Crystal River Inspection / Activity Plan 09/01/2003 - 09/30/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2003 07:05:37 Report 22 2
FP F/U
- FIRE PROT F/U Baseline Inspections 09/08/2003 09/12/2003 Fire Protection IP 7111105T 3
1 EB2
- REACTOR HEAD REPLACEMENT Other Routine 10/06/2003 10/10/2003 Reactor Vessel Head Replacement Inspection IP 71007 3
3 PS-RP
- RAD PROTECTION & HEAD REPLCMNT Other Routine 10/06/2003 10/10/2003 Reactor Vessel Head Replacement Inspection IP 71007 3
Baseline Inspections 10/06/2003 10/10/2003 Access Control to Radiologically Significant Areas IP 7112101 3
Baseline Inspections 10/06/2003 10/10/2003 ALARA Planning and Controls IP 7112102 3
Baseline Inspections 10/06/2003 10/10/2003 Radioactive Material Processing and Transportation IP 7112202 3
Baseline Inspections 10/06/2003 10/10/2003 Performance Indicator Verification IP 71151 3
1 EB2-ISI
- INSERVICE INSPECTION-U3 Baseline Inspections 10/13/2003 10/17/2003 Inservice Inspection Activities - PWR IP 7111108P 3
2 PS-RP
- RAD PROTECTION & HEAD REPLCMNT Other Routine 10/20/2003 10/24/2003 Reactor Vessel Head Replacement Inspection IP 71007 3
Baseline Inspections 10/20/2003 10/24/2003 Access Control to Radiologically Significant Areas IP 7112101 3
Baseline Inspections 10/20/2003 10/24/2003 ALARA Planning and Controls IP 7112102 3
Baseline Inspections 10/20/2003 10/24/2003 Radioactive Material Processing and Transportation IP 7112202 3
Baseline Inspections 10/20/2003 10/24/2003 Performance Indicator Verification IP 71151 3
1 S/G-ISI
- S/G INSERVICE INSPECTION-U3 Baseline Inspections 10/21/2003 10/23/2003 Inservice Inspection Activities - PWR IP 7111108P 3
6 EB2-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 12/01/2003 12/05/2003 Evaluation of Changes, Tests, or Experiments IP 7111102 3
Baseline Inspections 12/01/2003 12/05/2003 Permanent Plant Modifications IP 7111117B 3
- REQUAL INSPECTION Baseline Inspections 01/26/2004 01/30/2004 Licensed Operator Requalification IP 7111111B 3
1 EB2-HS
- HEAT SINK Baseline Inspections 03/01/2004 03/05/2004 Heat Sink Performance IP 7111107B 3
- EP EXERCISE Baseline Inspections 04/19/2004 04/23/2004 Exercise Evaluation IP 7111401 3
Baseline Inspections 04/19/2004 04/23/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 3
Baseline Inspections 04/19/2004 04/23/2004 Performance Indicator Verification IP 71151 3
3 DRP/BR3
- PI&R Baseline Inspections 06/14/2004 06/18/2004 Identification and Resolution of Problems IP 71152B 3
Baseline Inspections 06/28/2004 07/02/2004 Identification and Resolution of Problems IP 71152B 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Crystal River Inspection / Activity Plan 09/01/2003 - 09/30/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2003 07:05:37 Report 22 3
PS-RP
- RADIATION PROTECTION Baseline Inspections 06/21/2004 06/25/2004 Access Control to Radiologically Significant Areas IP 7112101 3
Baseline Inspections 06/21/2004 06/25/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 3
Baseline Inspections 06/21/2004 06/25/2004 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 3
Baseline Inspections 06/21/2004 06/25/2004 Radiological Environmental Monitoring Program IP 7112203 3
Baseline Inspections 06/21/2004 06/25/2004 Performance Indicator Verification IP 71151 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.