Category:CORRESPONDENCE-LETTERS
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20210K1621999-07-0707 July 1999 Informs That Licensee in Process of Preparing Scope of Service Delineation for Environ Assessment to Be Performed for New Airport Located Near Russellville,Ar,To Identify Anticipated Environ Impacts from Various Agencies 1CAN079902, Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation1999-07-0606 July 1999 Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 0CAN069906, Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages1999-06-30030 June 1999 Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages 1CAN069905, Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs1999-06-17017 June 1999 Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs 0CAN069903, Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii)1999-06-10010 June 1999 Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii) 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 20001999-06-0202 June 1999 Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 1CAN069901, Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice1999-06-0202 June 1999 Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice 0CAN059906, Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-05-28028 May 1999 Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 1CAN059904, Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn1999-05-20020 May 1999 Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn 2CAN059906, Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-11999-05-18018 May 1999 Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-1 1CAN059902, Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program1999-05-17017 May 1999 Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program 2CAN059905, Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative1999-05-14014 May 1999 Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative ML20206P7681999-05-10010 May 1999 Forwards Applications for Renewal of Operating License (Form 398) for MW Little & F Uptagrafft.Without Encl 2CAN059903, Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance1999-05-10010 May 1999 Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206H7121999-05-0606 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept, for Ano.All Radionuclides Detected by Radiological Environ Monitoring Program During 1998 Were Significantly Below Regulatory Limits 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEAR2CAN099009, Requests Interim Relief from Inservice Testing Re Performing Partial Stroke Test for Check Valve 2SI-16A.Valve Currently Required to Be Tested by 9009251990-09-21021 September 1990 Requests Interim Relief from Inservice Testing Re Performing Partial Stroke Test for Check Valve 2SI-16A.Valve Currently Required to Be Tested by 900925 0CAN099002, Discusses Validation of Nonlicensed Operator Staffing,In Response to Insp Repts 50-313/90-01 & 50-368/90-01.Concludes That Current Level of Three Nonlicensed Operators Per Shift, Adequate to Meet Demands of Operations Under EOP1990-09-14014 September 1990 Discusses Validation of Nonlicensed Operator Staffing,In Response to Insp Repts 50-313/90-01 & 50-368/90-01.Concludes That Current Level of Three Nonlicensed Operators Per Shift, Adequate to Meet Demands of Operations Under EOP 0CAN099007, Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-071990-09-14014 September 1990 Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07 2CAN099004, Forwards Response to 900809 Telcon Questions on CEN-386-P Re Extended Burnup,Including Criteria,Methods & Analysis1990-09-0707 September 1990 Forwards Response to 900809 Telcon Questions on CEN-386-P Re Extended Burnup,Including Criteria,Methods & Analysis 0CAN099001, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/90-19 & 50-368/90-19.Corrective Actions:Surveillance Procedures Reverified & Revised1990-09-0707 September 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/90-19 & 50-368/90-19.Corrective Actions:Surveillance Procedures Reverified & Revised 1CAN099003, Requests one-time Rev to Natl Exam Schedule for Operator License & Requalification Exams at Facility to Allow Testing in Aug,Rather than Feb of 19911990-09-0606 September 1990 Requests one-time Rev to Natl Exam Schedule for Operator License & Requalification Exams at Facility to Allow Testing in Aug,Rather than Feb of 1991 0CAN089009, Informs of Relocation to New Generation Support Bldg Just Outside Protected Area Southeast of Administration Bldg1990-08-31031 August 1990 Informs of Relocation to New Generation Support Bldg Just Outside Protected Area Southeast of Administration Bldg 0CAN089006, Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual1990-08-30030 August 1990 Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual 0CAN089008, Forwards Facility fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.73(d)1990-08-29029 August 1990 Forwards Facility fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.73(d) 0CAN089005, Requests Authorization to Use Inconel 690 Tubing & Bar Stock for Steam Generator Repairs at Plant.Approval Necessary to Support Planned Use of I-690 Sleeves & Plugs During 1R9 Scheduled to Begin on 9010011990-08-27027 August 1990 Requests Authorization to Use Inconel 690 Tubing & Bar Stock for Steam Generator Repairs at Plant.Approval Necessary to Support Planned Use of I-690 Sleeves & Plugs During 1R9 Scheduled to Begin on 901001 1CAN089011, Requests Relief from ASME Code Section XI Requirements Re Exercise & Stroke Time Testing for Low Pressure Injection Valves CV-1432 & CV-1433.Valves Located in Bypass Lines Around Decay Heat Coolers1990-08-16016 August 1990 Requests Relief from ASME Code Section XI Requirements Re Exercise & Stroke Time Testing for Low Pressure Injection Valves CV-1432 & CV-1433.Valves Located in Bypass Lines Around Decay Heat Coolers 2CAN089009, Requests Addl Time to Respond to NRC 900607 Request for Info Re Second 10-yr Interval of Inservice Insp Program. Response Will Be Submitted No Later than 9010311990-08-13013 August 1990 Requests Addl Time to Respond to NRC 900607 Request for Info Re Second 10-yr Interval of Inservice Insp Program. Response Will Be Submitted No Later than 901031 0CAN089002, Responds to Recommendations from Insp Repts 50-313/90-04 & 50-368/90-04 on 900202 That Reporting Format for Semiannual Radioactive Effluent Release Repts Be Revised to Comply W/ Reg Guide 1.21,Rev 11990-08-0808 August 1990 Responds to Recommendations from Insp Repts 50-313/90-04 & 50-368/90-04 on 900202 That Reporting Format for Semiannual Radioactive Effluent Release Repts Be Revised to Comply W/ Reg Guide 1.21,Rev 1 05000313/LER-1989-041, Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria1990-08-0202 August 1990 Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria 2CAN089006, Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info1990-08-0202 August 1990 Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info ML20081E0891990-07-31031 July 1990 Advises That Since Guidance Contained in Reg Guide 1.97 Not Addressed in Submittals Re Generic Ltr 82-33,further Clarification of Position Re Compliance W/Generic Ltr Appropriate,Per .Ltr Will Be Submitted by 901215 0CAN079014, Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 9009301990-07-31031 July 1990 Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 900930 0CAN079024, Forwards Revised Response to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Specific Communication Meetings Will Be Conducted W/Staff Re Decontamination Practices & Procedures1990-07-31031 July 1990 Forwards Revised Response to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Specific Communication Meetings Will Be Conducted W/Staff Re Decontamination Practices & Procedures 0CAN079020, Forwards Update to Status of Remaining Open Items on Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Encl Withheld (Ref 10CFR2.790)1990-07-31031 July 1990 Forwards Update to Status of Remaining Open Items on Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Encl Withheld (Ref 10CFR2.790) 0CAN079018, Certifies That Info Contained in Rev 12 to QA Manual Operations Freighted to NRC on 900723 & Accurately Represents Changes Made Since Previous Submittal,Per 10CFR50.54(a)(3)1990-07-24024 July 1990 Certifies That Info Contained in Rev 12 to QA Manual Operations Freighted to NRC on 900723 & Accurately Represents Changes Made Since Previous Submittal,Per 10CFR50.54(a)(3) 0CAN079021, Forwards Rev 12 to QA Manual Operations1990-07-23023 July 1990 Forwards Rev 12 to QA Manual Operations 0CAN079019, Forwards Rev 12 to QA Manual Operations.W/O Encl1990-07-23023 July 1990 Forwards Rev 12 to QA Manual Operations.W/O Encl 0CAN079011, Suppls Response to Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Re Isolation Valve CS-26. Corrective Actions:Special Work Plan Developed & Valve Cs-26 Local Leak Rate Tested on 9002161990-07-20020 July 1990 Suppls Response to Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Re Isolation Valve CS-26. Corrective Actions:Special Work Plan Developed & Valve Cs-26 Local Leak Rate Tested on 900216 2CAN079008, Forwards Response to NRC Questions on CEN-386-P Re Extended Burnup Rept & Statistical Treatment of Elastic Strain in Fuel Cladding at end-of-life & Measured Axial Fuel Rod pellet-to-pellet Gaps1990-07-17017 July 1990 Forwards Response to NRC Questions on CEN-386-P Re Extended Burnup Rept & Statistical Treatment of Elastic Strain in Fuel Cladding at end-of-life & Measured Axial Fuel Rod pellet-to-pellet Gaps 0CAN079006, Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance1990-07-17017 July 1990 Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance 2CAN079001, Submits Addl Info Re 890822 Tech Spec Change Request for RCS Safety Valves & Plant Sys Turbine Safety Valves. Tolerance of -3% in Combination W/Current High Pressurizer Trip Setpoint Ensures Valves Will Not Open Prior to Trip1990-07-0505 July 1990 Submits Addl Info Re 890822 Tech Spec Change Request for RCS Safety Valves & Plant Sys Turbine Safety Valves. Tolerance of -3% in Combination W/Current High Pressurizer Trip Setpoint Ensures Valves Will Not Open Prior to Trip ML20043H5161990-06-19019 June 1990 Informs of Changes of Responsibility for Plant Emergency Plan,Effective 900605 ML20043H3121990-06-18018 June 1990 Forwards Responses to Remaining NRC Questions Re Seismically Qualified,Partially Protected,Condensate Storage Tank (Qcst).Analyses in Calculations Demonstrate That Qcst Tank Foundation & Drilled Piers Adequate W/O Mod ML20043F3321990-06-15015 June 1990 Submits Addl Info on Tech Spec Change Request for Seismic Instrumentation,Per 890809 Request.Licensee Concurs W/Nrc Recommendation Re Editorial Change ML20043G0661990-06-13013 June 1990 Responds to Deviations Noted in Insp Repts 50-313/90-11 & 50-368/90-11.Corrective Actions:Further Evaluations Conducted to Develop Optimum List of post-accident Instruments Requiring Identification on Control Panels ML20043H3471990-06-11011 June 1990 Forwards Rev 19 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043G3801990-06-11011 June 1990 Responds to Violations Noted in Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Decision Made to Staff Unit 1 Exit Location Point W/Health Physics Technician 24 H Per Day ML20043F5121990-06-0808 June 1990 Forwards List of Directors & Officers of Entergy Operations, Inc.Operation of All Plants Transferred to Entergy on 900606 ML20043F4341990-06-0707 June 1990 Informs of Receipt of Necessary Approvals to Transfer Operating Responsibilities of Plant to Entergy Operations, Per Amends 128 & 102 to Licenses DPR-51 & NPF-6, Respectively.Extension of Amend Request Unnecessary ML20043E6561990-06-0707 June 1990 Requests That Listed Distribution Be Made on All Future NRC Correspondence.Correspondence to Ns Carns Should Be Addressed to Russellville ML20043E4991990-06-0505 June 1990 Provides Supplemental Response to Violations Noted in Insp Repts 50-313/89-02 & 50-368/89-02.Corrective Actions:Listed Program Enhancements Being Implemented to LER Process to Provide Timely Determinations of Condition Rept ML20043E3851990-06-0404 June 1990 Concurs w/900516 Ltr Re Implementation of SPDS Complete for Both Units & Requirements of NUREG-0737,Suppl 1 Met ML20043E3771990-06-0404 June 1990 Forwards Response to Concerns Re Control Room Habitability Survey.Addl Mods Identified Will Enhance Overall Reliability of Control Room Sys & Changes Designed to Increase Performance,Effectiveness & Response of Habitability Sys ML20043C0821990-05-25025 May 1990 Withdraws 900410 Request to Amend Tech Spec Table 3.3-1 Re Applicable Operational Modes for Certain Reactor Protective Instrumentation Operability Requirements ML20043B6531990-05-22022 May 1990 Forwards Rev to Industrial Security Plan to Eliminate Need to Protect Certain Vital Areas of Plant.Rev Withheld (Ref 10CFR73.21) ML20043B7091990-05-21021 May 1990 Forwards Revised Maelu Certificate of Insurance for Nuclear Onsite Property Insurance Coverage for 1990,changing Policy Number from X89166 to X90143R ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20043A5991990-05-15015 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Repts for Feb & Mar 1990 for Arkansas Nuclear One,Unit 1 ML20042H0551990-05-0909 May 1990 Forwards Civil Penalty in Amount of $50,000 for Violations Noted in Insp Repts 50-313/86-23 & 50-368/86-24 Re Environ Qualification of Electrical Equipment Important to Safety. Comprehensive Corrective Actions Undertaken ML20043B0841990-05-0909 May 1990 Corrects 900309 Ltr Re Completion of Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Design Change Package Addressing Perimeter & Interior Lighting Scheduled to Be Onsite Late Summer 1991 ML20043A8361990-05-0707 May 1990 Responds to Violations Noted in Insp Repts 50-313/90-05 & 50-368/90-05.Corrective Actions:Personnel Involved Received Counselling Re Incident & Operations Personnel Being Trained on Significance of Surveillance Requirements ML20042F4371990-05-0404 May 1990 Requests 90-day Extension to Provide Addl Time for Reviews of Amends 128 & 102 to Licenses DPR-51 & NPF-6,respectively, Re Ownership Transfer ML20042G4771990-05-0404 May 1990 Forwards Summary of Util Exercise Critique Board Evaluation of Radiological Emergency Preparedness Exercise REX-90,per Insp Repts 50-313/90-08 & 50-368/90-08 ML20042F3351990-05-0303 May 1990 Forwards Nonproprietary Suppl 1 to CEN-386-NP & Proprietary Suppl 1 to CEN-386-P, Responses to Questions on C-E Rept CEN-386-P, 'Verification of Acceptability of 1-Pin Burnup Limit....' Proprietary Rept Withheld (Ref 10CFR2.790) ML20042F2701990-04-30030 April 1990 Provides Exam Schedules for Reactor Coolant Pumps a & B in Revised Inservice Insp Program Plan.Insps Scheduled for Refueling Outages 1R10 & 1R12 for Pump a Exams & Refueling Outages 1R10,1R12 & 1R14 for Pump B Exams 1990-09-07
[Table view] |
LER-2085-022, Corrects 851106 Ltr Forwarding LER 85-022-00.Unit,docket & License Number Incorrectly Listed on Cover Ltr 2CAN118503 |
Event date: |
|
---|
Report date: |
|
---|
3682085022R00 - NRC Website |
|
text
_ _ _ _ _ _ _ _ - _ . _ . _____ ___ __ ______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
ARKANSAS POWER & LIGHT COMPANY l
POST OFFICE 80X 551 UTTLE ROCK, ARKANSAS 72203 (501)3714000 December 12, 1985 2CAN128505 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No NPF-6 Licensee Event Report No. 85-022-00 Gentlemen:
In accordance with 10CFR50.73(a)(2)(iv), attached is the subject report r;nncerning a reactor trip on high steam generator level due to closure of the 'B' main feedwater regulating valve.
This letter corrects a typographic error in the letter 2CAN118503 dated November 6, 1985. The unit, docket and license nun.bers were incorrectly listed on the cover letter. A copy of the original letter and licensee event report are attached.
(
Very truly yours,
/ J. Ted Enos
( Manager, Licensing JTE:RJS;1w Attachment cc: Mr. James M. Taylor Office of Inspection and Er forcement U. S. Nuclear Regulatory Commission Washington, DC 20555 0512260204 051212 f'Dft U
ADOCK 05000360 PDff peg
"'""'""=""'""'"'*""'""" Y'
r - ,
b
/
NRC Form 366 U.S. Nuclear Regulatory Commistfon (9 83) Approved OM8 No. 3150-0104 Expires: 8/31/85 LICEN5EE EVENf REPORT (L E R)
FACILITY NAME (1) Arkansas Nuclear One, Unit Two IDOCKET NukBER (2) IPAGE (3) 1015!0l0101 31 61 81110Fl012 TITLE (4) Reactor Trip on High 5 team Generator Level Oue to Closure of Main Feedwater Regulating valve
~ EVENT DATE (5) leo NuM8ER (6) REPORT OATE (7) OTHER FACILITIE5 INVOLVED (8) l l l 15equentiall l Revision i i Monthi Day lYear i Year i i Number ! l Number l Month [ Osy lYear i Facility Nsmes lDocket Number (s) i l i i i i l I I i 1015 olo 0 11 01 01 81 al 51 81 Slal 01 21 21 - 1 0l of 11 11 Of 61 81 St 1015 010 0 6PERATING l ITHIS REPORT 15 $UBMIITED PURSUANT TO THE REQUIREMENTS OF 10 CFR 5:
MODE (9) 11 (Check one or more of the follow 8no) (11)
F6WER) ,,,,i 20.402(b) l_l 20.405(c) lJ) 50.73(a)(2)(tv) l_l 73.71(b)
LEVELI i
_l 20.405(a)(1)(1) l _l 50.36(c)(1) l l 50.73(a)(2)(v) l_I 73.71(c)
(10) 1019181 l 20.405(a)(1)(if) 1.,,,,1 50. 36(c )( 2) l __ l 50.73(a)(2)(vii) l_I Other (Specify in l_l 20.405(a)(1)(Ill) l_l 50. 73(a)(2)(1) l_l 50.73(a)(2)(vfil)(A)l Abstract below and l _t 20.405(a)(1)(iv) l_ l 53.73(a)(2)(11) l in Text, NRC Form i l 20.405(4)(1)(v) l l 50.73(a)(2)(fit) I _li 50.73(4)(2)(x) 50.73(a)(2)(vift)(8)l 1 366A)
LICENSEE CONTACT FOR THIS LER (12)
Name l _ Telephone Number 0 wight J. Johnson, Plant Licensing Engineer IArea l ICode i 1510111916l41 13111010 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (I))
l l l lReportablel l 1 l l l Reportable i Cause System l Component Manufacturerl to NPR05 l ICausel5ysteml Component IManufacturer to NPRD5 i l l I i l l W 5t J Fi Cl VI Fl 11 31 Of Yi f I l i I I I l l l I i l I i i I L I I l I I l l. I I I I l I l l I I I I I f i
f 50PPLEMEN ' REPORT U PECTED (14) Day w ear l EAPECTED i Month ;
~
l $UBMI55!0N l ~
Ye ejf f a os~omplete c Espected Submission Date) IIll No l DATE (15) I l I I
I I( m t to 1400 spaces, i.e. , approximately fif teen single space typewritten lines) (16)
On 10/8/85 at 1051 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.999055e-4 months <br /> with the unit operating at 98% power the reactor was automatically tripped on high steam generator level based on 'B' and 'O' channels of the Reactor Protective System (RPS) receiving an Indicated ' A' steam generator level 193.44 (trip setpoint). The RP5 actuated on the 2 out of 4 channel trip logic to trip the reacter. Post trfp pressures and temperatures responded as espected the high steam generator level cleared when i the reactor was shut down, and emergency feedwater actuated as antic} pated to restore normal steam generator levels. The plant was stabilfred in hot standby (Mode 3) conditions. The cause of the high level in the 'A' steam generator was the closure of the '8' Main Feedwater Regulating Valve (MFRV) which caused an increase in main feedwater pump speed demand on both main feedwater pumps. This increase in pump speed caused a large feed flow / steam flow mismatch in the ' A' steam gerarator which was not adequately of f set by closure of the ' A' MFRV in i
time to prevent reaching the high level trip setpoint in the ' A' steam generator. The closure of the 'B' MfRV was due to desiccant carryover from the instrument air dryers foulfng the pneumatic relays in the '8' MFRV electro pneumatic valve positioner. Corrective actions to prevent recurrence have included installation of a 1 micron duples filter in the instrument air supply to the MFRVs, increased preventive maintenance in this area, and inspettlon of the Instrument air drying towers retention elements. A similar event was described in LER 50-368/84 014.
gQ' wi- ;
I Form 1062.01B NRC Form 366A U.S. Nuclear Regulatory Commission (9-83) Approved OMB No. 3150-0104 Expires: 8/31/85 LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILIfY NAME (1) 100CKLI hUMBER (2) i LER NUMBER (6) l PAGE (3) l l l lSequentfall lRevisioni Arkansas Nuclear One, Unit Two l l_ Year l Number ! l Number l fol5101010f 31 61 al 81 5 --! 01 21 21- i 01 Ol0l210Fl012 TEXT (If more space Is required, use additional NRC f orm 366A's) (11)
On 10/8/85 at 1051 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.999055e-4 months <br /> with the unit operating at 98% power the reactor was automatically tripped on high steam generator level in the 'A' steam generator. The trip was initiated by the receipt in the
'B' and 'D' channels of the Reactor Protective System (RPS) of ' A' steam generator level greater then 93.4L This condition resulted in the necessary 2 out of 4 channel trip configuration required for RPS actuation (a reactor trip). Post trip res1onse was normal and the high level condition was mitigated by steam generator and main feedwater control system reaction to the unit trip. No abnormal conditions were noted during the post trip period and the unit was stabillied in Mode 3 conditions with the reactor coolant system at 2250 psia and 545'F.
The cause of the high 'A' steam generator level was an over feeding condition that resulted from the closure of the 'B' Main Feedwater Regulating Valve (MFRV), 2CV 0740 (IEES Identifier = 025J FCV 0740) for the 'B' steam generator. When the 'B' MFRV closed the B main feedwater control system sensed the decrease in feedwater flow to the 'B' steam generator and increased the 'B' main feedwater pump speed to compensate. This increase in pump speed demand on the 'B' main feedwater pump was transmitted to the ' A' main feedwater control system which, through a high select circuit, resulted in the equivalent speed demand being placed on the ' A' main feedwater pump. This resulted in a large steam flow / feed flow mismatch on the 'A' steam generator and the high level trip setpoint was reached before the 'A' MFRV could respond to mitigate the high flow condition. The high level in the ' A' steam gererator was terminated when the reactor tripped due to normal steam generator level response (shrink ef fect) and the designed response of the main feedwater control system.
The shrink effect in steam generator level induced by the reactor trip initiated emergency feedwater actuation based on low steam generator level in the 'B' steam generator. Both emergency feedwater pumps and valve trains responded as required to the transient. At 1109, 10/8/85, the steam driven emergency feedwater pump (ZP 7A) was secured per Emergency Operating Procedure recovery actions. Normal steam generator levels were subsequently restored and maintained.
The cause of the 'B' MFRV closure has been identified as an accumulation of desiccant in the valve actuator assembly from the instrument air system dryers. This accumulation of desiccant restricted operation of pneumatic relays which allowed the valve to close. Both MFRVs are electro pneumatically positioned valves with pneumatic operators which are supplied with air from the plant instrument air system. The plant instrument air system supplies dry, oil free pressurtred air to a variety of plant systems. The compressed air is maintained dry by the use of drying towers which contain a desiccant. Over the operating Ilfe of this system the desiccast has broken down somewhat and ultra fine particles have apparently contaminated portions of the system, despite the presence of 40 micron primary filtering units in this system. No safety related components that utfllte instrument air have been af fected by desfecant contamination.
Corrective actions were initiated 10/8/85 at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> to replace the pneumatic relays and readjust the valve positioner on the 'B' Mf RV. The 'A' MFRV was stroke tested satisfactorily for response performance. This work was completed 10/8/85 at 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br />. The plant was subsequently returned to power operations. Additional corrective actions include the installation of 1 micron duplea filters in the Instrument air supply line to the MFRV's and an increase in preventive maintenance associated with this portion of the main feedwater control system. Also, work was completed on inspection and repair of the instrument air drying tower retention elements.
A study of potential long term solutions has been initiated by the maintenance, engineering, and operation groups to identify feasible future courses of action if any are necessary. A siellar event was described in LER 50 368/84 014.
l .
t
~
ARKANSAS POWER & LIGHT COMPANY POST OFFICE DOX 551 LITTLE ROCK. ARKANSAS 72203 (501)3714000 November 6, 1985 2CAN118503 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. OPR-51 Licensee Event Report No. 85-022-00 Gentlemen:
In accordance with 10CFR50.73(a)(2)(iv), attached is the subject report concerning a reactor trip on high steam generator level due to closure of the 'B' main feedwater regulating valvo.
. Very truly yours, 65D-J. Ted Enos flanager, Licensing JTE:RJS:1w Attachment cc: ltr. James M. Taylor Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555
. VE VOt f1 M'004 t" ficu f te t;f esitet s O v s t r u
I
U.S. Nuclear Regulatory Commission Approved CHa No. 3150 0104 1!CEN$EE EVEHT REPOR1 Espires: 8/31/85 (L E R)
FACILITY NAME (1) Arkansas Nuclear One, Unit Iwo TIILE (4) IDOUEI NUMBER (2) IPAGE (3)
Reactor Trip on Hign Steam Generator Level Oue to Closure of Main ng valvef eeowater R
_ EVENT DATE (5) i i (ER NUM8ER (6) l 15equentiell (Revision REPORT DATE (1) t I l OTHER FAtlLillE5 INVOLVEL (ff)
Month) l Day J lYear J
lYear I i Number i i Number IMonthi Day lYearFacility i Names l
( l i l I I i ' Docket Number (s) ~~
110101818f$l8I$l-l 6PERAllNG l of 21 21 - 1 01 0111!!0161At51 l_
015 010j04
llIIH15 REPORT 15 $U8HITTE0 PUR50ANI 10 ThE 015 010101 i i N00E (9) I REQUIREMLNIS 10 CFR O Of P0wERI l (Check one or more I 20.401(o) l of the fo)1owinn) (11)
LEVEll l_l 20.405(4)(1)(t) l _l 20.405(c) IJi 50.H(4)(2)(iv) l_t D. 7)(b)
(10) 101918'_I 20.405(a)(1)(tt) l_ l) 50.36(c)(1) 50,36(c)(2) l t 50.73(a)(2)(v) l
_l 20.405(a)(1)((H) I _1 50.73(a)(2)(1) l_I 50. 73(a)(2)(vil) ( _IOther 73.71(c) l__l 50. D(a)(2)(vif t)(All_l ($peelfy in ILl20.405(4)(1)(iv) i 20,405(4)(1)(v) li l_~1 50.73(a)(2)(ll) l_l 50.D(a)(2)(vHt)(8)1 Abstract below and in Test, hRC Form
- 50. 73(a )[2 )( I t i ) I I 50. D(a)(2)(s)
Name i 3664)
(ICENsEE~CONIACI FOR THIS LER (12)
Dwight J. Johnson, Plant Licensing Engineer 1 Te)ephone Nomoer
. IArea i ICode i l
Causel$vstem l
COMPLETE t ONt ((NE FOR (Reportablel I EACH i l COMPONENT FAILORE DE5CRIB ~
(
Component lHenufacturert to NPRDS l .. l lHeportaolet (Cautel5ystemi Corponent (Manuf acturert to NPcOS 11 ' $1 J F1 Cl VI il FI 11 3I OfI i i ) l i Yi i i i i I
I I i i i I i i l 1 I I I I i
i f I I I I I l i I i I l I i
$UPPt(HENI REPORT E WEC1ED (14) I I I I i i t i 1 1 i E p ECIED L Hont h Day rese h Yes (If yes. complete Evoected Submission Date) III No l $UCMIS$10M i IB5IIICI (Limit to 1400 spaces, I DATE t.e., approntmately fif teen single space typewritten li (15) I i ) i I I nes) (16)
On 10/8/85 generater level based at 1051on '8' hours and 'D' with the unit operating at 98% power the reactor was autoritica y tripped on hign steam steam generator level }93.4% (trip channels of the Reactor Protective $ystem (RP)) receivi setpoint). ng an indicated 'A' reactor.
the reactor levels.
Post trip pressures and temperatures responded as espected, the high steam was shut down, and emergency feedwater actuated as anticipated to rest r level cleared when i
The plant was stab (11 ed in hot standby (Mode 3) conditions. ore normal steam generator steam main feedwatergenerator pump speed wasdemand the closure on both main of the '8' Main feedwater pumps. feedwater Regulating a e in Valve (MFR time to prevent reaching steam generator the high which levelwas not tripadequately setpoint of f set in bThis y Closure the 'incrosse of the 'A A'MFRVsteam in pun.p ges in was due electro to desiccant pneumatic carryover valve positioner. from the instrument air dryers foulingays .
the pneumatic relThe closu in the 'B' MTRV micron duples filter in the instrument air supply to the MFRVs, increased preventhe 50 368/84 014.and inspection of the instrument air drying towers retention e)ements nce in this area, A similar event was described in LlR l
g5gQ M Nr-3-*
g.-
NRC Faro 366A fora 1062.018 (9 83) U.S. Nuclear Regulatory Commission Approved OM8 No. 3150 0104 Empires: 8/31/85 tlCEN5([ [ VENT REPORT (LER) T[XT CONTINUAi!0N FACILIIV NAHf. (1)
. lDOCM I NUMBER (2) l ttR NUMBER (6)
Arkansas Nuclear One, tinit Two l l PAGE (3)-
l l l 15equentiall l Revision l I Yearl Number l Number I f ol51010101 31 61 81 el 5 -- 06 26 21--
TEXI (If more space is required, use additional NRC Form 366A's) (17) 01 Ol0l210Flil2 On 10/8/85 generator level at 1051 in the 'A' hours with the unit operating at 984 power the reactor was automatically tripp steam generator.
the Reactor Protective System (RPS) of 'A' steam generator level greater then 93.4LThe and 'O' tripchannels was initiated of by th the necessary 2 out of 4 channel trip configuration required for RPS actuation (a reactor ,
Posttrip)This tric condition re system reactica to the unit trip. response was normal and the hign level condition was mitigated by steam ge stabilized in Mode 3 conditions with the reactor coolant system at 2250 psia and 545'f.No abnorm The cause of the high 'A' the steam generator level was an over feeding condition that resulted from the closure of
'B' Main generator. Feedwater When the Regulating Valve (MFRV), 2CV 07a0 (IEES Identif ter a 025J FCVsteam 0740) for the '8' the 'B' 'O' HFRV closed the 8 main feedwater control systee sensed the decrease in feedwater flow steamon speed demand generator the and increased the '8' main feed.ater pump speed to compensate .
'8' main feedwater pump was transmitted to the ' A' main feedwater control system which, through a high select circuit, resulted in the equivalent speed demand being placed on the pump,
'A' main feeddsterihls resulted in a large steam flow / feed flow mismatch on the setpoint was reached before the 'A' 'A' steam generator and the high level trlp MFRV could respond to mitigate the high flow condition. The high level in (shrink steam generator effect) andwas theterminated designed when the reactor of response tripped theduemain to normal steam generator feedwater controllevel respon system.
steam based generator.The on low steam generator level shrink effect in steam gener4 tor level induced by the in the 'B' reactor trfp responded as required to the transient. At 1109, 10/8/85, Both emergency feedwater pumps and valve trains secured per [mergency Operating Procedure recovery actions. the steam driven emergency feedwater pump (27 7A) was restored and maintained. Normal steam generator levels were subsequently assembly from the instrument air system dryers.The cause of the 'B' Nf RV closure has bee relays which allowed the valve to class. This accumulation of desiccant restrfeted operation of pneumatic operators which are supplied with air from the plant instrument air system.Both Mf 4Vs are electro pn The plant instrument air system supplies dry, oil free pressurlied air to a variety of plant systems.
the use of drying towers which contain a destccant. The compressed air is maintained dry by Over the operating Ilfe of this system the desiccant has brosen down presence somewhat of 40 micron primary and ultraunits filtering fineinparticles this system.have apparently contaminated portions of the system, de instrument air have been af fected by desiccant contamination. No safety related components that utillte
'8' HFRV.onCorrective positioner the actions The 'A' were initiated 10/A/85 at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> to replace the pneumatic relays and rea was completed 10/8/85 at 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br />, HFRV was stroke tested satisfactorily for response performance. This work the plant was sut,sequently returned to power operations. Additional HFRV's system. and an increase in preventive milntenance associated with this portion Also, work was completed on inspection and repair of the in;trument air drying tower retention elements A study of potential long term solutions has been initiated tiy the maintenance, engineering, and ope .
to 50 it4 identify 36A/84feasible 014 future courses of action if any are necessary. A similar event was described in