ML061320467

From kanterella
Revision as of 18:15, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
E-mail from G. Bowman of USNRC to S. Smith of USNRC, Regarding Monitoring Well Status - Friday January 27, 2006-1500 Hours
ML061320467
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/15/2006
From: Gregory Bowman
Entergy Nuclear Operations
To: Shawn Smith
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320467 (8)


Text

-~ -1111 1-1 ~-- I ----1 -II- X -I- 1 , --~II Jtacy ith -FW: MONITORING WELL STATUS-FRIDAY JANUARY 27, 2006-1500 HOURS Paqe 1 d From: To: Date:

Subject:

"Bowman, Greg "<GBowm9O~entergy.com>

"'sms4@nrc.gov"'

<sms4@nrc.gov>

3/15/06 8:40AM FW: MONITORING WELL STATUS-FRIDAY JANUARY 27,2006-1500 HOURS From: Croulet, Donald Sent: Monday, January 30, 2006 9:44 AM To: Conroy, Pat; Cox, Mark R; Bowman, Greg; 'Timothy Rice'; 'James Noggle'; Janicki, John; PRICE, ERNEST JR; Robert Oliveira (boliveira~amnucins.com)

Subject <mailto:boliveira~amnucins.com)Subject>:

FW: MONITORING WELL STATUS-FRIDAY JANUARY 27, 2006-1500 HOURS From: Sachatello, Ronald Sent: Friday, January 27, 2006 3:29 PM To: Rutkoske, Michael; Jones, T. R.; Skonieczny, John; Drake, Richard; Nuta, Dragos A; Bode, Paul M.;English, Christopher; Peters, James; Sandike, Steven; Wilson, Daniel; Leach, Don; Kulaga, Joe; Morin, Kenneth; Croulet, Donald; Durfee, Michael; Santis, Hank; Hinrichs, Gary; Lavera, Ron; Thiery, Al; Evers, Bob; Burns, Thomas; Zolotas, William; Colville, Richard; Colville, Howard J.; Daniele, John C.; Loope, Dennis; Tamburi, Robin M.; McMullin, Kathy; Davey, Peter; Quinn, Dennis Cc: Axelson, William L; Mayer, Don; Sachatello, Ronald; 'mbarvenik~gza.com';

'David Winslow'

Subject:

MONITORING WELL STATUS-FRIDAY JANUARY 27, 2006-1500 HOURS<<MONITORING WELL STATUS.doc>>

Latest info: MW-30 C(SFB3)_-)

This well will be sampled Monday Jan 30, 2006 MW-31 (MOB sidewalk)

Packer sample results completed.

Packer values (14 discrete well height samples) ranged from 707-1660 pCi/I MW-33 (U-2 Transformer Yard)MW-34 (U-2 Transformer Yard)MW-35 (U-2 Transformer Yard)MW-i 11 (U-2 Transformer Yard)MW-36 (East side inside Turbine Bldg)MW-40 (Parking Lot above Sewer Plant)Unit 3 Transformer Yard Riverfront Storm Drains (N.D.). This includes:

Man Hole 2, 12, 14, CB-15 226,000 pCi/A 211,000 pCi/l 104,000 pCi/l 119,000 pCi/i Drilling complete 181 feet down out of a terminal depth of 200'3canned with Ground Penetrating Radar AlI samples taken on 1/20/06 were None Detected Riverfront Boat Observation/Dye Test Only dye observed was from MH-1, all other river front storm drains areas injected with dye were not observed in river YNl4I 9 Stacy Sm FW: MONITORING WELL STATUS-FID JARY 27, 2006-1500 HOURS Page 2

--... ...... I 1111111- 1 -I c:\temp\GWi^00001.TMP" P-age 1- d c:\temp\GW}OOQ01.TMP Paqe 1 I Mail Envelope Properties (44181956.16D:

2: 57709)

Subject:

Creation Date: From: Created By: FW: MONITORING WELL STATUS-FRIDAY JANUARY 27, 2006-1500 HOURS 3/15/06 8:40AM"Bowman, Greg " <GBowm90@entergy.com>

GBowm90@entergy.com Recipients nrc.gov kpl-po.KPDO SMS4 (Stacy Smith)Post Office kpl-po.KPDO Route nrc.gov Files Size MESSAGE 2455 TEXT.htm 5872 MONITORING WELL STATUS.doc Mime.822 86442 Date & Time 03/15/06 08:40AM 55296 Options Expiration Date: Priority: Reply Requested:

Return Notification:

Concealed

Subject:

Security: None Standard No None No Standard LS _tc Smt OIOIG WELL STATUS.doc

--1 -l-1 -, ~ --, "I , ~- -I 1 11- Page 1 1 Stac Smith -MONITORING WELL STATUS.doc Page 1 MONITORING WELL STATUS (Jan 27, 2006-1500 hours)Well Location Number MW-ill Transformer Yard MW-30 fU-2 SFB)MW-31 MOB side walk MW-32 fU-2 SFB Alley Wit MW-33 Transformer Yard MW-34 Transformer Yard MW-35 Transformer Yard MW-36 U-2 Turbine Bldg MW-37 U-2 Turbine Bldg MW-38 South U-3 Boundary NY State Result: 701 pCi/I MW-40 Lot above Sewer Plani MW-48 Furthest South Well MW-39 1xUI SFB 1U3 RWST Status Next Step Baseline Sample PT Not in Service Adding casings to reach 80'el Well Installed Packer Test Done Well installed Well installed Well installed Well installed Down approximately 49' of 54'Drilled through concrete floor Well in service (12/08/05)

Current result: Add permanent Packei Current Results (Highest Historical Value)119.000 pCi/I (01/20/06) 302,000 pCi/L (11/10/05) i r Raw Water (no Packer) 399,000 pCi/L (11/23/05)

Highest Packer Water: 600,000 pCi/L ( 1/24/05)Sampled 12/30/05 Raw water (no Packer) 4,060 pCi/L (12/30/05)

Count Packer samples Complete Testing Raw Water (no Packer) 3,720 pCi/L (01/13/06)

Sampled water (01/20/06) 226,O00pCi/L 232,000 pCi/L (01/13/06)

Sampled water (01/20/06) 211,000 pCi/L 211,000 pCi/L) (01/20/06)

Sampled water (01/13/06) 104,00 pCi/L 104,000 pCiA (01/20/06)

Continue to drill Install ramp for moving drill machine Continue periodic sampling Split Sample MW-38 Results: Fitzpatrick Result: 985 pCi/A (12/08/05)

Non Split- Fitzpatrick Results only Fitzpatrick Result: N.D. (12/30/05)

Fitzpatrick Result: 1008 pCi/ 1(01/10/06)

Approximately 151 ' down of 200' Drilling today Approximately 35' down of 37' Continue to drill Vacuum evacuated Ready for drilling ( 219' well) rp StacyL: Smith -- .MOMTOF -Z_~IIING',.

,,-; WE L IA U.doc -Paae2.-1-_

1 11-~z1 ~ -- '_ -n ~[§tAgy Smith -MONITORING WELL STATUS.doc Page 2I CURRENT WELL STATUS Phase I Wells Status MW-30 MW-31 MW-32 MW-33 MW-34 MW-35 MW-36 MW-37 MW-38 Completed (awaiting access to sample)Completed Completed Completed Completed Completed Down about 54' (drilling complete)Drilled 9" through concrete floor (Ramp to move drill rig being installed)

Completed Phase II Wells Sequence (see note below}Status (Jan 27.2006)MW-39 *MW-40 *MW48 *MW42 *MW-46 *MW41 MW43 MW-44 MW45 MW47 MW49 MW-50 MW-51 MW-52 fouth of Unit I Fuel Storage Building) (vacuum evacuated-ready to drill)'Yarking Lot above Sewerage Plant (drilling in progress-down 181')Furthest Southerly Property Boundary (drilling complete-down 40'))GWest of Unit 2 RWST)P (ready for vacuum excavation)

West of Unit 3 PAB Sump (Ready to vaccum)South of Unit 3 RWST1\ (Ready to vacuum)South of Unit 3 Tank Pit and RWST (Ready to vacuum North of Unit 3 Fuel Storage Building Between Unit 3 Fuel Storage Building/PAB eady to vacuum)West of Unit I Fuel Storage Building (Ready to vacuum)-West side of Unit 3 Discharge Canal (Ready to vacuum)East side of Unit 3 Discharge Canal (Ready to vacuum)Southern property hill north of MW-40 (ready to vacuum)Northern property boundary (Location not established)

  • Note: Wells numbering 39,40,48,42,46 are priority wells at this time and may be drilled in a changing sequence within this subset based on depth of well considerations, equipment setup options, and engineering paperwork delivery.

--m---NTO IN W L S U .doc,-.11---1

---P,-. ..... a k§tacy Srpit- MONITORING WELL STATUSAdoc I ~ ~ ~ ~ ~ ~ P g 31-11-11-111 "II,-,,, 1 --RECENT TREND INFORMATION: (Activity in pCi/L)MONITORING WELLS (in pCi/l)DATE: 11/24/05 12/13-16 12119/05 12/30/05 01/06/06 01/13/06 01/20/06 MW-30: 600,000 (ONLY SAMPLE TAKEN WITH TEMPORARY PACKER SYSTEM)MW-31: 4,061 4,030 MW-32: 3,720 MW-33: 142,000 199,000 220,000 189,000 232,000 226,000 MW-34: 63,900 121,000 147,000 159,000 131,000 211,000 MW-35: 42,300 76,000 80,500 95,400 97,800 104,000 MW-ill: 296,000 192,000 212,000 113,000 199,000 119,000 MW-38: Most recent Split Sarnple results: 985 (Fitzpatrick 12/08/05))

701 State of New York (12/08/05)

Most recent Fitzpatrick results: Not detected (Fitzpatrick 12/30/05)1008 (Fitzpatrick 01/10/06)

[S S -MONITORING WELL STATUS.doc P Unit 2 Storm Drain Jan 19, 2006 (pCi2 ) Jan 24, 2006 MH2 (U-2 riverfront)

MH3 (North end of U-2 Turbine)MH4 (Entrance to U2 Transformer Yard)CMH( (U-2 Aux Feed Bldg)')MH6 (U2 Transformer Yard)MH7(U2 Transformer Yard)MH8 (U2 Transformer Yard)MH12 (U2 Riverfront)

MH14 (U2 Riverfront)

CB15 (U2 Riverfront)

ND 2,240 3,780 3,570 18,600 3,840 3,210 ND Resampling Resampling ND (river front)ND (river front)ND (river front)ND (river front)Unit 3 Storm Drain Manholes taken Jan 19, 2006 (pCi/1): A2 (Near U- S A4 (Near U- RWST A6 (Near U- RWST)B5 (Entrance to 3 Transformer Yarq).El (Unit 3 Roadway t curity Post)E2 (Unit 3 Roadway t Security Post)E2B (Unit 3 Roadway o Security Post)E3 (Unit 3 Roadway tj Security Post)E3A (Unit 3 Roadway to Security Post)ND 1,190 686 3,320 ND ND ND ND ND 8*L EStacy Smith -MONITORING WELL STATUS.doc Pagie 5 1"1-. Stacy Smith- MONITORING WELL. STATUS- -doc ....a.oe 51 -TREND COMPARISON Unit 3 Storm Drain Locations 01/19/06 01/17/06 01/12/06 A2 U WST1 ND A4UlRWSTj 1,190 A6 U ST_ 686 BI U-3 Transformer Yard 5010 4530 B3 U-3 Transformer Yard 4650 6280 B4 U-3 Transformer Yard 3600 3180 B5 U-3 Transformer Yard 3,320 B6 U-3 Transformer Yard ND B7 U-3 Transformer Yard 2690 2510 B8 U-3 Transformer Yard ND C I U-3 North of Service Bldg 867 997 D2 U-3 South of Service Bldg ND ND E4 U-3 Access Road to Command Post ND El U3 Access Road to Command Post ND E2 U3 Access Road to Command Post ND E2B U3 Access Road to Command Post ND E3 U3 Access Road to Command Post ND E3A U3 Access Road to Command Post ND E4A U-3 Access Road to Command Post ND E5 U-3 Access Road to U3 Command Post ND ESA U-3 Access Road to U3 Command Post ND E6 U-3 Access Road to U3 Command Post ND E7 U-3 Access Road to U3 Command Post ND