Letter Sequence Other |
---|
|
Results
Other: ML14010A331, ML14335A642, ML15301A093, NL-13-043, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation, NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, NL-14-031, Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-14-109, Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation, NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-15-025, Fourth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, NL-15-059, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard.., NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation, NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-16-024, Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-16-089, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard ...
|
MONTHYEARNL-13-043, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other ML13169A1272013-06-25025 June 2013 Request for Additional Information Regarding Reliable Spent Fuel Pool Instrumentation, Order No. EA-12-051 Project stage: RAI NL-13-103, Response to Request for Additional Information (RAI) Regarding Reliable Spent Fuel Pool (SFP) Instrumentation (Order No, EA-12-051) (TAC Nos. MF0737 and MF0738)2013-08-20020 August 2013 Response to Request for Additional Information (RAI) Regarding Reliable Spent Fuel Pool (SFP) Instrumentation (Order No, EA-12-051) (TAC Nos. MF0737 and MF0738) Project stage: Response to RAI NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ML13298A8052013-11-0808 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0737 and Project stage: RAI ML14010A3312014-01-14014 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Indian Point Energy Center, Units 2 and 3, TAC Nos.: MF0744 and MF0745 Project stage: Other ML13337A5942014-01-24024 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Acceptance Review NL-14-031, Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-27027 February 2014 Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-14-109, Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-14-132, Response to 03/12/2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendations of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dia-ichi.2014-11-0303 November 2014 Response to 03/12/2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendations of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dia-ichi. Project stage: Request ML14335A6422014-12-0909 December 2014 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other NL-15-012, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-01-28028 January 2015 Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request NL-15-025, Fourth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-15-036, Retraction of Entergy'S Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-03-16016 March 2015 Retraction of Entergy'S Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML15079A3542015-03-24024 March 2015 Withdrawal of Request for Relaxation of the Schedule Requirements for Order EA-12-049,Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Events Project stage: Withdrawal NL-15-059, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard..2015-05-20020 May 2015 Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard.. Project stage: Other NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-28028 August 2015 Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2015-08-28028 August 2015 Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation Project stage: Other ML15301A0932015-10-30030 October 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other NL-16-024, Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-29029 February 2016 Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ML16155A0842016-04-29029 April 2016 APS Response to Request for Additional Information Regarding Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Lnstrumentation Project stage: Response to RAI NL-16-089, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard ...2016-08-12012 August 2016 Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard ... Project stage: Other NL-16-115, Response to Request for Additional Information Regarding Review of Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,.2016-12-0202 December 2016 Response to Request for Additional Information Regarding Review of Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,. Project stage: Response to RAI 2014-08-27
[Table View] |
|
---|
Category:Letter type:NL
MONTHYEARNL-21-034, Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals2021-05-26026 May 2021 Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary NL-21-033, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2021-05-11011 May 2021 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-21-032, Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center2021-05-11011 May 2021 Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center NL-21-005, Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions2021-05-11011 May 2021 Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions NL-21-030, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NL-21-027, Registration of Spent Fuel Cask Use2021-04-20020 April 2021 Registration of Spent Fuel Cask Use NL-21-021, Registration of Spent Fuel Cask Use2021-04-19019 April 2021 Registration of Spent Fuel Cask Use NL-21-017, Pre-Notice of Disbursement from Decommissioning Trusts2021-04-0808 April 2021 Pre-Notice of Disbursement from Decommissioning Trusts NL-21-010, Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2021-02-17017 February 2021 Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-082, Notice of Planned Transfer of Decommissioning Funds2020-12-14014 December 2020 Notice of Planned Transfer of Decommissioning Funds NL-20-081, Pre-Notice of Disbursement from Decommissioning Trusts2020-12-0909 December 2020 Pre-Notice of Disbursement from Decommissioning Trusts NL-20-080, Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-93212020-11-19019 November 2020 Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-9321 NL-20-079, (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-12012 November 2020 (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NL-20-077, Submittal of Quality Assurance Program Manual Revision 22020-11-0909 November 2020 Submittal of Quality Assurance Program Manual Revision 2 NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-076, Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal2020-11-0202 November 2020 Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal NL-20-069, One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-10-0808 October 2020 One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-067, Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-09-16016 September 2020 Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-064, 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2020-09-0101 September 2020 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments NL-20-060, Status of Remaining Actions for Generic Letter 2004-022020-08-11011 August 2020 Status of Remaining Actions for Generic Letter 2004-02 NL-20-057, Cancellation of Commitment Related to Large Break LOCA Reanalysis2020-07-30030 July 2020 Cancellation of Commitment Related to Large Break LOCA Reanalysis NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-07-22022 July 2020 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center2020-07-0707 July 2020 Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center NL-20-052, Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results2020-07-0707 July 2020 Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-041, Registration of Unit 3 Spent Fuel Cask Use2020-05-13013 May 2020 Registration of Unit 3 Spent Fuel Cask Use NL-20-042, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2020-05-12012 May 2020 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-20-038, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-04-23023 April 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-035, Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-16016 April 2020 Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-034, Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-13013 April 2020 Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-03-24024 March 2020 Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-020, Submittal of 2019 Annual Fitness for Duty Performance Data Report Update2020-02-26026 February 2020 Submittal of 2019 Annual Fitness for Duty Performance Data Report Update NL-20-015, Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2020-02-10010 February 2020 Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane NL-19-094, 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2019-12-16016 December 2019 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-092, Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-11-20020 November 2019 Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-043, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122019-10-22022 October 2019 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-091, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use2019-10-17017 October 2019 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use NL-19-090, Registration of Unit 2 Spent Fuel Cask Use2019-10-0909 October 2019 Registration of Unit 2 Spent Fuel Cask Use NL-19-079, 50.59(d)(2) Summary Report of Changes, Tests and Experiments2019-09-26026 September 2019 50.59(d)(2) Summary Report of Changes, Tests and Experiments 2021-05-06
[Table view] Category:Status Report
MONTHYEARL-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21084A7892021-03-25025 March 2021 Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2020 - 10 CFR 50.82(a)(8)(vii) CNRO-2019-00006, Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ML18088B2462018-03-29029 March 2018 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2017, Per 10 CFR 50.82(a)(8)(vii) CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2017-03-31031 March 2017 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) ENOC-17-00006, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii)2017-03-30030 March 2017 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii) NL-16-024, Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-29029 February 2016 Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2015-08-28028 August 2015 Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-28028 August 2015 Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation NL-14-059, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions2014-04-29029 April 2014 Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions ENOC-14-00009, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2014-03-28028 March 2014 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation NL-14-031, Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-27027 February 2014 Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation NL-13-072, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions2013-05-0202 May 2013 Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions ENOC-13-00007, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ENOC-13-00011, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii)2013-03-29029 March 2013 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii) ML12137A0902012-05-29029 May 2012 Decommissioning Funding Status Report ML12137A1362012-05-29029 May 2012 Decommissioning Funding Status Report ML12137A1052012-05-29029 May 2012 Decommissioning Funding Status Report ML12122A0712012-05-14014 May 2012 Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 ENOC-11-00005, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1)2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1) ML1029403622010-11-12012 November 2010 October 2010 10 CFR 2.206 Monthly Status Report: Enclosures ENOC-10-00010, Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 20092010-03-31031 March 2010 Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 2009 ML1100404362009-09-16016 September 2009 Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 09/16/2009 ML0830800812008-11-20020 November 2008 October 2008 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206- Enclosures ML0905708302008-11-0505 November 2008 Entergy Center Status Report NL-08-131, Siren Project Status Update2008-08-12012 August 2008 Siren Project Status Update NL-08-121, Siren Project Milestone Schedule - Status Update, Letter Dated 07/25/082008-07-25025 July 2008 Siren Project Milestone Schedule - Status Update, Letter Dated 07/25/08 ENOC-08-00028, J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report2008-05-0808 May 2008 J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report ML0729506172007-09-13013 September 2007 E-mail from K. Mcmullin, Entergy to J. Boska, NRR Et Al on IPEC Status Report, September 13, 2007 ML0729705242007-08-0707 August 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Aug 7 2007 ML0729705222007-08-0606 August 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Aug 6 2007 ML0729705042007-07-31031 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 31 2007 ML0729704422007-07-27027 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 27, 2007 ML0729704332007-07-26026 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 26 ML0729703852007-07-18018 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 18 2007 ML0729506092007-06-11011 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 11, 2007 ML0729506082007-06-0707 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 7, 2007 ML0729506032007-06-0505 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding Indian Point Energy Center Status Report, June 5, 2007 ML0729506002007-06-0101 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 1, 2007 ML0729505982007-05-31031 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 31, 2007 ML0729505922007-05-30030 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 30, 2007 ML0729505912007-05-29029 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 29, 2007 ML0712803322007-05-18018 May 2007 April 2007 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 Cfr), Section 2.206 ML0729506112007-05-14014 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 14 2022-03-25
[Table view] |
Text
Enterav Nuclear Northeast SEntergy Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 254 6700 Lawrence Coyle Site Vice President NL-1 5-026 February 27, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike, OWFN-2FL Rockville, MD 20852-2738
SUBJECT:
Indian Point Energy Center's Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (TAC Nos.
MF0737 and MF0738)
Indian Point Unit Numbers 2 and 3 Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64
References:
- 1. NRC Order Number EA-1 2-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012 (ML12054A682)
- 2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012
- 3. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation", Revision 1, dated August 2012
- 4. Entergy letter to NRC (NL-12-145), Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated October 29, 2012
- 5. Entergy letter to NRC (NL-13-043), Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated February 27, 2013 Aoolý pt4 4
NL-15-026 Dockets 50-247 and 50-286 Page 2 of 3
- 6. Entergy letter to NRC (NL-1 3-109), Indian Point Energy Center's First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0737 and MF0738), dated August 27, 2013
- 7. Entergy letter to NRC (NL-14-029), Indian Point Energy Center's Second Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0737 and MF0738), dated February 27, 2014
- 8. Entergy letter to NRC (NL-14-109), Indian Point Energy Center's Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0737 and MF0738), dated August 27, 2014
Dear Sir or Madam:
On March 12, 2012, the Nuclear Regulatory Commission ("NRC" or "Commission")
issued an order (Reference 1) to Entergy. Reference 1 was immediately effective and directed Entergy to install reliable spent fuel pool level instrumentation. Specific requirements are outlined in Attachment 2 of Reference 1.
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an overall integrated plan pursuant to Section IV, Condition C. Reference 2 endorses industry guidance document NEI 12-02, Revision 1 (Reference 3) with clarifications and exceptions identified in Reference 2.
Reference 4 provided the Entergy initial status report regarding spent fuel pool instrumentation. Reference 5 provided the Entergy overall integrated plan.
Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of the status reports. The purpose of this letter is to provide the fourth six-month status report pursuant to Section IV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference 1. The attached report provides an update of milestone accomplishments since the last status report (Reference 8), including any changes to the compliance method, schedule, or need for relief and the basis, if any.
There are no new commitments identified in this submittal. If you have any questions concerning the content of this letter, please contact Mr. Robert Walpole, Manager, Regulatory Assurance at (914) 254-6710.
NL-15-026 Dockets 50-247 and 50-286 Page 3 of 3 I declare under penalty of perjury that the foregoing is true and correct. Executed on February D._, 2015.
Sincerely, LC/sp
Attachment:
Indian Point Energy Center's Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation cc: Mr. Douglas V. Pickett, Senior Project Manager, NRC NRR DORL Mr. Daniel H. Dorman, Regional Administrator, NRC Region 1 NRC Resident Inspectors Office Mr. John B. Rhodes, President and CEO, NYSERDA Ms. Bridget Frymire, New York State Dept. of Public Service Ms. Jessica A. Kratchman NRC NSIR DPR DDEP IRIB
ATTACHMENT TO NL-1 5-026 ENTERGY'S FOURTH SIX-MONTH STATUS REPORT FOR THE IMPLEMENTATION OF ORDER EA-12-051 MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 and 3 DOCKET NOS. 50-247 and 50-286
Attachment to NL-1 5-026 Dockets 50-247 and 50-286 Page 1 of 13 Indian Point Energy Center's (IPEC) Fourth Six Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation
- 1. Introduction Entergy Nuclear Operations, Inc. (Entergy) developed an Overall Integrated Plan (Reference 1) for Indian Point Energy Center (IPEC), documenting the requirements to install reliable spent fuel pool level instrumentation (SFPI), in response to Reference 2.
This attachment provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.
- 2. Milestone Accomplishments The following milestone(s) have been completed since August 27, 2014 and are current as of January 31, 2015.
0 Respond to ISE RAIs dated November 8, 2013 - Complete.
- 3. Milestone Schedule Status The following provides a line item update to milestone schedule to support the Overall Integrated Plan. It provides the activity status of each item, and whether the expected completion date has changed. The dates are planning dates subject to change as design and implementation details are developed.
Revised Target Milestone Target Completion Activity Status Completion Date Date Unit 3 Reliable SFPI Installed Spring 2015 Refueling In Progress N/A Outage Unit 2 Reliable SFPI Installed Spring 2016 Refueling In Progress N/A Outage Respond to NRC RAIs August 23, 2013 Complete N/A (Received June 25, 2013)
(Reference 3)
Respond to ISE RAIs dated September 30, 2014 Complete N/A November 8, 2013 (Reference 4)
- 4. Changes to Compliance Method There are no additional changes to the compliance method.
Attachment to NL-1 5-026 Dockets 50-247 and 50-286 Page 2 of 13
- 5. Need for Relief/Relaxation and Basis for the Relief/Relaxation IPEC expects to comply with the Order implementation date and no relief/relaxation is required at this time.
- 6. Open Items from Overall Integrated Plan and Interim Staff Evaluation IPEC has received an Interim Staff Evaluation (Reference 4) that includes 15 RAIs. There were 3 additional RAIs received prior to the October 2014 NRC Audit Visit (Reference 6), for a total of 18 RAIs. The following table provides the status of these 18 RAIs. The RAI responses provided are applicable to both Unit 2 and Unit 3. However, the NRC Audit Visit Report (Reference 6) indicates that it would be determined in the future if another audit visit is necessary for Unit 2, therefore, all of the Unit 2 RAIs are considered open until that determination is made.
RAI # IP2 Response Status IP3 Response Status 1 Submitted in Reference 7 Closed During NRC Audit (Reference 6) 2 Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 3 Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 4 Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 5 Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 6a Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 6b Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 6c Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 7 Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 8 Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 9 Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 10 Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 11 Submitted in Reference 7 Closed During NRC Audit (Reference 6) 12 Submitted in Reference 7 Closed During NRC Audit (Reference 6) 13 Uploaded to e-portal September 30, 2014 Closed During NRC Audit (Reference 6) 14 See Section 9 (See Note) See Section 9 (See Note) 15a Submitted in Reference 7 Closed During NRC Audit (Reference 6) 15b Submitted in Reference 7 Closed During NRC Audit (Reference 6) 16 See Section 9 Closed During NRC Audit (Reference 6) 17 See Section 9 Closed During NRC Audit (Reference 6) 18a See Section 9 (See Note) See Section 9 (See Note) 18b See Section 9 (See Note) See Section 9 (See Note) 18c See Section 9 (See Note) See Section 9 (See Note)
Note: These RAIs were listed as Open Items in the NRC Audit Visit Report (Reference 6).
- 7. Potential Interim Staff Evaluation Impacts There are no additional potential impacts to the Interim Staff Evaluation identified at this time except for those identified in Section 6.
Attachment to NL-15-026 Dockets 50-247 and 50-286 Page 3 of 13
- 8. References The following references support the updates to the overall integrated plan described in this attachment.
- 1. Entergy letter to NRC (NL-13-043), "Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated February 27, 2013 (ADAMS Accession No. ML13072A082).
- 2. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012 (ADAMS Accession No. ML12054A682).
- 3. "Request for Additional Information Overall Integrated Plan in Response to Order EA 051, 'Reliable Spent Fuel Pool Instrumentation' Entergy Operations, Order No. EA-12-051 (TAC Nos. MF0737 and MF0738)," dated June 25, 2013 (ADAMS Accession No. ML13169A127).
- 4. "Indian Point Nuclear Generating Unit Nos. 2 and 3 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0737 and MF0738)," dated November 8, 2013 (ADAMS Accession No. ML13298A805).
- 5. "Summary of the November 26, 2013, Public Meeting to Discuss Industry Responses to Staff Interim Evaluations for Spent Fuel Pool Instrumentation," dated December 26, 2013 (ADAMS Accession No. ML13347B030).
- 6. "Indian Point Nuclear Generating Unit Nos. 2 and 3 - Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EAI-12-051 (TAC NOS. MF0744, MF0745, MF0737, AND MF0738)", dated December 9, 2014 (ADAMS Accession No. ML14335A642)
- 7. Entergy letter to NRC (NL-14-109), Indian Point Energy Center's Third Six-Month Status Report for the Implementation of Order EA-1 2-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0737 and MF0738), dated August 27, 2014
- 8. Donald C. Cook Nuclear Plant, Units 1 and 2 - Report for the Onsite Audit of MOHR Regarding Implementation of Reliable Spent Fuel Pool Instrumentation Related to Order EA-12-051 (TAC NOS. MF0761 and MF0762) dated August 27, 2014 (ADAMS Accession No. ML14216A362)
Attachment to NL-1 5-026 Dockets 50-247 and 50-286 Page 4 of 13
- 9. Responses to the Interim Staff Evaluation Requests for Additional Information RAI #14 Please provide a list of the procedures addressing operation (both normal and abnormal response), calibration, test, maintenance, and inspection procedures that will be developed for use of the spent SFP instrumentation. The licensee is requested to include a brief description of the specific technical objectives to be achieved within each procedure.
The immediately following replaces what was provided to the NRC during the audit based on the open item identified in the audit report (Reference 6).
The following operations procedure has been developed for IPEC Unit 3; a comparable procedure is planned for Unit 2:
Procedure Description 3-FSG-0 11, Alternate New procedure which provides actions to restore Spent Fuel Pit Makeup and Cooling (SFP) level using an alternate makeup source for a Beyond Design Basis External Event (BDBEE) resulting in an Extended Loss of AC Power (ELAP). This procedure includes remote Spent Fuel Pool Level Indicator operation, the location of the displays, and cautionary statements such as an EMI/RFI exclusion zone around the displays.
The following table is a list of Preventative Maintenance (PM) tasks planned to be developed for the Entergy fleet:
Task Name Objective Frequency of Occurrence Channel Calibration To validate that the MOHR instruments (both 2Y Check channels) are displaying the correct spent fuel pool level within the accuracy of the instruments.
Channel Check/Panel To check each channel against each other for 1Y Functional Check comparison and to perform functional assessments of each panel.
Operator Rounds/System Operator Rounds is intended to observe the As Required Engineering Walkdown system status via panel display, switch positions and indicating lights, to validate the MOHR instrumentation system is operating satisfactorily from its intended power source, and to detect obvious external signs of deterioration.
Signal Processor Clock To prevent failure of the onboard clock battery and 1OY Battery Replacement adverse impact to the signal processor operating system.
Attachment to NL-1 5-026 Dockets 50-247 and 50-286 Page 5 of 13 SFPI RAI #16 Describe actions taken to verify electromagnetic compatibility with the vendor's limited test.
Note: The following response was provided for NRC review during the October 2014 NRC Audit Visit; this RAI was closed by the NRC Audit Team (Reference 6).
The NRC Audit of MOHR was in conjunction with the NRC's review of D.C. Cook's SFPI OIP, however the audit report also applies to other licensees using the MOHR technology to comply with the requirement of Order EA-12-051 (Reference 8). In this report, the NRC stated:
As a result of the NRC staff's evaluation of the EMC testing results, the staff identified a generic open item applicable to all licensees using this technology to identify any additionalmeasures, site-specific installationinstructionsor position taken to address the potential effect of an EMC event on the SFPI equipment To address this concern, Ops procedure 3-FSG-01 1, Section 4, notes includes a cautionary statement to preclude radio usage within close proximity to the displays when taking a reading.
In addition, no system voltages being affected or installed are greater than 125 Volts, and new instrumentation cables in the Fuel Storage Building and Fanhouse are being installed in rigid steel conduit where practical to limit the amount of EMI emitted by the new wiring. The isolation transformer being installed in the power circuit of each SFPI circuit will limit the introduction of any noise or harmonics (typically referred to as "total harmonic distortion," or THD) into the safety related instrument buses that may be generated by the new equipment.
SFPI RAI #17 Please provide a final configurations of the IP2 and IP3 SFP area, clearly depicting the SFP monitoring Level 1, 2, and 3, the planned locations/placement of the primary and back-up SFP level sensor/probe, and the proposed routing of the cables that will extend from the sensors toward the location of the read-out/display device.
Note: The following response was provided for NRC review during the October 2014 NRC Audit Visit; this RAI was closed by the NRC Audit Team (Reference 6); however, the first sentence of the original response has been revised below for clarification purposes (the changes are editorial only).
Figure 1 & Figure 2 depict an elevation view of the Unit 2 & Unit 3 final SFP Monitoring Levels.
As stated in IPEC's Third Six-Month Status Report (Reference 7), there were several changes made to the probe locations and channel routing shown in Attachments 1 and 3 of the OIP (Reference 1). For both units, the Channel A probe is shown where the Channel B probe is located, and the Channel B probe is shown where the Channel A probe is located. Additionally for Unit 2, the location of the Channel B probe in the SFP and the routing of both channels has been altered from the OIP. Updated cable routing and probe locations are shown below in Figure 3 through Figure 6.
Attachment to NL-15-026 Dockets 50-247 and 50-286 Page 6 of 13 ELEVATION REFERENCE 9321-F-2514-19 FSB General Arrangement Plans & Elev.
-..---- - I-.Sm------------ .943 --------------- 2-ARP-SGF (Alarm Response Procedure) & 9321 -F-7043
--- Lu ---------------------------- 933 9321-F-2514-19 FSB General Arrangemmnt Plans & Elev 9321-F-7043 (LC-050 in Section B-B)
W&IR--------------- ------------- ------------- 9X3-3 2-ARP-SGF (Alarm Response Procedure) & 9321 -F-7043
l-- ------------- 9 2-2--------------- TS 3.7.11 Spent Fuel Pit Level 9321-F-2577, FSB Aux Coolant System Sections, Section C-C
- --------------------- -- - 80814 NEI 12-02 (Level 3 + 10')
-B------ . .------------------- L* - -. 7o-8114-
-- - - ----------------------- ------------- 70(-5 14 Bottom Min. Sensitive Range. 3' below LEVEL 3 upper limit 9321-F-1388 & HOLTEC #397 to 408 11 II00LEV 67-81/4-M---------
54'-7" 9321-F-2514-19 FSB General Arrangement Plans & Elev.
i Figure 1: Unit 2 SFP Elevation View with Levels Indicated
Attachment to NL-1 5-026 Dockets 50-247 and 50-286 Page 7 of 13 ELEVATION REFERENCE
..... 9-<0" 93211-F-202T7 RO Fuel Storage Bidding El. 96'-O Plans, Sections and Details Mehdanical N 94' 3-ARP.013 (Aarm Response Procedure) &9321-F-70433
-I-
. 93' -. 9321-F-20277 RO Fuel Storage Building El. 95'-0 Plans, Sections and Details Mechanical 9321 -F-70443 (LC-650 in Section B-B)
.-.........- 9T 3-ARP-013 (Alarm Response Procedure) &9321-F-70433
TS 3.7.14 Spent Fuel Pit Level
.... - -5 3W8
,--------------*--------- 9321-F-25773, FSB Aux Coolant System Sections (Plan 7, Section C-C) 8W-7 1l2I -----------------
NEI 12-02 (Level 3
f.*T_ .----------- ----- R..W-... 70-7 1W2 D II 11111-- 70-4 1/2" OW-7 1/2" Bottom Min. S-Sensitive Range. 3' below LEVEL 3 upper limit IP3V-1604-0004, IP3V-1684-.0032 54V-7' 9321-C-11023 RI Proposed FSB MeL Pre-Permit Congt.
Figure 2: Unit 3 SFP Elevation View with Levels Indicated
Attachment to NL-1 5-026 Dockets 50-247 and 50-286 Page 8 of 13 6
D 0 C C a 0 M- Wit - UM CIW. v
- MAN -MP 0M (Na
$FP1NONELPCAI(NM PLAN AT EL.95'-O" A A SFPI GENERAL ARRAIWOEMENTs GENERAL ARRANGEMENT 1P2 DRAWING 9321-F-.2514 DI SK-EIPX042-C X 6 1 7 I 1 6 3 1 2 Figure 3: Unit 2 SFPI General Arrangement Drawing 1
Attachment to NL-15-026 Dockets 50-247 and 50-286 Page 9 of 13 6 r I e 5 1 4 31 2 1 0 0 C C a a
- 31 MW MEW xW oMRIN ME -Wm 0-3W SPI POO LoC4T1ow A A SFPI CONCEPTUAL DESIG#4I 1P2 ~W~nk GENERAL IPEC2 ARRANGEWMET MI2.F.3080. 9321-F-1332
- EK6NTIPXG42:'Z ZE.
a I II aI 5 I 3 2 Figure 4: Unit 2 SFPI General Arrangement Drawing 2
Attachment to NL-15-026 Dockets 50-247 and 50-286 Page 10 of 13 a i ? i 6 5 4 i3i 2 1 1 D 0 C C 5 a
- MM ME - gn, Ouea. W
- "nNK- SM 0$- WRBI C) "E, E ON~
A A SFPI OEFIERALAMFIPNEKETi GENE=~ ARRAMIEVENT
-IPEC3 MINAING 9321-F-20277 a a 1 2 Figure 5: Unit 3 SFPI General Arrangement Drawing I
Attachment to NL-15-026 Dockets 50-247 and 50-286 Page 11 of 13 a 7 1 f 1 5 13 1 2 D, 0 C C a a
- RED M~E - ý 'EIcIA:
- R IREM- DSI OI$WEL SF44 Pr4K LOCA1g(NM A A SFPI GENERAkL ARRAJAGEAEFGTs GeNEMAL ARKVIGEEUNT
-IPEC3 DRAWING 9321-F-31503-DjKEMEPX042,-G=ýX 9 I i e a S 4 3 i 2 1I Figure 6: Unit 3 SFPI General Arrangement Drawing 2
Attachment to NL-1 5-026 Dockets 50-247 and 50-286 Page 12 of 13 SFPI RAI #18 Please provide the following:
a) A description of the plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted for the level measurement system and its supporting equipment.
b) Information describing compensatory actions when both channels are out-of-order, and the implementation procedures.
c) Additional information describing expedited and compensatory actions in the maintenance procedure to address when one of the instrument channels cannot be restored to functional status within 90 days The immediately following replaces what was provided to the NRC during the audit based on the open item identified in the audit report (Reference 6).
a) SFPI channel/equipment maintenance/preventative maintenance and testing program requirements to ensure design and system readiness are established in accordance with Entergy's processes and procedures and in consideration of vendor recommendations to ensure that appropriate regular testing, channel checks, functional tests, periodic calibration, and maintenance is performed. See response to SFPI RAI #14 for a list of procedures and PM tasks being developed.
b) Both primary and backup SFPI channels incorporate permanent installation (with no reliance on portable, post-event installation) of relatively simple and robust augmented quality equipment. Permanent installation coupled with stocking of adequate spare parts reasonably diminishes the likelihood that a single channel (and greatly diminishes the likelihood that both channels) is (are) out-of-service for an extended period of time.
Control of compensatory actions for out of service SFPI channel(s) will be controlled by inclusion in the Plant's Technical Requirements Manual (TRM); the following is the draft proposed TRM for SFPI:
TRM 3.10 BEYOND DESIGN BASES COMPONENTS TRM 3.10.C Spent Fuel Pool Level Instrumentation TRO 3.10.C The primary and back-up spent fuel pool level instruments shall be OPERABLE.
APPLICABILITY: At all times.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. The primary or back-up A. 1 Restore spent fuel pool 90 days spent fuel pool level level instrument to instrument does not meet OPERABLE status the OPERABLE requirements. AND
Attachment to NL-1 5-026 Dockets 50-247 and 50-286 Page 13 of 13 A.2 If not restored within two 14 Days weeks, present a report to OSRC giving why out of service and plan to repair B. Action A.1 completion B.1 Initiate actions to Immediately time not met. implement compensatory measures such as use of alternate suitable equipment or supplemental personnel C. The primary and back-up C.1 Restore one of the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> spent fuel pool level channels of instruments do not meet instrumentation.
the OPERABLE requirements.
D. Required Action and D.1 Initiate actions to Immediately associated Completion Implement compensatory Time of Condition C not measures such as use of met alternate suitable equipment or supplemental personnel Note: Compensatory measures under consideration are use of alternate suitable equipment or supplemental personnel.
c) The requested information is provided in the RAI-18.b response.