Revisions to Technical Requirements Manual
ML23195A035
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 06/30/2023
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML23195A035 (1)


Text

Ul.LJ.J..

-)V I L;.Vk.:>

MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2023 9712 USER INFORMATION:

GERLACH*ROSEY M Address: NiJCSA2 Phone#:

542-3194 EMPL#:028401 CA#:

0363 TRANSMITTAL INFORMATION:

TO:

GERLACH*ROSEY M 06/30/2023 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

Page 1

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS

~OM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF "llllll'RRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 03/08/2023 ADD MANUAL TABLE OF CONTENTS DATE: 06/29/2023 CATEGORY: DOCUMENTS TYPE: TRMl of 2

UU!l *

..:>U1 L.V.L...:>

ID:

TEXT 2.2 REMOVE:

REV: 11 ADD:

REV: 12 CATEGORY: DOCUMENTS TYPE: TRMl ID:

TEXT 3.3.6 ADD:

REV: 6 REMOVE:

REV: 5 CATEGORY: DOCUMENTS TYPE: TRMl ID:

TEXT B3.3.6 ADD:

REV: 7 REMOVE:

REV: 6 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN 2

CORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE MPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

of 2

SSES MANUAL Manual Name :

TRMl

.Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:

06/29/2023 Procedure Name Rev Issue Date TEXT LOES 96 01/03/2019

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 29 12/13/2022

Title:

TABLE OF CONTENTS TEXT 1.1 1

01/31/2014

Title:

USE AND APPLICATION DEFINITIONS Change ID Change Nwnber*

~-

. ~)

0v

'(//

/

<:~

,;/

.,..., /)"

0*1201,015 ~

"V TEXT 2.1

Title:

PLANT PROGRAMS AND SETPOINTS PLANT /DG@~~S*~Y

\\ "\\

,.. TEXT 2.2 12 06/2.9-~023"

/_ \\'

/

Title:

PLANT PROGRAMS AND SETPOINTS rNSTRUMENT-TRIP SETPOINT TABLE

(

J ~

/""* '<~

/ / ' *,

7 /

_'..._03/1,8/_g.021 TEXT 3.0

<.,,r,,. '

""/

Title:

TECHNICAL REQUIREMENT fOf OP~?5ION (TRO) APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY

/~" 'v TEXT 3. 1. 1

"" <;;;--1~ 11 / 0 9 / 2 0 0 7

-~,, '--...

Title:

REACTIVITY CONTROL SYS!l'EMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD f,,f "

\\

'-..j INJECTION (ATWS\\ARr-) \\[NSTRUMENTATION TEXT 3.1.2

/~~~)

0 11/18/2002

/ /',_V A ___,/

Title:

REACTIVIT~ CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT

\\,

} '

\\ '-.__/)

'"*--~/

TEXT 3.1. 3 6

12/18/2017

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 1

10/12/2020

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.1 21 03/29/2022

Title:

CORE OPERATING LIMIST REPORT (COLR)

Page 1 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0

11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3

03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2

11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 11 06/29/2017

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0

11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 6

06/29/2023

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 4

01/17/2022

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1

10/22/2003

Title:

INSTRUMENTATION INTENTIONALLY LEFT BLANK TEXT 3.3.9 04/17/2008

Title:

OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1

12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1

10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 2

04/02/2019

Title:

WATER MONITORING INSTRUMENTATION Page 2 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1 1

04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2

Title:

REACTOR COOLANT SYSTEM TEXT 3.4.3 1

1 04/16/2009 INTENTIONALLY LEFT BLANK 11/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2

04/17/2008

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1

04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 3

05/13/2022

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 2

03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT 3.5.2 2

03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT 3.5.3 1

03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SlJP_PLY TO ADS TEXT 3.6.1 0

11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 3

01/03/2019

Title:

SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0

11/18/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0

11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0

11/18/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (URS) AND GROUND WATER LEVEL TEXT 3.7.3.1 6

04/21/2022

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3

04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 4

05/16/2016

Title:

PLANT SYSTEMS CO2 SYSTEMS TEXT 3.7.3.4 2

04/16/2009

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2

04/16/2009

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2

04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7

.1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 13 12/18/2017

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1

04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1 1

03/05/2015

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0

11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1

04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3

06/04/2012

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2

09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 5

03/05/2015

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 3

03/05/2019

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 1

11/01/2018

Title:

STRUCTURAL INTEGRITY TEXT 3.8.1 3

04/22/2020

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2

11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 3

06/23/2021

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC Page 5 of 16 Report Date: 06/30/23

SSES MA.NC.JAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 4

01/28/2020

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0

11/18/2002

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1

11/14/2013

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2

03/05/2019

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2

02/25/2021

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0

11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0

11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 1

03/12/2019

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1

04/26/2006

Title:

MISCELLA.WEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 3

06/19/2019

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 4

10/05/2022

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2

04/17/2008

Title:

INTENTIONALLY LEFT BLANK Page 6 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3. 11. 1. 3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3. 11. 1. 4 2

10/09/2012

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3. 11. 1. 5 3

03/05/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 4

03/12/2019

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE -

NOBLE GASES TEXT 3. 11. 2. 3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3. 11. 2. 4 0

11/18/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3. 11. 2. 5 4

07/03/2013

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3. 11. 2. 6 8

06/29/2017

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE Page 7 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1 6

01/03/2022

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3. 11. 4. 2 2

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11. 4. 3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0

11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4

04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1 0

08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 1

01/03 019

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 1

01/03/2019

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1

12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 1

07/01/2021

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.6 0

08/31/1998

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Page 8 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 1

12/13/2022

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT B3.0 6

03/18/2021

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 2

04/29/2014

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 4

12/18/2017

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 1

10/12/2020

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0

11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 1

01/31/2014

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2

03/31/2011

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3

12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7

06/29/2017

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2

11/09/2007

Title:

INTENTIONALLY LEFT BLANK Page 9 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 7

06/29/2023

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 4

01/17/2022

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1

10/22/2003

Title:

INTENTIONALLY LEFT BLANK TEXT B3.3.9 4

01/03/2019

Title:

OPRM INSTRUMENTATION TEXT B3.3.10 3

08/09/2010

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1

10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 1

04/02/2019

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1

04/16/2009

Title:

INTENTIONALLY LEFT BLANK TEXT B3.4.3 1

11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page.10 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 4

05/13/2022

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.l 2

03/17/2020

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT B3.5.2 2

03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT B3.5.3 2

03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0

11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2

04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l 0

11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0

11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 4

02/16/2017

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2

04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3 1

01/03/2019

Title:

PLANT SYSTEMS BASES CO2 SYSTEMS TEXT B3.7.3.4 4

06/19/2019

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.S 1

04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1

04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0

11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3

09/27/2012

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0

11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0

11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0

11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0

11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4

06/04/2013

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2

01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 12 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8 4

01/31/2014

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 3

03/05/2019

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2

11/01/2018

Title:

STRUCTURAL INTEGRITY TEXT B3.8.1 2

03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0

11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 2

06/23/2021

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0

11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0

11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1

11/14/2013

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3

03/05/2019

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 3

02/25/2021

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0

11/19/2002 Titl~: REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 1

03/12/2019

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0

11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3. 10. 2.

1 03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 3

10/05/2022

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.i0.4 1

04/17/2008

Title:

INTENTIONALLY LEFT BLANK TEXT B3.11.l.1 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11. 1. 2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3. 11. 1. 3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3. 11. 1. 4 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.ll.l.5 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Page 14 of 16 Report Date: 06/30/23

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1 1

12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.ll.2.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.ll.2.4 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5

07/03/2013

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.ll.2.6 2

09/08/2016

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.l 6

01/03/2022

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4. 2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.l 1

10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1

12/03/2010

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Page 15 of 16 Report Date: 06/30/23

-SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS 16 of 16 Report Date: 06/30/23

Rev. 12 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table Instrument Trip Setpoint Program 2.2 The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard

. Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements.

Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.

Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.

Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.

Reference:

MFP-QA-1220, Engineering Change Process Handbook SUSQUEHANNA - UNIT 1 TRM / 2.0-5

Rev. 12 2.2.1 2.2.1.1 2.2.1.2 2.2.1.3 2.2.1.4 2.2.1.5 2.2.1.6 2.2.1.7 2.2.1.8 2.2.1.9 2.2.1.10 2.2.1.11 2.2.1.12 2.2.1.13 2.2.1.14 2.2.1.15 SYSTEM/REFERENCE LCO [TRO]

Reactor Protection 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 (a) See Figure 2.2-1 Instrument Trip Setpoint Program 2.2 TABLE 2.2-1 (Page 1 qf 8)

INSTRUMENTATION SETPOINTS TRIP FUNCTION Intermediate Range Monitor, Neutron Flux -

High Average Power Range Monitor, Neutron Flux - High *(setdown)

Average Power Range Monitor, Simulated Thermal Power - High, Two Loop Operation Average Power Range Monitor, Simulated Thermal Power - High, Single Loop Operation Average Power Range Monitor, Simulated Thermal Power - High, Clamp Average Power Range Monitor, Neutron Flux -

High Reactor Vessel Steam Dome Pressure - High Reactor Vessel Water Level - Low, Level 3 Main Steam Isolation Valve - Closure This section not used.

Drywell Pressure - High Scram Discharge Volume Water Level -

High - Level Transmitter Scram Discharge Volume Water Level -

High - Float Switch Turbine Stop Valve - Closure Turbine Control Valve Fast Closure, Trip Oil Pressure - Low TRIP SETPOINT s 120/125 divisions of full scale s 18% of RATED THERMAL POWER 0.55 W + 58.7%

0.55 (W- /1W) + 58.7%(b) s 113.5% of RATED THERMAL POWER s 118% of RATED THERMAL POWER s 1087 psig 2:: 13. 0 inches (a) s 10% closed s 1.72 psig s 65 gallons s 61 gallons s 5.5% closed 2:: 500 psig (bl For Single loop operation, the value of 11W = 8.7 SUSQUEHANNA - UNIT 1 TRM / 2.0-6

Rev. 12 Instrument Trip Setpoint Program 2.2 2.2.1.16 2.2.1.16.1 2.2.1.16.2 2.2.1.16.3 2.2.1.16.4 2.2.1.16.5 2.2.1.16.6

. 2.2.1.16.7 2.2.1.16.8 2.2.1.16.9 2.2.1.16.10 2.2.1.16.11 SYSTEM/REFERENCE LCO [TRO]

OPRM Instrumentation 3.3.1.1 3.3.1.1

[3.3.9]

[3.3.9]

[3.3.9]

[3.3.9]

[3.3.9]

[3.3.9]

[3.3.9]

[3.3.9]

[3.3.9]

TABLE 2.2-1 (Page 2 of 8)

INSTRUMENTATION SETPOINTS TRIP FUNCTION Sp PBA Amplitude Trip Np PBA Successive Confirmation Count Trip TOL (£) Period Tolerance fc Conditioning Filter Cutoff Frequency Tmin Oscillation Period Lower Time Limit Tmax Oscillation Period Upper Time Limit LPRMmin Minimum LRPMs/Cell Required for Cell Operability S1 Peak Threshold Setpoint/ABA & GRBA S2 Valley Threshold Setpoint/ABA & GRBA Smax Amplitude Trip Setpoint/ABA DR3 Growth Rate Factor Setpoint/GRBA 2.2.2 2.2.2.1 Isolation Actuation Instrumentation Primary Containment Isolation 2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, level 3 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, level 2 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low low, Level 1 2.2.2.1.4 3.3.6.1 Drywell Pressure - High 2.2.2.1.5 3.3.6.1 SGTS Exhaust Radiation - High 2.2.2.1.6

[3.3.6]

Main Steam Line Radiation High High

{a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-7 TRIP SETPOINT See COLR TRO 3.2 See COLR - TRO 3.2.

0.10 sec 1.50 Hz 1.00 sec 3.50 sec 2

1.20 0.85' 1.50 1.60

?! 13.0 inches(a)

?! -38.0 inches{a)

~ -129 inches<al

s: 1.72 psig
s: 23.0 mR/hr
c:; 15 x full power background without hydrogen injection

Rev. 12 Instrument Trip Setpoint Program 2.2 2.2.2.2 2.2.2.2.1 2.2.2.2.2 2.2.2.2.3 2.2.2.2.4 2.2.2.2.5 2.2.2.3 2.2.2.3.1 2.2.2.3.2 2.2.2.3.3 2.2.2.3.4 2.2.2.3.5 2.2.2.3.6 2.2.2.3.7 2.2.2.3.8 2.2.2.4 2.2.2.4.1 2.2.2.4.2 2.2.2.4.3 2.2.2.4.4 2.2.2.4.5 2.2.2.4.6 2.2.2.4.7 2.2.2.4.8 2.2.2.4.9 SYSTEM/REFERENCE LCO [TRO]

TABLE 2.2-1 (Page 3 of 8)

INSTRUMENTATION SETPOINTS TRIP FUNCTION Secondary Containment Isolation 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 Reactor Vessel Water Level - Low Low, Level2 Drywell Pressure High Refuel Floor High Exhaust Duct Radiation -

High Railroad Access Shaft Exhaust Duct Radiation High Refuel Floor Wall Exhaust Duct Radiation -

High Main Steam Line Isolation 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 Reactor Vessel Water Level - Low Low Low, Level 1 Main Steam Line Pressure - Low Main Steam Line Flow - High Condenser Vaouum - Low Reactor Building Main Steam Line Tunnel Temperature - High This section is not used.

This section is not used.

This section is not used.

Reactor Water Cleanup System Isolation 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 Reactor Vessel Water Level - Low Low, Level2 RWCU b. Flow - High RWCU Flow - High RWCU Penetration Area Temperature - High This section is not used.

RWCU Pump Area Temperature - High This Section is not used.

RWCU Heat Exchanger Area Temperature -

High This section is not used.

(al See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-8 TRIP SETPOINT 2 -38.0 inches(a)

,; 1.72 psig
18mR/hr
,; 5 mR/hr
,; 21 mR/hr 2 -129 inches(a) 2': 861 psig
,; 173 psid 2': 9.0 inches Hg vacuum
,; 177°F 2 -38 inches(a)
,; 59 gpm
462gpm
,; 131°F
147°F
,; 147°F

Rev. 12 Instrument Trip Setpoint Program 2.2 2.2.2.5 2.2.2.5.1 2.2.2.5.2 2.2.2.5.3 2.2.2.5.4 2.2.2.5.5 2.2.2.5.6 2.2.2.5.7 2.2.2.5.8 2.2.2.5.9 2.2.2.6 2.2.2.6.1 2.2.2.6.2 2.2.2.6.3 2.2.2.6.4 2.2.2.6.5 2.2.2.6.6 2.2.2.6.7 2.2.2.6.8 2.2.2.6.9 2.2.2.7 2.2.2.7.1 2.2.2.7.2 2.2.2.7.3 2.2.3 2.2.3.1 2.2.3.1.1 2.2.3.1.2 2.2.3.1.3 SYSTEM/REFERENCE LCO [TRO]

TABLE 2.2-1 (Page 4 of 8)

INSTRUMENTATION SETPOINTS TRIP FUNCTION Reactor Core Isolation Cooling System Isolation 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 RCIC Stearn Line ti Pressure - High RCIC Steam Supply Line Pressure Low RCIC Turbine Exhaust Diaphragm Pressure -

High RCIC Equipment Room Temperature - High RCIC Pipe Routing Area Temperature - High RClC Emergency Area Cooler Temperature -

High Drywell Pressure - High This section is not used.

This section is not used.

High Pressure Coolant Injection System Isolation 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 HPCI Steam Line ti Pressure - High HPCI Steam Supply Line Pressure - Low HPCI Turbine Exhaust Diaphragm Pressure -

High HPCI Equipment Room Temperature - High HPCI Emergency Area Cooler Temperature -

High HPCI Pipe Routing Area Temperature - High Drywell Pressure - High This section is not used.

This section is not used.

Shutdown Cooling/System Isolation 3.3.6.1 3.3.6.1

[3.3.6}

ECCS Actuation Core Spray System 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 Reactor Vessel Steam Dome Pressure - High RHR Flow - High Reactor Vessel Water Level Low Low Low, Level 1 Drywall Pressure - High Reactor Vessel Steam Dome Pressure - Low injection permissive (al see Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-9 TRIP SETPOINT s 188 inches H20

60 psig s 10.0 psig s 167°F s 167"F s 167°F s 1.72 psig s 370 inches H20
,
104 psig
,:; 10 psig s 167°F s 167°F s 167°F
1.72 psig 2 13.0 inches(a) s98 psig
25,000gpm 2 -129 inches(a) s 1.72 psig 2 396.5,
,
; 428.5 psig

Instrument Trip Setpoint Program Rev. 12 2.2.3.2 2.2.3.2.1 2.2.3.2.2 2.2.3.2.3 2.2.3.2.4 2.2.3.3 2.2.3.3.1 2.2.3.3.2 2.2.3.3.3 2.2.3.3.4 2.2.3.4 2.2.3.4.1 2.2.3.4.2 2.2.3.4.3 2.2.3.4.4 2.2.3.4.5 2.2.3.4.6 2.2.3.4.7 2.2.3.5 2.2.3.5.1 2.2.3.5.1.1 2.2.3.5.1.2 SYSTEM/REFERENCE LCO [TRO]

TABLE 2.2-1 (Page 5 of 8)

INSTRUMENTATION SETPOI NTS TRIP FUNCTION LPCI Mode of RHR System 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 HPCI System 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level 1 Drywell Pressure - High Reactor Vessel Steam Dome Pressure - Low, injection permissive Reactor Vessel Steam Dome Pressure Low, Recirculation Discharge Valve permissive Reactor Vessel Water Level - Low Low, Level2 Drywell Pressure - High Condensate Storage Tank Level - Low Reactor Vessel Water Level - High, Level 8 Automatic Depressurization System (ADS) 3.3.5,1 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level 1 Drywell Pressure - High ADS Timer Core Spray Pump Discharge Pressure - High Low Pressure Coolant Injection Pump Discharge Pressure - High Reactor Vessel Water Level - Low, Level 3 Confirmatory ADS Drywell Pressure Bypass Timer Loss of Power - ECCS Actuation 4.16kv ESS Bus Undervoltage (Loss of Voltage< 20%)

3.3.8.1 3.3.8.1 Bus Undervoltage Time delay (a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-10 TRIP SETPOINT

-129 inches(a) s; 1.72 psig
396.5, s; 428.5 psig
236 psig, decreasing

~ -38 inches<aJ s; 1.72 psig

2: 40.5 inches above tank bottom s; 54 inches

~ -129 inches s; 1.72 psig s 102 seconds

135, s 155 psig 2".121, s 129 psig
13 inches s 420 seconds
823.2, s 856.8 Volts
0.4, s 0.6 seconds

Rev. 12 2.2.3.5.2 2.2.3.5.2.1 2.2.3.5.2.2 2.2.3.5.3 2.2.3.5.3.1 2.2.3.5.3.2 2.2.3.5.3.4 2.2.3.5.4 2.2.3.5.4.1 2.2.3.5.4.2 2.2.3.5.5 2.2.3.5.5.1 2.2.3.5.5.2 2.2.4 2.2.4.1 2.2.4.1 2.2.5 2.2.5.1 2.2.5.2 2.2.6 2.2.6.1 2.2.6.2 2.2.6.3 Instrument Trip Setpoint Program 2.2 SYSTEM/REFERENCE LCO [TRO]

TABLE 2.2-1 (Page 6 of 8)

INSTRUMENTATION SETPOINTS TRIP FUNCTION 4.16kV ESS Bus Undervoltage (Degraded Voltage< 65%)

3.3.8.1 3.3.8.1 Bus Undervoltage Time delay 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)

3.3.8.1 3.3.8.1 3.3.8.. 1 Bus Undervoltage Time Delay (Non-LOCA)

Time Delay (LOCA) 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 65%)

[3.8.5]

[3.8.5]

480V Basis Time Delay 480V ESS Bus 0B565 Undervoltage (Degraded Voltage,< 92%)

[3.8.5]

[3.8.5]

480V Basis Time Delay ATWS Alternate Rod Injection and Recirculation Pump Trip 3.3.4.2/[3.1.1]

3.3.4.2/[3.1.1]

Reactor Vessel, Water Level - Low Low, Level2 Reactor Vessel Steam Dome Pressure - High End of Cycle Recirculation Pump Trip 3.3.4.1 3.3.4.1 Turbine Stop Valve-Closure Turbine Control Valve - Fast Closure Reactor Core Isolation Cooling System Actuation 3.3.5.2 3.3.5.2 3.3.5.2 Reactor Vessel Water Level - Low Low, Level2 Reactor Vessel Water Level - High, Level 8 Condensate Storage Tank Level - Low TRIP SETPOINT 2 2641.1, :,; 2748.9 Volts

5 3.3 seconds 2 3829.3, :5 3906.7 Volts 2 4 minute, 30 seconds
5 5 minute, 30 seconds 2 9, :,; 11 seconds 2308.9, :5315.1 Volts 2 4.5, :,; 5.5 seconds 2 437.6, :,; 446.4 Volts 2 9, :,; 11 seconds 2 -38 inches(aJ
,; 1135 psig
5.5% closed 2500 psig 2 -38 inches(al
,; 54 inches(a) 2 36.0 inches above tank bottom (al See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-11

Rev. 12 Instrument Trip Setpoint Program 2.2 2.2.7 2.2.7.1 2.2.7.1.1 2.2.7.1.2 2.2.7.2 2.2.7.2.1 2.2.7.2.2 2.2.7.2.3 2.2.7.2.4 2.2.7.2.5 2.2.7.3 2.2.7.3.1 2.2.7.3.2 2.2.7.4 2.2.7.4.1 2.2.7.4.2 2.2.7.5 2.2.7.5.1 2.2.7.6 2.2.7.6.1 SYSTEM/REFERENCE LCO [TRO]

Control Rod Block Rod Block Monitor 3.3.2 3.3.2 3.3.2 3.3.2 3.3.2 3.3.2 APRM

[3.1.3]

[3.1.3]

[3.1.3]

[3.1.3]

[3.1.3]

Source Range Monitors

[3.1.3]

[3.1.3]

TABLE 2.2-1 (Page 7 of 8)

INSTRUMENTATION SETPOINTS TRIP FUNCTION Low Power Range - Upscale Intermediate Power Range Upscale High Power Range - Upscale Low Power Range Setpoint Intermediate Power Range Setpoint High Power Range Setpoint Simulated Thermal Power-High Two Loop Operation Simulated Thermal Power-High - Single Loop Operation Simulated Thermal Power-High - Clamp Downscale Neutron Flux - High (Setdown)

Upscale Downscale Intermediate Range Monitors

[3.1.3]

[3.1.3]

Upscale Downscale Scram Discharge Volume

[3.1.3]

Water Level High Reactor Coolant System Recirculation Flow

[3.1.3]

Upscale (b) With a signal-to-noise ratio 2:: 2, or within the limits of Figure 2.2-2.

(cl For single loop operation, the value of /iW 8.7 SUSQUEHANNA - UNIT 1 TRM / 2.0-12 TRIP SETPOINT See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 0.55W + 54.2%

0.55 (W-/iW) + 54.2% (cl s; 108% of RA TED THERMAL POWER

~ 5% of RATED THERMAL POWER s; 12% of RATED THERMAL POWER

o:2E5 cps 2:: 3.0 cps(b) s; 108/125 divisions of full scale

~ 5/125 divisions of full scale s: 35.9 gallons 114%

Rev. 12 SYSTEM/REFERENCE LCO [TRO]

2.2.8 CREOASS 2.2.8.1 3.3.7.1 2.2.8.1.1 3.3.7.1 2.2.8.1.2 3.3.7.1 2.2.8.1.3 3.3.7.1 2.2.8.1.4 3.3.7.1 2.2.8.1.5 3.3.7.1 Instrument Trip Setpoint Program 2.2 TABLE 2.2-1 (Page 8 of 8)

INSTRUMENTATION SETPOINTS TRIP FUNCTION Main Control Room Outside Air Intake Radiation Monitor Reactor Vessel Water Level - Low Low, Level2 Drywell Pressure - High Refuel Floor High Exhaust Duct Radiation - High Railroad Access Shaft Exhaust Duct Radiation

-High Refuel *Floor Wall Exhaust Duct Radiation - High TRIP SETPOINT

5 mR/hr
-38.0 inches(a)
1.72 psig
18 mR/hr
5 mR/hr
21 mR/hr 2.2.9 Feedwater/Main Turbine Trip System Actuation 2.2.9.1 2.2.10 2.2.10.1 3.3.2.2 MVP Isolation

[3.3.11]

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 Reactor Vessel Level - High Main Steam Line Radiation - High High TRM / 2.0-13

54.0 inches(a)
15 x full power background without hydrogen injection

Rev. 12 800 658. 5-MAIN STEAM LINE 1, S (8)

6. S (7)
7. S (4)

BOTTDM OF STEAM

0. S ( 3> INSTRU DRYER SKIRT 7.5 f'EED 498, S VATER 450 400 398, S ( 1) 350

~.. l 300 ACTIVE F'UEL 250 ~~j RECIRC 161. S OUTLET NOZZLE 100 so FIGURE 2, 2-1 Instrument Trip Setpoint Program 2.2 WATER LEVEL NOMENCLATURE HEIGHT ABOVE NO.

VESSEL ZER READING (IN.)

(8) 581, 5

+54 (7) 566,5

+39 (4) 557. 5

+30 (3) 540,5

+13 (2) 489. 5

-38

( l) 398. S

-129 WIDE

~NARROW RANG£---1 RANGE

+60

+60-+60~+601

<9> 54 (7) 39 HI ALARM 1El,":C'° l&"'i O-O T IPS

( )

13 REACTO

-38 SCRAM CONTRIBUTE (2) INITIATE RCIC, TD ADS HPCI, ARI TRIP RECIRC PUMPS

-129 (1) INITIATE RHR, CS START DIESEL

-150 CONTRIBUTE TD ADS CLOSE MSIV' S NOTE* SCALE IN INCHES ABOVE VESSEL ZERO REACTOR VESSEL WATER LEVEL SUSQUEHANNA - UNIT 1 TRM / 2.0-14

Rev. 12 3

2.8 2.6 2.4 2.2 2

1.8

(/)

a..

(.)

1.6 w

~

1.4 0:::

. t-1.2 z

)

0

(.)

1

~

0:::

0.8

(/)

0.6 0.4 0.2 0

\\

\\

\\

\\

\\

2 Instrument Trip Setpoint Program 2.2 Instrument Trip Setpoint Table 2.2

\\

6 Acceptable

~

Not Acceptable 10 14 18 22 Signal-to-Noise Ratio Figure 2.2-2 26 30 Minimum SRM Trip Setpoint Versus Signal-to-Noise Ratio SUSQUEHANNA - UNIT 1 TRM / 2.0-15

Rev. 6 TRM Isolation Actuation Instrumentation 3.3.6 3.3 Instrumentation 3.3.6 TRM Isolation Actuation Instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.

APPLICABILITY:

As specified in Table 3.3.6-1 ACTIONS


NOTES-* --

1.

P'enetration flow paths isolated to comply with Action C may be unisolated intermittently under administrative controls.

2.

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in trip.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable Function 2.a AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Function 2.a B. One or more Functions with B.1 Restore isolation capability.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.

C. Required Action and C.1 Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

  • associated Completion Time compensatory measures for of Condition A or B not met.

the degraded condition.

(continued)

SUSQUEHANNA - UNIT 1 TRM / 3.3-13

Rev. 6 TRM Isolation Actuation Instrumentation 3.3.6 TECHNICAL REQUIREMENT SURVEILLANCE


NOTES-----

1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.

SURVEILLANCE FREQUENCY TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.6.5 Perform LOGIC SYSTEM FUNC1IONAL TEST 24 months TRS 3.3.6.6 Perform RESPONSE TIME TEST 24 months on a staggered test basis

  • (continued)

SUSQUEHANNA - UNIT 1 TRM / 3.3-14

Rev. 6 TRM Isolation Actuation Instrumentation 3.3.6 TABLE 3.3.6-1 PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS ALLOWABLE VALUE

1.

Deleted

2.

Primary Containment Isolation

a.

Main Steam Line 1,2,3 2

TRS 3.3.6.1 s 21 x full power Radiation - High TRS 3.3.6.2 background without High TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6(aJ

3.

Shutdown Cooling System Isolation (bl

a.

RHR Flow - High 3,4(0l,5(c) 1 (d)

TRS 3.3.6.1 s 26,000 gpm TRS 3.3.6.2 TRS 3.3.6.4 TRS 3.3.6.5 (a} Radiation detectors are exempt from response time testing.

(b) Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.

(c)

Required in MODES 4 and 5 when automatic isolation of the associated penetration flow path is credited in calculating DRAIN TIME per LCO 3.5.2.

(d)

When required in Modes 4 and 5, only one trip system is required.

SUSQUEHANNA - UNIT 1 TRM /3.3-15

Rev.6 TRM Isolation Actuation Instrumentation 3.3.6 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1 TRM /3.3-16

Rev. 7 TRM Isolation Actuation Instrumentation B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES TRO The TRM Actuation instrumentation automatically initiates closure of appropriate primary containment isolation valves (PCIVs). The function of the PCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs) (Reference 1). The TRM Isolation Actuation Instrument has been relocated from the Technical Specifications because the identified Function is not credited in the plant design basis to mitigate any plant event, but does provide a diverse means to initiate an Isolation Actuation.

The isolation instrumentation includes the sensors, relays, and instruments that are necessary to cause initiation of primary containment and Reactor Coolant Pressure Boundary (RCPB) isolation. When the setpoint is reached, the sensor actuates, which then outputs an isolation signal to the isolation logic. Monitoring a wide range of independent parameters provides functional diversity. The input parameters to the isolation logic are:

(a)

Main steam line radiation, and (b)

RHR Flow - High.

The RHR high flow isolation is only applicable to the RHR suction side piping; it will not detect smaller branch size breaks or breaks on the discharge side of the RHR pump.

The valves associated with these trip channels are identified in Table B 3.3.6-1. Each of these valves is also associated with other trip channels as identified in LCO Bases B 3.6.1.3.

The trips occur after a one second delay. See Tech Spec Basis B 3.3.6-1.

(continued)

SUSQUEHANNA - UNIT 1 TRM / B 3.3-10

Rev. 7 BASES ACTIONS TRS TRM Isolation Actuation Instrumentation B 3.3.6 The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. The ACTIONS are modified by two Notes. Note 1 allows penetration flow path(s) to be unisolated intermittently under administrative controls. These controls consist of stationing a dedicated operator at the controls of the valve, who is in continuous communication with the control room. In this way, the penetration can be rapidly isolated when a need for primary containment isolation is indicated.

Note 2 is provided to modify the ACTIONS for separate Condition entry, consistent with similar Note in the TS 3.3.6.1 Actions.

Condition C applies if the channel is not restored to OPERABLE status or placed in trip, or isolation capability is not restored, within the allowed Completion Time. If inoperable channels should not be placed in trip (e.g., might result in a undesirable transient) Action C may be intentionally entered as a result of not meeting Required Action A.1 in its required Completion Time. Required Action C.1 requires appropriate compensatory measures be in place within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Examples of appropriate compensatory measures may consist of verifying that diverse isolation functions remain OPERABLE. Furthermore, isolating the penetration

. (e.g., as may be required by TS Actions for an inoperability affecting both the TRM Function and a required TS Function) also provides adequate compensatory actions since isolating the affected penetration flow path(s) accomplishes the safety function of the inoperable channels. If it is not desired to isolate the affected penetration flow path(s) (e.g., as in the case where isolating the penetration flow path(s) could result in a reactor scram or disabling RHR-SDC), alternate compensatory measures should be pursued.

The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is acceptable due to the fact that these Functions are not assumed in any accident or transient analysis in the FSAR.

The TRSs are defined to be performed at the specified Frequency to ensure that the TRM Isolation Actuation Instrumentation Functions are maintained OPERABLE. TRM Isolation Actuation Instrumentation Surveillances are performed consistent with the Bases for LCO 3.3.6.1 "Isolation Activation Instrumentation."

(continued)

SUSQUEHANNA - UNIT 1 TRM / B 3.3-11

Rev. 7 BASES TRS 3.3.6.5 TRM Isolation Actuation Instrumentation 83.3.6 The LOGIC SYSTEM FUNCTIONAL TEST demonstrates the OPERABILITY of the required isolation logic for a specific channel. The system functional testing performed on PC!Vs in LCO 3.6.1.3 overlaps this surveillance to provide complete testing of the assumed safety function. The 24 month Frequency is based on the need to perform portions of this surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the surveillance when performed at the 24 month Frequency.

TRS 3.3.6.6 The response time testing of Function 2.a is per FSAR Table 7.3-29.

REFERENCES

1.

FSAR Section 7.3.1 2.

NRC Inspection and Enforcement Manual, Part 9900: Technical Guidance, Standard Technical Specification Section 1.0 Definitions, Issue dated 12/8/96.

SUSQUEHANNA - UNIT 1 TRM / B 3.3-12

Rev. 7 Plant systems Reactor Recirculation RHR TRM Isolation Actuation Instrumentation B 3.3.6 Table B 3.3.Sc1 Primary Containment Isolation Valves (Page 1 of 1)

Valve Number Valve Description HV-143F019 Reactor Coolant Sample Valve HV-143F020 Reactor Coolant Sample Valve HV-151F022 RHR - Reactor Vessel Head Spray Valve HV-151F023 RHR - Reactor Vessel Head Spray Valve HV-151F008 RHR Shutdown Cooling Valve HV-151F009 RHR Shutdown Cooling Valve Isolation Signal Function No.

(Table 3.3.6-1) 2.a 2.a 3.a

~.a 3.a 3.a SUSQUEHANNA - UNIT 1 TRM / B 3.3-13