ML22363A101
ML22363A101 | |
Person / Time | |
---|---|
Site: | Susquehanna ![]() |
Issue date: | 12/09/2022 |
From: | Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2022-17545 | |
Download: ML22363A101 (1) | |
Text
J.Jt::L.
- v::, I
.{.V.,{,.,{,
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2022-17545 USER INFORMATION:
GERLACH*ROSEY M Address: NUCSA2 Phone#:
542-3194 EMPL#: 028401 CA#:
0363 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSEY M 12/09/2022 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1
THE FOLLOWING CH,ANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS OM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF RORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 12/05/2022 ADD MANUAL TABLE OF CONTENTS DATE: 12/.08/2022 CATEGORY: DOCUMENTS TYPE: TRM2 I of 2
ID:
TEXT 2.2 REMOVE:
REV:11 ADD:
REV: 12 Page I
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR 2
ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE AI::,L CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
SSES MANUAL Manual Name:
TRM2 anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
12/08/2022 Procedure Name TEXT LOES Rev 99
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 27
Title:
TABLE OF CONTENTS TEXT 1.1 0
Issue Date 01/03/2019 03/05/2019 11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1
02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT P TEXT 2.2
Title:
PLANT PROGRAMS AND 12 TEXT 3.0 8
Title:
APPLICABILITY TEXT 3. 1.1 11/09/2007 Change ID Change Number OPERATION (TRO) APPLICABILITY
Title:
REACTIVITY C INJECTION ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD TEXT 3.1.2 11/19/2002 SYSTEMS CONTROL ROD DRIVE (CRD.) HOUSING SUPPORT TEXT 3. 1. 3 5
12/18/2017
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 1
10/12 /2020
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 19 03/31/2021
Title:
CORE OPERATING LIMITS REPORT (COLR)
Page 1 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name:
TRM2 Ianual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0
11/19/2002
Title:
INSTR1]MENTATION RADIATION MONITORING INSTRUMENI'ATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 11 07/21/2017
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK
.'EXT 3. 3. 6 5
03/05/2019
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 4
01/17/2022
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INTENTIONALLY LEFT BLANK TEXT 3.3.9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 2
04/02/2019
Title:
WATER MONITORING INSTRUMENTATION Page 2 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name:
TRM2
.Ianual
Title:
TECHN"ICAL REQUIREMENTS MANUAL UNIT 2
)
TEXT 3.4.1 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1
04/16/2009
Title:
INTENTIONALLY LEFT BLANK TEXT 3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2
05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1
0_4/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS
._'EXT 3. 4. 6 1
04/25/2013
(
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 2
03/05/2019
Title:
ECCS RPV'WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT 3.5.2 2
03/05/2019
Title:
ECCS RPV WATER.INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT 3.5.3 1
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 01/03/2019
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3 6 3 0
11/19/2002 Tit~e: CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name:
TRM2 Ianual
Title:
TECHNICAL REQUIREMENI'S MANOAL DNIT 2 TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHOTOOWN TEXT 3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS filTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL J--
TEXT 3.7.3.l 7
04/21/2022
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3
04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS
.'EXT 3. 7. 3. 3 4
05/16/2016
Title:
PLANT SYSTEMS CO2 SYSTEMS TEXT 3.7.3.4 2
04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS r
TEXT 3.7.3.5 2
04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS I 04/16/2009 TEXT 3.7.3.6 2
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1
04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 15 08/02/2021
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION
. (
TEXT 3.7.4 1
04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name:
TRM2 Ianual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT* 3. 7. 5. 1 1
03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1
04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3
06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION
.'EXT 3. 7. 8 9
03/05/2015
Title:
PLANT SYSTEMS SNOBBERS TEXT 3.7.9 2
03/05/2019
Title:
PLANT SYSTEMS CONTROL STRUCTlJRB HVAC
)
TEXT 3.7.10 2
04/29/2014
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 2
11/01/2018
Title:
PLANT SYSTEMS TEXT 3.8.1 4
08/02/2021
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 3
06/23/2021
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5 of 15 Report Date: 12/08/22
SSES MANUAL Manual Na.me:
TRM2 Ianual
Title:
TECHNICAL REQUIREMENTS MANUAL TINIT 2 TEXT 3.8.3 4
01/28/2020
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1
02/04/2005
)
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM/"'
TEXT 3.8.5 1
,' 11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 3
03/05/2019
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 3
02/25/2021
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM
.L'EXT 3. 9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 1
03/12/2019
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/20'07
Title:
MISCELLANEOUS SHOTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 4
10/05/2022
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2
04/17/2009
Title:
INTENTIONALLY LEFT BLANK Page 6 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name:
TRM2
.Ianual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3. 11. 1. 2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3. 11. 1. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2
10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3. 11. 1. 5 3
03/05/2015
Title:
RADIOACTIVE EFFLUENTS :RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
'EXT r3.11.2.1 4
03/12/2019
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3. 11. 2. 2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
NOBLE GASES TEXT 3. 11. 2. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4
07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 8
07/21/2017
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE
~
Page 7 of 15 Report Date: 12/08/22
SSES MANUAL
\\
Manual Name:
TRM2 ra.nual
Title:
TECHNICAL REQUIREMENTS MANOAL UNIT 2 TEXT 3. 11. 4. 1 5
01/03/2022
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3. 11. 4. 2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3. 11. 4. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1
. 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL.SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENT*s
.'EXT 3.12. 3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 1
01/03/2019
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 1
01/03/2019
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1
12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 1
07/01/2021
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Page 8 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name I TRM2
.Ianual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.7 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 7
03/18/2021
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 2_
04/29/2014
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.l.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.l.3 4
12/18/2017
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION
.'EXT B3.l.4 1
10/12/2020
Title:
REACTIVITY CONTROL AND CHECK VALVE SYSTEM BASES CONTROL ROD SCRAM ACCUMOLATORS INSTRUMENTATION TEXT B3.2.l 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.l 1
01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2
03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2
11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 7
07/21/2017
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3 3 5 2
11/09/2007 Titl~:
0 INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page 9 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name:
TRM2 Ianual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.6 6
03/05/2019
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 4
01/17/2022
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INTENTIONALLY BLANK TEXT B3.3.9 4
01/03/2019
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.. 3. 10 3
02/22/2012
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS
.'EXT B3. 3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 1
04/02/2019
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.l 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY
/'
TEXT B3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 1
01/03/2019
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 10 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name:
TRM2
.Ianual Title1 TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.6 2
01/03/2019
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.l 2
03/17/2020
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT B3.5.2 2
03/05/2019 Title1 ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT B3.5.3 2
03/05/2019
Title:
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING
'EXT B3. 6. 2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 I
1 04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHOTDOWN)
TEXT B3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.l 4
02/16/2017
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name:
TRM2 lanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.3 0
11/19/2002
Title:
PLANT SYSTEMS BASES CO2 SYSTEMS TEXT B3.7.3.4 3
06/19/2019
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1
04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1
04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0
11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES
_'EXT B3. 7. 3. 8 3
09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0
11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5,3 0
11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4
06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2
01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 12 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name:
TRM2
.ranual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.8 4
. 01/31/2014 J
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 3
03/05/2019
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC
(
TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENI' FUEL STORAGE POOLS TEXT B3.7.11 3
11/01/2018
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2
03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCORRENT DEVICES 0
11/19/2002 PROTECTIVE
'EXT B3. 8." 2. 1
Title:
ELECTRICAL CONTINUOUS POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTIO~ -
TEXT B3.8.2.2 2
06/23/2021
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0
11/19/2002
Title:
.ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4
'O 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER,SUBSYSTEM TEXT B3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 4,
03/05/2019
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 3
02/25/2021
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 15 Report Date: 12/08/22
SSES MANUAL Manual Name:
TRM2 Ianual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.l 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 1
03/12/2019
Title:
REFUELING *OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.l 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION
.'EXT B3.10. 3 3
10/05/2022 1Title: MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3. 11. 1. 1 05/10/2016
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1. 2 0
11/19/2002'
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1. 3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3. 11. 1. 4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1. 5 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11. 2.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE Page 14 of 15 Report Date: 12/08/22
t SSES MANUAL Manual Name:
TRM2 lanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.ll.2.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
NOBLE GASES TEXT B3.ll.2.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICOLATES FORM TEXT B3.11. 2. 4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11. 2. 5 5
07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11. 2. 6 2
09/08/2016
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION
'EXT B3.ll.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.ll.4.l 6
01/03/2022
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.ll.4.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.ll.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.l 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL 12/03/2010
";"\\
TEXT B3.12.2 1
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15 of 15 Report Dati: 12/08/22
Rev. 12 Instrument Trip Setpoint Program 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications.and Technical Requirements.
Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.
Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.
Alarm setpoints and other non-protection system tr~p settings as may be fourid in the Technical Specifications or in the Technical Requirements are not included in this table.
Reference:
MFP-QA-1220, Engineering Change Process Handbook SUSQUEHANNA - UNIT 2 TRM /2.0-5
Rev. 12 2.2.1 2.2,1.1 2.2.1.2 2.2.1.3 2.2.1.4 2.2.1.5 2.2.1.6 2.2.1.7 2.2.1.8 2.2.1.9 2.2.1.10 2.2.1.11 2.2.1.12 2.2.1.13 2.2.1.14 2.2.1.15 SYSTEM/REFERENCE LCO [TRO Reactor Protection 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 3.3.1.1 (s) See Figure 2.2-1.
Instrument Trip Setpoint Program 2.2 TABLE 2.2-1 (Page 1 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION Intermediate Range Monitor, Nei.!tror:r Flux -
High Average Power Range Monitor, Neutron Flux - High (Setdown)
Average Power Range Monitor, Simulated Thermal Power - High Two Loop Operation Average Power Range Monitor, Simulated Thermal Power - High Single Loop Operation Average Power Range Monitor, Simulated Thermal Power - High flow Clamp Average Power Range Monitor, Neutron Flux -
High Reactor Vessel Stearn Dome Pressure - High Reactor Vessel Water Level - Low, Level 3 Main Steam Isolation Valve - Clos1:1re This Section Not Used Drywell Pressure - High Scram Discharge Volume Water l:..evel -
High - Level Transmitter Scram Discharge Volume Water Level -
High - Float $witch T1:1rbine Stop Valve - Closure Turbine Control Valve Fast Closure, Trip Oil Pressure - Low TRIP SETPOINT
- 120/125 divisions of full scale
- 18% of RATED THERMAL POWER 0.55 W + 58.7%
0.55 0/v-l:!.W) + 58.7%(b)
- 113.5% of RATED THERMAL POWER
- 118% of RATED THERMAL PO'NER
- 1087 psig
- ?: 13.0 inches(a)
- 10% closed
- 1.72 psig
- 65 gallons
- 61 gallons
- $; 5.5% closed
- ?: 500 pslg (bl For single loop operation, the value of l:!.W = 8.7.
SUSQUEHANNA - UNIT 2 TRM / 2.a-6
Rev. 12 Instrument Trip Setpoint Program 2.2 2.2.1.16 2.2.1.16.1 2.2.1.16.2 2.2.1.16.3 2.2.1.16.4 2.2.1.16:5 2.2.1.16.6 2.2.1.16.7 2.2.1.16.8 2.2.1.16.9 2.2.1.16.10 2.2.1.16.11 2.2.2 2.2.2.1 2.2.2.1.1 2.2.2.1.2 2.2.2.1.3 2.2.2.1.4 22.2.1.5 2.22.1.6 SYSTEM/REFERENCE LCO [TRO]
TABLE 2.2-1, (Page 2 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION OPRM Instrumentation 3.3.1.1 3.3.1.1
[3'.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
[3.3.9]
Sp PBA Amplitude Trip Np PBA Successive Confirn,atJon Count Trip TOL (E) Period Tolerance fc Conditioning Filter Cutoff F:requency Tmin Oscillation Period Lower Time Limit Tmax Osallation Period Upper Time Limit LPRMmin Minimum LRPMs/Cell Required for Cell Operability S1 Peak Threshold Setpolnt/ABA & GRBA S2 Valley Threshold Setpo1nt/ABA & GRBA Smax Amplrtude Trip Setpoint/ABA DR3 Growth Rate Factor Setpolnt/GRBA Isolation Actuation Instrumentation Primary Cornainment Isolation 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1
[3.3.6]
Reactor Vessel Water Level LO'N, Level 3 Reactor Vessel Water Level Low Low, Level 2 Reactor Vessel Water Level Low Low Low, Level 1 Drywall Pressure - High SGTS Exhaust Radiation - High Main Steam Line Radiati6n - High High (a) See Figure 2.2-1.
SUSQUEHANNA - UNIT 2 TRM /2.0-7 TRIP SETPOINT See COLR - TRO 3.2 See COLR - TRO 3 2 0.10 sec 1.50 Hz 1.00 sec 3.50 sec 2
1.20 0.85 1.50 1.60
~ 13.0 inches<0l
~ -38.0 lnches<e)
~ -129 lnches(e)
- .
- ; 1.72 psig
- 5 23.0 mR/hr
- .
- ; 15 x full power background wtthout hydrogen injection
I.
Rev. 12 Instrument Trip Setpoint Program 2.2 2.222 2.2.2.2.1 2.2.2.2.2 2.2 2.2.3 2.2.2.2.4 2.2.2.2.5 2.22 3 2.2.2.3.1 2.2 2.3.2 2.2.2.3.3 2.2.2 3.4 2.2.2.3.5 2.2.2.3.6 2 2.2 3.7 2.2.2.3.8 2.2 2.4 2.2.2.4.1 2.2 2.4.2 2.2.2.4 3 2 2.2 4.4 2 2.2.4.5 2.2 2.4.6 2.2 2.4 7 2.2 2.4.8 2 2.2 4.9 SYSTEM/REFERENCE LCO [fRO]
TABLE 2.2-1 (Page 3 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION Secondary Containmem Isolation 3.3 6.2 3.3.6.2 3.3 6.2 3 3.6.2 3 3.62 Reactor Vessel Water Level - Low Low, Level2 Drywall Pressure - High Refuel Floor High Exhaust Duct Radiation -
High Railroad Access Shaft Exhaust Duct Radiation -
High Refuel Floor Wall Exhaust Duct Rad1abon -
High Main Steam Line Isolation 3.3.61 3.3.6.1 3 3 6.1 3.3.6.1 3.3.6.1
[3 3.6]
Reactor Vessel Water Level - Low Low Low, Level 1 Main Steam Line Pressure - Low Main Steam Line Flow - High Condenser Vacuum - Low Reactor Building Mam Steam Lme Tunnel Temperature - High This Section Not lJsed This section is not used.
Turt:Jme Building Main Steam Tunnel Temperature - High Reactor Water Cleanup System Isolation 3.3 6.1 3 3.6.1 3.3.61 3.3.61 3.3.6.1 3.3.6.1 Reactor Vessel Water Level - Low Low, Level2 RWCU 11 Flow - High RWCU Flow - High RWCU Penetration Area Temperature - High This sectJon Is not used RWCU Pump Area Temperature - High This section is not used RWCU Heat Exchanger Area Temperature -
High This section is not used.
(al See Figure 2.2-1.
SUSQUEHANNA - UNIT 2 TRM / 2.0-8 TRIP SETPOINT
~ -38.0 inches(a) s 1.72 psIg s 18 mR/hr s 5 mR/hr s 21 mR/hr
~ -129 mches(a)
~ 861 psig s 173 psid
~ 9.0 inches Hg vacuum s 177°F s 197°F
~ -38 inches(a) s 59 gpm s 462 gpm s 131°F s 147°F s 147°F
Rev. 12 2.2 2.5 2.2.2.5.1 2.2.2.5.2 2.2.2.5.3 2.2.2.5.4 2.2.2.5.5 2.2.2.5.6 2.2.2.5.7 2.2.2.6.8 2.2.2.5.9 2.2.2.6 2.2.2.6.1 2.2.2.6.2 2.2.2.6.3 2.22.6.4 2.2.2.6.5 2.2.2.6.6 2.2.2.6.7 2.2.2.6.8 2.2.2.6.9 2.2.2.7 2.2.2.7.1 2.2.2.7.2 2.2.2.7.3 2.2.3 2.2.3.1 2.2.3.1.1 2.2.3.1.2 2 2.3.1.3 Instrument Trip Setpoint Program 2.2 SYSTEM/REFERENCE LCO [fRO]
TABLE 2.2-1 (Page 4 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION Reactor Core Isolation Cooling System Isolation 3.3.6.1 3.3.6.1 3.3.6.1 3.3.61 3.3.6.1 3.3.6.1 3.3.6.1 RCIC Steam Line 11 Pressure - High RCIC Steam Supply Line Pressure - Low RCIC Turbine Exhaust Diaphragm Pressure -
High RCIC Equipment Room Temperature - High RCIC Pipe Routing Area Temperature - High RCIC Emergency Area Cooler Temperature -
High Drywall Pressure - High This section is not used.
This section Is not used.
High Pressure Coolant Injection System Isolation 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 HPCI Steam Line /1 Pressure - High HPCI Steam Supply Line Pressure - Low HPCI Turbine Exhaust Diaphragm Pressure -
High HPCI Equipment Room Temperature - High HPCI Emergency Area Cooler Temperature -
High HPCI Pipe Routing Area Temperature - High Drywall Pressure - High This section is not used.
This section is not used.
Shutdown Cooling/System Isolation 3.3.6.1 3.3.6.1
[3.3.6]
ECCS Actuation Core Spray System 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 Reactor Vessel Steam Dome Pressure - High RHR Flow - High Reactor Vessel Water Level - Low Low Low, Level 1 Drywall Pressure - High Reactor Vessel Steam Dorne Pressure - Low injection permissive TRIP SETPOINT s 138 Inches H20
~ 60 pslg s 10.0 pslg s 167°F s 167"F s 167°F s 1.72 psig s 370 inches H20
~ 104 psig s 10 psig s 167°F s 167°F s 167°F s 1.72 psig
~ 13.0 lnches<al s 98 psig s25,000 gpm
~ -129 inches<al s 1.72 psig
~ 396.5, s 428.5 psig
{al See Figure.2.2-1.
SUSQUEHANNA - UNIT 2 TRM / 2.0-9
Rev. 12 Instrument Trip Setpoint Program 2.2 2.2.3.2 2.2.32.1 2.2.32.2 2.2 3.2.3 2.2.3.2.4 2.2.3.3
.2 2.3.3.1 2.2 3.3.2 2.2.3.3.3 2.2.3.3.4 2.2.3.4 2.2.3.4.1 2.2.3.4.2 2.2.3.4.3 2.2.34.4 2.2.3.4.5 2.2.3.4.6 2.2.3.4.7 2.2.3.5 2.2.3.5.1 2.2.3.5.1.1 2.2 3.5.1 2 SYSTEM/REFERENCE LCO [TRO]
TABLE 2.2-1 (Page 5 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION LPCI Mode of RHR System 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 HPCI System 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level 1 Drywall Pressure - High Reactor Vessel Steam Dome Pressure - Low, lnJectlon permissive Reactor Vessel Steam Dome Pressure - Low, Recirculation Discharge Valve pennlssive Reactor Vessel Water Level - Low Low, Level2 Drywall Pressure - High.
Condensate Storage Tank Level - Low Reactor Vessel Water Level - High, Level 8 Automatic Depressurization System (ADS) 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level 1 Drywall Pressure - High ADS llmer Core Spray Pump Discharge Pressure - High Low Pressure Coolant Injection Pump Discharge Pressure - High Reactor Vessel Water Level - Low, Level 3 Confirmatory ADS Drywall Pressure Bypass "fimer Loss of Power - ECCS Actuation 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)
3.3 8.1 3.3.8.1 Bus Undervottage Time delay (11) See Figure 2.2-1.
SUSQUEHANNA - UNIT 2 TRM / 2.0-10 TRIP SETPOINT
- ,
- -129 inches(9l
~ 1.72 psig
- ,
- 396.5, ~ 428.5 psig
- ,
- 236 pslg, decreasing
- ,
- -38 lnches(a)
~ 1.72 pslg
- ,
- 40.5 inches above tank bottom
~ 54 Inches
~ -129 inches
~ 1.72 pslg
~ 102 seconds
- ,
- 135, ~ 155 psig
- ,
- 121, ~ 129 psig
- ,
- 13 inches
~ 420 seconds
- ,
- 823.2, ~ 856.8 Volts
~ 0.4, ~ 0.6 seconds
Rev. 12 Instrument Trip Setpoint Program 2.2 2.2.3.52 2.2.3.5.21 2.2.3.52 2 22.3.5.3 2.2.3.5.3.1 2.2.3.5.3.2 22.3.5.3.4 2.2.3.5.4 2.2.3.5.4.1 2.2.3.5.4.2 2.2.3.5 5 2.2.3.5.5.1 2.2.3.5.5.2 2.2.4 2.2.4.1 2.2.4.1 2.2.5 2.2.5.1 2.2.52 2.2.6 2.2.6.1 2.2.6.2 2.2.6.3 SYSTEM/REFERENCE LCO [TRO]
TABLE 2.2-1 (Page 6 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION 4.16kV ESS Bus Undervoltage (Degraded Voltage< 65%)
3.3.8.1 3.3.8.1 Bus Undervoltage T1me delay 4.16kV ESS Bus Undervoltage (Degraded Voltage,< 93%)
3.3.8.1 3.3 8.1 3.3.8.1 Bus Undervoltage Time Delay (Non-LOCA)
Time Delay (LOCA) 480V ESS Bus 08565 Undervoltage (Degraded Voltage,< 65%)
[3.8.5]
t3 8.5]
480V Basis Tlme Delay 480V ESS Bus 08565 Undervoltage (Degraded Voltage, < 92%)
[3.8.5]
[3.8.5]
480V Basis Time Delay ATW$ Alternate Rod Injection and Rech:culation Pump Trip 3.3.4.2/[3.1.1]
3.3.4.2/[3.1.1]
Reactor Vessel, Water Level - Low Low, Level2 Reactor Vessel Steam Dome Pressure - High End of Cycle Recirculation Pump Trip 3.3.4.1 3.34.1 Turbine Stop Valve-Closure Turbine Cor1trol Valve - Fast Closure Reactor Core Isolation Cooling System Actuation 3.3.5.2 3.3.5.2 3.3.5.2 Reactor Vessel Water Level - Low Low, Level2 Reactor Vessel Water Level - High, Level 8 Condensate Storage Tank Level-Low (el See Figure 2.2-1.
SUSQUEHANNA - UNIT 2 TRM / 2.0-11 TRIP SETPOINT
~ 2641.1,::;; 2748.9 Volts
~ 2.7,:,; 3.3 seconds 2 3829.3,::;; 3906.7 Volts 2 4 minute, 30 seconds
- ,; 5 minute, 30 secomds 2 9,:,; 11 seconds 2 308.9,::;; 315.1 Volts 2 4.5,:,; 5.5 seconds 2 437.6, :,; 446.4 Volts 2 9, :,; 11 seconds 2 -38 Inches(&)
- 1135 pslg
- 5 5% closed 2 500 pslg
~ -38 inches(al
- 54 lnches(aJ 2 36.0 inches above tank bottom
Rev. 12 Instrument Trip Setpoint Program 2.2 22.7 2.2.7.1 2 2.7.1.1 2.2.7.1.2 2.2.7.2 2.2.72.1 2.2.7.2.2 2.2.7.2.3 2.2.7.2.4 2.2.7.2.5 2.2.7.3 2.2.7.3.1 2.2.7.3.2 2.2.7.4 2.2.7.4.1 2.2.7.4.2 2.2.7.5 2.2.7.5.1 2.2.7.6 2.2.7.6.1 SYSTEM/REFERENCE LCO [TRO]
Control Rod Block Rod Block Monitor 3.3.2 3.3.2 3.3.2 3.3.2 3.3.2 3.3.2 APRM
[3.1.3]
[3.1.3]
[3.1.3]
[3.1.3]
[3.1.3]
Source Range Monitors
[3.1.3]
[3 1.3]
TABLE 2.2-1 (Page 7 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION Low Power Range - Upscale Intermediate PoWer Range - Upscale High Power Range - Upscale Low Power Range Setpoint Intermediate Power Range Setpolnt High Power Range Setpoint Simulated Thermal Power-High - Two Loop Operation Simulated Thermal Power-High - Single Loop Operation Simulated Thermal Power-High Clamp Downscale Neutron Flux - High (Setdown)
Upscale Dovmscale Intermediate Range Monitors
[3.t.3]
[3.1.3]
Upscale Downscale Scram Discharge Volume
[3.1.3]
Water level - High Reactor Coolant System Recirculation Flow
[3.1.3]
Upscale Cbl With a signal-to-noise ratio 2 2, or within the limits of Figure 2.2-2.
(cl For single loop operation, the valve of !:iW = 8.7.
SUSQUEHANNA - UNIT 2 TRM / 2.0-12 TRIP SETPOINT See COLR - TRO 3.2 See COLR - TRO 3.2 See COLR - TRO 3.2 See COLR - TRO 3.2 See COLR-TRO 3.2 See COLR - TRO 3.2 0.55 W + 54.2%
0.55 0/11- [),,W) + 54.2%(c)
- -; 108% of RATED THERMAL PO\\o\\lER
- 2: 5% of RATED THERMAL PO\\/1/ER
- -; 12% of RATED THERMAL POvVER
- 2E5 cps 2 3.0 cpsCbl
- -; 108/125 divisions of full scale 2 5/125 dMslons of full scale
- 35.9 gallons 114%
Rev. 12 SYSTEM/REFERENCE LCO [TRO]
2.2.8 CREOASS 2.2.8.1 3.3.7.1 2.2.8.1.1 3.3.7.1 2.2.8.1.2 3.3.7.1 2.2.8.1.3 3.3.7.1 2.2.8.1.4 3.3.7.1 2.2.8.1.5 3.3.7.1 Instrument Trip Setpoint Program 2.2 TABLE 2.2-1 (Page 8 of 8)
INSTRUMENTATION SETPOINTS TRIP FUNCTION Main Control Room Outside Air Intake Radiation Monitor Reactor Vessel Water Level - Low Low, Level2 Drywell Pressure - High Refuel Floor High Exhaust Duct Radiation - High Railroad Access Shaft Exhaust Duct Radiation
-High Refuel Floor Wall Exhaust Duct Radiation - High TRIP SETPOINT
~ 5 mR/hr
~ -38.0 lnches(a)
~ 1.n pslg
~ 18 mR/hr
~ 5 mR/hr
~ 21 mR/hr 2.2.9 2.2.9.1 2.210 2.2.10.1 Feedwater/Maln Turbine Trip System AcitJatlon 3.3.22 MVP Isolation
[3.3.11]
(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 Reactor Vessel Level - High Main Steam Line Radiation - High High TRM /2.0-13
~ 54.0 inch~(a)
~ 15 x full power background without hydrogen injection
Rev. 12 800 5-MAIN STEAM LINE BCJTTIJ4 CF STEAM DRYER SKIRT FEED 498.
\\!ATER
=7
~IVE FUEL
... J 181,0-RECIRC RECIRC 161.
INLET llllTLET NlZZLE NJZZLE 100 50 FIGURE 2. 2-1 Instrument Trip Setpoint Program 2.2 WATER LEVEL NIIMENCLATLRE f£IGHT A]!(]VE NJ.
VESSEL ZERll READit<<i
<IN.)
(8) 581. 5
+54 (7) 366. 5
+39 (4)
'SS7, 5
+30 (3)
~5
+13 (2) 489. s
-38
< 1) 398. 5
-129 WIDE NARROW RM&~
RAN'.iE
+60
+60-+60::c:+60~
(8)
~ (7) 39 HI HFCI 'i > >J !S' C
13
-0 38 SCRAM CONTRIBUTE (2) INITIATE RCIC, mADS HPCI, ARI TRIP RECIRC PIMPS
-129 (1) INITIATE RHR, CS START DIESEL
-150 CClfTRIBUTE m ADS CLOSE MS IV' S NOTE* SCALE IN INCt£S ABOVE VESSEL Z£RD REACTOR VESSEL WATER LEVEL SUSQUEHANNA - UNIT 2 TRM / 2.0-14
Rev. 12 3
2.8 2.6 2.4 2.2 2
1.8 CA (I...
u 1.6 w
~ 1.4
~
1.2 0 u 1
~
a::::
0.8 Cf) 0.6 0.4 0.2 0
\\
\\
\\
\\
2 Instrument Trip Setpoint Program 2.2 Instrument Trip Setpoint Table 2.2
\\
\\
6 Acceptable
~ --r--. r--........
Not Acceptable 10 14 18 22 Signal-to-Noise Ratio Figure 2.2-2 26 30 Minimum SRM Trip Setpoint Versus Signal~to-Noise Ratio SUSQUEHANNA - UNIT 2 TRM / 2.0~15