ML102440791

From kanterella
Revision as of 04:43, 13 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Report 22 - 2010 Mid Cycle - Inspection/Activity Plan (09/01/2010 - 12/31/2011)
ML102440791
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/2010
From:
NRC/RGN-II
To:
Progress Energy Florida
Shared Package
ML102440782 List:
References
Download: ML102440791 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2010 08:29:43 Report 22 09/01/2010

-12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Crystal River DRSEB3-SPECIAL INSPECTION - CONTAINMENT EVAL 1 3 IP Special Inspection 93812 01/01/2010 09/01/2010 DRP/BR3-S/G REPLACEMENT/CONTAINMENT SIT INSP.

2 3 IP Steam Generator Replacement Inspection 50001 09/01/2010 12/31/2010 EB3LR-EB3 LICENSE RENEWAL FOLLOWUP 2 3 IP License Renewal Inspection 71002 09/13/2010 09/17/2010 LIC REN-LICENSE RENEWAL COMPLETION 2 3 IP License Renewal Inspection 71002 10/04/2010 10/08/2010 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 3 IP Exercise Evaluation 7111401 10/04/2010 10/08/2010 3 IP Performance Indicator Verification 71151 10/04/2010 10/08/2010 TI-177-GASEOUS INTRUSION 3 3 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 10/25/2010 10/29/2010 OL RQ-FOCUSED TRAINING INSPECTION 2 3 IP Training And Qualification Effectiveness 41500 10/25/2010 10/29/2010 PSB1-RP-RP PUBLIC RADIATION PROTECTION 4 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/06/2010 12/10/2010 3 IP Occupational Dose Assessment 71124.04 12/06/2010 12/10/2010 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 12/06/2010 12/10/2010 3 IP Radiological Environmental Monitoring Program 71124.07 12/06/2010 12/10/2010 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/06/2010 12/10/2010 3 IP Performance Indicator Verification 71151 12/06/2010 12/10/2010 PSB1-TI-TI-179 NSTS VERIFICATION 4 3 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 12/06/2010 12/10/2010 TFPI-805 TFPI 6 3 IP Fire Protection [Triennial]

7111105T 04/04/2011 04/08/2011 3 IP Fire Protection [Triennial]

7111105T 04/18/2011 04/22/2011 EB3HS-HEAT SINK 1 3 IP Heat Sink Performance 7111107T 06/20/2011 06/24/2011 OL EXAM-INIITIAL EXAM PREP 3 3 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23355 08/22/2011 08/26/2011 OL EXAM-INIITIAL EXAM - WEEK 1 3 3 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23355 09/12/2011 09/16/2011 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1 3 IP A lert and Notification System Testing 7111402 09/12/2011 09/16/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 09/01/2010 08:29:43 Report 22 09/01/2010

-12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Crystal River PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1 3 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/12/2011 09/16/2011 3 IP Emergency Action Level and Emergency Plan Changes 7111404 09/12/2011 09/16/2011 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/12/2011 09/16/2011 3 IP Performance Indicator Verification 71151 09/12/2011 09/16/2011 OL EXAM-INITIAL EXAM - WEEK 2 3 3 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23355 09/19/2011 09/23/2011 PSB1-RP-RP OCCUPATIONAL WEEK 1 3 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/31/2011 11/04/2011 3 IP Occupational ALARA Planning and Controls 71124.02 10/31/2011 11/04/2011 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/31/2011 11/04/2011 3 IP Radiation Monitoring Instrumentation 71124.05 10/31/2011 11/04/2011 3 IP Performance Indicator Verification 71151 10/31/2011 11/04/2011 PSB1-RP-RP OCCUPATIONAL WEEK 2 3 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/14/2011 11/18/2011 3 IP Occupational ALARA Planning and Controls 71124.02 11/14/2011 11/18/2011 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/14/2011 11/18/2011 3 IP Radiation Monitoring Instrumentation 71124.05 11/14/2011 11/18/2011 3 IP Performance Indicator Verification 71151 11/14/2011 11/18/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.