ML22109A106

From kanterella
Jump to navigation Jump to search
2021 Annual Environmental Protection Plan Report
ML22109A106
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/19/2022
From: Fleming J
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
HDI-IPEC-22-033
Download: ML22109A106 (4)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104

Telephone (856) 797-0900 Fax (856) 797-0909

HDI-IPEC-22-033 10 CFR 50.36(b)

April 19, 2022

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Indian Point Energy Center Renewed Facility License No. DPR-05, DPR-26 and DPR-64 NRC Docket Nos. 50-03, 50-247, and 50-286

Subject:

2021 Annual Environmental Protection Plan Report

Holtec Decommissioning International, LLC (HDI), on behalf of Holtec Indian Point 2, LLC (IP2) and Holtec Indian Point 3, LLC (IP3) submits the enclosed Indian Point Units 1, 2, and 3 Annual Environmental Protection Plan Report for the period January 1, 2021 through December 31, 2021. The report is submitted in accordance with Appendix B to each facility's license, DPR-5, DPR-26, and DPR-64, respectively. This report satisfies the requirements of Subsection 5.4.1 of the Environmental Technical Specifications.

This letter contains no new regulatory commitments.

If you have any questions or need further information, please contact Mr. Walter Wittich, IPEC Licensing at 914-254-7212, or me at (856) 797-0900, ext. 3578.

Sincerely,

Jean A. Fleming HDI Vice President, Regulatory and Environmental Affairs Holtec Decommissioning International, LLC

Enclosure:

2021 Annual Environmental Protection Plan Report

cc: NRC Senior Project Manager, NRC NMSS NRC Region l Regional Administrator NRC Senior Regional Inspector, Indian Point Energy Center New York State Liaison Officer Designee, NYSERDA New York State (NYS) Public Service Commission

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104

Telephone (856) 797-0900 Fax (856) 797-0909

ENCLOSURE TO HDI-IPEC-22-033

2021 Annual Environmental Protection Plan Report

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104

Telephone (856) 797-0900 Fax (856) 797-0909

Annual Environmental Protection Plan Report For the 2021 Calendar Year Pursuant to Appendix B to Facility Licenses Indian Point Unit Nos. 1, 2, and 3

Subsection 5.4.1 of Appendix B to the Nuclear Regulatory Commission Facility Operating Licenses for Indian Point Units 1, 2, (as amended on April 28, 2020) and 3 (as amended on May 28, 2021), requires that an Annual Environmental Protection Plan Report (the Report) describing implementation of the facilities Environmental Protection Plan (the EPP) for the previous year be submitted to the NRC prior to May 1 of each year. This Report is for the 2021 calendar year.

1. Subsection 5.4.1 of Appendix B specifies that the Report shall include summaries and analyses of the results of any EPP activities (environmental monitoring) required by Subsection 4.2 of the EPP for the reporting period.

Response

National Marine Fisheries Service (NMFS) Biological Opinion and Incidental Take Statement

Listed below are the submittal dates for the 2021 Sturgeon Monitoring Reports submitted to NMFS, NYSDEC, and the NRC via email, pursuant to the Terms and Conditions 12 and 14 of the amended February 9, 2018 Biological Opinion and Incidental Take Statement (ITS). The 2021 annual report includes the submittal dates for the 2021 weekly reports pursuant to Terms and Conditions #11 of the ITS.

April 2021 Report submitted May 4, 2021 May 2021 Report submitted May 17, 2021 2021 Annual Report submitted January 24, 2022

Subsection 5.4.1 of Appendix B also specifies the Report shall include:

A. A list of EPP noncompliances during calendar year 2021 and the corrective ac tions taken to remedy them.

Response

During the calendar year 2021 there were no EPP noncompliances.

B. A list of all changes in station design or operation, tests, and experiments made in accordance with Subsection 3.1 which involved a potentially significant unreviewed environmental issue at Indian Point Units 1, 2, and 3 during calendar year 2021.

Response

During the calendar year 2021, there were no changes in station design or operation, tests, and experiments, which involved a potentially significant unreviewed environmental issue at Indian Point Units 1, 2, or 3.

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104

Telephone (856) 797-0900 Fax (856) 797-0909 C. A list of non-routine reports submitted in accordance with Subsection 5.4.2.

Response

During calendar year 2021, there were no non-routine reports submitted for Indian Point Units 1, 2 and 3.

D. A list of all reports submitted in accordance with the SPDES (State Pollution Discharge Elimination System) permit during 2021.

Response

Listed below are the submittal dates for the 2021 monthly Discharge Monitoring Reports which were submitted to the NYSDEC and US Environmental Protection Agency via NYSDECs electronic database NetDMR, pursuant to the SPDES Permit for Indian Point Units 1, 2 and 3 (Permit No. NY 0004472). These reports were all electronically signed and submitted on behalf of the General Manager Plant Operations (GMPO) or the Site Vice President (SVP).

February 26, 2021 March 24, 2021 April 28, 2021 May 19, 2021 June 26, 2021 July 28, 2021 August 26, 2021 September 28, 2021 October 28, 2021 November 22, 2021 December 15, 2021 January 25, 2022 (Dec 2021 Report)

Listed below are the recipients, transmitters and transmittal dates for the Indian Point Units 1, 2 and 3 Annual Reports for calendar year 2021, as required by Special Conditions in the SPDES Permit (Permit No. NY 0004472).

Annual Operating Data Report (daily electrical generations, circulating water flows, and intake and discharge circulating water temperatures) for calendar year 2021, submitted via email, in accordance with Special Conditions 8 and 19 in the SPDES Permit:

Submitted To Transmitter Date Peter Maier Carlos A. Garcia January 28, 2022 NYSDEC Lorraine Holdridge NYSDEC

Annual 2021 Outage Day Report, as required by Special Condition 26 in the SPDES Permit, submitted via email:

Submitted To Transmitter Date Chuck Nieder Carlos A. Garcia January 26, 2022 NYSDEC Colleen Kimble NYSDEC