Inspection/Activity Plan for 09/01/2004 - 03/31/2006
ML042430669
Person / Time
Site: Crystal River 
Issue date: 08/30/2004
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Young D
Florida Power Corp
Shared Package
ML042430667 List:
References
Download: ML042430669 (2)


Text

Crystal River Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:17:49 Report 22 7

EB1-TFP

- TRIENNIAL FIRE PROTECTION PRE-INSP VISIT Baseline Inspections 12/13/2004 12/17/2004 Fire Protection IP 7111105T 3

4 EB1-TFP

- TRIENNIAL FIRE PROTECTION Baseline Inspections 01/10/2005 01/14/2005 Fire Protection IP 7111105T 3

Baseline Inspections 01/24/2005 01/29/2005 Fire Protection IP 7111105T 3

2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 03/28/2005 04/01/2005 Safety System Design and Performance Capability IP 7111121 3

1 OL EP

- EP INSPECTION Baseline Inspections 04/25/2005 04/29/2005 Alert and Notification System Testing IP 7111402 3

Baseline Inspections 04/25/2005 04/29/2005 Emergency Response Organization Augmentation Testing IP 7111403 3

Baseline Inspections 04/25/2005 04/29/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 3

Baseline Inspections 04/25/2005 04/29/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 3

Baseline Inspections 04/25/2005 04/29/2005 Performance Indicator Verification IP 71151 3

5 EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 04/25/2005 04/29/2005 Safety System Design and Performance Capability IP 7111121 3

Baseline Inspections 05/09/2005 05/13/2005 Safety System Design and Performance Capability IP 7111121 3

2 OL PREP

- INITIAL EXAM PREP Not Applicable 08/08/2005 08/12/2005 CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23237 3

1 EB2-MR

- MAINTENANCE EFFECTIVENESS Baseline Inspections 08/15/2005 08/19/2005 Maintenance Effectiveness IP 7111112B 3

3 OL EXAM

- INITIAL EXAM Not Applicable 08/29/2005 09/02/2005 CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23237 3

1 EB2-ISI

- INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 3

2 PS-RP

- RP OCCUPATIONAL BASELINE - WEEK 1 Baseline Inspections 10/17/2005 10/21/2005 Access Control to Radiologically Significant Areas IP 7112101 3

Baseline Inspections 10/17/2005 10/21/2005 ALARA Planning and Controls IP 7112102 3

Baseline Inspections 10/17/2005 10/21/2005 Radioactive Material Processing and Transportation IP 7112202 3

Baseline Inspections 10/17/2005 10/21/2005 Performance Indicator Verification IP 71151 3

1 EB2SGISI

- STEAM GENERATOR ISI Baseline Inspections 10/24/2005 10/28/2005 Inservice Inspection Activities - PWR IP 7111108P 3

2 PS-RP

- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 10/31/2005 11/04/2005 Access Control to Radiologically Significant Areas IP 7112101 3

Baseline Inspections 10/31/2005 11/04/2005 ALARA Planning and Controls IP 7112102 3

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Crystal River Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:17:49 Report 22 2

PS-RP

- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 10/31/2005 11/04/2005 Radioactive Material Processing and Transportation IP 7112202 3

Baseline Inspections 10/31/2005 11/04/2005 Performance Indicator Verification IP 71151 3

4 EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 11/14/2005 11/18/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 3

Baseline Inspections 11/14/2005 11/18/2005 Permanent Plant Modifications IP 7111117B 3

1 EB2-HS

- HEAT SINK Baseline Inspections 01/09/2006 01/13/2006 Heat Sink Performance IP 7111107B 3

2 OL RQ

- REQUAL INSPECTION Baseline Inspections 01/30/2006 02/03/2006 Licensed Operator Requalification Program IP 7111111B 3

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.