MONTHYEARENOC-17-00005, ISFSI - Financial Test for Decommissioning Funding Parent Guarantee for the Year Ending December 31, 2016 Per 10 CFR Part 30 App. a2017-03-30030 March 2017 ISFSI - Financial Test for Decommissioning Funding Parent Guarantee for the Year Ending December 31, 2016 Per 10 CFR Part 30 App. a ENOC-17-00006, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii)2017-03-30030 March 2017 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii) ENOC-16-00008, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2015, Per 10 CFR 50.82(a)(8)(vii)2016-03-30030 March 2016 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2015, Per 10 CFR 50.82(a)(8)(vii) ENOC-16-00007, ISFSI - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2015, Per 10 CFR Part 30 App. a2016-03-30030 March 2016 ISFSI - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2015, Per 10 CFR Part 30 App. a ENOC-15-00005, Decommissioning Funding Status Report Entergy Nuclear Operations, Inc2015-03-30030 March 2015 Decommissioning Funding Status Report Entergy Nuclear Operations, Inc ENOC-15-00006, ISFSI and Vermont Yankee - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2014 Per 10 CFR Part 30 App. a2015-03-27027 March 2015 ISFSI and Vermont Yankee - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2014 Per 10 CFR Part 30 App. a ENOC-15-00007, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 20142015-03-27027 March 2015 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2014 ENOC-14-00015, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Nuclear Operations, Inc. Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Nuclear Operations, Inc. Independent Spent Fuel Storage Installations ENOC-14-00016, Response to Request for Voluntary Response to 2.206 Petition Regarding Financial Qualifications,2014-07-24024 July 2014 Response to Request for Voluntary Response to 2.206 Petition Regarding Financial Qualifications, ENOC-14-00006, Entergy Nuclear Operations, Inc. - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2013 - 10 CFR 50.82(a)(8)(vii)2014-03-28028 March 2014 Entergy Nuclear Operations, Inc. - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2013 - 10 CFR 50.82(a)(8)(vii) ENOC-14-00008, Entergy Nuclear Operations, Inc. - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2013 Per 10 CFR Part 30 App. a2014-03-28028 March 2014 Entergy Nuclear Operations, Inc. - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2013 Per 10 CFR Part 30 App. a ENOC-14-00009, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2014-03-28028 March 2014 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ENOC-14-00004, Completion of Change to the Entergy Quality Assurance Manual Per Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Manual Per Confirmatory Order EA-11-096 ENOC-13-00028, Vermont, Notice of Change in Corporate Form of Energy Nuclear Holding Company2013-11-19019 November 2013 Vermont, Notice of Change in Corporate Form of Energy Nuclear Holding Company ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)2013-11-0404 November 2013 Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) ENOC-13-00023, Response to Request for Additional Information, 2013 Decommissioning Fund Status Report - Entergy Nuclear Operations, Inc2013-07-23023 July 2013 Response to Request for Additional Information, 2013 Decommissioning Fund Status Report - Entergy Nuclear Operations, Inc ENOC-13-00016, Response to Request for Additional Information Regarding 10 CFR 50.33 Financial Qualification Review2013-05-0606 May 2013 Response to Request for Additional Information Regarding 10 CFR 50.33 Financial Qualification Review ENOC-13-00009, ISFSI Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 20122013-03-29029 March 2013 ISFSI Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2012 ENOC-13-00007, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ENOC-13-00011, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii)2013-03-29029 March 2013 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii) ENOC-13-00001, ISFSI Decommissioning Funding Plans (10 CFR 72.30) - Correction Notice2013-01-0808 January 2013 ISFSI Decommissioning Funding Plans (10 CFR 72.30) - Correction Notice ENOC-12-00039, ISFSI Decommissioning Funding Plans (10 CFR 72.30)2012-12-13013 December 2012 ISFSI Decommissioning Funding Plans (10 CFR 72.30) ENOC-12-00024, Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106 Section V. D. Review and Revision of EN-QV-1362012-08-0303 August 2012 Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106 Section V. D. Review and Revision of EN-QV-136 ENOC-12-00021, Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106, Section V.F. Assessment Plan Available for Review2012-06-21021 June 2012 Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106, Section V.F. Assessment Plan Available for Review ENOC-12-00018, Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106 Section V. B. Case Study Available for Review2012-05-23023 May 2012 Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106 Section V. B. Case Study Available for Review ENOC-12-00017, Entergy Letter Dated May 22, 2012 Re EA-10-090, EA-10-248, EA-11-1062012-05-22022 May 2012 Entergy Letter Dated May 22, 2012 Re EA-10-090, EA-10-248, EA-11-106 ENOC-11-00021, Entergy Operations, Inc., Entergy Nuclear Operations, Inc., Submittal of Planned Reorganization of Quality Control Reporting Relationship2011-11-14014 November 2011 Entergy Operations, Inc., Entergy Nuclear Operations, Inc., Submittal of Planned Reorganization of Quality Control Reporting Relationship ENOC-11-00012, Entergy Nuclear Operations, Inc. - Response to Request for Additional Information to Support the Review of 2011 Decommissioning Funding Status Report2011-06-24024 June 2011 Entergy Nuclear Operations, Inc. - Response to Request for Additional Information to Support the Review of 2011 Decommissioning Funding Status Report ENOC-11-00010, Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark I Primary Containment Systems and Without Dedicated Class E1 Power for Cooling Elevated Irradiated Used Fuel Sto2011-05-24024 May 2011 Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark I Primary Containment Systems and Without Dedicated Class E1 Power for Cooling Elevated Irradiated Used Fuel Storage ENOC-11-00005, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1)2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1) ENOC-10-00034, Entergy Operations, Inc., and Entergy Nuclear Operations, Inc., Follow-up Action to NRC Enforcement Discretion Letter EA-09-190, Holtec Elimination of Multi-Purpose Canister (MPC) Shop Helium Leak Rate Test2010-11-0202 November 2010 Entergy Operations, Inc., and Entergy Nuclear Operations, Inc., Follow-up Action to NRC Enforcement Discretion Letter EA-09-190, Holtec Elimination of Multi-Purpose Canister (MPC) Shop Helium Leak Rate Test ENOC-10-00035, Entergy - Request for Withdrawal of Administrative License Amendments Relating to Application for Order Approving Indirect Transfer of Control of Licenses2010-10-14014 October 2010 Entergy - Request for Withdrawal of Administrative License Amendments Relating to Application for Order Approving Indirect Transfer of Control of Licenses ENOC-10-00010, Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 20092010-03-31031 March 2010 Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 2009 ENOC-10-00006, Submittal of Fitness-for-Duty Program Performance Report for January 2009 - December 20092010-03-0101 March 2010 Submittal of Fitness-for-Duty Program Performance Report for January 2009 - December 2009 ENOC-09-00038, Entergy Nuclear Operations, Inc. - Supplemental Information in Support of Request for Further Extension of Orders Approving Transfer of Control of Licenses and for Review of Trust Agreement Amendments2009-12-10010 December 2009 Entergy Nuclear Operations, Inc. - Supplemental Information in Support of Request for Further Extension of Orders Approving Transfer of Control of Licenses and for Review of Trust Agreement Amendments ENOC-09-00029, Entergy - Request for Further Extension of Orders Approving Transfer of Licenses and for Review of Trust Agreement Amendments for Pilgrim, Indian Point, FitzPatrick, Vermont Yankee, Palisades and Big Rock Point2009-11-0303 November 2009 Entergy - Request for Further Extension of Orders Approving Transfer of Licenses and for Review of Trust Agreement Amendments for Pilgrim, Indian Point, FitzPatrick, Vermont Yankee, Palisades and Big Rock Point ENOC-09-00034, Revised Decommissioning Funding Assurance Plan2009-10-29029 October 2009 Revised Decommissioning Funding Assurance Plan ENOC-09-00025, Entergy Nuclear Operations, Inc., Update Regarding Status and Request for Threshold Determination Under 10 CFR 50.802009-08-18018 August 2009 Entergy Nuclear Operations, Inc., Update Regarding Status and Request for Threshold Determination Under 10 CFR 50.80 ENOC-09-00024, Decommissioning Funding Assurance Plans2009-08-13013 August 2009 Decommissioning Funding Assurance Plans ENOC-09-00022, Entergy - Status of Decommissioning Funding Assurance2009-07-0606 July 2009 Entergy - Status of Decommissioning Funding Assurance ENOC-09-00021, Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses2009-05-29029 May 2009 Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses ENOC-09-00015, Request for Extension of Orders Approving Transfer of Control of Licenses2009-05-15015 May 2009 Request for Extension of Orders Approving Transfer of Control of Licenses ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ENOC-09-00007, Status Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc. for Year Ending December 31, 2008 - 10 CFR 50.75(f)(1)2009-03-30030 March 2009 Status Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc. for Year Ending December 31, 2008 - 10 CFR 50.75(f)(1) ENOC-09-00005, Fitness-for-Duty Program Performance Report for the Period July 2008 - December 20082009-02-23023 February 2009 Fitness-for-Duty Program Performance Report for the Period July 2008 - December 2008 ENOC-08-00041, Fitness-for-Duty Program Performance Report for the Period January 2008 - June 20082008-08-22022 August 2008 Fitness-for-Duty Program Performance Report for the Period January 2008 - June 2008 ENOC-08-00040, Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses2008-07-28028 July 2008 Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses ENOC-08-00031, Indian, James A. FitzPatrick, Vermont Yankee, Palisades - Notice Regarding Trustee for Nuclear Decommissioning Trusts2008-05-22022 May 2008 Indian, James A. FitzPatrick, Vermont Yankee, Palisades - Notice Regarding Trustee for Nuclear Decommissioning Trusts ENOC-08-00028, J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report2008-05-0808 May 2008 J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report ENOC-08-00024, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2008-04-23023 April 2008 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2017-03-30
[Table view] Category:Status Report
MONTHYEARBVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21084A7892021-03-25025 March 2021 Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2020 - 10 CFR 50.82(a)(8)(vii) CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc CNRO-2019-00006, Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc ML18088B2462018-03-29029 March 2018 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2017, Per 10 CFR 50.82(a)(8)(vii) CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2017-03-31031 March 2017 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) ENOC-17-00006, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii)2017-03-30030 March 2017 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii) NL-16-024, Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-29029 February 2016 Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2015-08-28028 August 2015 Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-28028 August 2015 Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation BVY 15-016, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Orders Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-51) and Mitigation Strategies for Beyond-Design-Basis..2015-02-27027 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Orders Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-51) and Mitigation Strategies for Beyond-Design-Basis.. BVY 14-065, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) and Request to Rescind Order2014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) and Request to Rescind Order NL-14-059, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions2014-04-29029 April 2014 Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions ENOC-14-00009, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2014-03-28028 March 2014 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc NL-14-031, Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-27027 February 2014 Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation BVY 14-015, Vermont Yankee'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-26026 February 2014 Vermont Yankee'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) BVY 14-014, Vermont Yankee'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-02-26026 February 2014 Vermont Yankee'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML13247A0292013-08-28028 August 2013 Vermont Yankee'S First Six-Month Status Report in Response to Letter March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation BVY 13-076, Vermont Yankee'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2013-08-28028 August 2013 Vermont Yankee'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-13-072, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions2013-05-0202 May 2013 Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions ENOC-13-00007, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ENOC-13-00011, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii)2013-03-29029 March 2013 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii) ML13031A6352012-08-12012 August 2012 Status Report on Unidentified Leakage for Vermont Yankee, Pilgrim, and Millstone, Units 2 and 3 ML12137A0902012-05-29029 May 2012 Decommissioning Funding Status Report ML12137A1052012-05-29029 May 2012 Decommissioning Funding Status Report ML12137A1362012-05-29029 May 2012 Decommissioning Funding Status Report ML12122A0712012-05-14014 May 2012 Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 ENOC-11-00005, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1)2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1) ML1029403622010-11-12012 November 2010 October 2010 10 CFR 2.206 Monthly Status Report: Enclosures ENOC-10-00010, Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 20092010-03-31031 March 2010 Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 2009 ML1100404362009-09-16016 September 2009 Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 09/16/2009 ML0830800812008-11-20020 November 2008 October 2008 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206- Enclosures ML0905708302008-11-0505 November 2008 Entergy Center Status Report NL-08-131, Siren Project Status Update2008-08-12012 August 2008 Siren Project Status Update NL-08-121, Siren Project Milestone Schedule - Status Update, Letter Dated 07/25/082008-07-25025 July 2008 Siren Project Milestone Schedule - Status Update, Letter Dated 07/25/08 ENOC-08-00028, J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report2008-05-0808 May 2008 J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report ENOC-08-00018, Stations - Decommissioning Fund Status Report for the Period Ending December 31, 20072008-03-26026 March 2008 Stations - Decommissioning Fund Status Report for the Period Ending December 31, 2007 ML0801505932008-01-17017 January 2008 December 2007 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206 ML0729506172007-09-13013 September 2007 E-mail from K. Mcmullin, Entergy to J. Boska, NRR Et Al on IPEC Status Report, September 13, 2007 ML0729705242007-08-0707 August 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Aug 7 2007 ML0729705222007-08-0606 August 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Aug 6 2007 ML0729705042007-07-31031 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 31 2007 ML0729704422007-07-27027 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 27, 2007 ML0729704332007-07-26026 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 26 2023-03-29
[Table view] |
Text
z E;ntergy EntergyNuearOperations, Inc Jackson, MS 39213 Tel: 601-368-5516 Bryan S. Ford Senior Manager, Fleet Regulatory Assurance ENOC-1 7-00006 March 30, 2017 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 205555-0001
SUBJECT:
Status of Funding for Managing Irradiated Fuel For Year Ending December 31, 2016 10 CFR 50.82(a)(8)(vii)
Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating Station 1 Docket No.50-003 License No. DPR-5 Big Rock Point Docket No. 50-155 License No. DPR-6 Vermont Yankee Docket No. 50-271 License No. DPR-28
Dear Sir or Madam:
10 CFR 50.82(a)(8)(vii) requires that after submitting its site-specific decommissioning cost estimate pursuant to 1 0 CFR 50.82(a)(4)(i), a licensee must annually submit to the NRC, by March 31 a report on the status of its funding for managing irradiated fuel. On behalf of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Palisades, LLC, and Entergy Nuclear Vermont Yankee, LLC, Entergy Nuclear Operations, Inc. hereby submits the information requested for Indian Point 1 Big Rock Point, and Vermont Yankee. All or most of the spent fuel mananagement costs are a liability of the U.S. Government as a result of its breach of the spent fuel disposal contract. However, this report takes no credit for recoveries on that liability.
There are no new commitments made in this letter. If you have any questions, please contact the undersigned at 601-368-5516.
Sincerely, BSF/ljs/aye
ENOC-1 7-00006 Page 2 of 2 Attachments: 1 . Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel Indian Point 1 for Year Ending December 31 201 6 1 0 CFR 50.82(a)(8)(vii)
- 2. Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel Big Rock Point, for Year Ending December 31 201 6 1 0 CFR 50.82(a)(8)(vii)
- 3. Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel Vermont Yankee, for Year Ending December 31 201 6 1 0 CFR 50.82(a)(8)(vii) cc:
Mr. A. C. Bakken (ECH)
Mr. J. R. Davis (ECH)
Mr. B. E. Green (TMBR)
Mr. L. M. Coyle (ECH)
Mr. C. F. Arnone (PAL)
Mr. J. A. Ventosa (ECH)
Mr. L. J. Smith (ECH)
Mr. A. J. Vitale (IPEC)
Mr. J. W. Boyle (VTY)
USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Project Manager, Indian Point 1 USNRC Project Manager, Indian Point 2 USNRC Project Manager, Indian Point 3 USNRC Project Manager, Big Rock Point USNRC Project Manager, Palisades USNRC Project Manager, Vermont Yankee USNRC Resident Inspector, Indian Point 2 USNRC Resident Inspector, Indian Point 3 USNRC Resident Inspector, Palisades Michigan Department of Environmental Quality Michigan Public Service Commission Ms. Bridget Frymire NYS Department of Public Service 3 Empire State Plaza Albany, NY 12223 Ms. June E. Tierney, Commissioner Vermont Department of Public Service 1 1 2 State Street Drawer 20 Montpelier, Vermont 05602-2601
Attachment 1 ENOC-i 7-00006 (Page 1 of 1)
Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel Indian Point 1 For Year Ending December 31, 2016 10 CFR 50.82(a)(8)(vii)
Plant Name: Indian Point Nuclear Generating Unit No. 1 1 . Funds accumulated to cover the i 93.77 million cost of managing irradiated fuel as of 1 2/31/201 6 [Note 1]
- 2. Projected costs to manage fuel until DOE removal (201 6$) $ 54.55 million
- 3. Plan as required See Note 2 Note 1 : This amount represents the excess funds available in the Unit 1 decommissioning trust fund less an amount necessary to decommission the Independent Spent Fuel Storage Installation (lSFSl). Per Unit ls updated decommissioning cost analysis, the present value (201 6$) of excess funds in Unit 1 s decommissioning trust at the end of decommissioning in 2073, after considering license termination expenses, is
$1 94.89 million ($590.76 million/(1 .02)A(20732017)). See Ending DTF Balance for 2073, Table 1 4-1 Decommissioning Funding Status Report per 1 0 CFR §50.75(f)(1) and 10 CFR 50.82(a)(8)(v) Entergy Nuclear Operations, Inc., filed March 2017. The estimated cost for decommissioning Indian Point 1 and 2s share of the site ISFSl is $6.79 million.
Of the 31 casks from Indian Point 1 and 2 on the ISFSI, 5 are attributable to Unit 1 or ,
16.1%. Unit ls share of ISFSI decommissioning cost is calculated as 16.1% x $6.79 million, or $1 .09 million. Thus, the present value of Unit 1 trust funds available for spent fuel management is $1 94.89 million minus $1 .09 million, or $1 93.80 million. For purposes of this report only, Indian Point 1 trust funds are being considered separately from Indian Point 2 trust funds; however, both funds are covered by a single trust agreement, and will likely be handled together upon decommissioning.
Note 2: The excess currently existing in Unit 1 5 decommissioning trust is sufficient to cover the estimated costs of spent fuel management. The licensee acknowledges the need for an exemption pursuantto 10 CFR §50.12(a) to use radiological decommissioning trust funds for costs other than decommissioning activities as defined in 1 0 CFR 50.2.
Attachment 2 ENOC-1 7-0006 (Page 1 of 1)
Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel Big Rock Point For Year Ending December 31, 2016 10 CFR 50.82(a)(8)(vii)
Plant Name: Big Rock Point 1 . Funds accumulated to cover the See Note 1 cost of managing irradiated fuel as of 12/31/2016
- 2. Projected costs to manage fuel until DOE removal (201 6$) $ 57.37 million
- 3. Plan as required See Note 1 Note 1 : Spent fuel management costs have been paid for out of Entergy Nuclear Palisades, LLC operating funds since Big Rock Point was acquired from Consumers Energy on April 1 1, 2007. Entergy Nuclear Palisades, LLC plans to continue paying for spent fuel management costs from said operating funds. Therefore, no funds are specifically accumulated for the cost of managing irradiated fuel at Big Rock Point as of 12/31/2016.
Attachment 3 ENOC-i 7-00006 (Pagel of 4)
Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel Vermont Yankee For Year Ending December 31, 2016 10 CFR 50.82(a)(8)(vii)
Plant Name: Vermont Yankee
- 1. Fundsaccumulatedtocoverthe $193.61 million cost of managing irradiated fuel as of 1 2/31/201 6 [Note 1]
- 2. Projected costs to manage fuel until DOE removal (2016$) $ 264.88 million
- 3. Plan as required See Note 2 Note 1 : This amount represents the excess funds available in the Vermont Yankee decommissioning trust fund less an amount necessary to decommission the Independent Spent Fuel Storage Installation (lSFSl). Per Vermont Yankees site-specific decommissioning cost estimate (Reference 1), the present value of excess funds in the decommissioning trust at the end of decommissioning in 2075, after considering license termination expenses, is $1 98.81 million ($626.97 million/(1 .02)A(20752017)). See Table 3-1 below. Table 3-1 has been constructed by removing spent fuel management expenses from Table 1 5-1 Decommissioning Funding Status Report per 1 0 CFR
§50.75(f)(1) and 10 CFR 50.82(a)(8)(v) Entergy Nuclear Operations, Inc. filed March 2017, to yield the surplus atthe end of decommissioning that would otherwise be available for spent fuel management and ISFSI decommissioning. This calculated surplus takes into account available funds in the decommissioning trust. The estimated cost for decommissioning Vermont Yankees ISFSI is $5.20 million. Thus, the present value of Vermont Yankee trust funds available for spent fuel management is $198.81 million minus $5.20 million, or $193.61 million.
Note 2: Reference 3, Attachment 1 5 demonstrates that the Vermont Yankee decommissioning trust fund is sufficiently funded for all license termination activities and certain spent fuel management activities (i.e., operational costs, shown in Col. 2, less Col. 3, of Table 15-1 of Reference 3), and reflects completion of the transfer to dry fuel storage in 2018, contingent upon certain regulatory approvals. As discussed in the Irradiated Fuel Management Program Update (Reference 2) costs related to spent fuel management operations (e.g., operations and maintenance costs for the spent fuel and Independent Spent Fuel Storage Installation, totaling approximately $175 million) will be funded from the decommissioning trust fund. Entergy Nuclear Operations, Inc. obtained an exemption that allows the use of trust funds for spent fuel management activities (NRC Approval of Exemption Request for Spent Fuel Management, 80 Fed. Reg. 35992, June 23, 2015, Reference 4). The remaining $90 million is associated with transfer of spent fuel to dry storage (e.g., procurement of dry storage systems, transfer of fuel from the spent fuel pool to the Independent Spent Fuel Storage Installation (ISFSI), and construction of the second SF51 pad). To fund the transfer to dry storage portion of spent fuel management costs, Entergy Nuclear Vermont Yankee, LLC has established two separate revolving credit facilities from third party banks totaling $1 45 million.
Attachment 3 ENOC-1 7-00006 (Page 2 of 4)
Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel Vermont Yankee For Year Ending December 31, 2016 10 CFR 50.82(a)(8)(vii)
Table 3-1 Vermont Yankee Nuclear Power Station SAFSTOR Methodology -
Annual Cash Flow Analysis Total License Termination (In Thousands in 2015 Dollars)
Column 4 License Termination Column 5 Column 9 Column 3 Cost pins Beginning Year Column 1 Column 2 Exclude Spent Fuel of Year Column 8 Ending 50.75 50.54 (bb) Dry Fuel Management Trust Trust Trust License Spent Fuel Spent Fuel Cost less Dry Fund Column 6 Column 7 Fund Fund Termination Management Management Fuel Cost Balance Withdraw Contribute Earnings Balance Year Cost ($000s) Cost ($000s) Cost ($000s) ($000s) ($000s) ($000s) ($000s) ($000s) ($000s) 2017 42,386 0 0 42,386 561,615 42,386 0 10,385 529,613 2018 51,878 0 0 51,878 529,613 51,878 0 9,555 487,289 2019 5,414 0 5,414 487,289 5,414 0 9,638 491,513 2020 5,362 0 5,362 491,513 5,362 0 9,723 495,874 2021 5,362 0 5,362 495,874 5,362 0 9,810 500,322 2022 3,741 0 3,741 500,322 3,741 0 9,932 506,513 2023 3,741 0 3,741 506,513 3,741 0 10,055 512,827 2024 3,741 0 3,741 512,827 3,741 0 10,182 519,267 2025 3,680 0 3,680 519,267 3,680 0 10,312 525,899 2026 3,829 0 3,829 525,899 3,829 0 10,441 532,511 2027 3,882 0 3,882 532,511 3,882 0 10,573 539,202 2028 3,838 0 3,838 539,202 3,838 0 10,707 546,072 2029 3,829 0 3,829 546,072 3,829 0 10,845 553,088 2030 3,882 0 3,882 553,088 3,882 0 10,984 560,190 2031 3,829 0 3,829 560,190 3,829 0 11,127 567,489 2032 3,838 0 3,838 567,489 3,838 0 11,273 574,924 2033 3,882 0 3,882 574,924 3,882 0 11,421 582,463 2034 3,829 0 3,829 582,463 3,829 0 11,573 590,207 2035 3,829 0 3,829 590,207 3,829 0 11,728 598,105 2036 3,891 0 3,891 598,105 3,891 0 11,284 606,099 2037 3,829 0 3,829 606,099 3,829 0 12,045 614,316 2038 3,829 0 3,829 614,316 3,829 0 12,210 622,696 2039 3,882 0 3,882 622,696 3,882 0 12,376 631,191 2040 3,838 0 3,838 631,191 3,838 0 12,547 639,900 2041 3,829 0 3,829 639,900 3,829 0 12,721 648,793 2042 3,882 0 3,882 648,793 3,882 0 12,898 657,809 2043 3,829 0 3,829 657,809 3,829 0 13,080 667,060 2044 3,838 0 3,838 667,060 3,838 0 13,264 676,486 2045 3,882 0 3,882 676,486 3,882 0 13,452 686,057 2046 3,829 0 3,829 686,057 3,829 0 13,645 695,873
Attachment 3 ENOC-1 7-00006 (Page 3 of 4)
Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel Vermont Yankee For Year Ending December 31, 2016 10 CFR 50.82(a)(8)(vii) 2047 3,829 0 3,829 695,873 3,829 0 13,841 705,885 2048 3,891 0 3,891 705,885 3,891 0 14,040 716,034 2049 3,829 0 3,829 716,034 3,829 0 14,244 726,449 2050 3,829 0 3,829 726,449 3,829 0 14,452 737,073 2051 3,882 0 3,882 737,073 3,882 0 14,664 747,855 2052 3,838 0 3,838 747,855 3,838 0 14,880 758,897 2053 3,671 0 3,671 758,897 3,671 0 15,105 770,330 2054 3,724 0 3,724 770,330 3,724 0 15,332 781,938 2055 3,671 0 3,671 781,938 3,671 0 15,565 793,832 2056 3,680 0 3,680 793,832 3,680 0 15,803 805,955 2057 3,724 0 3,724 805,955 3,724 0 16,045 818,276 2058 3,671 0 3,671 818,276 3,671 0 16,292 830,896 2059 3,671 0 3,671 830,896 3,671 0 16,544 843,769 2060 3,733 0 3,733 843,769 3,733 0 16,801 856,837 2061 3,671 0 3,671 856,837 3,671 0 17,063 870,229 2062 3,671 0 3,671 870,229 3,671 0 17,331 883,889 2063 3,724 0 3,724 883,889 3,724 0 17,603 897,768 2064 3,680 0 3,680 897,768 3,680 0 17,882 911,969 2065 3,671 0 3,671 911,969 3,671 0 18,166 926,464 2066 3,724 0 3,724 926,464 3,724 0 18,455 941,195 2067 3,671 0 3,671 941,195 3,671 0 18,750 956,274 2068 33,520 0 33,520 956,274 33,520 0 18,455 941,209 2069 74,947 0 74,947 941,209 74,947 0 17,325 883,587 2070 107,412 0 107,412 883,587 107,412 0 15,524 791,699 2071 87,194 0 87,194 791,699 87,194 0 14,090 718,595 2072 87,640 0 87,640 718,595 87,640 0 12,619 643,573 2073 51,945 0 51,945 643,573 51,945 0 11,833 603,461 2074 537 0 537 603,461 537 0 12,058 614,982 2075 310 0 310 614,982 310 0 12,293 626,966 728,091 0 0 728,091 561,615 728,091 0 793,442 626,966
Attachment 3 ENOC-1 7-00006 (Page 4 of 4)
Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel Vermont Yankee For Year Ending December 31, 2016 10 CFR 50.82(a)(8)(vii)
REFERENCES:
1 . Letter, Entergy Nuclear Operations, Inc. to USNRC, Post Shutdown Decommissioning Activities Report, BVY 14-078, dated December 19, 2014 (Accession No. ML14357A110)
- 2. Letter, Entergy Nuclear Operations, Inc. to USNRC, Update to Irradiated Fuel Management Program Pursuant to YOCFR 50.54(bb), BVY14-085, dated December 19,2014 (Accession No. ML14358A251)
- 3. Letter, Entergy Nuclear Operations, Inc. to USNRC, Decommissioning Funding Status Report per 10 CFR §50.75(f)(1) and 10 CFR 50.82(a)(8)(v), Filed March 2017
- 4. NRC Approval of Exemption Request for Spent Fuel Management, 80 Fed. Reg. 35992 (June 23, 2015)