ML032390276
ML032390276 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 08/27/2003 |
From: | NRC/RGN-II |
To: | |
Shared Package | |
ML032390273 | List: |
References | |
Download: ML032390276 (2) | |
Text
Page 1 of 2 Crystal River 08/27/2003 07:05:37 Inspection / Activity Plan Report 22 09/01/2003 - 09/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type FP F/U - FIRE PROT F/U 2 3 IP 7111105T Fire Protection 09/08/2003 09/12/2003 Baseline Inspections EB2 - REACTOR HEAD REPLACEMENT 1 3 IP 71007 Reactor Vessel Head Replacement Inspection 10/06/2003 10/10/2003 Other Routine PS-RP - RAD PROTECTION & HEAD REPLCMNT 3 3 IP 71007 Reactor Vessel Head Replacement Inspection 10/06/2003 10/10/2003 Other Routine 3 IP 7112101 Access Control to Radiologically Significant Areas 10/06/2003 10/10/2003 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 10/06/2003 10/10/2003 Baseline Inspections 3 IP 7112202 Radioactive Material Processing and Transportation 10/06/2003 10/10/2003 Baseline Inspections 3 IP 71151 Performance Indicator Verification 10/06/2003 10/10/2003 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U3 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/13/2003 10/17/2003 Baseline Inspections PS-RP - RAD PROTECTION & HEAD REPLCMNT 2 3 IP 71007 Reactor Vessel Head Replacement Inspection 10/20/2003 10/24/2003 Other Routine 3 IP 7112101 Access Control to Radiologically Significant Areas 10/20/2003 10/24/2003 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 10/20/2003 10/24/2003 Baseline Inspections 3 IP 7112202 Radioactive Material Processing and Transportation 10/20/2003 10/24/2003 Baseline Inspections 3 IP 71151 Performance Indicator Verification 10/20/2003 10/24/2003 Baseline Inspections S/G-ISI - S/G INSERVICE INSPECTION-U3 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/21/2003 10/23/2003 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59 6 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 12/01/2003 12/05/2003 Baseline Inspections 3 IP 7111117B Permanent Plant Modifications 12/01/2003 12/05/2003 Baseline Inspections OL RQ - REQUAL INSPECTION 2 3 IP 7111111B Licensed Operator Requalification 01/26/2004 01/30/2004 Baseline Inspections EB2-HS - HEAT SINK 1 3 IP 7111107B Heat Sink Performance 03/01/2004 03/05/2004 Baseline Inspections OL EP - EP EXERCISE 2 3 IP 7111401 Exercise Evaluation 04/19/2004 04/23/2004 Baseline Inspections 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/19/2004 04/23/2004 Baseline Inspections 3 IP 71151 Performance Indicator Verification 04/19/2004 04/23/2004 Baseline Inspections DRP/BR3 - PI&R 3 3 IP 71152B Identification and Resolution of Problems 06/14/2004 06/18/2004 Baseline Inspections 3 IP 71152B Identification and Resolution of Problems 06/28/2004 07/02/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Crystal River 08/27/2003 07:05:37 Inspection / Activity Plan Report 22 09/01/2003 - 09/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RADIATION PROTECTION 3 3 IP 7112101 Access Control to Radiologically Significant Areas 06/21/2004 06/25/2004 Baseline Inspections 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/21/2004 06/25/2004 Baseline Inspections 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/21/2004 06/25/2004 Baseline Inspections 3 IP 7112203 Radiological Environmental Monitoring Program 06/21/2004 06/25/2004 Baseline Inspections 3 IP 71151 Performance Indicator Verification 06/21/2004 06/25/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.