-----**l******-1*--*--J**-****j*******_j***~----J ________ J_ _____ J_~---~-~~~~~~~~:.!:~~--~~~:-~T~~~-!-~-~-~~~,T~------* I I I I I I I l ll B I I I I I g J l I I I I I I ~ I I R I t J I I I I l I I I I I I I l
t-------t*------t*------t-------1--------*1-~------1--------1--------1--------1-------1: US ED: IN DET:ERM I Nl~G FD ~RX 1--
1---------1---------1---------1--------t--------;-~------i--------t--------~--------t--------t--------t--------t--------t--------t--------
I I I I J I ll I i I I a I II I I I I ~ I I I I I I l I ~ I I I I I I I J I I I. I I I I I I I I I J I J I I I I It I J D
*-r-**-----"'"l""'-------... -------,--------,---------,--------~----*---~--------,--------,--------T*-------T-----*--T--------T--------T--------
1 I I I J I I I I I I Ii I I I I I I I I I I I ~ I I I I I I I I I I I I I I D B I I 0.30 30 I I I I I I I I II D I I 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR) FLOW DEPENDENT LHGR LIMIT MULTIPLIER ONE TSV OR TCV CLOSED* ATRIUM'-10 FUEL FIGURE 6.2-6
- Operation with one TSV or TCV closed is only supported ~t power levels :5:75% rated power
(./) c (./) 0 c l"'l"l
- r:
)> z :z: )> c :z: f-l -l .N -l
- a 3
- -
w N I w co l"'l"l "Tl 11 l"'l"l n -I f-l rn 0 )> -l l"'l"l 0 w - O"l - N 0 I-' -.....i 1.10 1.00 0.90 0.80 0.70 0.60 0.50 SSES UNIT 2.CYCLE; 19 LEGEND CURVE A: BASE CURVE I ' I I I J I J 1 I --..... -----------~-----------1-o-----------1----------- 1 J I I I I I I I I l I I I I I l I l I ---:------------~-----------r-----------r----------- 1 I I I l I I I CURVE B: CORE POWER::;;: 26% AND CORE FLOW::;;: 50 MLBM/HR I I I ---r---------t--------~--r-----... 11-s-.o'"'o-,.9-o"'t-- 1 l I I I I I I I I -..... --------i-----------~-----------~----------...:.----...... -----i-----------~-----------~-----------1------------~-----...-----~-----~--- 1 1 I ~ I I I I I I I
- I I
l I I I I I I I I I I I I I I I I II
~-----------i------------~----------~-----------i------------i------------~-----------t---------
i------------~----------
l I I I I I I I I I I I I I I JI A I I I I I I I I I I I l
r----------r-----------r-----... -----r--.------+----... -----r---------- :................. -r---------t----------t----------+----------
1 I I I I I I I I I I I I I J I I I I I I
L-----------~-----------L-----------1----------
L-----------~-----------1..-----------L-----------L-----------L----------
I I I I I I J I I I I I I f I I I I I I 1 I I I I I I [ I
~----~------+-----------
I I I I I I* I I I
J.-
~-----------~----------.+~-------
SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
~ J~~~~_'.1_:~1--~---+---+------i : REFERENCE~ T.S. 3.~.3 and ri' 3.3. 7 :
1---- I I I
- I
'i,~~~~-,r-~~--;::::!========::i::========:c========::i::==:::: I I 1 I I I I
r- --------+-------~--1-----------r----------1-------*-*t-**-------r--------
USED IN DETERMINING FDLRX
~--~.l~.~~ ~~~l--------~-----~----~----------~-----------~----------.!------------r-----------r~----------r-----------r----------
1 I I I I I I I I I 1 I I I I I I I I I I 23, 0.47 I I I I i I I I I
~- ---------~-----------L----------..:.-----------L----------..... -----------L-----------L-----------L-----------1..----------J..----------
I I l I I I I H I I . 0.40 I ~ S I I I I I D I I I . 26 0 43. I I I t I I I I --~--- ---~-------: __ * -----------~----~-----i------------~-----------t-----------..}.----J*-----t-----------1------------1------------~----------- I I I I l I I I I r---...... :--i J I I I I I 1 I B I _._~ 2a. o.~o ~--------i------------~----------+-----------l-----------~-----------1------------1----------+-----------l------------l--------~--- 1 I i i i i i 1 I 1 I J 1 a 1 r 1 1 0.30 ~-------'- 1 ~--~~~*---~-....... *--~~~~*~----....r..'~~~--~*--~~~...... *~----~-'1--~--~..... *------1-~------~*--~~~-i 20 30 40 50 60 Core Power (% RATED) POWER DEPENDENT LHGR LIMIT MULTIPLIER ONE TSV OR TCV CLOSED* ATRIUM'-10 FUEL FIGURE 6.2-7 70
- Operation with one TSV or TCV closed is only supported at power levels §5% rated power 80
Rev. 13 7.0. ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS. 7.1 Technical Specification Reference Technical Specification 3.3.2.1 7.2 Description The RBM Allowable Value and Trip Setpoints for; a) Low Power Range Setpoint, b) Intermediate Power Range_ Setpoint, c) High Power Range Setpoint, d) Low Power Range - Upscale, e) Intermediate Power Range - Upscale, and f) High Power Range - Upscale PL-NF-17-Q01 Rev. 0 Page 38 of 62 shall be established as specified in Table 7.2-1. The RSM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable. The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits !'.ffe violated. If the full withdrawal of any control rod would not violate a fuel' design limit, then the RBM system is not required.to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are n<?t violated. SUSQUEHANNA UNIT 2 TRM/3.2-39 EFFECTIVE DATE 03/16/2017
Rev. 13 Function Low Power Range Setpoint Table 7.2-1 RBM Setpoints Allowable ValueC1> 28.0 PL:NF-17-001 Rev.O Page 39 of 62 Nominal Trip Set oint 24.9 Intermediate Power Range Setpoint 63.0 61.0 Low Power Range-Upscale 123.4 123.0 Intermediate Power Range - Upscale 117.4 117.0 High Power Range - Upscale
- 107.6 107.2
{1) (2) Power setpoint function (Low, Intermediate, and High Power Range* Setpoints) determined in percent of RATED THERMAL POWER Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.
- Table 7.2-2 RBM System Operability Requirements Thermal Power MCPR <2*3>
(%of Rated)
- 28 and< 90
< 1.76
- 90 and< 95
< 1.47 ?: 95 < 1.68 Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable. C3> Applicable to both Two Loop and Single Loop Operation. SUSQUEHANNA UNIT 2 TRM/3.2-40 EFFECTIVE DATE 03/16/2017
Rev. 13 8.0 RECIRCULATION LOOPS -SINGLE LOOP OPERATION 8.1 Technical Specification Reference PL-NF-17-001 Rev.a Page 40 of 62 Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3.4.1, 3.4.1, 3.7.6, and 3.7.8 8.2 Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 8.3 Description APLHGR The APLHGR limit for ATRIUM'-10 fuel shall be equal to the APLHGR Limit from Figure 8.2-1. The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure. Regulator Operable and Inoperable in Single Loop operation. Minimum Critical Power Ratio Limit The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM'-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status. a) Main-Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOC to EOC b) Main Turbin~ Bypass Inoperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-!5: Power-Dependent MCPR value determined from BOC to EOG c) EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOC to EOG Figure 8.2-7: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 2 TRM/3.2-41 EFFECTIVE DATE 03/16/2017
Rev. 13 d) Backup Pressure Regulator Inoperable. PL-NF-17-001 Rev.a Page 41of62 Figure 8.2-8: Flow-Dependent MCPR value determined from BOC to EOG Figure 8.2-9: Power-Dependent MCPR value determined from BOC to EOC e) One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 8.2-1 O:Flow-Dependent MCPR value determined from BOC to EOG Figure 8.2-11 :Power-Dependent MCPR value determined from BOC to EOC The MCPR limits in Figures 8.2-2 through 8.2-11 are valid only for Single Loop operation. Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0. RBM Setpoints and Operability Requirements The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0. SUSQUEHANNA UNIT 2 TRM/3.2-42 EFFECTIVE DATE 03/16/2017
(/) c: (/) D c: rn
- r:
)> z z )> c: z 1--l -I 16.0 14.0 ~ 12.0
- .J Q) ltl.....
c: co It!~ a: c: -l Cl> *Q
- AJ °' 10
-
- S:: ca,_
Q) Q) c w~~ N I .p,. w rn 11 11 rn (J -I 1--l < rn CJ )> ca CJ) J: ro Q) c
- J 10.0 8.0 6.0 I
I SSES UNIT 2 CYCLE 19 f i : I I ! ~ I i i l i ~ I ! I ! i I I ! f l i ! : I j 1 i : : I 111;1~:~~1i~1111;~*11:1::111!!111: ---~---~---~---~---~---~---~---~---~---~---~---~---~---~---*---~---~---+---l---~---~---*---~---~-------~---4---~---~---~---~---~---~---~--- l I I I I J I I I I I l I I I I I I l I I I I I J g I J J I I I J I I I I * ~ I J I I ~ I I I I I l I I I I I ~ ~ I I I I I I I I I f I I I I l I I I I I I I I I I I l I I 1 l' ---i--L-J __ J ___ ~ __ J_j __ J_J_J_J_J__j __ J_j __ J __ !---!-- 1~--, R~F~R;N1C~ !*,s. ;.4 1 .1~n~3~2-~,~--- J I I' I l I ll l I I I I I I I I I l I I I I I J I I IZ I I U I I I I l I J I I I l I I l I JI I I A J I 1 I I I I I I t ~ I I t I I I t I I I I I I I I I I I I I I I I I I I I I J USED IN DETERMINING MAPRAT I 1 I I l t I l l I ~ l I I ~ I I ~ I ---r---~---~"--~---~---~---~---~--~~---P---~---~---~-~-+***+--*~"--+---+-- ~--- 1 : ~ f f ~ I I I I I I f f I I I I J. f I I f f I I I ~ f l I I I t f I
- 1 f
I I I l I I l I I I m I I I I I I I I I ~ I I f I I I I I I I f I ~ f u s r n 1 u 1 1 1 I ~ ([ B B ---i----r---r---r---r---r---r---r---r---~---r-~-t---r---t---t---t---t---+-~-t---t---t---t---i---1---t---1---1---1---1---1---i---i---i---i--- i 1 1 r i 1 i i : i i ; ; i 1 1 i i 1 i i ; : i r
- i : 1 1 i i :
~ 1 1 l 1 1 1 r 1 J 1 1 J r r I 1 1 J 1 11 1 1 I 1 1 a l r 1 J 1 I i i ! i i i ! ! i i i i i i i f i i I i i ! ! ! i ! i ! ! i i i i ! ---r---~---~--a~---~---~---~---~---~---~---~---****~---~---~---~---~---~---~---+---~---T---~---~---~---~---~---~---~---~---~---~---~---~--- 1 ;
- I I
~ I I I I I 1 I I I l i i : ~ J I l I I I I ~ I I ~.o, ~o.~ i I 1sooo, 10.0 I ; ; : l ; : ; : :,, 1 1 ; 1 1 ; 1 1 1 ! ; ! ; l I f ! ! 1 I I I i ! i I i i i ! ! ! i i* i l i. i. ; i i i I I I i -t-~-i-~-t-~-t-~-t-~"""~"""~-ta.... ~Li::---t---r---~---t---~---t---t---f---f---f**-+***f*--t---+---1---i---i---i---i---1---~---;---i---~---i---1--- I I I I l I I I I I J I I I g I I I I I ll I I I D I I I I I I I I I I J I I I I II I I l n I a I 1 a f
- ~~llllfl;lll~l
- ~~IJ I
,l~llillll~f;~**111~lffl I I I I I I I I l ) I I I I I J I I I 11 I I 1 I I l I I I I I I I ---r---r---r---r---r---r---r---r---r---r---r---r---. ---r---r---y---y---r---1---1---1---1---1---1---1---1---,---,---,---,---,---,---1--- 1 I J ~ f I I I ~ ~ I I I f ~ I ~ I I l ~
- ~
I f I I I I I I I I I I I I I I I l I I I I I 1 I I I 1 J l I I J I I i ' i i ! ! i i i i ! i i ; 1 ! ! ; I i i ! ! i i ! f i i i i I i. i ! ---~---~---~---~---~---~---~---1---t---~---t---r---t---t---t---t---t---+---. ~---t---t---t---t---~---~---1---1---1---i---1---1---~---i-~- 1 I I I I I l I I I I I J I I I I ~ I I I I I I I 1 l I I I f I I I I I I I I t I I I I I I t 1 ~ 11 I I l I I I l I I I I B I I I I I I I l I I I I I I I 1 I I I t B I I I I ---~---~--~~---~---~---~---~---~---~---~---t---i---i-~-t---i---!---i~--i---J---~---~---~---~---~--- 1 -J---~---~---~---~---4---~---~---~--- I I. f 1 I l ~ ~ I ~ I I ~ f I I l i I ~ I I j f R ~ I 1 ~ ~ f ~ I I I l I I I I I f I I ~ I
- I I
f 1 I I I I .1 I 1 1 I ~ J I I 1 I I 1 I[ I J I I J l I .I I I I J I I I I I I I I I I I . 8 I I
- 1~;111111~111~:11111111;;;~;
1~11 ~--L---~---L---~---~---~---~---L---~---L---L---~w*M~---~---&---~---~---~---~-~-~---~---~---~---~---~---~---J---~---~---~--~ -~---~---~--- 1 I ~ I f I I J ) I I ~ I I I I I I f f I I I ~ I I ~ I I '1 I I I I I I I 1 I J I I I I I I I l I I II I I 11 8 I J JI I I I '1 I ~ I J I I I I I I I I I I ~ I I I I 1 I I '1. I I I I I I I I I I I I I J I I I I I I I l I I I I 8 I a J I
- i ;
l I I I I I l I I I I I I I I I I I I I I J S l I g I I I I
- 1 a1000 5 6 I
---r---r---r---r---r*--t-*-r*--r---t---t---t---t---t---t---t---t---r---t---t---t---1---1---1---1---1---1---1---1---1---1---1* * ~ ! i i I t i i i 1 ! ! ! i i i i ! ! i i i i I ! ! ! i i i i i i ** i i I I I I I J I I I I I I I I I I I I I I I I I J I I I I I J I I I J 1 1 I I I I J I I I I I I I I I I I I I I I I J I I I I I 1 S l I I -l rn C) w 4.0 0.0 J I I J I I I I I J I I I I I J r I I I I I I I ~ I I I JI I I 10000.0 20000.0 30000.0 40000.0 50000.0 60000.0 70000.0 1---' Ol - N C) I---' -.......i Average Planar Exposure (MWD/MTU) AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMIT VERSUS AVERAGE PLANAR EXPOSURE - SINGLE LOOP OPERATION ATRIUMTM.10 FUEL FIGURE 8.2*1
!~ Rev. 13 PL-NF-17-001 Rev. O Page43of62 Main Turbine* Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 2 TRM/3.2-44 EFFECTIVE DATE 03/16/2017
:::---==-~-~ ----_
- -----=--==---- - -_ ___ *J _______ _ (/) SSES UNIT 2 CYCLE*19 c: 3.6 (/) 0 c rn LEGEND
- c 3.4
)> z CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM z )> INSERTION TIME c: 3.2
- z CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME
>--1 --i N 3.0 ~ 2.8 E
- J SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES -
ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 C> s:: 2.6 --i ~
- o Q) a.
3: 0 2.4 w 0:: I USED IN DETERMINING MFLCPR I D.. N () I
- iE
.p. 2.2 (J"l 2.0 rn 130, 1.871 1.8 rn ('") A B --i 1--1 1.6 rn I 108, 1.48 ~ I
REFERENCE:
T.S. 3.4.1and3.2.21 0 )> --i 1.4 rn 0 30 40 w. J--1 en - N 0 J--1 ""-J 50 60 70 80 . 90 100 Total Core Flow (MLB/HR) MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC) FIGURE 8.2-2 110
(/) c:: (/) 0 c: fTl
- r:
)>
- z:
- z:
)> c:: z 1----i -l N .E
- i Ol
.= -l ~
- a
(]) c.
- s:
0 - w oc
- 0.
N (.) I
- E
+>- O"l _.. 1, SSES UNIT 2 CYCLE 19 46 I I 4.4 4.2 1------1------1---1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 4.o 3.8 [23; 3.711 CURVE C: CORE POWER::;; 26% AND CORE FLOW :S:: 50 MLBM/HR 36 i 23, 3.65 ~'\\.~ l 26, 3.55 I I I I I 3.4 - c 126, 3.4211----1------1-----1 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2 3.0 USED IN DETERMINING MFLCPR I 2.8 2.6 1---11-1! 26.01, 2.40 '1-.,--t-----1-------1------1-----+---------li-----1 2.4 l------l~""""-,..--1-----+------+-----+-------1-----+.------1------1 2.0 2.2 ~ I I 1-------+-.....:::sio.oc"""---+.1.140, 2.oa.1----1------+-----+---------l1-----1*-----i A...:__ BI 60, 1.90 I 1.8 1.6 ]
REFERENCE:
T.S. 3.4.1 and 3.2.21 . 1.4 100, 1.90 I 20 30 40 50 60 70 Core Power(% RATED) 80 90 100 MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS I EOC-RPT 1 BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC) FIGURE 8.2~3
- a CD
1 I' 1: 'I* I* I,, I I I I Rev. 13 Main Turbine Bypass Inoperable PL-NF-17-001 Rev.a Page 46of62 SUSQUEHANNA UNIT 2 TRM/3.2-47 EFFECTIVE DATE 03/16/2017
(./) c (./) 0 c rn
- r:
)> z z )> c ::z 1--1 -r N -r
- o 3
- -
w. N I ..p,. OJ rr1 "'Tl "'Tl rr1 n -r 1--1 m Cl )> -r m 0 w - 1--' O"l. N 0 I-' '-I "§
- J CJ c
~ RS Cl> 0. 0 n:: a.. (..) ~ _-_.: -_- ---=--: -:_:: __. _-- - --- ----- --- - *-- -
- . ---- _--_ -=----=-- : _---:-
~ - ------_:--:.:= -~-. - SSES UNIT*2 CYCLE 19 4.2 LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.8 INSERTION TIME ~ CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.6 3.4 3.2 SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS - VALVES ARE INOPERABLE PER SR 3.7.6.1OR3.7.6.2 3.0 I I I I USED IN DETERMINING MFLCPR 2.8 2.6 ( 2.4 2.2 130, 2.11 I 2.0 A B 1.8 -J
REFERENCE:
T.S. 3.4.1, 3.7.6, and 3.2.21
- 108, 1.651-1.6 1.4 30 40 50 60 70 80 90 rota! Core Flow (MLB/HR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW* MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC} FIGURE 8.2*4 100 110
(/) c: VJ 0 c rn
- c
)>
- z.
z )> c z 1-1 -l N -l
- o
-
- s:: -
w N I ..j::::> \\.0 rn '1 '1 rr1 n -l I-! rr) Cl )> -l rri 0 w - I-' °' - N 0 . I-' -.J E
- J C) s::
~ ra (!) a. 0 c:::
- a.
(.) :a SSES UNIT 2 CYCLE 19 44 I I I I LEGEND 4.2 ~23, 4.121 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM \\ INSERTION TIME 4.0, \\ CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.8 - c - i126, 3.781 CURVE C: CORE POWER:::.;; 26% AND CORE FLOWS 50 MLBM/HR 123, 3.651 \\ 3.6 . \\ \\ 3.4 !26, 3.421 SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 3.2 3.0 I USED IN DETERMINING MFLCPR 2.8 2.6 I 26.01, 2.45 I 2.4 ............... ~
- 40,2.11:
2.2 160, 1.961 A B 2.0 I
REFERENCE:
T.S. 3.4.1, 3.7.6, and 3.2.21
- 1. 8 20 30 40 50 60 70 80 Core Power(% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER . MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC) FIGURE 8.2-5 90 100, 1.961 100
I 1'.,,,, I' I* I. SUSQUEHANNA UNIT 2 Rev.13 EOC-RPT Inoperable TRM/3.2-50 PL-NF-17-001 Rev.a Page49 of62 EFFECTIVE DATE 03/16/2017
(/) SSES UNIT 2 CYCLE 19 c (/) 0 4.0 I c rrl
- c.
LEGEND 3.8 )>
- z:
CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM
- z:
)> INSERTION TIME 3.6 c :z: CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME ~ 3.4 -I N I 3.2 SAFETY-ANALYSES ASSUME THAT FOUR BYPASS VALVES E 3.0 ARE OPERABLE PER SR3.7.6.1AND3.7.6.2
- i.
- 0) c
-I ~ . :;;o ,IJ) c.. 3: 0 I I I USED IN DETERMINING MFLCPR I 2.8 2.6 w o:= O.* N (.) I
- 2:
2.4 <..n I-" 2.2 fT'I 2.0 I] 130, 1.871. I] rrl ~ 1.8 - A_B ~ rrl 1.6
REFERENCE:
T.S. 3.4.1, 3.3.4.1, and 3.2.2 I I
- 108, 1.48 I 0 )>
-I rn 1.4 30 40 50 60 70 80 . 90 Total Core Flow (MLB/HR) MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW . EOC-RPT INOPERABLE. SINGLE LOOP OPERATION (BOC to EOC) FIGURE 8.2-6 100. 110
(/J c (/J 0 c rn
- c:
)>
- z:
- z:
)> c ::z: f-< --l N E
- J en c:
--l ~
- o C1I c.
-
- s::
0 w ~
- n.
N 0 I 2 <.11 N 4.6 4.4 4.2 4.0 SSES UNIT 2 CYCLE 19 1-------1-------+----1LEGEND 1-----1------+---rCURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 1-;:::==:::;---+-----:--t---tCURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.8 ~ 23, 3.71 11---1-----1----1 1--...... -----------1-----iCURVE C: CORE POWER::;; 26% AND CORE FLOW::;; 50 MLBM/HR 3.6 V\\...""' I I I 23, 3.65 :\\ 26, 3.55 3.4
- 3. 2
- 3. 0
- 2. 8
- 2. 6
- 2. 4*
. 2. 2 2.0 1.8 - c -Lll.!2~6,~3~.4~2~1--1----11 I I I I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 I I I I I I I USED IN DETERMINING MFLCPR t= 1-----11--1126.01, 2.40 ~1----1-------+-----------i------t---...,.......,..--1-------1 1 I ............. 140, 2.06 11---4---..,..---+-----1------1------1------i t I A B 1100, 1.90 I 60, 1.90 -----i--
1-----.---~
H
REFERENCE:
T.S. 3.4.1, 3.3.4.1, and 3.2.2ji---------1----------1--------1 1.6 1.4 20 30 40 50 60 70 Core Power(% RATED) 80 90 100 MCPR OPERATING LIMIT VERSUS CORE POWER EOC-RPT INOPERABLE SINGLE LOOP OPERATION (BOC to EOC) FIGURE 8.2-7
- a
~ ~ (.,)
i! I I I i Rev. 13 PL-NF-17-001 Rev.O Page 52of62 Back~p Pressure Regulator Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-53 EFFECTIVE DATE 03/16/2017
(./) c:: 4.0 (./) C> c: rn 3.8
- c
)> z z 3.6 )> c z 3.4 1--t -I N 3.2 ..... E 3.0
- J
- 0)
. c: 2.8
- i::;
-I 1\\1 s..
- 0
(]) 0.. 3: 0 2.6 w 0::: 0.. N 0 I
- s 2.4 (J1
~ 2.2 rn 2.0 rn ~ 1.8 1--1 rn 1.6 a )> -I rn 0 w - I---'
- 0)
N a I---' -.....J 1.4 --- ---- ---------- ---- -------=-------===- SSES UNIT 2 CYCLE 19 LEGEND CURVE A; MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR3.7.6.1AND3.7.6.2 I USED IN DETERMINING MFLCPR -i30, 1.871 A B j
REFERENCE:
T.S. 3.4.1, 3.7.8, and 3.2.2 I 1os, 1.48 I 30 40 50 60 70 80 90 Total Core Flow (MLB/HR) MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE SINGLE LOOP OPERATION (BOC to EOC) FIGURE 8.2-8 100 110
~.,:r-:.;~~:*.=___----- - ---~---- V> c (/) 46 Cl c rr1
- c
)> z z )> c z f-l -l N 4 .4 4 3 3 3 3 -l :!: 3 ~ E ....... :J w
- 0) 2 i::
N
- e.
I l!;: 2 01 Q) Ui
- c.
0 2 ~ a... .4 .2 .0 .8 l 23, 3.71 I .6 .... : 26, 3.55: 123, 3.65 1 \\
- 4 : c -126, 3.421
.2 .0
- 2s.01, 2.11:
.8 .6 ~ .4 ~ 2 rr1 .2 2.0 SSES UNIT 2 CYCLE 19 LEGEND CURVE A: MAXIMUM ALLOWABLE AVEftA,GE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME CURVE C: CORE POWER::;; 26% AND CORE FLOW s 50 MLBM/HR . SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 I I I I I USED IN DETERMINING MFLCPR I 40, 2.51 I A B 160,2.141 11 11 rr1 n -l f-l 1.8 ~
REFERENCE:
T.S. 3.4.1, 3.7.8, and 3.2.2 rn 1.6 1.4 20 30 40 50 60 70 80 Core Power(% RATED) MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE SINGLE LOOP OPERATION (BOC to EOC) FIGURE 8.2-9 90 I 100, 2.141 100
- o co
. ~*
.: l I I 1, i' I' I! I* Rev.13 PL-NF-17-001 Rev. 0 Page 55of62 One TSV or TCV Closed SUSQUEHANNA UNIT 2 TRM/3.2-56 EFFECTIVE DATE 03/16/2017
~--------------------------------------------- 1--- I (/) c: 4.0 (/) 0 c: rri
- 3.8
- r:
z z 3.6 )> c: z 1-1 3.4 -I N 3.2 "§ 3.0
- i
- 0) c:
2.8 +; -I e
- a Q) 0..
3: 0 2.6 w 0::: a.. N u I
- §i:
2.4 U1 -......J 2.2 rri. 2.0 "Tl rri n 1.8 -i 1-1 rri 1.6 D > -i 1.4 rri 0 w I-' O'i N 0 f--' -.....J ~-- - - :-:...-==-=---- --.: --- - :: - -_- *===-==---=. -_:. - SSES UNIT 2 CYCLE 19 LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR LJ30, 2.111 ~ A B LJ REFER~NCE: T.S. 3.4.1, 3.2.2, and TRM 3.3. 7 I 30 40 50 60 70 80 Total Cqre Flow (MLB/HR) MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW ONE TSV OR TCV CLOSED* SINGLE LOOP OPERATION (BOC to EOC)
- 90.
FIGURE 8.2-10 100
- Operation with one TSV or TCV closed is only supported at power levels ::::;;753 rated power l
1108, 1.671 110
- -- -:.- -=-==--=-:**i_'.,:_,.. -- - -- --_--- -=---=--- -- --- - ::==--=-=----==-- - -
- ..~:~.'. --=-==-=--=--=--- ::- ----- --=-=--=---=---=--
(./) c (./) 0 c rn
- c
)> z
- z
):> c
- z.
1-i -i N -l
- o 3
w N I U1 co l'T1 11 11 rrJ n -i 1-1 rrJ 0 )> -l r-n 0 w 1--' O'l N 0 I-' 4.6 4.4 4.2 4.0 3.8 3.6 E 3.4
- i Cl c:
3.2 ~ Q) 3.0 c.. 0 0::: 0.. 2.8 (.)
- iE 2.6 2.4 2.2 2.0 1.8 1.6 1.4 SSES UNIT 2 CYCLE 19 I
I I LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 123, 3.71 : CURVE C: CORE POWER s:; 26% AND CORE FLOW s:; 50 MLBM/HR 23 3 65,~..... J 26, 3.55 I I I I I "'\\
- 1 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES 126, 3.421
-c . ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR I I 26.01, 2.40 I
- 40, 2.06:
A B I I 160, 1.90 I
- (-
D
REFERENCE:
T.S. 3.4.1, 3.2.2, and TRM 3.3. 7.I 20 30 40 50 60 Core Power(% RATED} MCPR OPERATING LIMIT VERSUS CORE POWER. ONE TSV OR TCV CLOSED* SINGLE LOOP OPERATION (BOC to EOC) FIGURE 8.2-11 70
- Operation with one TSV or TCV closed is only s'upported at power levels :=:75% rated power
- 1s, 1.90 80
';l Rev. 13 9.0 POWER I FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2
- Description PL-NF-17-001 Rev. O Page 58of62 Monitor reactor conditions to maintain THERMAL POWER I core flow outside of Stability Regions I and II of the Power I Flow map, Figure 9.1.
If the OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Regfon l of the Power I Flow map is considered an immediate. exit region. If the OPRM Instrumentation is inoperable per TS 3.3.1.1, Region I of the Power I Flow map is considered an immediate scram region. Region II of the Power I Flow map is considered an immedic;ite exit region regardless of the operability of the OPRM Instrumentation. SUSQUEHANNA UNIT 2 TRM/3.2-59 EFFECTIVE DATE 03/16/2017
120 110 100 90 80 70 60 50 40 30 20 10 0 Rev. 13
Purpose:
~~~~~~~~~~~~~~~~~~ Initial I Date: f STABILITY REGION I IF OPRM lNOPERABLEIMMEDIATELY SCRAM TAWAPPUCABLE PROCEDURE. IFOPRMOPERABLEIMMEDIAIELY EXIT IAW APPLICABLE PROCEDURE. STABillTY REGION 11 IMMEDIAlELYEXlTIAWAPPUCABLE PROCEDURE. RE!SlRICTI!D REGION IF ABOVE MELLLABOUNOARY, IMMEDIATELY EXITIAWAPPLICAllLE PROCEDURE. PL-NF-17-001 Rev. 0 Page 59 of 62 110 100 90 BO 10 ~l-'F~H-'"l"tf=+-+-+-+-t-F'-Hf-+-+-t-+-+-+-+-+-++..,f-t--H~+-+-+-+-+-+--1--1--+-1-+-1--1H--f-l-+-+-+-l-+-+-t-J~O 0 10 20 30 40 50 60 70 80 90 Total Core Flow (Mlbmlhr) (for SLO <75% Pump Speed Use Form G0-200-009-2) Figure 9.. 1 SSES Unit 2*Cycle 19 Power I Flow Map 100 110 SUSQUEHANNA UNIT 2 TRM/3.2-60 EFFECTIVE DATE 03/16/2017
Rev. 13 10.0 OPRM SETPOINTS 10.1 Technical Specification Reference Technical Specification 3.3.1.1 10.2 Description PL-NF-17-001 Rev. O Page 60of62 Setpoints for the OPRM Instrumentation are established that will reliably detect and suppress anticipated stability related power oscillations while providing a high de.gree of confidence that the MCPR Safety limit is not violated. The setpoints are described in Section 2.0 and are listed below: = 1.12 = 16 = 60 Mlbm I hr SUSQUEHANNA UNIT 2 TRM/3.2-61 EFFECTIVE DATE 03/16/2017
--~ Rev.13 11.0 REFERENCES PL-NF-17-001 Rev. O Page 61 of 62 11.1 Th$ analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. XN-NF-81-58(P)(A), Revision 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response ~valuation Model," Exxon Nuclear Company, March 1984.
- 2. EMF-2361(P)(A), Revision 0, "EXEM BWR-2000 ECCS Evaluation Model,"
Framatome ANP, May 2001.
- 3. EMF-2292(P)(A), Revision 0, "ATRIUMTM-10: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
- 4. XN-NF-84-105(P)(A), Volume 1 and Volume 1 Supplements 1 and 2, "XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company, February 1987.
- 5. XN-NF-80-19(P)(A), Volume 1 and Supplements 1and2, "Exxon Nuclear Methodology for Boiling Water Reactors: Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
- 6. XN-NF-80-19(P}(A), Volumes 2, 2A, 28, and 2C "Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model," Exxon Nuclear Company, September 1982.
- 7. XN-NF-80-19(P)(A), Volume 3 Revision 2 nExxon Nuclear Methodology for Boiling Water R_eactors Thermex: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
- 8. XN-NF-80-19(P)(A), Volume 4, Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
- 9. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company, Inc.,
September 1986.
- 10. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, "Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors,n November 1990.
- 11. NE-092-001A, Revision 1, "Licensing Topical Report for Power Uprate With Increased Core Flow," Pennsylvania Power & Light Company, December 1992 and NRG SER (November 30, 1993).
SUSQUEHANNA UNIT 2 TRM/3.2-62 EFFECTIVE DATE 03/16/2017
Rev. 13 PL-NF-17-001 Rev. O Page 62 of 62
- 12. ANF-89-98(P)(A) Revision 1 and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation, May 1995.
- 13. EMF-2209(P)(A), Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
- 14. EMF-85-74(P)(A}, Revision O, Supplement 1(P)(A) and Supplement 2(P)(A),
- "RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"
Siemens Power Corporation, February 1998.
- 15. EMF-2158{P)(A), Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASM0-4/Microburn-82," Siemens Power Corporation, October 1999.
- 16. EMF-CC-074(P)(A), Volume 4, Revision O, "BWR Stability Analysis -
Assessment of STAIF with Input from MICROBURN-82," Siemens Power Corporation, August 2000.
- 17. NED0-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
- 18. ANF-913(P)(A), Volume 1 Revision 1 and Volume 1 Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses,-" Advanced Nuclear Fuels Corporation, August 1990.
- 19. ANF-1358(P)(A), Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005.
SUSQUEHANNA UNIT 2 TRM/3.2-63 EFFECTIVE DATE 03/16/2017}}