ML061320467

From kanterella
Jump to navigation Jump to search
E-mail from G. Bowman of USNRC to S. Smith of USNRC, Regarding Monitoring Well Status - Friday January 27, 2006-1500 Hours
ML061320467
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/15/2006
From: Gregory Bowman
Entergy Nuclear Operations
To: Shawn Smith
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320467 (8)


Text

- I - ~

- - - 1111 1-1 ~-- II- X- I- 1, - - ~II Jtacy ith - FW: MONITORING WELL STATUS-FRIDAY JANUARY 27, 2006-1500 HOURS Paqe 1 d From: "Bowman, Greg "<GBowm9O~entergy.com>

To: "'sms4@nrc.gov"' <sms4@nrc.gov>

Date: 3/15/06 8:40AM

Subject:

FW: MONITORING WELL STATUS-FRIDAY JANUARY 27,2006-1500 HOURS From: Croulet, Donald Sent: Monday, January 30, 2006 9:44 AM To: Conroy, Pat; Cox, Mark R; Bowman, Greg; 'Timothy Rice'; 'James Noggle'; Janicki, John; PRICE, ERNEST JR; Robert Oliveira (boliveira~amnucins.com)

Subject <mailto:boliveira~amnucins.com)Subject>: FW: MONITORING WELL STATUS-FRIDAY JANUARY 27, 2006-1500 HOURS From: Sachatello, Ronald Sent: Friday, January 27, 2006 3:29 PM To: Rutkoske, Michael; Jones, T. R.; Skonieczny, John; Drake, Richard; Nuta, Dragos A; Bode, Paul M.;

English, Christopher; Peters, James; Sandike, Steven; Wilson, Daniel; Leach, Don; Kulaga, Joe; Morin, Kenneth; Croulet, Donald; Durfee, Michael; Santis, Hank; Hinrichs, Gary; Lavera, Ron; Thiery, Al; Evers, Bob; Burns, Thomas; Zolotas, William; Colville, Richard; Colville, Howard J.; Daniele, John C.; Loope, Dennis; Tamburi, Robin M.; McMullin, Kathy; Davey, Peter; Quinn, Dennis Cc: Axelson, William L; Mayer, Don; Sachatello, Ronald; 'mbarvenik~gza.com'; 'David Winslow'

Subject:

MONITORING WELL STATUS-FRIDAY JANUARY 27, 2006-1500 HOURS

<<MONITORING WELL STATUS.doc>>

Latest info:

MW-30 C(SFB3)_-) This well will be sampled Monday Jan 30, 2006 MW-31 (MOB sidewalk) Packer sample results completed. Packer values (14 discrete well height samples) ranged from 707-1660 pCi/I MW-33 (U-2 Transformer Yard) 226,000 pCi/A MW-34 (U-2 Transformer Yard) 211,000 pCi/l MW-35 (U-2 Transformer Yard) 104,000 pCi/l MW-i 11 (U-2 Transformer Yard) 119,000 pCi/i MW-36 (East side inside Turbine Bldg) Drilling complete MW-40 (Parking Lot above Sewer Plant) 181 feet down out of a terminal depth of 200' Unit 3 Transformer Yard 3canned with Ground Penetrating Radar Riverfront Storm Drains AlI samples taken on 1/20/06 were None Detected (N.D.). This includes: Man Hole 2, 12, 14, CB-15 Riverfront Boat Observation/Dye Test Only dye observed was from MH-1, all other river front storm drains areas injected with dye were not observed in river YNl4I 9

Stacy Sm FW: MONITORING WELL STATUS-FID JARY 27, 2006-1500 HOURS Page 2

-- ... ...... I 1111111-1 -

I c:\temp\GWi^00001.TMP Paqe 1-

"P-age 1 dI c:\temp\GW}OOQ01.TMP Mail Envelope Properties (44181956.16D: 2: 57709)

Subject:

FW: MONITORING WELL STATUS-FRIDAY JANUARY 27, 2006-1500 HOURS Creation Date: 3/15/06 8:40AM From: "Bowman, Greg " <GBowm90@entergy.com>

Created By: GBowm90@entergy.com Recipients nrc.gov kpl-po.KPDO SMS4 (Stacy Smith)

Post Office Route kpl-po.KPDO nrc.gov Files Size Date & Time MESSAGE 2455 03/15/06 08:40AM TEXT.htm 5872 MONITORING WELL STATUS.doc 55296 Mime.822 86442 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard

- ~ -, "I ,

-l-1 - , ~- - I 1 11- - 3 Smt LS _tc OIOIG WELL STATUS.doc -PagePage 111 StacSmithMONITORING

- WELL STATUS.doc MONITORING WELL STATUS (Jan 27, 2006-1500 hours)

Well Location Status Next Current Number Step Results (Highest Historical Value)

MW-ill Transformer Yard Baseline Sample PT Current result: 119.000 pCi/I (01/20/06) 302,000 pCi/L (11/10/05) i MW-30 fU-2 SFB) Not in Service Add permanent Packeir Raw Water (no Packer) 399,000 pCi/L (11/23/05)

Adding casings to reach 80'el Highest Packer Water: 600,000 pCi/L ( 1/24/05)

MW-31 MOB side walk Well Installed Sampled 12/30/05 Raw water (no Packer) 4,060 pCi/L (12/30/05)

Packer Test Done Count Packer samples MW-32 fU-2 SFB Alley Wit Well installed Complete Testing Raw Water (no Packer) 3,720 pCi/L (01/13/06)

MW-33 Transformer Yard Well installed Sampled water (01/20/06) 226,O00pCi/L 232,000 pCi/L (01/13/06)

MW-34 Transformer Yard Well installed Sampled water (01/20/06) 211,000 pCi/L 211,000 pCi/L) (01/20/06)

MW-35 Transformer Yard Well installed Sampled water (01/13/06) 104,00 pCi/L 104,000 pCiA (01/20/06)

MW-36 U-2 Turbine Bldg Down approximately 49' of 54' Continue to drill MW-37 U-2 Turbine Bldg Drilled through concrete floor Install ramp for moving drill machine MW-38 South U-3 Boundary Well in service Continue periodic sampling Split Sample MW-38 Results:

NY State Result: 701 pCi/I (12/08/05)

Fitzpatrick Result: 985 pCi/A (12/08/05)

Non Split- Fitzpatrick Results only Fitzpatrick Result: N.D. (12/30/05)

Fitzpatrick Result: 1008 pCi/ 1(01/10/06)

MW-40 Lot above Sewer Plani Approximately 151 ' down of 200' Drilling today MW-48 Furthest South Well Approximately 35' down of 37' Continue to drill MW-39 1xUI SFB 1U3 RWST Vacuum evacuated Ready for drilling ( 219' well)

rp

[§tAgy Smith StacyL: --.

MOMTOF WE,,-; L IA U.doc

-Z_~IIING',.

Smith - MONITORING WELL STATUS.doc

-Paae2.-1-_ 1 11-~z1 ~ -- '_ - n ~

Page 2I CURRENT WELL STATUS Phase I Wells Status MW-30 Completed (awaiting access to sample)

MW-31 Completed MW-32 Completed MW-33 Completed MW-34 Completed MW-35 Completed MW-36 Down about 54' (drilling complete)

MW-37 Drilled 9" through concrete floor (Ramp to move drill rig being installed)

MW-38 Completed Phase II Wells Sequence (see note below} Status (Jan 27.2006)

MW-39

  • fouth of Unit I Fuel Storage Building) (vacuum evacuated-ready to drill)

MW-40 * 'Yarking Lot above Sewerage Plant (drilling in progress-down 181')

MW48

  • Furthest Southerly Property Boundary (drilling complete-down 40')

MW42 * )GWest of Unit 2 RWST)P (ready for vacuum excavation)

MW-46

  • West of Unit 3 PAB Sump (Ready to vaccum)

MW41 South of Unit 3 RWST1\ (Ready to vacuum)

MW43 South of Unit 3 Tank Pit and RWST (Ready to vacuum MW-44 North of Unit 3 Fuel Storage Building MW45 Between Unit 3 Fuel Storage Building/PAB eady to vacuum)

MW47 West of Unit I Fuel Storage Building (Ready to vacuum)

MW49 -West side of Unit 3 Discharge Canal (Ready to vacuum)

MW-50 East side of Unit 3 Discharge Canal (Ready to vacuum)

MW-51 Southern property hill north of MW-40 (ready to vacuum)

MW-52 Northern property boundary (Location not established)

  • Note:

Wells numbering 39,40,48,42,46 are priority wells at this time and may be drilled in a changing sequence within this subset based on depth of well considerations, equipment setup options, and engineering paperwork delivery.

- IN W L S

-m---NTOU .doc,-.11---1 - - -P,-. ..... a k§tacy Srpit- MONITORING WELL STATUSAdoc I~"II,-,,,

~ ~ -- ~ ~ P g 31-11 1

RECENT TREND INFORMATION:

(Activity in pCi/L)

MONITORING WELLS (in pCi/l)

DATE: 11/24/05 12/13-16 12119/05 12/30/05 01/06/06 01/13/06 01/20/06 MW-30: 600,000 (ONLY SAMPLE TAKEN WITH TEMPORARY PACKER SYSTEM)

MW-31: 4,061 4,030 MW-32: 3,720 MW-33: 142,000 199,000 220,000 189,000 232,000 226,000 MW-34: 63,900 121,000 147,000 159,000 131,000 211,000 MW-35: 42,300 76,000 80,500 95,400 97,800 104,000 MW-ill: 296,000 192,000 212,000 113,000 199,000 119,000 MW-38: Most recent Split Sarnple results: 985 (Fitzpatrick 12/08/05)) 701 State of New York (12/08/05)

Most recent Fitzpatrick results: Not detected (Fitzpatrick 12/30/05) 1008 (Fitzpatrick 01/10/06)

[S S - MONITORING WELL STATUS.doc P Unit 2 Storm Drain Jan 19, 2006 (pCi2 ) Jan 24, 2006 MH2 (U-2 riverfront) ND ND (river front)

MH3 (North end of U-2 Turbine) 2,240 MH4 (Entrance to U2 Transformer Yard) 3,780 CMH( (U-2 Aux Feed Bldg)') 3,570 MH6 (U2 Transformer Yard) 18,600 MH7(U2 Transformer Yard) 3,840 MH8 (U2 Transformer Yard) 3,210 MH12 (U2 Riverfront) ND ND (river front)

MH14 (U2 Riverfront) Resampling ND (river front)

CB15 (U2 Riverfront) Resampling ND (river front)

Unit 3 Storm Drain Manholes taken Jan 19, 2006 (pCi/1):

A2 (Near U- S ND A4 (Near U- RWST 1,190 A6 (Near U- RWST) 686 B5 (Entrance to 3 Transformer Yarq). 3,320 El (Unit 3 Roadway t curity Post) ND E2 (Unit 3 Roadway t Security Post)

E2B (Unit 3 Roadway o Security Post)

ND ND 8*L E3 (Unit 3 Roadway tj Security Post) ND E3A (Unit 3 Roadway to Security Post) ND

EStacy Smith - MONITORING WELL STATUS.doc Pagie 5 1 Stacy Smith- MONITORING WELL. STATUS- doc "1-. - .... a.oe- 51 TREND COMPARISON Unit 3 Storm Drain Locations 01/19/06 01/17/06 01/12/06 A2 U WST1 ND A4UlRWSTj 1,190 A6 U ST_ 686 BI U-3 Transformer Yard 5010 4530 B3 U-3 Transformer Yard 4650 6280 B4 U-3 Transformer Yard 3600 3180 B5 U-3 Transformer Yard 3,320 B6 U-3 Transformer Yard ND B7 U-3 Transformer Yard 2690 2510 B8 U-3 Transformer Yard ND C I U-3 North of Service Bldg 867 997 D2 U-3 South of Service Bldg ND ND E4 U-3 Access Road to Command Post ND El U3 Access Road to Command Post ND E2 U3 Access Road to Command Post ND E2B U3 Access Road to Command Post ND E3 U3 Access Road to Command Post ND E3A U3 Access Road to Command Post ND E4A U-3 Access Road to Command Post ND E5 U-3 Access Road to U3 Command Post ND ESA U-3 Access Road to U3 Command Post ND E6 U-3 Access Road to U3 Command Post ND E7 U-3 Access Road to U3 Command Post ND