ML23195A035
ML23195A035 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 06/30/2023 |
From: | Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML23195A035 (1) | |
Text
Ul.LJ.J.. -)V I L;.Vk.:>
Page 1 of 2
- MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2023 9712
USER INFORMATION:
GERLACH*ROSEY M EMPL#:028401 CA#: 0363 Address: NiJCSA2 Phone#: 542-3194
TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY M 06/30/2023 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS
~OM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF "llllll'RRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1
REMOVE MANUAL TABLE OF CONTENTS DATE: 03/08/2023
ADD MANUAL TABLE OF CONTENTS DATE: 06/29/2023
CATEGORY: DOCUMENTS TYPE: TRMl
UU!l *..:>U1 L.V.L...:>
2 of 2 ID: TEXT 2.2 REMOVE: REV: 11
ADD: REV: 12
CATEGORY: DOCUMENTS TYPE: TRMl ID: TEXT 3.3.6 ADD: REV: 6
REMOVE: REV: 5
CATEGORY: DOCUMENTS TYPE: TRMl ID: TEXT B3.3.6 ADD: REV: 7
REMOVE: REV: 6
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN CORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE
- MPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL
,.-* Manual Name : TRMl
.Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
Table Of Contents Issue Date: 06/29/2023 Procedure Name Rev Issue Date Change ID Change Nwnber*
TEXT LOES 96 01/03/2019
Title:
LIST OF EFFECTIVE SECTIONS
TEXT TOC 29 12/13/2022 ~-
Title:
TABLE OF CONTENTS. ~)
TEXT 1.1 1 01/31/2014 0v
Title:
USE AND APPLICATION DEFINITIONS *. __. "' / '(//
<:~,;/..,..., /)"
TEXT 2.1, 0*1201,015 ~ "V
Title:
PLANT PROGRAMS AND SETPOINTS PLANT /DG@~~S*~Y
\\ "\\ '
,.. TEXT 2.2 12 06/2.9-~023" /_ \\' /
Title:
PLANT PROGRAMS AND SETPOINTS rNSTRUMENT-TRIP SETPOINT TABLE, ( J ~
/ / ' *, /""* '<~
TEXT 3.0 < 7 / _'..._03/1,8/_g.021
Title:
TECHNICAL REQUIREMENT fOf OP~?5ION (TRO) APPLICABILITY & SURVEILLANCE (TRS).,,r,,. ' ""/
APPLICABILITY /~" 'v TEXT 3. 1. 1 "" <;;;--1~ 11 -~,, '--... / 0 9 / 2 0 0 7
Title:
REACTIVITY CONTROL SYS!l'EMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD. f,,f " \\ '-..j INJECTION (ATWS\\ARr-) \\[NSTRUMENTATION TEXT 3.1.2 /~~~) 0 11/18/2002 / /',_V A ___,/
Title:
REACTIVIT~ CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT ' \\, } '
\\ '-.__/) '"*--~/
TEXT 3.1. 3 6 12/18/2017
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION
TEXT 3.1.4 1 10/12/2020
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
TEXT 3.2.1 21 03/29/2022
Title:
CORE OPERATING LIMIST REPORT (COLR)
Page 1 of 16 Report Date: 06/30/23 SSES MANUAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
- TEXT 3.3.1 0 11/18/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION
TEXT 3.3.2 3 03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION
TEXT 3.3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION
TEXT 3.3.4 11 06/29/2017
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION
TEXT 3.3.5 0 11/18/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK
TEXT 3.3.6 6 06/29/2023
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION
- TEXT 3.3.7 4 01/17/2022
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM
TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION INTENTIONALLY LEFT BLANK
TEXT 3.3.9 04/17/2008
Title:
OPRM INSTRUMENTATION CONFIGURATION
TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS
TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION
TEXT 3.3.12 2 04/02/2019
Title:
WATER MONITORING INSTRUMENTATION
- Page 2 of 16 Report Date: 06/30/23 SSES MANUAL
. Manual Name: TRMl
- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY
TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM INTENTIONALLY LEFT BLANK
TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS
TEXT 3.4.4 2 04/17/2008
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT
TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS
TEXT 3.4.6 3 05/13/2022
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION
TEXT 3.5.1 2 03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT
TEXT 3.5.2 2 03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION
TEXT 3.5.3 1 03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SlJP_PLY TO ADS
TEXT 3.6.1 0 11/18/2002
Title:
CONTAINMENT VENTING OR PURGING
TEXT 3.6.2 3 01/03/2019
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION
TEXT 3.6.3 0 11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION
- Page 3 of 16 Report Date: 06/30/23 SSES MANUAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
- TEXT 3.6.4 0 11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES
TEXT 3.7.1 0 11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN
TEXT 3.7.2 0 11/18/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (URS) AND GROUND WATER LEVEL
TEXT 3.7.3.1 6 04/21/2022
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM
TEXT 3.7.3.2 3 04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS
TEXT 3.7.3.3 4 05/16/2016
Title:
PLANT SYSTEMS CO2 SYSTEMS
- TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS
TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS
TEXT 3.7.3.6 2 04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES
TEXT 3.7.3.7.1 04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES
TEXT 3.7.3.8 13 12/18/2017
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION
TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM
- Page 4 of 16 Report Date: 06/30/23 SSES MANUAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT 3.7.5.1 1 03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR
TEXT 3.7.5.2 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE
TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS
TEXT 3.7.6 3 06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION
TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 5 03/05/2015
Title:
PLANT SYSTEMS SNUBBERS
TEXT 3.7.9 3 03/05/2019
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC
TEXT 3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1 11/01/2018
Title:
STRUCTURAL INTEGRITY
TEXT 3.8.1 3 04/22/2020
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS
TEXT 3.8.2.2 3 06/23/2021
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5 of 16 Report Date: 06/30/23 SSES MA.NC.JAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
- TEXT 3.8.3 4 01/28/2020
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES
TEXT 3.8.4 0 11/18/2002
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM
TEXT 3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION
TEXT 3.8.6 2 03/05/2019
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING
TEXT 3.8.7 2 02/25/2021
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM
TEXT 3.9.1 0 11/18/2002
Title:
REFUELING OPERATIONS DECAY TIME
- TEXT 3.9.2 0 11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS
TEXT 3.9.3 1 03/12/2019
Title:
REFUELING OPERATIONS REFUELING PLATFORM
TEXT 3.10.1 1 04/26/2006
Title:
MISCELLA.WEOUS SEAL SOURCE CONTAMINATION
TEXT 3.10.2 3 06/19/2019
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION
TEXT 3.10.3 4 10/05/2022
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2 04/17/2008
Title:
INTENTIONALLY LEFT BLANK
- Page 6 of 16 Report Date: 06/30/23 SSES MANUAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT 3.11.1.1 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION
TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE
TEXT 3. 11. 1. 3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM
TEXT 3. 11. 1. 4 2 10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION
TEXT 3. 11. 1. 5 3 03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
- TEXT 3.11.2.1 4 03/12/2019
Title:
RADIOACTIVE EFFLUENTS DOSE RATE
TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES
TEXT 3. 11. 2. 3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM
TEXT 3. 11. 2. 4 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM
TEXT 3. 11. 2. 5 4 07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM
TEXT 3. 11. 2. 6 8 06/29/2017
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION
TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE Page 7 of 16 Report Date: 06/30/23 SSES MANUAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
- TEXT 3.11.4.1 6 01/03/2022
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM
TEXT 3. 11. 4. 2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS
TEXT 3.11. 4. 3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM
TEXT 3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL
TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS
TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT
- TEXT 4.1 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION
TEXT 4.2 1 01/03 019
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION
TEXT 4.3 1 01/03/2019
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION
TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS
TEXT 4.5 1 07/01/2021
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS
TEXT 4.6 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM
- Page 8 of 16 Report Date: 06/30/23 SSES MANUAL
Manual Name: TRMl
- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT 4.7 1 12/13/2022
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS
TEXT B3.0 6 03/18/2021
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY
TEXT B3.1.1 2 04/29/2014
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT
TEXT B3.1.3 4 12/18/2017
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION
- TEXT B3.1.4 1 10/12/2020
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE
TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 1 01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION
TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION
TEXT B3.3.3 3 12/18/2008
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION
TEXT B3.3.4 7 06/29/2017
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION
TEXT B3.3.5 2 11/09/2007
Title:
INTENTIONALLY LEFT BLANK Page 9 of 16 Report Date: 06/30/23 SSES MANUAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
- TEXT B3.3.6 7 06/29/2023
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION
TEXT B3.3.7 4 01/17/2022
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM
TEXT B3.3.8 1 10/22/2003
Title:
INTENTIONALLY LEFT BLANK
TEXT B3.3.9 4 01/03/2019
Title:
OPRM INSTRUMENTATION
TEXT B3.3.10 3 08/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS
TEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION
- TEXT B3.3.12 1 04/02/2019
Title:
WATER MONITORING INSTRUMENTATION
TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY
TEXT B3.4.2 1 04/16/2009
Title:
INTENTIONALLY LEFT BLANK
TEXT B3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR
TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT
TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS
- Page.10 of 16 Report Date: 06/30/23 SSES MANUAL
Manual Name: TRMl
- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT B3.4.6 4 05/13/2022
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION
TEXT B3.5.l 2 03/17/2020
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT
TEXT B3.5.2 2 03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION
TEXT B3.5.3 2 03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING
- TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION
TEXT B3.6.3 2 04/17/2008
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION
TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES
TEXT B3.7.l 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL
TEXT B3.7.3.1 4 02/16/2017
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM
TEXT B3.7.3.2 2 04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS
- Page 11 of 16 Report Date: 06/30/23 SSES MANUAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT B3.7.3.3 1 01/03/2019
Title:
PLANT SYSTEMS BASES CO2 SYSTEMS
TEXT B3.7.3.4 4 06/19/2019
Title:
PLANT SYSTEMS BASES HALON SYSTEMS
TEXT B3.7.3.S 1 04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS
TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES
TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES
TEXT B3.7.3.8 3 09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION
TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM
TEXT B3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR
TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE
TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS
TEXT B3.7.6 4 06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION
TEXT B3.7.7 2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION
Page 12 of 16 Report Date: 06/30/23
- SSES MANUAL
Manual Name: TRMl
- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT B3.7.8 4 01/31/2014
Title:
PLANT SYSTEMS BASES SNUBBERS
TEXT B3.7.9 3 03/05/2019
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC
TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS
TEXT B3.7.11 2 11/01/2018
Title:
STRUCTURAL INTEGRITY
TEXT B3.8.1 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES
TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
- CONTINUOUS
TEXT B3.8.2.2 2 06/23/2021
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC
TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES
TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM
TEXT B3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION
TEXT B3.8.6 3 03/05/2019
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING
TEXT B3.8.7 3 02/25/2021
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM
- Page 13 of 16 Report Date: 06/30/23 SSES MANUAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME
TEXT B3.9.2 0 11/19/2002 Titl~: REFUELING OPERATIONS BASES COMMUNICATIONS
TEXT B3.9.3 1 03/12/2019
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM
TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION
TEXT B3. 10. 2. 1 03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION
TEXT B3.10.3 3 10/05/2022
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.i0.4 1 04/17/2008
Title:
INTENTIONALLY LEFT BLANK
TEXT B3.11.l.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION
TEXT B3.11. 1. 2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE
TEXT B3. 11. 1. 3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM
TEXT B3. 11. 1. 4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION
TEXT B3.ll.l.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
Page 14 of 16 Report Date: 06/30/23
- SSES MANUAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE
TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES
TEXT B3.ll.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM
TEXT B3.ll.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM
TEXT B3.11.2.5 5 07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM
TEXT B3.ll.2.6 2 09/08/2016
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE
TEXT B3.11.4.l 6 01/03/2022
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM
TEXT B3.11.4. 2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS
TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM
TEXT B3.12.l 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL
TEXT B3.12.2 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Page 15 of 16 Report Date: 06/30/23
- SSES MANUAL
Manual Name: TRMl
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
- TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS
16 of 16 Report Date: 06/30/23
- Instrument Trip Setpoint Program Rev. 12 2.2
- 2.0 PLANT PROGRAMS AND SETPOINTS
2.2 Instrument Trip Setpoint Table
The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard
. Technical Specifications. Actual instrument setpoints are established utilizing the.
Allowable Values specified in the Technical Specifications and Technical Requirements.
Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.
Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.
Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.
Reference:
MFP-QA-1220, Engineering Change Process Handbook
SUSQUEHANNA - UNIT 1 TRM / 2.0-5 Instrument Trip Setpoint Program Rev. 12 2.2
- TABLE 2.2-1 (Page 1 qf 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT
2.2.1 Reactor Protection
2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux -s 120/125 divisions of full scale High 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron s 18% of RATED THERMAL POWER Flux - High *(setdown) 2.2.1.3 3.3.1.1 Average Power Range Monitor, Simulated 0.55 W + 58.7%
Thermal Power - High, Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Simulated 0.55 (W- /1W) + 58.7%(b)
Thermal Power - High, Single Loop Operation 2.2.1.5 3.3.1.1 Average Power Range Monitor, Simulated s 113.5% of RATED THERMAL Thermal Power - High, Clamp POWER 2.2.1.6 3.3.1.1 Average Power Range Monitor, Neutron Flux -s 118% of RATED THERMAL High POWER 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure - High s 1087 psig 2.2.1.8 3.3.1.1 Reactor Vessel Water Level - Low, Level 3 2:: 13. 0 inches (a) 2.2.1.9 3.3.1.1 Main Steam Isolation Valve - Closure s 10% closed 2.2.1.10 This section not used.
2.2.1.11 3.3.1.1 Drywell Pressure - High s 1.72 psig 2.2.1.12 3.3.1.1 Scram Discharge Volume Water Level - s 65 gallons
- High - Level Transmitter 2.2.1.13 3.3.1.1 Scram Discharge Volume Water Level - s 61 gallons High - Float Switch 2.2.1.14 3.3.1.1 Turbine Stop Valve - Closure s 5.5% closed 2.2.1.15 3.3.1.1 Turbine Control Valve Fast Closure, Trip 2:: 500 psig Oil Pressure - Low
(a) See Figure 2.2-1 (bl For Single loop operation, the value of 11W = 8.7
SUSQUEHANNA - UNIT 1 TRM / 2.0-6 Instrument Trip Setpoint Program Rev. 12 2.2
- TABLE 2.2-1 (Page 2 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT
2.2.1.16 OPRM Instrumentation
2.2.1.16.1 3.3.1.1 Sp PBA Amplitude Trip See COLR TRO 3.2 2.2.1.16.2 3.3.1.1 Np PBA Successive Confirmation Count Trip See COLR - TRO 3.2.
2.2.1.16.3 [3.3.9] TOL (£) Period Tolerance 0.10 sec 2.2.1.16.4 [3.3.9] fc Conditioning Filter Cutoff Frequency 1.50 Hz 2.2.1.16.5 [3.3.9] Tmin Oscillation Period Lower Time Limit 1.00 sec 2.2.1.16.6 [3.3.9] Tmax Oscillation Period Upper Time Limit 3.50 sec
. 2.2.1.16.7 [3.3.9] LPRMmin Minimum LRPMs/Cell Required for 2 Cell Operability 2.2.1.16.8 [3.3.9] S1 Peak Threshold Setpoint/ABA & GRBA 1.20 2.2.1.16.9 [3.3.9] S2 Valley Threshold Setpoint/ABA & GRBA 0.85' 2.2.1.16.10 [3.3.9] Smax Amplitude Trip Setpoint/ABA 1.50 2.2.1.16.11 [3.3.9] DR3 Growth Rate Factor Setpoint/GRBA 1.60
2.2.2 Isolation Actuation Instrumentation
2.2.2.1 Primary Containment Isolation
2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, level 3 ?! 13.0 inches(a) 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, level 2 ?! -38.0 inches{a)
- 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low low, ~ -129 inches<al Level 1 2.2.2.1.4 3.3.6.1 Drywell Pressure - High :s: 1.72 psig 2.2.2.1.5 3.3.6.1 SGTS Exhaust Radiation - High :s: 23.0 mR/hr 2.2.2.1.6 [3.3.6] Main Steam Line Radiation High High :c:; 15 x full power background without hydrogen injection
{a) See Figure 2.2-1
- SUSQUEHANNA - UNIT 1 TRM / 2.0-7 Instrument Trip Setpoint Program Rev. 12 2.2
- TABLE 2.2-1 (Page 3 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT
2.2.2.2 Secondary Containment Isolation
2.2.2.2.1 3.3.6.2 Reactor Vessel Water Level - Low Low, 2 -38.0 inches(a)
Level2 2.2.2.2.2 3.3.6.2 Drywell Pressure High :,; 1.72 psig 2.2.2.2.3 3.3.6.2 Refuel Floor High Exhaust Duct Radiation - ;;;18mR/hr High 2.2.2.2.4 3.3.6.2 Railroad Access Shaft Exhaust Duct Radiation :,; 5 mR/hr High 2.2.2.2.5 3.3.6.2 Refuel Floor Wall Exhaust Duct Radiation - :,; 21 mR/hr High
2.2.2.3 Main Steam Line Isolation
2.2.2.3.1 3.3.6.1 Reactor Vessel Water Level - Low Low Low, 2 -129 inches(a)
Level 1 2.2.2.3.2 3.3.6.1 Main Steam Line Pressure - Low 2': 861 psig 2.2.2.3.3 3.3.6.1 Main Steam Line Flow - High :,; 173 psid 2.2.2.3.4 3.3.6.1 Condenser Vaouum - Low 2': 9.0 inches Hg vacuum 2.2.2.3.5 3.3.6.1 Reactor Building Main Steam Line Tunnel :,; 177°F
- Temperature - High 2.2.2.3.6 This section is not used.
2.2.2.3.7 This section is not used.
2.2.2.3.8 This section is not used.
2.2.2.4 Reactor Water Cleanup System Isolation
2.2.2.4.1 3.3.6.1 Reactor Vessel Water Level - Low Low, 2 -38 inches(a)
Level2 2.2.2.4.2 3.3.6.1 RWCU b. Flow - High :,; 59 gpm 2.2.2.4.3 3.3.6.1 RWCU Flow - High ::;462gpm 2.2.2.4.4 3.3.6.1 RWCU Penetration Area Temperature - High :,; 131°F 2.2.2.4.5 This section is not used.
2.2.2.4.6 3.3.6.1 RWCU Pump Area Temperature - High ::;; 147°F 2.2.2.4.7 This Section is not used.
2.2.2.4.8 3.3.6.1 RWCU Heat Exchanger Area Temperature -:,; 147°F High 2.2.2.4.9 This section is not used.
(al See Figure 2.2-1
- SUSQUEHANNA - UNIT 1 TRM / 2.0-8 Instrument Trip Setpoint Program Rev. 12 2.2
- TABLE 2.2-1 (Page 4 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT
2.2.2.5 Reactor Core Isolation Cooling System Isolation
2.2.2.5.1 3.3.6.1 RCIC Stearn Line ti Pressure - High s 188 inches H20 2.2.2.5.2 3.3.6.1 RCIC Steam Supply Line Pressure Low ;;:: 60 psig 2.2.2.5.3 3.3.6.1 RCIC Turbine Exhaust Diaphragm Pressure - s 10.0 psig High 2.2.2.5.4 3.3.6.1 RCIC Equipment Room Temperature - High s 167°F 2.2.2.5.5 3.3.6.1 RCIC Pipe Routing Area Temperature - High s 167"F 2.2.2.5.6 3.3.6.1 RClC Emergency Area Cooler Temperature - s 167°F High 2.2.2.5.7 3.3.6.1 Drywell Pressure - High s 1.72 psig 2.2.2.5.8 This section is not used.
2.2.2.5.9 This section is not used.
2.2.2.6 High Pressure Coolant Injection System Isolation
2.2.2.6.1 3.3.6.1 HPCI Steam Line ti Pressure - High s 370 inches H20 2.2.2.6.2 3.3.6.1 HPCI Steam Supply Line Pressure - Low ;,: 104 psig 2.2.2.6.3 3.3.6.1 HPCI Turbine Exhaust Diaphragm Pressure -:,:; 10 psig High
- 2.2.2.6.4 3.3.6.1 HPCI Equipment Room Temperature - High s 167°F 2.2.2.6.5 3.3.6.1 HPCI Emergency Area Cooler Temperature - s 167°F High 2.2.2.6.6 3.3.6.1 HPCI Pipe Routing Area Temperature - High s 167°F 2.2.2.6.7 3.3.6.1 Drywell Pressure - High ::;; 1.72 psig 2.2.2.6.8 This section is not used.
2.2.2.6.9 This section is not used.
2.2.2.7 Shutdown Cooling/System Isolation
2.2.2.7.1 3.3.6.1 Reactor Vessel Water Level - Low, Level 3 2 13.0 inches(a) 2.2.2.7.2 3.3.6.1 Reactor Vessel Steam Dome Pressure - High s98 psig 2.2.2.7.3 [3.3.6} RHR Flow - High ::;;25,000gpm
2.2.3 ECCS Actuation
2.2.3.1 Core Spray System
2.2.3.1.1 3.3.5.1 Reactor Vessel Water Level Low Low Low, 2 -129 inches(a)
Level 1 2.2.3.1.2 3.3.5.1 Drywall Pressure - High s 1.72 psig 2.2.3.1.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low 2 396.5, :,:; 428.5 psig injection permissive
(al see Figure 2.2-1
- SUSQUEHANNA - UNIT 1 TRM / 2.0-9 Instrument Trip Setpoint Program Rev. 12
- TABLE 2.2-1 (Page 5 of 8)
INSTRUMENTATION SETPOI NTS
SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT
2.2.3.2 LPCI Mode of RHR System
2.2.3.2.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, ;;:: -129 inches(a)
Level 1 2.2.3.2.2 3.3.5.1 Drywell Pressure - High s; 1.72 psig 2.2.3.2.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low, :::: 396.5, s; 428.5 psig injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure Low, :::: 236 psig, decreasing Recirculation Discharge Valve permissive
2.2.3.3 HPCI System
2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low, ~ -38 inches<aJ Level2 2.2.3.3.2 3.3.5.1 Drywell Pressure - High s; 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level - Low :2: 40.5 inches above tank bottom 2.2.3.3.4 3.3.5.1 Reactor Vessel Water Level - High, Level 8 s; 54 inches
2.2.3.4 Automatic Depressurization System (ADS)
2.2.3.4.1 3.3.5,1 Reactor Vessel Water Level - Low Low Low, ~ -129 inches Level 1
- 2.2.3.4.2 3.3.5.1 Drywell Pressure - High s; 1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer s 102 seconds 2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure - High :::: 135, s 155 psig 2.2.3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump 2".121, s 129 psig Discharge Pressure - High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 ;:;;: 13 inches Confirmatory 2.2.3.4.7 3.3.5.1 ADS Drywell Pressure Bypass Timer s 420 seconds
2.2.3.5 Loss of Power - ECCS Actuation
2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage< 20%)
2.2.3.5.1.1 3.3.8.1 Bus Undervoltage :::: 823.2, s 856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay :::: 0.4, s 0.6 seconds
(a) See Figure 2.2-1
SUSQUEHANNA - UNIT 1 TRM / 2.0-10 Instrument Trip Setpoint Program Rev. 12 2.2
- TABLE 2.2-1 (Page 6 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT
2.2.3.5.2 4.16kV ESS Bus Undervoltage (Degraded Voltage< 65%)
2.2.3.5.2.1 3.3.8.1 Bus Undervoltage 2 2641.1, :,; 2748.9 Volts 2.2.3.5.2.2 3.3.8.1 Time delay ;:: :5 3.3 seconds
2.2.3.5.3 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)
2.2.3.5.3.1 3.3.8.1 Bus Undervoltage 2 3829.3, :5 3906.7 Volts 2.2.3.5.3.2 3.3.8.1 Time Delay (Non-LOCA) 2 4 minute, 30 seconds
- 5 5 minute, 30 seconds 2.2.3.5.3.4 3.3.8.. 1 Time Delay (LOCA) 2 9, :,; 11 seconds
2.2.3.5.4 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 65%)
2.2.3.5.4.1 [3.8.5] 480V Basis 2308.9, :5315.1 Volts 2.2.3.5.4.2 [3.8.5] Time Delay 2 4.5, :,; 5.5 seconds
2.2.3.5.5 480V ESS Bus 0B565 Undervoltage (Degraded Voltage,< 92%)
2.2.3.5.5.1 [3.8.5] 480V Basis 2 437.6, :,; 446.4 Volts
- 2.2.3.5.5.2 [3.8.5] Time Delay 2 9, :,; 11 seconds
2.2.4 ATWS Alternate Rod Injection and Recirculation Pump Trip
2.2.4.1 3.3.4.2/[3.1.1] Reactor Vessel, Water Level - Low Low, 2 -38 inches(aJ Level2 2.2.4.1 3.3.4.2/[3.1.1] Reactor Vessel Steam Dome Pressure - High :,; 1135 psig
2.2.5 End of Cycle Recirculation Pump Trip
2.2.5.1 3.3.4.1 Turbine Stop Valve-Closure :;:; 5.5% closed 2.2.5.2 3.3.4.1 Turbine Control Valve - Fast Closure 2500 psig
2.2.6 Reactor Core Isolation Cooling System Actuation
2.2.6.1 3.3.5.2 Reactor Vessel Water Level - Low Low, 2 -38 inches(al Level2 2.2.6.2 3.3.5.2 Reactor Vessel Water Level - High, Level 8 :,; 54 inches(a) 2.2.6.3 3.3.5.2 Condensate Storage Tank Level - Low 2 36.0 inches above tank bottom
(al See Figure 2.2-1
- SUSQUEHANNA - UNIT 1 TRM / 2.0-11 Instrument Trip Setpoint Program Rev. 12 2.2
- TABLE 2.2-1 (Page 7 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT
2.2.7 Control Rod Block
2.2.7.1 Rod Block Monitor
2.2.7.1.1 3.3.2 Low Power Range - Upscale See COLR TRO 3.2 3.3.2 Intermediate Power Range Upscale See COLR TRO 3.2 3.3.2 High Power Range - Upscale See COLR TRO 3.2 2.2.7.1.2 3.3.2 Low Power Range Setpoint See COLR TRO 3.2 3.3.2 Intermediate Power Range Setpoint See COLR TRO 3.2 3.3.2 High Power Range Setpoint See COLR TRO 3.2
2.2.7.2 APRM
2.2.7.2.1 [3.1.3] Simulated Thermal Power-High Two Loop 0.55W + 54.2%
Operation 2.2.7.2.2 [3.1.3] Simulated Thermal Power-High - Single Loop 0.55 (W-/iW) + 54.2% (cl Operation 2.2.7.2.3 [3.1.3] Simulated Thermal Power-High - Clamp s; 108% of RA TED THERMAL POWER 2.2.7.2.4 [3.1.3] Downscale ~ 5% of RATED THERMAL POWER 2.2.7.2.5 [3.1.3] Neutron Flux - High (Setdown) s; 12% of RATED THERMAL POWER
- 2.2.7.3 Source Range Monitors
2.2.7.3.1 [3.1.3] Upscale ::o:2E5 cps 2.2.7.3.2 [3.1.3] Downscale 2:: 3.0 cps(b)
2.2.7.4 Intermediate Range Monitors
2.2.7.4.1 [3.1.3] Upscale s; 108/125 divisions of full scale 2.2.7.4.2 [3.1.3] Downscale ~ 5/125 divisions of full scale
2.2.7.5 Scram Discharge Volume
2.2.7.5.1 [3.1.3] Water Level High s: 35.9 gallons
2.2.7.6 Reactor Coolant System Recirculation Flow
2.2.7.6.1 [3.1.3] Upscale 114%
(b) With a signal-to-noise ratio 2:: 2, or within the limits of Figure 2.2-2.
(cl For single loop operation, the value of /iW 8.7
- SUSQUEHANNA - UNIT 1 TRM / 2.0-12 Instrument Trip Setpoint Program Rev. 12 2.2
- TABLE 2.2-1 (Page 8 of 8)
INSTRUMENTATION SETPOINTS
SYSTEM/REFERENCE LCO [TRO] TRIP FUNCTION TRIP SETPOINT
2.2.8 CREOASS
2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake ::; 5 mR/hr Radiation Monitor 2.2.8.1.1 3.3.7.1 Reactor Vessel Water Level - Low Low, ;:;: -38.0 inches(a)
Level2 2.2.8.1.2 3.3.7.1 Drywell Pressure - High ::; 1.72 psig 2.2.8.1.3 3.3.7.1 Refuel Floor High Exhaust Duct ::; 18 mR/hr Radiation - High 2.2.8.1.4 3.3.7.1 Railroad Access Shaft Exhaust Duct Radiation ::; 5 mR/hr
-High 2.2.8.1.5 3.3.7.1 Refuel *Floor Wall Exhaust Duct ::; 21 mR/hr Radiation - High
2.2.9 Feedwater/Main Turbine Trip System Actuation
2.2.9.1 3.3.2.2 Reactor Vessel Level - High ::; 54.0 inches(a)
2.2.10 MVP Isolation
2.2.10.1 [3.3.11] Main Steam Line Radiation - High High ::; 15 x full power background without hydrogen injection
(a) See Figure 2.2-1
SUSQUEHANNA - UNIT 1 TRM / 2.0-13 Instrument Trip Setpoint Program Rev. 12 2.2
WATER LEVEL NOMENCLATURE NO. VESSEL ZER READING HEIGHT ABOVE 800 (IN.)
(8) 581, 5 +54 (7) 566,5 +39 (4) 557. 5 +30 (3) 540,5 +13 (2) 489. 5 -38
( l) 398. S -129
658. 5-MAIN STEAM LINE RANGE WIDE ~NARROW RANG£---1
1, S (8) +60 +60-+60~+601
- 6. S (7) <9> 54 (7) 39 HI ALARM
- 7. S (4)
BOTTDM OF STEAM 0. S ( 3> INSTRU O-O T IPS ( ) 13 1El,":C'° l&"'i DRYER SKIRT 7.5 REACTO VATER f'EED 498, S -38 SCRAM CONTRIBUTE
(2) INITIATE RCIC, TD ADS 450 HPCI, ARI TRIP RECIRC PUMPS
400 398, S ( 1) -129 (1) INITIATE RHR, CS
300 ACTIVE F'UEL
250 ~~j
RECIRC 161. S OUTLET NOZZLE
100
so NOTE* SCALE IN INCHES ABOVE VESSEL ZERO
REACTOR VESSEL WATER LEVEL FIGURE 2, 2-1
- SUSQUEHANNA - UNIT 1 TRM / 2.0-14 Instrument Trip Setpoint Program Rev. 12 2.2
Instrument Trip Setpoint Table 2.2
3
2.8
2.6
2.4 2.2 \\
2 \\
(/) \\
1.8 a.. \\
....._, 1.6 (.)
w \\
~ 1.4 Acceptable 0:::
. t-1.2 \\ '
z
- )
0 ~ --.... --- -- -
(.) 1 "'
- ~
0::: 0.8
(/)
0.6 Not Acceptable 0.4
0.2
0 2 6 10 14 18 22 26 30
Signal-to-Noise Ratio
Figure 2.2-2 Minimum SRM Trip Setpoint Versus Signal-to-Noise Ratio
- 3.3 Instrumentation
3.3.6 TRM Isolation Actuation Instrumentation
TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.
APPLICABILITY: As specified in Table 3.3.6-1
ACTIONS
NOTES-* --
- 1. P'enetration flow paths isolated to comply with Action C may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME
A. One or more required A.1 Place channel in trip. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable Function 2.a
AND
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Function 2.a
B. One or more Functions with B.1 Restore isolation capability. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.
C. Required Action and C.1 Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- associated Completion Time compensatory measures for of Condition A or B not met. the degraded condition.
(continued)
SUSQUEHANNA - UNIT 1 TRM / 3.3-13 TRM Isolation Actuation Instrumentation Rev. 6 3.3.6
TECHNICAL REQUIREMENT SURVEILLANCE
NOTES-----
- 1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.
SURVEILLANCE FREQUENCY
TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days
TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days
TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months
TRS 3.3.6.5 Perform LOGIC SYSTEM FUNC1IONAL TEST 24 months
- TRS 3.3.6.6 Perform RESPONSE TIME TEST 24 months on a staggered test basis
- (continued)
SUSQUEHANNA - UNIT 1 TRM / 3.3-14 TRM Isolation Actuation Instrumentation Rev. 6 3.3.6
TABLE 3.3.6-1 PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION
APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS ALLOWABLE VALUE
- 1. Deleted
- 2. Primary Containment Isolation
- a. Main Steam Line 1,2,3 2 TRS 3.3.6.1 s 21 x full power Radiation - High TRS 3.3.6.2 background without High TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6(aJ
- 3. Shutdown Cooling System Isolation (bl
- TRS 3.3.6.5
(a} Radiation detectors are exempt from response time testing.
(b) Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.
(c) Required in MODES 4 and 5 when automatic isolation of the associated penetration flow path is credited in calculating DRAIN TIME per LCO 3.5.2.
(d) When required in Modes 4 and 5, only one trip system is required.
SUSQUEHANNA - UNIT 1 TRM /3.3-15 TRM Isolation Actuation Instrumentation Rev.6 3.3.6
THIS PAGE INTENTIONALLY LEFT BLANK
SUSQUEHANNA - UNIT 1 TRM /3.3-16 TRM Isolation Actuation Instrumentation Rev. 7 B 3.3.6
B 3.3.6 TRM Isolation Actuation Instrumentation
BASES
TRO The TRM Actuation instrumentation automatically initiates closure of appropriate primary containment isolation valves (PCIVs). The function of the PCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs) (Reference 1). The TRM Isolation Actuation Instrument has been relocated from the Technical Specifications because the identified Function is not credited in the plant design basis to mitigate any plant event, but does provide a diverse means to initiate an Isolation Actuation.
The isolation instrumentation includes the sensors, relays, and instruments that are necessary to cause initiation of primary containment and Reactor Coolant Pressure Boundary (RCPB) isolation. When the setpoint is reached, the sensor actuates, which then outputs an isolation signal to the isolation logic. Monitoring a wide range of independent parameters provides functional diversity. The input parameters to the isolation logic are:
(a) Main steam line radiation, and
(b) RHR Flow - High.
The RHR high flow isolation is only applicable to the RHR suction side piping; it will not detect smaller branch size breaks or breaks on the discharge side of the RHR pump.
The valves associated with these trip channels are identified in Table B 3.3.6-1. Each of these valves is also associated with other trip channels as identified in LCO Bases B 3.6.1.3.
The trips occur after a one second delay. See Tech Spec Basis B 3.3.6-1.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.3-10 TRM Isolation Actuation Instrumentation Rev. 7 B 3.3.6
- BASES
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. The ACTIONS are modified by two Notes. Note 1 allows penetration flow path(s) to be unisolated intermittently under administrative controls. These controls consist of stationing a dedicated operator at the controls of the valve, who is in continuous communication with the control room. In this way, the penetration can be rapidly isolated when a need for primary containment isolation is indicated.
Note 2 is provided to modify the ACTIONS for separate Condition entry, consistent with similar Note in the TS 3.3.6.1 Actions.
Condition C applies if the channel is not restored to OPERABLE status or placed in trip, or isolation capability is not restored, within the allowed Completion Time. If inoperable channels should not be placed in trip (e.g., might result in a undesirable transient) Action C may be intentionally entered as a result of not meeting Required Action A.1 in its required Completion Time. Required Action C.1 requires appropriate compensatory measures be in place within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Examples of appropriate compensatory measures may consist of verifying that diverse isolation functions remain OPERABLE. Furthermore, isolating the penetration
. (e.g., as may be required by TS Actions for an inoperability affecting both the TRM Function and a required TS Function) also provides adequate compensatory actions since isolating the affected penetration flow path(s)
- accomplishes the safety function of the inoperable channels. If it is not desired to isolate the affected penetration flow path(s) (e.g., as in the case where isolating the penetration flow path(s) could result in a reactor scram or disabling RHR-SDC), alternate compensatory measures should be pursued.
The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is acceptable due to the fact that these Functions are not assumed in any accident or transient analysis in the FSAR.
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the TRM Isolation Actuation Instrumentation Functions are maintained OPERABLE. TRM Isolation Actuation Instrumentation Surveillances are performed consistent with the Bases for LCO 3.3.6.1 "Isolation Activation Instrumentation."
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.3-11 TRM Isolation Actuation Instrumentation Rev. 7 83.3.6
- BASES
TRS 3.3.6.5
The LOGIC SYSTEM FUNCTIONAL TEST demonstrates the OPERABILITY of the required isolation logic for a specific channel. The system functional testing performed on PC!Vs in LCO 3.6.1.3 overlaps this surveillance to provide complete testing of the assumed safety function. The 24 month Frequency is based on the need to perform portions of this surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the surveillance when performed at the 24 month Frequency.
TRS 3.3.6.6
The response time testing of Function 2.a is per FSAR Table 7.3-29.
REFERENCES 1. FSAR Section 7.3.1
2. NRC Inspection and Enforcement Manual, Part 9900: Technical Guidance, Standard Technical Specification Section 1.0 Definitions, Issue dated 12/8/96.
SUSQUEHANNA - UNIT 1 TRM / B 3.3-12 TRM Isolation Actuation Instrumentation Rev. 7 B 3.3.6
Table B 3.3.Sc1 Primary Containment Isolation Valves (Page 1 of 1)
Isolation Signal Plant systems Valve Number Valve Description Function No.
(Table 3.3.6-1)
Reactor HV-143F019 Reactor Coolant Sample Valve 2.a Recirculation HV-143F020 Reactor Coolant Sample Valve 2.a RHR HV-151F022 RHR - Reactor Vessel Head Spray Valve 3.a HV-151F023 RHR - Reactor Vessel Head Spray Valve ~.a HV-151F008 RHR Shutdown Cooling Valve 3.a HV-151F009 RHR Shutdown Cooling Valve 3.a
SUSQUEHANNA - UNIT 1 TRM / B 3.3-13