Report 22, Inspection / Activity Plan 09/01/2008 - 12/31/2009
ML082460601
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB3
To:
Shared Package
ML082460598 List:
References
Download: ML082460601 (2)


Text

Page 1 of 2 Crystal River 09/02/2008 12:08:50 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TI-171 - B.5.B PHASE 2&3 3 3 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/06/2008 10/10/2008 Generic Safety Inspectio PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 3 IP 7112101 Access Control to Radiologically Significant Areas 10/27/2008 10/29/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 3 IP 7112101 Access Control to Radiologically Significant Areas 12/01/2008 12/05/2008 Baseline Inspections 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/01/2008 12/05/2008 Baseline Inspections 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/01/2008 12/05/2008 Baseline Inspections 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 12/01/2008 12/05/2008 Baseline Inspections 3 IP 71151-OR01 Occupational Exposure Control Effectiveness 12/01/2008 12/05/2008 Baseline Inspections 3 IP 71151-PR01 RETS/ODCM Radiological Effluent 12/01/2008 12/05/2008 Baseline Inspections EB3TI172 - TI-172 2 3 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 Generic Safety Inspectio EB1-MODS - MODIFICATIONS-10CFR50.59 4 3 IP 7111117 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 02/23/2009 02/27/2009 Baseline Inspections 3 IP 7111117 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 03/09/2009 03/13/2009 Baseline Inspections PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 3 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 05/04/2009 05/08/2009 Baseline Inspections 3 IP 7111402 Alert and Notification System Testing 05/04/2009 05/08/2009 EP Baseline Inspection 3 IP 7111403 Emergency Response Organization Augmentation Testing 05/04/2009 05/08/2009 EP Baseline Inspection 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/04/2009 05/08/2009 EP Baseline Inspection 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 05/04/2009 05/08/2009 EP Baseline Inspection 3 IP 71151-EP01 Drill/Exercise Performance 05/04/2009 05/08/2009 Baseline Inspections 3 IP 71151-EP02 ERO Drill Participation 05/04/2009 05/08/2009 Baseline Inspections 3 IP 71151-EP03 Alert & Notification System 05/04/2009 05/08/2009 Baseline Inspections LI - LICENSE RENEWAL INSPECTION 5 3 IP 71002 License Renewal Inspection 07/27/2009 07/31/2009 License Renewal Inspec OL EXAM - INITIAL EXAM - PREP 3 3 V23305 CRYSTAL RIVER/SEPTEMBER 2009 EXAM AT POWER FACILITIES 08/03/2009 08/07/2009 Not Applicable LI - LICENSE RENEWAL INSPECTION 5 3 IP 71002 License Renewal Inspection 08/10/2009 08/14/2009 License Renewal Inspec OL EXAM - INITIAL EXAM - WEEK 1 3 3 V23305 CRYSTAL RIVER/SEPTEMBER 2009 EXAM AT POWER FACILITIES 08/31/2009 09/04/2009 Not Applicable PSB1-RP - RP PREINSPECTION VISIT (OCCUPATIONAL) 1 3 IP 7112101 Access Control to Radiologically Significant Areas 09/07/2009 09/10/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Crystal River 09/02/2008 12:08:50 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM - WEEK 2 2 3 V23305 CRYSTAL RIVER/SEPTEMBER 2009 EXAM AT POWER FACILITIES 09/14/2009 09/18/2009 Not Applicable EB3SGR - STEAM GENERATOR REPLACEMENT 4 3 IP 50001 Steam Generator Replacement Inspection 09/26/2009 11/26/2009 Other Routine PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 1 (OUTAGE) 3 3 IP 7112101 Access Control to Radiologically Significant Areas 09/28/2009 10/02/2009 Baseline Inspections 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/28/2009 10/02/2009 Baseline Inspections 3 IP 7112202 Radioactive Material Processing and Transportation 09/28/2009 10/02/2009 Baseline Inspections 3 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/28/2009 10/02/2009 Baseline Inspections 3 IP 71151-PR01 RETS/ODCM Radiological Effluent 09/28/2009 10/02/2009 Baseline Inspections EB3ISI - INSERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/05/2009 10/09/2009 Baseline Inspections EB3TI172 - TI-172 RCS DM BUTT WELDS 1 3 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 10/05/2009 10/09/2009 Generic Safety Inspectio This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.