April 1, 2015 Memo To:

File From:

Michael Wentzel

Subject:

Figures from Indian Point Quarter 3 2014 Groundwater Monitoring Report The following figures are from the 3rd quarter 2014 groundwater monitoring report for Indian Point (available at http://www.safesecurevital.com/uploads/15-3-20.pdf) and were made available to NRC staff by request as documented in an email from Dara Gray, Entergy, to Michael Wentzel, NRC, dated March 31, 2015. The files listed below, which were identified in the March 31, 2015 email, are not included because the NRC staff was unable to open the files:

FINAL Figure 4 - Q3 2014 Current and Potential Future SSC Source Locations.pdf FINAL Figure 5A - Q3 2014 Longterm Transducer Monitoring Evaluation Map.pdf FINAL Figure 5A - Q3 2014 Longterm Transducer Monitoring Evaluation M...LY].pdf

ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete pier Rip-rap 30 30 40 50 30 40 50 70 60 70 80 90 60 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 HUDSON RIVER I-2 HR-1 U3-3 RW-1 U3-C1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 39 ND ND ND 3.55 0.26 2.82 2.07 1.31 3.27 0.42 0.47 5.99 5.65 0.41 3.52 0.26 0.94 0.559 5.479 1.606 1.708 0.218 0.301 0.373 3.215 0.832 0.361 23.55 9.595 1.782 1.682 1.352 0.898 0.914 1.292 6.445 2.138 9.545 1.792 0.879 0.807 3.438 0.737 6.212 6.188 2.948 2.468 1.545 0.587 0.476 0.414 0.242 0.225 0.204 0.438 0.977 1.025 0.658 1.234 0.558 0.334 0.436 0.301 0.302 23.797 13.162 52.846 41.225 12.385 126.125 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 8.42 1.44 2.939 28.81 2.335 2.536 3.915 21.51 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete pier 30 30 40 50 30 40 50 70 60 70 80 90 60 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 4

4 1

1 1

1 1

1 1

1 3

50 4030 20 10 5

1 1

1 1

1 1

I-2 HR-1 U3-3 RW-1 U3-C1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 ND 45.2 8.62 0.83 3.61 33.2 1.46 1.78 1.72 6.63 1.58 1.19 1.52 4.22 5.14 0.69 2.98 1.02 0.425 1.969 1.024 8.394 0.147 0.492 0.115 0.143 0.229 0.519 0.911 0.593 3.095 6.499 1.335 0.732 0.795 1.393 7.218 1.387 2.598 3.038 0.559 0.235 0.418 4.815 4.663 4.455 3.188 2.473 1.515 0.545 0.475 0.439 0.325 0.333 0.316 0.421 1.006 1.158 0.869 1.865 0.525 0.324 0.246 0.435 0.173 0.351 29.225 34.913 29.267 10.265 113.743 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 HUDSON RIVER 5.19 4.113 0.884 1.605 3.195 2.634 19.516 21.51 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 60 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Unit 2 Condensate Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6A CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-24 CB-6 CB-5A (CB-6)

CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 4

1 1

1 1

1 1

1 50 40 30 20 101 5

I-2 HR-1 U3-3 RW-1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 ND ND 8.16 34.4 1.46 0.74 10.5 1.19 1.52 4.22 0.36 3.26 0.23 1.109 0.427 7.306 2.107 0.748 0.307 0.147 0.492 0.115 0.143 0.229 0.519 3.853 0.666 0.593 30.75 2.587 6.107 1.745 1.813 1.318 0.651 1.355 7.423 1.281 6.405 2.188 1.288 2.948 0.519 0.248 0.452 4.808 4.595 4.508 4.658 3.258 2.485 1.515 0.553 0.651 0.474 0.399 0.328 0.356 0.394 1.003 1.128 0.807 1.958 0.507 0.341 1.002 0.444 0.184 0.351 19.929 17.115 107.033 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 HUDSON RIVER 3.278 3.195 1.914 5.246 15.784 21.388 21.51 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete pier 30 30 40 50 30 40 50 70 60 70 80 90 60 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 4

3 40 30 20 10 5

50 I-2 HR-1 U3-3 RW-1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 4

ND ND 1.2 7.1 0.45 51.2 1.46 1.43 1.15 11.3 1.16 3.75 2.69 0.39 4.16 0.67 3.65 0.55 0.455 7.709 3.175 1.057 0.369 7.938 0.147 0.492 0.115 0.143 0.229 0.519 4.623 0.552 2.232 5.421 4.867 1.815 1.213 0.604 0.654 9.113 0.489 1.761 1.091 1.515 0.327 0.263 5.145 4.033 5.005 3.433 2.453 1.395 0.533 0.528 0.438 0.387 0.464 0.399 0.446 1.097 1.172 0.816 2.258 0.404 0.198 0.921 0.514 0.194 0.499 23.571 12.065 15.531 59.733 111.467 6.26 8.81 9.18 4.20 4.89 5.75 5.87 9.20 0.51 0.50 9.26 4.95 9.47 6.71 9.78 2.49 2.72 6.53 3.56 5.17 5.87 6.62 7.25 7.89 9.49 8.06 9.84 2.82 6.09 6.70 7.40 6.56 5.24 6.19 5.32 0.54 0.51 0.57 7.93 1.37 0.11 0.11 3.07 0.28 47.31 40.64 35.74 34.47 43.20 45.40 11.06 11.61 45.62

-1.54

-1.18 33.30 36.98 22.06 24.18 23.43 10.52 13.89 12.82 11.84 10.09

-1.52

-1.82

-0.40

-0.70

-1.03

-0.44

-2.73

-0.91

-1.59

-1.55

-0.43

-0.56

-2.40 HUDSON RIVER 3.11 4.048 2.004 13.683 22.60 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-6 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 U1-NCD U1-SFDS 3

3 MH-5 3

40 30 20 10 5

50 I-2 HR-1 RW-1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 HUDSON RIVER ND ND ND 4.1 1.03 1.13 1.04 1.75 1.49 1.95 6.84 2.51 4.88 0.38 2.35 0.515 5.377 4.258 1.106 0.546 8.358 4.866 0.156 0.145 5.048 0.683 0.399 70.15 63.25 4.343 118.9 1.138 0.605 0.673 1.058 10.13 0.486 1.394 1.068 0.848 1.119 2.725 0.294 0.278 0.379 4.093 5.213 3.937 3.883 2.628 1.543 0.465 0.636 0.501 0.425 0.372 0.472 0.462 1.147 1.169 0.887 3.573 0.568 0.471 0.198 0.855 0.518 0.194 18.533 7.24 9.68 4.11 5.20 6.05 5.78 8.19 9.65 9.47 2.00 2.19 5.89 2.99 5.49 5.75 8.12 7.63 8.35 1.95 5.66 6.68 7.55 6.50 4.45 5.46 4.55 0.44 0.31 1.99 42.10 36.03 34.78 44.12 46.44 10.00 11.86 12.60 46.83

-2.38

-2.07

-0.86

-0.33 33.71 48.19 27.33 26.37 26.51 29.10 10.87 11.23 11.25 11.36 20.46 11.11 10.55 13.13 12.33 10.71 10.63 11.11

-0.25

-0.06

-0.08

-5.66

-3.28

-2.66

-1.33

-1.68

-2.15

-2.03

-1.13

-0.82

-2.86

-1.03

-1.87

-1.62

-0.68

-0.07

-2.42

-1.72

-3.41

-2.99

-1.43

-2.70 ND 5.94 2.98 5.52 9.519 2.088 25.13 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-6 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 U2-C1 HR-1 UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 40 30 20 10 5

50 ND ND ND 1.8 2.58 15.8 7.28 5.92 8.79 1.13 5.95 58.5 4.52 5.41 4.51 5.82 4.16 1.65 2.49 3.74 0.47 0.509 3.363 0.767 0.767 6.201 0.156 0.145 0.772 0.331 57.05 1.642 1.693 1.915 1.205 0.606 0.664 1.035 6.878 1.887 1.093 0.848 1.119 2.725 2.995 0.493 0.313 0.295 4.937 0.456 0.684 0.457 0.443 0.369 0.442 0.342 0.465 1.137 1.257 0.952 0.553 0.195 0.793 0.554 0.194 11.633 2.7675 158.625 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 35.07 34.43 39.64 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 49.99 21.08 22.37 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 HUDSON RIVER 2.46 6.19 0.982 1.127 21.51 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-6 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 U2-C1 HR-1 UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 40 30 20 10 5

50 17 ND ND ND ND ND ND ND 5.7 0.4 157 1.64 2.83 26.3 5.91 4.65 1.29 8.61 8.44 1.81 2.94 88.5 56.8 22.2 3.99 1.61 5.24 2.12 1.93 1.54 0.95 11.3 6.11 9.52 3.55 2.28 1.32 4.61 3.97 6.02 3.91 6.16 4.05 6.23 3.85 2.29 0.49 1.18 2.33 4.61 0.43 0.388 0.393 0.248 0.247 0.256 0.827 0.665 0.848 0.592 0.323 0.583 0.705 0.502 0.318 0.481 0.635 0.375 0.362 0.312 0.422 0.587 0.972 0.927 0.432 0.473 0.687 0.534 12 5.9 6.4 0.4 0.6 45.4 7.88 9.86

-0.8 4.26 6.55 8.63 8.12 8.77 7.22 9.74 9.59 3.46 3.52 7.13 4.16 5.82 6.45 7.67 7.75 7.52 7.97 9.36 6.22 6.58 6.39 4.83 6.19 4.82 0.34 1.97 0.42 0.67 0.09 0.61 0.34 1.32 35.71 34.55 40.81 42.71 10.06 13.21 12.78 45.99

-1.08

-0.04

-0.22 21.82 23.05 30.15 10.38 10.44 10.37 10.03 12.83

-0.37

-1.57

-1.83

-0.09

-0.56

-0.25

-0.03

-0.37

-0.96

-0.19

-0.14

-0.52

-0.44

-2.03

-1.61

-0.45

-1.67 HUDSON RIVER 1.76 2.88 8.14 1.22 22.18 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL 10 5

20 13 MH-4 MH-4A MH-5 MH-6 MH-2 CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-6 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 U2-C1 HR-1 UTILITY TUNNEL CSS CSS TRENCH MW-30 40 30 20 10 5

50 ND ND ND ND ND ND ND 4.63 5.89 56.8 22.2 3.99 5.47 1.59 0.91 11.3 6.11 4.61 7.24 4.37 0.59 1.03 2.25 0.38 0.398 1.725 3.209 1.331 0.338 7.907 0.248 0.247 9.025 2.305 0.253 2.935 108.9 2.165 2.083 1.963 0.925 0.671 3.953 2.663 0.848 1.323 4.187 0.215 0.329 0.727 5.817 3.033 5.963 3.143 2.515 0.705 0.502 0.318 0.484 0.522 0.385 0.369 0.283 0.445 0.802 0.895 1.098 4.965 0.456 0.472 0.694 0.521 29.775 16.433 10.203 153.882 12 5.9 6.4 0.4 0.6 45.4 7.88 9.86

-0.8 4.26 6.55 8.63 8.12 8.77 7.22 9.74 9.59 3.46 3.52 7.13 4.16 5.82 6.45 7.67 7.75 7.52 7.97 9.36 6.22 6.58 6.39 4.83 6.19 4.82 0.34 1.97 0.42 0.67 0.09 0.61 0.34 1.32 35.71 34.55 40.81 42.71 10.06 13.21 12.78 45.99

-1.08

-0.04

-0.22 21.82 23.05 30.15 10.38 10.44 10.37 10.03 12.83

-0.37

-1.57

-1.83

-0.09

-0.56

-0.25

-0.03

-0.37

-0.96

-0.19

-0.14

-0.52

-0.44

-2.03

-1.61

-0.45

-1.67 HUDSON RIVER 1.67 7.283 3.522 8.353 0.286 0.3995 22.18 Plant North N

N Plant North N

N Plant North N

N RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 0

0 0

1.89 1.57 0.09 0.15 0.95 0.16 1.15 1.13 0.21 0.14 1.62 1.57 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0.1 0.2 0.11 0.17 0.27 0.37 0.23 0.17 2.14 1.36 0.44 1.39 0.55 2.36 1.88 1.29 1.72 0.36 0.17 0.34 0.15 1.36 0.63 0.62 0.63 1.72 2.04 1.42 2.29 0.18 1.93 0.15 3.12 0

0 0

0 0

0 2.49 2.12 1.9 1.5 1.2 1.2 1.2 1.2 1.3 0.63 0

13.1 10.3 42.8 8.2 6.7 8.2 1.1 12.46

-0.5 0.8 0.3 1.7 0.8 0.7 1.0 1.1 0.3 0.6 5.1 21.1 2.2 7.1 6.0 5.3 9.8 2.9 9.6 9.4 8.6 0.7 0.7 0.9 1.1 0.4 7.1 7.2 8.0 6.0 9.1 10.0 21.0 5.5 5.4 5.5 1.3 7.4 7.5 35.6 34.5 22.3 1.4 1.0 21.8 1.2 28.2 1.1 0.9 1.1 28.5 39.6 41.6 0.9 1.0 0.7 0.3 0.9 8.9 3.7 9.6 6.9 9.9 8.1 8.5 6.0 9.9 9.5 1.4 5.2 8.9 5.7 6.6 9.6 0.6 0.5 11.8 0.9 12.8 44.1 10.1 0.1

-0.5

-0.6 0.3 0.0 0.1 Trans.

Concrete sidewalk Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Concrete sidewalk Conc. sidewalk Wooden walk Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL 10 5

20 13 ND ND ND ND ND ND 0.248 ND 4.61 2.25 0.467 0.819 9.75 4.86 34.2 0.754 11.3 0.502 264 9.1 10.8 5.40 4.32 11.2 11.3 297 302 11.9 107 44.8 119 34.9 17 30.1 276 26.8 24.0 3.51 15.4 4.32 55.2 3.57 11.3 0.76 1.85 13.1 9.04 12.5 3.08 13.2 40.6 4.06 5.76 1.25 0.297 1.89 2.08 0.282 0.679 0.761 0.849 0.278 0.183 0.7 0.208 0.78 9.61 0.369 0.508 0.888 0.856 0.55 0.462 0.76 1.28 0.541 0.313 0.538 0.339 0.392 1.65 1.05 1.86 0.393 1.11 10.5 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 42.5' 42.5' MH-4 MH-4A MH-5 MH-6 MH-2 CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-6 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 U2-C1 HR-1 2

3 4

UTILITY TUNNEL 5

6 CSS CSS TRENCH 40 30 20 10 5

50 HUDSON RIVER Plant North N

N Plant North N

N Q4 - 2007 Q1 - 2008 Q4 - 2008 Q1 - 2009 Q2 - 2009 Plant North N

N (DATA THROUGH 8/28/07)

(SEE HYDROGEOLOGIC SITE INVESTIGATION REPORT)

BOUNDING UNIT 2 ACTIVITY ISOPLETHS Q4 - 2009 Plant North N

N Plant North N

N ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete pier Rip-rap 30 30 40 50 30 40 50 70 60 70 80 90 60 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 I-2 HR-1 U3-3 RW-1 U3-C1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 HUDSON RIVER ND ND 0.26 3.32 2.82 2.07 1.67 1.99 3.27 0.69 0.42 5.69 5.87 5.93 2.86 0.499 7.928 47.65 1.686 1.893 4.531 0.218 0.115 0.301 0.373 0.993 0.361 38.24 9.008 1.703 1.315 0.842 0.901 1.288 7.153 12.59 1.769 9.488 1.608 0.879 0.807 3.208 0.471 6.073 2.405 1.415 0.425 0.675 0.481 0.394 0.277 0.281 0.246 0.449 1.036 1.138 0.711 1.383 3.195 0.568 0.306 0.256 0.907 0.394 0.301 0.302 29.148 12.005 70.248 25.663 132.625 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 4.12 7.437 2.112 1.312 2.335 4.173 28.256 21.51 Plant North N

N ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

I-2 HR-1 U3-3 U3-2 RW-1 U3-C1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 ND ND ND ND ND ND ND ND ND ND 137 3.39 1.51 2.03 45.9 6.48 2.27 2.07 27.7 7.01 2.03 0.53 3.69 3.913 20.36 1.446 1.073 12.86 15.56 0.516 2.845 0.464 8.437 2.314 1.482 2.756 1.897 5.188 8.753 8.557 1.373 5.172 1.436 0.769 1.355 5.818 5.648 5.333 4.975 3.255 2.643 0.882 0.474 0.412 0.404 0.426 0.961 1.164 0.404 0.499 0.956 0.291 0.516 0.5585 0.8588 0.6305 0.8992 13.428 21.133 0.7585 0.5238 0.4897 0.9928 0.6033 0.5353 113.333 0.53367 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 3.6 8.986 1.131 4.075 1.3145 67.085 11.30083 21.51 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

I-2 HR-1 U3-3 U3-2 RW-1 U3-C1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 ND ND ND ND ND ND ND ND ND ND 123 0.68 1.51 3.12 11.1 6.36 27.7 7.01 4.56 3.799 1.432 0.881 18.22 0.516 2.845 6.293 7.943 107.7 3.682 1.644 3.858 2.698 4.608 2.095 7.653 2.477 1.767 5.994 1.462 1.192 2.456 5.355 5.775 5.035 3.838 3.273 0.882 0.474 0.636 0.447 0.374 0.527 0.426 1.005 0.591 1.351 0.404 0.499 0.291 0.516 15.906 11.656 3.4425 0.6305 1.5208 15.938 21.133 2.7475 1.2088 0.5376 0.5067 0.9735 3.6775 0.5457 0.54033 1.07275 0.58667 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 5.827 1.345 5.366 0.645 5.103 84.525 13.38077 21.51 Plant North N

N Plant North N

N HUDSON RIVER I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

7 ND ND ND ND ND ND ND ND ND ND 1.51 7.81 15.7 1.85 27.7 7.01 4.32 3.995 1.413 10.16 0.516 3.665 0.784 2.845 2.761 6.293 7.124 4.768 1.808 4.806 2.233 3.675 4.365 5.567 2.443 6.616 1.688 1.192 2.456 5.013 5.603 4.673 4.378 3.905 3.515 0.882 0.474 0.636 2.007 0.447 0.374 0.426 1.057 1.073 1.718 3.685 0.407 0.499 1.035 0.568 0.291 0.516 0.5115 14.658 0.5523 0.8153 14.868 104.82 19.252 21.133 0.5624 0.5413 0.5775 0.5455 103.125 0.46733 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 6.305 1.146 5.503 74.52 1.047 2.095 13.104 5.9425 21.51

© 2015 - GZA GeoEnvironmental, Inc. J:\\17,000-18,999\\17869\\17869-91.MG\\Figures\\GIS\\MXD Documents\\Q3_2014\\15-03-16 F06A Q3 2014 Temporal Trends in Unit 2 Rolling Average Tritium Activity Maps 17869-93_FINAL.mxd, 3/20/2015, 11:22:48 AM, elaine.donohue 0

100 200 300 50 Scale in Feet Figure No.:

Job No.:

Dwg. Date:

Proj. Mgr.: MJB Designed By: MJB Reviewed By: MJB Operator: EDC 01.0017869.92 6A INDIAN POINT ENERGY CENTER BUCHANAN, NEW YORK TEMPORAL TRENDS IN UNIT 2 ROLLING AVERAGE TRITIUM ACTIVITY MAPS 03-20-2015 GZA GeoEnvironmental, Inc.

249 Vanderbilt Avenue Norwood, MA 02062 Phone: (781) 278-3700 Fax: (781) 278-5701 I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 7.05 9.45 9.77 4.55 5.16 6.14 6.02 8.44 0.10 0.29 9.02 7.88 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 8.30 9.02 9.92 2.34 7.06 6.46 7.19 7.20 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64

-1.30 32.72 21.90 21.08 22.37 29.05 10.48 10.60 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND 34 12 12 ND ND ND ND 3.7 4.5 0.7 9.62 35.3 49.5 1.36 0.42 11.5 18.2 3.48 1.76 5.08 19.5 3.64 6.31 76.2 8.56 6.58 6.52 6.22 13.4 4.14 2.37 7.22 1.55 4.96 6.83 1.89 1.89 5.23 5.23 3.99 4.68 5.78 5.18 4.53 1.01 1.65 0.96 2.67 2.77 1.04 0.686 0.323 0.819 0.515 0.963 0.787 0.953 0.298 0.539 0.435 0.993 0.578 0.512 0.523 1.1 6.84 1.81 16.2 7.93 2.32 0.701 I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 7.05 9.45 9.77 4.55 5.16 6.14 6.02 8.44 0.10 0.29 9.02 7.88 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 8.30 9.02 9.92 2.34 7.06 6.46 7.19 7.20 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64

-1.30 32.72 21.90 21.08 22.37 29.05 10.48 10.60 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND 12 12 ND ND ND ND 3.9 9.93 49.5 1.31 0.42 11.9 25.2 1.85 20.5 6.31 6.87 7.13 4.96 4.42 1.65 0.73 2.85 2.18 0.686 35.77 0.323 18.84 3.075 0.836 5.196 0.515 3.635 73.96 8.913 4.433 7.398 6.638 10.72 4.573 3.133 1.447 1.018 6.513 1.833 1.566 5.348 3.778 5.385 6.115 5.338 4.428 1.129 1.187 0.388 0.435 1.023 1.097 0.8193 0.8067 0.7303 0.8895 0.5633 0.5327 0.5203 5.28 1.44 9.44 7.883 2.315 0.6424 0.8233 I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 7.05 9.45 9.77 4.55 5.16 6.14 6.02 8.44 0.10 0.29 9.02 7.88 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 8.30 9.02 9.92 2.34 7.06 6.46 7.19 7.20 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64

-1.30 32.72 21.90 21.08 22.37 29.05 10.48 10.60 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND ND ND 1.2 1.4 8.97 73.3 4.65 6.25 5.02 4.74 3.32 5.01 0.73 2.88 0.812 6.507 25.13 23.68 1.227 0.323 0.301 11.58 22.29 0.439 2.615 0.684 1.698 3.566 14.37 0.673 1.775 6.288 8.575 5.058 6.775 7.555 7.018 8.408 4.045 1.705 1.266 6.138 1.653 1.213 3.533 5.045 3.745 3.968 6.193 5.273 4.143 1.436 1.038 0.435 0.839 1.015 1.623 1.114 0.8067 0.7765 0.4483 0.5938 0.5113 0.5045 4.756 1.264 10.33 7.668 2.315 0.5894 0.6763 I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND ND ND ND ND 1.7 1.2 3.3 2.9 3.8 5.21 16.3 17.6 1.12 10.6 26.6 2.27 8.97 3.49 1.78 6.05 67.8 7.74 5.53 6.59 7.82 7.43 4.25 4.12 5.57 1.36 1.36 5.02 4.74 3.32 5.52 1.65 1.21 4.43 4.51 2.88 3.91 5.76 5.34 1.55 1.67 0.73 2.99 1.36 1.17 0.673 0.439 0.688 0.831 0.799 0.946 0.623 0.827 0.496 0.865 0.999 0.567 0.512 0.592 21.51 2.86 1.07 8.93 7.18 1.09 0.579 0.747 I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND 20 ND ND ND ND ND ND ND ND ND ND ND ND ND ND 1.2 7.7 5.1 0.5 3.54 12.3 1.13 9.21 23.4 1.86 1.52 8.97 1.89 3.49 3.53 5.53 64.4 6.65 5.69 6.13 7.38 4.04 4.54 5.25 1.31 1.31 5.02 4.74 3.32 4.72 1.44 1.18 3.87 2.24 4.02 2.26 3.71 5.11 1.17 3.48 1.69 1.74 0.88 1.03 0.59 2.97 1.17 1.13 0.439 0.831 0.847 0.714 0.482 0.493 0.538 21.51 ND 2.39 1.03 5.87 1.21 6.69 0.916 Plant North N

N Plant North N

N Plant North N

N HUDSON RIVER HUDSON RIVER HUDSON RIVER HUDSON RIVER Plant North N

N Plant North N

N Plant North N

N Plant North N

N HUDSON RIVER HUDSON RIVER HUDSON RIVER Q1 - 2013 Q2 - 2013 Q3 - 2013 Q4 - 2013 Q1 - 2010 Q4 - 2010 Q1 - 2011 Q3 - 2011 Q4 - 2011 Q1 - 2012 Q4 - 2012 I-2 U3-3 U3-2 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 80 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Tank Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel Overhead FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A B5 B7 CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-27 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UNIT 3 ALL EY WAY UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 9

10 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND ND ND ND ND ND ND 3.4 1.6 18.4 2.33 7.14 4.77 5.19 7.08 3.42 2.78 2.71 1.37 1.88 1.13 3.14 0.56 0.629 87.52 29.55 0.863 14.17 232.2 1.395 9.435 7.955 3.683 10.41 4.287 8.628 115.1 5.148 5.548 5.748 7.535 4.636 4.864 6.198 1.482 2.164 3.943 2.095 1.155 3.624 2.424 3.372 2.806 3.083 4.088 4.305 0.985 3.013 1.895 0.906 1.014 1.031 0.9638 0.6998 0.4667 0.7483 0.5488 21.51 1.29 3.533 4.067 8.755 7.033 5.703 3.115 Data Notes:

1. Quarterly Tritium isopleths and activity values are yearly rolling arithmetic averages of the current and preceding three quarters' data. Only values greater than the MDC are used in this average, thus adding a degree of conservatism to the subsequent dose computations.
2. Illustration of contaminant plume is a schematic representation only. In reality, the geologic bedrock formation is over 99% solid, crystalline rock, with the contaminated water contained only in the remaining (less than 1%) interstitial space (i.e. fractures).
3. Foundation drain sampling locations, for which investigation levels are not applicable.
4. Historically elevated Tritium levels in MW-42-49 observed during Q1 2009 were consistent with leakage visually identified on 03/07/2009 (and terminated immediately thereafter) from the waste distillate tank valves located within the Unit 1 fuel storage building. Data trends through Q1 2010 indicate that the observed Tritium peaks in MW-42-49 and downgradient wells associated with this release have dissipated through the groundwater flow system.
5. Elevated levels of Tritium detected in MH-9 and MH-10a during routine 80-10 Effluents Program sampling on 1/15/2010 appears to have originated from a Q4 2009 transient leak in temporary RWST / R.O. skid connection hoses, which flowed into MH-9. It also appears that this release entered the well vault for MW-32, and may have penetrated the well casings and entered the subsurface around the monitoring installation.
6. Please refer to Figure 6 for the drawn Unit 1 Tritium plume isopleths. The likely causation of the Q2 2011 Tritium increases in multiple Unit 1 monitoring installations was a transient Sample Sink Overflow and subsequent floor flooding in a Unit 1 Chemical Systems Building sample room on the 53 elevation.
7. Elevated levels of Tritium initially detected in U1-CSS, MW-39, MW-46, MW-54, MW-56 and MW-57 during the Q2-2011 sampling event appear to have originated from a Q2 2011 Sample Sink Overflow and subsequent floor flooding in a Unit 1 Chemical Systems Building sample room on the 53 elevation.
8. Elevated levels of Tritium initially detected in MW-31 during the Q2 2012 sampling event appear to have originated from a leak in an existing Unit 2 Maintenance Outage Building (MOB) drain line. This double contained, stainless steel line was used to service the R.O. skid at its new location in the MOB during the 2012 Unit 2 refueling outage.
9. Elevated levels of Tritium initially detected in MW-42-49, MW-53-82 and U1-CSS during the Q4 2013 sampling event appear to have originated from an overflow of the Unit 1 Containment Spray Annulus (CSA).
10. Elevated levels of Tritium initially detected in Q2 2014 supplemental samples from MW-31 and MW-32. Release originated from transient flooding of the Unit 2 Fan Building 51 floor during 2014 refueling outage discharge of RCS drain down to a partially obstructed floor drain.

General Notes:

1. Base map was developed from an untitled electronic file provided by Badey and Watson Surveying and Engineering, P.C., Dated 2/3/06; CAD file name:

"GZA.dwg".

Probable Legacy Release SSCs Unit 2 Fuel Pool (All identified leaks repaired as of December 2007)

Unit 1 West Fuel Pool (All U1-SFPs drained and inactive as of October 2008)

Terminated Connection To Storm Drain Drain Exfiltration Inter-Structure Joint / Mud Mat Containment Spray Sump Trench Depth-Specific Data Screened in Soil Screened in Bedrock Depth Multiple Screened Intervals 11.3 11.9 12.6 12.8 255.0 56.0 42.3 1.2 Average activity of H3 (pCi/L x1000) for each screened Interval.

Groundwater elevation for each screened interval at time of low river tide for Q4 2008 (11/11/2008).

1 1

Notes:

1. Groundwater contours drawn from Q4 2008 groundwater data to show groundwater conditions used for recalibration of the Precipitation Mass Balance Model (see Q2 2009 LTM Report). These contours developed from limited data recorded on 11/11/2008. Actual elevations may vary from conditions shown and the actual distribution of piezometric heads is likely more complex than indicated.

Vadose Zone Contaminant Transport Groundwater Elevation Contours 20 Ambient "Watertable" Contours for Q4 2008 (11/11/2008) 1 1

Contours Other Than 10' Interval 5

I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 80 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Tank Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A B5 B7 CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 9

0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND 1.04 1.86 3.49 5.78 4.77 1.37 5.02 4.74 3.32 0.52 1.29 1.44 4.22 2.78 2.71 1.82 2.718 21.98 16.13 8.558 21.41 0.439 1.563 10.24 1.155 1.886 0.831 2.967 5.145 58.08 5.743 5.815 7.543 7.178 4.125 4.393 1.223 4.343 3.495 1.863 3.558 2.093 3.398 4.725 0.985 1.255 3.133 1.758 1.059 0.693 2.905 0.506 1.024 0.547 0.8285 0.5513 0.4667 0.8733 0.9715 21.51 ND 6.07 2.603 2.546 8.653 1.326 6.403 Plant North N

N HUDSON RIVER Q2 - 2014 LEGEND Standby Radionuclide Monitoring Installation Longterm Radionuclide Monitoring Installation MW-30 Boring / Monitoring Installation Designation Footing Drain Active Storm Drain Catch Basin Abandoned Storm Drain Plant North N

N HUDSON RIVER Q1 - 2014 I-2 U3-3 U3-2 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 80 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Tank Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Asphalt Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel Overhead FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A B5 B7 CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-27 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UNIT 3 ALL EY WAY UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 9

10 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND ND ND ND ND 3.4 0.8 2.33 5.66 4.77 5.19 7.08 3.42 2.88 3.53 2.78 2.71 1.66 25.85 93.52 84.85 0.332 15.35 305.2 1.149 9.435 7.955 7.537 8.766 5.057 4.287 11.93 266.8 5.025 5.313 7.175 6.783 4.787 6.191 6.744 1.934 2.121 3.985 2.627 1.155 3.802 3.376 2.753 3.923 3.936 0.985 2.458 1.829 1.911 1.045 1.063 2.868 1.923 0.575 1.069 0.6515 0.7684 0.8706 0.4215 0.8812 0.7584 0.4945 21.51 6.32 1.27 5.397 6.715 7.033 5.341 3.365 Plant North N

N HUDSON RIVER Q3 - 2014 H3 data x1,000 pCi/L Activity Data1,2 Note: Illustration of contaminant plume is a schematic representation only. In reality, the geologic bedrock formation is over 99% solid, crystalline rock, with the contaminated water contained only in the remaining (less than 1%) interstitial space (i.e. fractures).

5,000 - 10,000 10,000 - 50,000 50,000 - 100,000 100,000 - 250,000

>250,000 No Depth-Specific Samples Bar Graphs; Average H3, pCi/L Not Detected (ND)

ND - 1,000 1,000 - 5,000 5,000 - 10,000 10,000 - 50,000 50,000 - 100,000

> 200,000 100,000 - 200,000 Isopleths; Average H3, pCi/L ND 0.56 2.8 6.25 32.2 65 155 260 Localized Transient Releases Transient Spill from Temporary R.O. Skid Piping -

Entered MW-32 Vault and MH 11/21/2009 5

Sample Sink Overflow - Unit 1 Chemical Systems Building - Q2 2011 7

Transient Distillate Tank Valve Leak in Unit 1 Fuel Storage Building - 3/07/2009 4

Unit 1 Containment Spray Annulus (CSA) Overflow 9

Unit 2 MOB Drain Leak - Q2 2012 8

Unit 2 Fan Building 51 Floor Drain Overfill 10

ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete pier Rip-rap 30 30 40 50 30 40 50 70 60 70 80 90 60 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 HUDSON RIVER I-2 HR-1 U3-3 RW-1 U3-C1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 39 ND ND ND 3.55 0.26 2.82 2.07 1.31 3.27 0.42 0.47 5.99 5.65 0.41 3.52 0.26 0.94 0.559 5.479 1.606 1.708 0.218 0.301 0.373 3.215 0.832 0.361 23.55 9.595 1.782 1.682 1.352 0.898 0.914 1.292 6.445 2.138 9.545 1.792 0.879 0.807 3.438 0.737 6.212 6.188 2.948 2.468 1.545 0.587 0.476 0.414 0.242 0.225 0.204 0.438 0.977 1.025 0.658 1.234 0.558 0.334 0.436 0.301 0.302 23.797 13.162 52.846 41.225 12.385 126.125 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 8.42 1.44 2.939 28.81 2.335 2.536 3.915 21.51 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete pier 30 30 40 50 30 40 50 70 60 70 80 90 60 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 4

4 1

1 1

1 1

1 1

1 3

50 4030 20 10 5

1 1

1 1

1 1

I-2 HR-1 U3-3 RW-1 U3-C1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 ND 45.2 8.62 0.83 3.61 33.2 1.46 1.78 1.72 6.63 1.58 1.19 1.52 4.22 5.14 0.69 2.98 1.02 0.425 1.969 1.024 8.394 0.147 0.492 0.115 0.143 0.229 0.519 0.911 0.593 3.095 6.499 1.335 0.732 0.795 1.393 7.218 1.387 2.598 3.038 0.559 0.235 0.418 4.815 4.663 4.455 3.188 2.473 1.515 0.545 0.475 0.439 0.325 0.333 0.316 0.421 1.006 1.158 0.869 1.865 0.525 0.324 0.246 0.435 0.173 0.351 29.225 34.913 29.267 10.265 113.743 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 HUDSON RIVER 5.19 4.113 0.884 1.605 3.195 2.634 19.516 21.51 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 60 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Unit 2 Condensate Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6A CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-24 CB-6 CB-5A (CB-6)

CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 4

1 1

1 1

1 1

1 50 40 30 20 101 5

I-2 HR-1 U3-3 RW-1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 ND ND 8.16 34.4 1.46 0.74 10.5 1.19 1.52 4.22 0.36 3.26 0.23 1.109 0.427 7.306 2.107 0.748 0.307 0.147 0.492 0.115 0.143 0.229 0.519 3.853 0.666 0.593 30.75 2.587 6.107 1.745 1.813 1.318 0.651 1.355 7.423 1.281 6.405 2.188 1.288 2.948 0.519 0.248 0.452 4.808 4.595 4.508 4.658 3.258 2.485 1.515 0.553 0.651 0.474 0.399 0.328 0.356 0.394 1.003 1.128 0.807 1.958 0.507 0.341 1.002 0.444 0.184 0.351 19.929 17.115 107.033 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 HUDSON RIVER 3.278 3.195 1.914 5.246 15.784 21.388 21.51 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete pier 30 30 40 50 30 40 50 70 60 70 80 90 60 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 4

3 40 30 20 10 5

50 I-2 HR-1 U3-3 RW-1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 4

ND ND 1.2 7.1 0.45 51.2 1.46 1.43 1.15 11.3 1.16 3.75 2.69 0.39 4.16 0.67 3.65 0.55 0.455 7.709 3.175 1.057 0.369 7.938 0.147 0.492 0.115 0.143 0.229 0.519 4.623 0.552 2.232 5.421 4.867 1.815 1.213 0.604 0.654 9.113 0.489 1.761 1.091 1.515 0.327 0.263 5.145 4.033 5.005 3.433 2.453 1.395 0.533 0.528 0.438 0.387 0.464 0.399 0.446 1.097 1.172 0.816 2.258 0.404 0.198 0.921 0.514 0.194 0.499 23.571 12.065 15.531 59.733 111.467 6.26 8.81 9.18 4.20 4.89 5.75 5.87 9.20 0.51 0.50 9.26 4.95 9.47 6.71 9.78 2.49 2.72 6.53 3.56 5.17 5.87 6.62 7.25 7.89 9.49 8.06 9.84 2.82 6.09 6.70 7.40 6.56 5.24 6.19 5.32 0.54 0.51 0.57 7.93 1.37 0.11 0.11 3.07 0.28 47.31 40.64 35.74 34.47 43.20 45.40 11.06 11.61 45.62

-1.54

-1.18 33.30 36.98 22.06 24.18 23.43 10.52 13.89 12.82 11.84 10.09

-1.52

-1.82

-0.40

-0.70

-1.03

-0.44

-2.73

-0.91

-1.59

-1.55

-0.43

-0.56

-2.40 HUDSON RIVER 3.11 4.048 2.004 13.683 22.60 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-6 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 U1-NCD U1-SFDS 3

3 MH-5 3

40 30 20 10 5

50 I-2 HR-1 RW-1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 HUDSON RIVER ND ND ND 4.1 1.03 1.13 1.04 1.75 1.49 1.95 6.84 2.51 4.88 0.38 2.35 0.515 5.377 4.258 1.106 0.546 8.358 4.866 0.156 0.145 5.048 0.683 0.399 70.15 63.25 4.343 118.9 1.138 0.605 0.673 1.058 10.13 0.486 1.394 1.068 0.848 1.119 2.725 0.294 0.278 0.379 4.093 5.213 3.937 3.883 2.628 1.543 0.465 0.636 0.501 0.425 0.372 0.472 0.462 1.147 1.169 0.887 3.573 0.568 0.471 0.198 0.855 0.518 0.194 18.533 7.24 9.68 4.11 5.20 6.05 5.78 8.19 9.65 9.47 2.00 2.19 5.89 2.99 5.49 5.75 8.12 7.63 8.35 1.95 5.66 6.68 7.55 6.50 4.45 5.46 4.55 0.44 0.31 1.99 42.10 36.03 34.78 44.12 46.44 10.00 11.86 12.60 46.83

-2.38

-2.07

-0.86

-0.33 33.71 48.19 27.33 26.37 26.51 29.10 10.87 11.23 11.25 11.36 20.46 11.11 10.55 13.13 12.33 10.71 10.63 11.11

-0.25

-0.06

-0.08

-5.66

-3.28

-2.66

-1.33

-1.68

-2.15

-2.03

-1.13

-0.82

-2.86

-1.03

-1.87

-1.62

-0.68

-0.07

-2.42

-1.72

-3.41

-2.99

-1.43

-2.70 ND 5.94 2.98 5.52 9.519 2.088 25.13 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-6 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 U2-C1 HR-1 UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 40 30 20 10 5

50 ND ND ND 1.8 2.58 15.8 7.28 5.92 8.79 1.13 5.95 58.5 4.52 5.41 4.51 5.82 4.16 1.65 2.49 3.74 0.47 0.509 3.363 0.767 0.767 6.201 0.156 0.145 0.772 0.331 57.05 1.642 1.693 1.915 1.205 0.606 0.664 1.035 6.878 1.887 1.093 0.848 1.119 2.725 2.995 0.493 0.313 0.295 4.937 0.456 0.684 0.457 0.443 0.369 0.442 0.342 0.465 1.137 1.257 0.952 0.553 0.195 0.793 0.554 0.194 11.633 2.7675 158.625 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 35.07 34.43 39.64 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 49.99 21.08 22.37 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 HUDSON RIVER 2.46 6.19 0.982 1.127 21.51 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-6 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 U2-C1 HR-1 UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 40 30 20 10 5

50 17 ND ND ND ND ND ND ND 5.7 0.4 157 1.64 2.83 26.3 5.91 4.65 1.29 8.61 8.44 1.81 2.94 88.5 56.8 22.2 3.99 1.61 5.24 2.12 1.93 1.54 0.95 11.3 6.11 9.52 3.55 2.28 1.32 4.61 3.97 6.02 3.91 6.16 4.05 6.23 3.85 2.29 0.49 1.18 2.33 4.61 0.43 0.388 0.393 0.248 0.247 0.256 0.827 0.665 0.848 0.592 0.323 0.583 0.705 0.502 0.318 0.481 0.635 0.375 0.362 0.312 0.422 0.587 0.972 0.927 0.432 0.473 0.687 0.534 12 5.9 6.4 0.4 0.6 45.4 7.88 9.86

-0.8 4.26 6.55 8.63 8.12 8.77 7.22 9.74 9.59 3.46 3.52 7.13 4.16 5.82 6.45 7.67 7.75 7.52 7.97 9.36 6.22 6.58 6.39 4.83 6.19 4.82 0.34 1.97 0.42 0.67 0.09 0.61 0.34 1.32 35.71 34.55 40.81 42.71 10.06 13.21 12.78 45.99

-1.08

-0.04

-0.22 21.82 23.05 30.15 10.38 10.44 10.37 10.03 12.83

-0.37

-1.57

-1.83

-0.09

-0.56

-0.25

-0.03

-0.37

-0.96

-0.19

-0.14

-0.52

-0.44

-2.03

-1.61

-0.45

-1.67 HUDSON RIVER 1.76 2.88 8.14 1.22 22.18 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL 10 5

20 13 MH-4 MH-4A MH-5 MH-6 MH-2 CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-6 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 U2-C1 HR-1 UTILITY TUNNEL CSS CSS TRENCH MW-30 40 30 20 10 5

50 ND ND ND ND ND ND ND 4.63 5.89 56.8 22.2 3.99 5.47 1.59 0.91 11.3 6.11 4.61 7.24 4.37 0.59 1.03 2.25 0.38 0.398 1.725 3.209 1.331 0.338 7.907 0.248 0.247 9.025 2.305 0.253 2.935 108.9 2.165 2.083 1.963 0.925 0.671 3.953 2.663 0.848 1.323 4.187 0.215 0.329 0.727 5.817 3.033 5.963 3.143 2.515 0.705 0.502 0.318 0.484 0.522 0.385 0.369 0.283 0.445 0.802 0.895 1.098 4.965 0.456 0.472 0.694 0.521 29.775 16.433 10.203 153.882 12 5.9 6.4 0.4 0.6 45.4 7.88 9.86

-0.8 4.26 6.55 8.63 8.12 8.77 7.22 9.74 9.59 3.46 3.52 7.13 4.16 5.82 6.45 7.67 7.75 7.52 7.97 9.36 6.22 6.58 6.39 4.83 6.19 4.82 0.34 1.97 0.42 0.67 0.09 0.61 0.34 1.32 35.71 34.55 40.81 42.71 10.06 13.21 12.78 45.99

-1.08

-0.04

-0.22 21.82 23.05 30.15 10.38 10.44 10.37 10.03 12.83

-0.37

-1.57

-1.83

-0.09

-0.56

-0.25

-0.03

-0.37

-0.96

-0.19

-0.14

-0.52

-0.44

-2.03

-1.61

-0.45

-1.67 HUDSON RIVER 1.67 7.283 3.522 8.353 0.286 0.3995 22.18 Plant North N

N Plant North N

N Plant North N

N RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 0

0 0

1.89 1.57 0.09 0.15 0.95 0.16 1.15 1.13 0.21 0.14 1.62 1.57 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0.1 0.2 0.11 0.17 0.27 0.37 0.23 0.17 2.14 1.36 0.44 1.39 0.55 2.36 1.88 1.29 1.72 0.36 0.17 0.34 0.15 1.36 0.63 0.62 0.63 1.72 2.04 1.42 2.29 0.18 1.93 0.15 3.12 0

0 0

0 0

0 2.49 2.12 1.9 1.5 1.2 1.2 1.2 1.2 1.3 0.63 0

13.1 10.3 42.8 8.2 6.7 8.2 1.1 12.46

-0.5 0.8 0.3 1.7 0.8 0.7 1.0 1.1 0.3 0.6 5.1 21.1 2.2 7.1 6.0 5.3 9.8 2.9 9.6 9.4 8.6 0.7 0.7 0.9 1.1 0.4 7.1 7.2 8.0 6.0 9.1 10.0 21.0 5.5 5.4 5.5 1.3 7.4 7.5 35.6 34.5 22.3 1.4 1.0 21.8 1.2 28.2 1.1 0.9 1.1 28.5 39.6 41.6 0.9 1.0 0.7 0.3 0.9 8.9 3.7 9.6 6.9 9.9 8.1 8.5 6.0 9.9 9.5 1.4 5.2 8.9 5.7 6.6 9.6 0.6 0.5 11.8 0.9 12.8 44.1 10.1 0.1

-0.5

-0.6 0.3 0.0 0.1 Trans.

Concrete sidewalk Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Concrete sidewalk Conc. sidewalk Wooden walk Open grate Tank drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall 30 30 40 50 30 40 50 70 60 70 80 90 Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Vent pit Mach.

stand Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL 10 5

20 13 ND ND ND ND ND ND 0.248 ND 4.61 2.25 0.467 0.819 9.75 4.86 34.2 0.754 11.3 0.502 264 9.1 10.8 5.40 4.32 11.2 11.3 297 302 11.9 107 44.8 119 34.9 17 30.1 276 26.8 24.0 3.51 15.4 4.32 55.2 3.57 11.3 0.76 1.85 13.1 9.04 12.5 3.08 13.2 40.6 4.06 5.76 1.25 0.297 1.89 2.08 0.282 0.679 0.761 0.849 0.278 0.183 0.7 0.208 0.78 9.61 0.369 0.508 0.888 0.856 0.55 0.462 0.76 1.28 0.541 0.313 0.538 0.339 0.392 1.65 1.05 1.86 0.393 1.11 10.5 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 42.5' 42.5' MH-4 MH-4A MH-5 MH-6 MH-2 CB-33 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 CB-6 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 U2-C1 HR-1 2

3 4

UTILITY TUNNEL 5

6 CSS CSS TRENCH 40 30 20 10 5

50 HUDSON RIVER Plant North N

N Plant North N

N Q4 - 2007 Q1 - 2008 Q4 - 2008 Q1 - 2009 Q2 - 2009 Plant North N

N (DATA THROUGH 8/28/07)

(SEE HYDROGEOLOGIC SITE INVESTIGATION REPORT)

BOUNDING UNIT 2 ACTIVITY ISOPLETHS Q4 - 2009 Plant North N

N Plant North N

N ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete pier Rip-rap 30 30 40 50 30 40 50 70 60 70 80 90 60 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 I-2 HR-1 U3-3 RW-1 U3-C1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 HUDSON RIVER ND ND 0.26 3.32 2.82 2.07 1.67 1.99 3.27 0.69 0.42 5.69 5.87 5.93 2.86 0.499 7.928 47.65 1.686 1.893 4.531 0.218 0.115 0.301 0.373 0.993 0.361 38.24 9.008 1.703 1.315 0.842 0.901 1.288 7.153 12.59 1.769 9.488 1.608 0.879 0.807 3.208 0.471 6.073 2.405 1.415 0.425 0.675 0.481 0.394 0.277 0.281 0.246 0.449 1.036 1.138 0.711 1.383 3.195 0.568 0.306 0.256 0.907 0.394 0.301 0.302 29.148 12.005 70.248 25.663 132.625 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 4.12 7.437 2.112 1.312 2.335 4.173 28.256 21.51 Plant North N

N ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

I-2 HR-1 U3-3 U3-2 RW-1 U3-C1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 ND ND ND ND ND ND ND ND ND ND 137 3.39 1.51 2.03 45.9 6.48 2.27 2.07 27.7 7.01 2.03 0.53 3.69 3.913 20.36 1.446 1.073 12.86 15.56 0.516 2.845 0.464 8.437 2.314 1.482 2.756 1.897 5.188 8.753 8.557 1.373 5.172 1.436 0.769 1.355 5.818 5.648 5.333 4.975 3.255 2.643 0.882 0.474 0.412 0.404 0.426 0.961 1.164 0.404 0.499 0.956 0.291 0.516 0.5585 0.8588 0.6305 0.8992 13.428 21.133 0.7585 0.5238 0.4897 0.9928 0.6033 0.5353 113.333 0.53367 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 3.6 8.986 1.131 4.075 1.3145 67.085 11.30083 21.51 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

I-2 HR-1 U3-3 U3-2 RW-1 U3-C1 U2-C1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-58 MW-57 MW-56 MW-55 MW-54 MW-53 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-109 MW-108 ND ND ND ND ND ND ND ND ND ND 123 0.68 1.51 3.12 11.1 6.36 27.7 7.01 4.56 3.799 1.432 0.881 18.22 0.516 2.845 6.293 7.943 107.7 3.682 1.644 3.858 2.698 4.608 2.095 7.653 2.477 1.767 5.994 1.462 1.192 2.456 5.355 5.775 5.035 3.838 3.273 0.882 0.474 0.636 0.447 0.374 0.527 0.426 1.005 0.591 1.351 0.404 0.499 0.291 0.516 15.906 11.656 3.4425 0.6305 1.5208 15.938 21.133 2.7475 1.2088 0.5376 0.5067 0.9735 3.6775 0.5457 0.54033 1.07275 0.58667 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 5.827 1.345 5.366 0.645 5.103 84.525 13.38077 21.51 Plant North N

N Plant North N

N HUDSON RIVER I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

7 ND ND ND ND ND ND ND ND ND ND 1.51 7.81 15.7 1.85 27.7 7.01 4.32 3.995 1.413 10.16 0.516 3.665 0.784 2.845 2.761 6.293 7.124 4.768 1.808 4.806 2.233 3.675 4.365 5.567 2.443 6.616 1.688 1.192 2.456 5.013 5.603 4.673 4.378 3.905 3.515 0.882 0.474 0.636 2.007 0.447 0.374 0.426 1.057 1.073 1.718 3.685 0.407 0.499 1.035 0.568 0.291 0.516 0.5115 14.658 0.5523 0.8153 14.868 104.82 19.252 21.133 0.5624 0.5413 0.5775 0.5455 103.125 0.46733 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-0.91

-2.03 6.305 1.146 5.503 74.52 1.047 2.095 13.104 5.9425 21.51

© 2015 - GZA GeoEnvironmental, Inc. J:\\17,000-18,999\\17869\\17869-91.MG\\Figures\\GIS\\MXD Documents\\Q3_2014\\15-03-16 F06A Q3 2014 Temporal Trends in Unit 2 Rolling Average Tritium Activity Maps 17869-93_FINAL.mxd, 3/20/2015, 11:22:48 AM, elaine.donohue 0

100 200 300 50 Scale in Feet Figure No.:

Job No.:

Dwg. Date:

Proj. Mgr.: MJB Designed By: MJB Reviewed By: MJB Operator: EDC 01.0017869.92 6A INDIAN POINT ENERGY CENTER BUCHANAN, NEW YORK TEMPORAL TRENDS IN UNIT 2 ROLLING AVERAGE TRITIUM ACTIVITY MAPS 03-20-2015 GZA GeoEnvironmental, Inc.

249 Vanderbilt Avenue Norwood, MA 02062 Phone: (781) 278-3700 Fax: (781) 278-5701 I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 7.05 9.45 9.77 4.55 5.16 6.14 6.02 8.44 0.10 0.29 9.02 7.88 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 8.30 9.02 9.92 2.34 7.06 6.46 7.19 7.20 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64

-1.30 32.72 21.90 21.08 22.37 29.05 10.48 10.60 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND 34 12 12 ND ND ND ND 3.7 4.5 0.7 9.62 35.3 49.5 1.36 0.42 11.5 18.2 3.48 1.76 5.08 19.5 3.64 6.31 76.2 8.56 6.58 6.52 6.22 13.4 4.14 2.37 7.22 1.55 4.96 6.83 1.89 1.89 5.23 5.23 3.99 4.68 5.78 5.18 4.53 1.01 1.65 0.96 2.67 2.77 1.04 0.686 0.323 0.819 0.515 0.963 0.787 0.953 0.298 0.539 0.435 0.993 0.578 0.512 0.523 1.1 6.84 1.81 16.2 7.93 2.32 0.701 I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 7.05 9.45 9.77 4.55 5.16 6.14 6.02 8.44 0.10 0.29 9.02 7.88 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 8.30 9.02 9.92 2.34 7.06 6.46 7.19 7.20 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64

-1.30 32.72 21.90 21.08 22.37 29.05 10.48 10.60 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND 12 12 ND ND ND ND 3.9 9.93 49.5 1.31 0.42 11.9 25.2 1.85 20.5 6.31 6.87 7.13 4.96 4.42 1.65 0.73 2.85 2.18 0.686 35.77 0.323 18.84 3.075 0.836 5.196 0.515 3.635 73.96 8.913 4.433 7.398 6.638 10.72 4.573 3.133 1.447 1.018 6.513 1.833 1.566 5.348 3.778 5.385 6.115 5.338 4.428 1.129 1.187 0.388 0.435 1.023 1.097 0.8193 0.8067 0.7303 0.8895 0.5633 0.5327 0.5203 5.28 1.44 9.44 7.883 2.315 0.6424 0.8233 I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 7.05 9.45 9.77 4.55 5.16 6.14 6.02 8.44 0.10 0.29 9.02 7.88 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 8.30 9.02 9.92 2.34 7.06 6.46 7.19 7.20 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64

-1.30 32.72 21.90 21.08 22.37 29.05 10.48 10.60 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND ND ND 1.2 1.4 8.97 73.3 4.65 6.25 5.02 4.74 3.32 5.01 0.73 2.88 0.812 6.507 25.13 23.68 1.227 0.323 0.301 11.58 22.29 0.439 2.615 0.684 1.698 3.566 14.37 0.673 1.775 6.288 8.575 5.058 6.775 7.555 7.018 8.408 4.045 1.705 1.266 6.138 1.653 1.213 3.533 5.045 3.745 3.968 6.193 5.273 4.143 1.436 1.038 0.435 0.839 1.015 1.623 1.114 0.8067 0.7765 0.4483 0.5938 0.5113 0.5045 4.756 1.264 10.33 7.668 2.315 0.5894 0.6763 I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND ND ND ND ND 1.7 1.2 3.3 2.9 3.8 5.21 16.3 17.6 1.12 10.6 26.6 2.27 8.97 3.49 1.78 6.05 67.8 7.74 5.53 6.59 7.82 7.43 4.25 4.12 5.57 1.36 1.36 5.02 4.74 3.32 5.52 1.65 1.21 4.43 4.51 2.88 3.91 5.76 5.34 1.55 1.67 0.73 2.99 1.36 1.17 0.673 0.439 0.688 0.831 0.799 0.946 0.623 0.827 0.496 0.865 0.999 0.567 0.512 0.592 21.51 2.86 1.07 8.93 7.18 1.09 0.579 0.747 I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND 20 ND ND ND ND ND ND ND ND ND ND ND ND ND ND 1.2 7.7 5.1 0.5 3.54 12.3 1.13 9.21 23.4 1.86 1.52 8.97 1.89 3.49 3.53 5.53 64.4 6.65 5.69 6.13 7.38 4.04 4.54 5.25 1.31 1.31 5.02 4.74 3.32 4.72 1.44 1.18 3.87 2.24 4.02 2.26 3.71 5.11 1.17 3.48 1.69 1.74 0.88 1.03 0.59 2.97 1.17 1.13 0.439 0.831 0.847 0.714 0.482 0.493 0.538 21.51 ND 2.39 1.03 5.87 1.21 6.69 0.916 Plant North N

N Plant North N

N Plant North N

N HUDSON RIVER HUDSON RIVER HUDSON RIVER HUDSON RIVER Plant North N

N Plant North N

N Plant North N

N Plant North N

N HUDSON RIVER HUDSON RIVER HUDSON RIVER Q1 - 2013 Q2 - 2013 Q3 - 2013 Q4 - 2013 Q1 - 2010 Q4 - 2010 Q1 - 2011 Q3 - 2011 Q4 - 2011 Q1 - 2012 Q4 - 2012 I-2 U3-3 U3-2 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 80 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Tank Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel Overhead FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A B5 B7 CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-27 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UNIT 3 ALL EY WAY UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 9

10 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND ND ND ND ND ND ND 3.4 1.6 18.4 2.33 7.14 4.77 5.19 7.08 3.42 2.78 2.71 1.37 1.88 1.13 3.14 0.56 0.629 87.52 29.55 0.863 14.17 232.2 1.395 9.435 7.955 3.683 10.41 4.287 8.628 115.1 5.148 5.548 5.748 7.535 4.636 4.864 6.198 1.482 2.164 3.943 2.095 1.155 3.624 2.424 3.372 2.806 3.083 4.088 4.305 0.985 3.013 1.895 0.906 1.014 1.031 0.9638 0.6998 0.4667 0.7483 0.5488 21.51 1.29 3.533 4.067 8.755 7.033 5.703 3.115 Data Notes:

1. Quarterly Tritium isopleths and activity values are yearly rolling arithmetic averages of the current and preceding three quarters' data. Only values greater than the MDC are used in this average, thus adding a degree of conservatism to the subsequent dose computations.
2. Illustration of contaminant plume is a schematic representation only. In reality, the geologic bedrock formation is over 99% solid, crystalline rock, with the contaminated water contained only in the remaining (less than 1%) interstitial space (i.e. fractures).
3. Foundation drain sampling locations, for which investigation levels are not applicable.
4. Historically elevated Tritium levels in MW-42-49 observed during Q1 2009 were consistent with leakage visually identified on 03/07/2009 (and terminated immediately thereafter) from the waste distillate tank valves located within the Unit 1 fuel storage building. Data trends through Q1 2010 indicate that the observed Tritium peaks in MW-42-49 and downgradient wells associated with this release have dissipated through the groundwater flow system.
5. Elevated levels of Tritium detected in MH-9 and MH-10a during routine 80-10 Effluents Program sampling on 1/15/2010 appears to have originated from a Q4 2009 transient leak in temporary RWST / R.O. skid connection hoses, which flowed into MH-9. It also appears that this release entered the well vault for MW-32, and may have penetrated the well casings and entered the subsurface around the monitoring installation.
6. Please refer to Figure 6 for the drawn Unit 1 Tritium plume isopleths. The likely causation of the Q2 2011 Tritium increases in multiple Unit 1 monitoring installations was a transient Sample Sink Overflow and subsequent floor flooding in a Unit 1 Chemical Systems Building sample room on the 53 elevation.
7. Elevated levels of Tritium initially detected in U1-CSS, MW-39, MW-46, MW-54, MW-56 and MW-57 during the Q2-2011 sampling event appear to have originated from a Q2 2011 Sample Sink Overflow and subsequent floor flooding in a Unit 1 Chemical Systems Building sample room on the 53 elevation.
8. Elevated levels of Tritium initially detected in MW-31 during the Q2 2012 sampling event appear to have originated from a leak in an existing Unit 2 Maintenance Outage Building (MOB) drain line. This double contained, stainless steel line was used to service the R.O. skid at its new location in the MOB during the 2012 Unit 2 refueling outage.
9. Elevated levels of Tritium initially detected in MW-42-49, MW-53-82 and U1-CSS during the Q4 2013 sampling event appear to have originated from an overflow of the Unit 1 Containment Spray Annulus (CSA).
10. Elevated levels of Tritium initially detected in Q2 2014 supplemental samples from MW-31 and MW-32. Release originated from transient flooding of the Unit 2 Fan Building 51 floor during 2014 refueling outage discharge of RCS drain down to a partially obstructed floor drain.

General Notes:

1. Base map was developed from an untitled electronic file provided by Badey and Watson Surveying and Engineering, P.C., Dated 2/3/06; CAD file name:

"GZA.dwg".

Probable Legacy Release SSCs Unit 2 Fuel Pool (All identified leaks repaired as of December 2007)

Unit 1 West Fuel Pool (All U1-SFPs drained and inactive as of October 2008)

Terminated Connection To Storm Drain Drain Exfiltration Inter-Structure Joint / Mud Mat Containment Spray Sump Trench Depth-Specific Data Screened in Soil Screened in Bedrock Depth Multiple Screened Intervals 11.3 11.9 12.6 12.8 255.0 56.0 42.3 1.2 Average activity of H3 (pCi/L x1000) for each screened Interval.

Groundwater elevation for each screened interval at time of low river tide for Q4 2008 (11/11/2008).

1 1

Notes:

1. Groundwater contours drawn from Q4 2008 groundwater data to show groundwater conditions used for recalibration of the Precipitation Mass Balance Model (see Q2 2009 LTM Report). These contours developed from limited data recorded on 11/11/2008. Actual elevations may vary from conditions shown and the actual distribution of piezometric heads is likely more complex than indicated.

Vadose Zone Contaminant Transport Groundwater Elevation Contours 20 Ambient "Watertable" Contours for Q4 2008 (11/11/2008) 1 1

Contours Other Than 10' Interval 5

I-2 U3-3 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 80 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Tank Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK W ASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A B5 B7 CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 9

0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND 1.04 1.86 3.49 5.78 4.77 1.37 5.02 4.74 3.32 0.52 1.29 1.44 4.22 2.78 2.71 1.82 2.718 21.98 16.13 8.558 21.41 0.439 1.563 10.24 1.155 1.886 0.831 2.967 5.145 58.08 5.743 5.815 7.543 7.178 4.125 4.393 1.223 4.343 3.495 1.863 3.558 2.093 3.398 4.725 0.985 1.255 3.133 1.758 1.059 0.693 2.905 0.506 1.024 0.547 0.8285 0.5513 0.4667 0.8733 0.9715 21.51 ND 6.07 2.603 2.546 8.653 1.326 6.403 Plant North N

N HUDSON RIVER Q2 - 2014 LEGEND Standby Radionuclide Monitoring Installation Longterm Radionuclide Monitoring Installation MW-30 Boring / Monitoring Installation Designation Footing Drain Active Storm Drain Catch Basin Abandoned Storm Drain Plant North N

N HUDSON RIVER Q1 - 2014 I-2 U3-3 U3-2 RW-1 MW-67 MW-66 MW-37 MW-36 MW-35 MW-34 MW-33 MW-52 MW-50 MW-49 MW-47 MW-42 MW-32 MW-31 MW-65 MW-62 MW-60 MW-59 MW-57 MW-56 MW-55 MW-54 MW-53 MW-30 MW-64 MW-61 MW-63 U1-CSS MW-111 MW-108 MW-58 MW-109 ROOF DRAIN ELEVATION 65' 43.8' 43.8' 43.8' 21.75' 22.75' (EL.=0.0) 33' 13' 43.8' 33' 33' 33' 33' 33' 42.5' 42.5' Trans.

Transformer area and switch gear Storage Containers A/C Units Grass Concrete curb Grass Shrubs Open grate Tank Asphalt drive Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt drive Asphalt Asphalt Drive Gravel Gravel Transformer yard this Area No Access Asphalt Concrete Retaining Wall Stone retaining wall Concrete curb Concrete pier Rip-rap 30 30 40 50 30 40 50 70 70 80 70 60 70 80 90 60 80 110 Condensate Tank Transformers on raised Concrete Pad Trans.

Transformers Concrete slab Tank Transformers on raised Concrete Pad Tank Storage Tank Transformer Substation "H" Trailer Trans Tank Storage Tank Tank Pit Asphalt Trans Trans Trans Storage Tanks Asphalt Grass Vent pit Mach.

stand Unit 2 Condensate Storage Tank Liquid Nitrogen Transformers Yard (Gravel)

Tank Gravel Overhead FUEL TRAN SFER POOL STORAGE POOL STORAGE POOL FAILED FUEL AUX. POOL DISASSEMBLY POOL CASK LOAD POOL CASK WASH &

DISASSEMBLY ISOLATION PIT PU MP SU CTION WELL WAT ER STORAGE POOL MH-4 MH-4A MH-5 MH-6 MH-2 B6 B6A B5 B7 CB-33 CB-34 CB-15 CB-14 CB-13 CB-32 CB-31 CB-30 A7 U1-CB-22 CB-29 CB-28 CB-24 CB-27 CB-6 CB-5A (CB-6)

CB-5B CB-7 CB-5 MH16 CB-3B CB3A CB4 CB-2C CB3 CB-2B CB-2A CB-2 CB-1 MH18 MH8 MH17 MH7 MH23A CB-16 MH9 MH10 MH11 MH22 MH21 MH13 MH3 MH12 MH1 CB-18 MH15 CB-19 CB-23 MH14 CB-17 CB-12 MH-23 MH-19 MH-20 Transformer Yard PAB East Fuel Pool Water Storage Tank FUEL POOL UNIT 2 WEST FUEL POOL UNIT 1 UNIT 3 ALL EY WAY UTILITY TUNNEL UTILITY TUNNEL CSS CSS TRENCH MW-30 50 40 30 20 10 5

20 13 B-6 U1-NCD U1-SFDS 3

3 3

MH-5 VCFD 4

4 1

1 1

1 1

1 1

1 3

5 7

8 9

10 0.1 8.3 7.2 7.05 9.45 9.77

-1.3 4.55 5.16 6.14 6.02 8.44 0.29 9.02 7.88 21.9 10.6 3.13 3.29 6.97 4.06 5.76 6.41 7.45 9.05 8.82 9.02 9.92 2.34 7.06 6.46 7.19 5.55 6.04 5.64 0.49 0.68 0.47 2.52 0.47 0.16 2.04 45.79 39.64 35.07 34.43 41.21 44.13 11.53 12.16 44.48

-1.64 32.72 21.08 22.37 29.05 10.48 10.54 10.68 12.36 11.71 10.27

-1.79

-1.69

-1.85

-0.37

-0.85

-1.24

-0.84

-0.15

-0.12

-1.93

-0.14

-0.86

-0.82

-0.02

-1.56

-1.02

-2.59

-2.25

-2.03 ND ND ND ND ND ND ND ND ND ND ND ND 3.4 0.8 2.33 5.66 4.77 5.19 7.08 3.42 2.88 3.53 2.78 2.71 1.66 25.85 93.52 84.85 0.332 15.35 305.2 1.149 9.435 7.955 7.537 8.766 5.057 4.287 11.93 266.8 5.025 5.313 7.175 6.783 4.787 6.191 6.744 1.934 2.121 3.985 2.627 1.155 3.802 3.376 2.753 3.923 3.936 0.985 2.458 1.829 1.911 1.045 1.063 2.868 1.923 0.575 1.069 0.6515 0.7684 0.8706 0.4215 0.8812 0.7584 0.4945 21.51 6.32 1.27 5.397 6.715 7.033 5.341 3.365 Plant North N

N HUDSON RIVER Q3 - 2014 H3 data x1,000 pCi/L Activity Data1,2 Note: Illustration of contaminant plume is a schematic representation only. In reality, the geologic bedrock formation is over 99% solid, crystalline rock, with the contaminated water contained only in the remaining (less than 1%) interstitial space (i.e. fractures).

5,000 - 10,000 10,000 - 50,000 50,000 - 100,000 100,000 - 250,000

>250,000 No Depth-Specific Samples Bar Graphs; Average H3, pCi/L Not Detected (ND)

ND - 1,000 1,000 - 5,000 5,000 - 10,000 10,000 - 50,000 50,000 - 100,000

> 200,000 100,000 - 200,000 Isopleths; Average H3, pCi/L ND 0.56 2.8 6.25 32.2 65 155 260 Localized Transient Releases Transient Spill from Temporary R.O. Skid Piping -

Entered MW-32 Vault and MH 11/21/2009 5

Sample Sink Overflow - Unit 1 Chemical Systems Building - Q2 2011 7

Transient Distillate Tank Valve Leak in Unit 1 Fuel Storage Building - 3/07/2009 4

Unit 1 Containment Spray Annulus (CSA) Overflow 9

Unit 2 MOB Drain Leak - Q2 2012 8

Unit 2 Fan Building 51 Floor Drain Overfill 10

GW FLOW DIRECTION 50 40 30 20 10 0

-10

-20

-30

-40

-50

-60

-70

-80

-90

-100

-110

-120

-130

-140

-150

-160

-170

-180

-190

-200

-210

-220

-230

-240

-250

-260

-270

-280

-290

-300

-310

-320

-330

-340

-350

-360

-370

-380 60 70 80 90 100 IP2-SFP ELEVATION IN FEET EL. = 0.64 1

1 1

1 1

1 Overburden Bedrock Monitoring Well Screened Interval 1.25 Average Activity of H-3 (pCi/L X 1,000) for each Screened Interval (Quarter 3 2014)

Concrete 5,000 - 10,000 10,000 - 50,000 50,000 - 100,000

> 100,000 CONTOUR INTERVAL SOIL ROCK UNIT 2 LEAK COLLECTION DEVICE EVALUATION 3rd QUARTER 2014 Groundwater Flow Direction GZA Engineers and Scientists INDIAN POINT ENERGY CENTER BUCHANAN, NEW YORK 6B 01.0017869.93 MJB MJB MJB GAS/EMD 249 VANDERBILT AVENUE NORWOOD, MASSACHUSETTS 02062 (Phone) 781-278-3700 UNIT 2 LEAK COLLECTION DEVICE EVALUATION 3rd QUARTER 2014 CROSS SECTION A - A' LEGEND Cross-Section extracted from Figure 9.1 in the Final Hydrogeologic Site Investigation Report, (01-07-2008) and updated with current activity data.

0 15' 30' 60' 90' SCALE IN FEET NOTE: H3 DATA PRESENTED ARE 3rd QUARTER 2014 YEARLY ROLLING AVERAGES.

Note: Illustration of contaminant plume is a schematic representation only.

In reality, the geologic bedrock formation is over 99% solid, crystalline rock, with the contaminated water contained only in the remaining (less than 1%)

interstitial space (i.e. fractures).

Unsaturated Zone Flow Direction Mud Mat ISOPLETH PLAN Isopleth Plan View Extracted from Figure 6 Notes:

1.

Groundwater contours (plan view) and equipotential lines (cross-section) drawn from Q4 2008 groundwater data to show groundwater conditions used for recalibration of the Precipitation Mass Balance Model. (See Q2 2009 LTM Report) 2.

Groundwater contours developed from limited data available on 11/11/2008. Actual elevations may vary from conditions shown and the actual distribution of piezometric heads is likely more complex than indicated.

3.

MW-32, MW-49, MW-50 & MW-62 are offset and projected onto the section line.

4.

The stratification lines are based upon interpolations between widely spaced borings, and monitoring wells and thus represent the approximate boundaries between soil types. Actual transitions may vary from those shown.

5.

Base map developed from electronic files, prepared by Badey and Watson Surveying &

Engineering PC, Cold Spring, NY 10516. Exact locations and orientations of structures above the water table are approximate and/or have been modified on these sections to better illustrate contaminant source mechanisms and/or migration pathways.

Groundwater Piezometric Head Contours for Q4 2008 (11-11-2008)

Groundwater Table Q4 2008 (11-11-2008) 1 1

1 1

3-20-2015

GW FLOW DIRECTION 50 40 30 20 10 0

-10

-20

-30

-40

-50

-60

-70

-80

-90

-100

-110

-120

-130

-140

-150

-160

-170

-180

-190

-200

-210

-220

-230

-240

-250

-260

-270

-280

-290

-300

-310

-320

-330

-340

-350

-360

-370

-380 60 70 80 90 100 IP2-SFP ELEVATION IN FEET EL. = 0.64 1

1 1

1 1

1 Overburden Bedrock Monitoring Well Screened Interval 1.25 Average Activity of H-3 (pCi/L X 1,000) for each Screened Interval (Quarter 3 2014)

Concrete 5,000 - 10,000 10,000 - 50,000 50,000 - 100,000

> 100,000 CONTOUR INTERVAL SOIL ROCK UNIT 2 LEAK COLLECTION DEVICE EVALUATION 3rd QUARTER 2014 Groundwater Flow Direction GZA Engineers and Scientists INDIAN POINT ENERGY CENTER BUCHANAN, NEW YORK 6B 01.0017869.93 MJB MJB MJB GAS/EMD 249 VANDERBILT AVENUE NORWOOD, MASSACHUSETTS 02062 (Phone) 781-278-3700 UNIT 2 LEAK COLLECTION DEVICE EVALUATION 3rd QUARTER 2014 CROSS SECTION A - A' LEGEND Cross-Section extracted from Figure 9.1 in the Final Hydrogeologic Site Investigation Report, (01-07-2008) and updated with current activity data.

0 15' 30' 60' 90' SCALE IN FEET NOTE: H3 DATA PRESENTED ARE 3rd QUARTER 2014 YEARLY ROLLING AVERAGES.

Note: Illustration of contaminant plume is a schematic representation only.

In reality, the geologic bedrock formation is over 99% solid, crystalline rock, with the contaminated water contained only in the remaining (less than 1%)

interstitial space (i.e. fractures).

Unsaturated Zone Flow Direction Mud Mat ISOPLETH PLAN Isopleth Plan View Extracted from Figure 6 Notes:

1.

Groundwater contours (plan view) and equipotential lines (cross-section) drawn from Q4 2008 groundwater data to show groundwater conditions used for recalibration of the Precipitation Mass Balance Model. (See Q2 2009 LTM Report) 2.

Groundwater contours developed from limited data available on 11/11/2008. Actual elevations may vary from conditions shown and the actual distribution of piezometric heads is likely more complex than indicated.

3.

MW-32, MW-49, MW-50 & MW-62 are offset and projected onto the section line.

4.

The stratification lines are based upon interpolations between widely spaced borings, and monitoring wells and thus represent the approximate boundaries between soil types. Actual transitions may vary from those shown.

5.

Base map developed from electronic files, prepared by Badey and Watson Surveying &

Engineering PC, Cold Spring, NY 10516. Exact locations and orientations of structures above the water table are approximate and/or have been modified on these sections to better illustrate contaminant source mechanisms and/or migration pathways.

Groundwater Piezometric Head Contours for Q4 2008 (11-11-2008)

Groundwater Table Q4 2008 (11-11-2008) 1 1