Crystal River Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2007 10:40:44 Report 22 7
EB1-CDBI
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 09/10/2007 09/14/2007 3
7111121 IP Component Design Bases Inspection Baseline Inspections 09/24/2007 09/28/2007 3
7111121 IP Component Design Bases Inspection Baseline Inspections 10/01/2007 10/05/2007 3
7111121 IP Component Design Bases Inspection 4
OL EXAM
- INITIAL EXAM PREP Not Applicable 10/01/2007 10/05/2007 3
V23272 CRYSTAL RIVER/OCTOBER 2007 EXAM AT POWER FACILITIES 2
PSB1-RP
- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 10/10/2007 10/12/2007 3
7112101 IP Access Control to Radiologically Significant Areas 4
OL EXAM
- INITIAL EXAM Not Applicable 10/22/2007 11/02/2007 3
V23272 CRYSTAL RIVER/OCTOBER 2007 EXAM AT POWER FACILITIES 1
EB3-ISI
- U3 INSERVICE INSPECTION Baseline Inspections 11/12/2007 11/16/2007 3
7111108P IP Inservice Inspection Activities - PWR 2
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP WK1 Baseline Inspections 11/12/2007 11/16/2007 3
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/12/2007 11/16/2007 3
7112102 IP ALARA Planning and Controls Baseline Inspections 11/12/2007 11/16/2007 3
7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 11/12/2007 11/16/2007 3
71151 IP Performance Indicator Verification 1
EB3SGISI
- U3 STEAM GENERATOR ISI Baseline Inspections 11/18/2007 11/22/2007 3
7111108P IP Inservice Inspection Activities - PWR 1
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-3)
Safety Issues 11/26/2007 11/30/2007 3
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
3 PSB1-RP
- RP OCCUPATIONAL BASELINE INSP WK2 Baseline Inspections 11/26/2007 11/30/2007 3
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/26/2007 11/30/2007 3
7112102 IP ALARA Planning and Controls Baseline Inspections 11/26/2007 11/30/2007 3
7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 11/26/2007 11/30/2007 3
71151 IP Performance Indicator Verification 5
EB2-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 01/08/2008 01/10/2008 3
7111105T IP Fire Protection [Triennial]
Baseline Inspections 01/28/2008 02/01/2008 3
7111105T IP Fire Protection [Triennial]
Baseline Inspections 02/11/2008 02/15/2008 3
7111105T IP Fire Protection [Triennial]
- REQUAL INSPECTION Baseline Inspections 02/04/2008 02/08/2008 3
7111111B IP Licensed Operator Requalification Program 1
- PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections 03/03/2008 03/07/2008 3
71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Crystal River Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2007 10:40:44 Report 22 4
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 04/14/2008 04/18/2008 3
71152B IP Identification and Resolution of Problems Baseline Inspections 04/28/2008 05/02/2008 3
71152B IP Identification and Resolution of Problems 3
PSB1-EP
- EP EXERCISE Baseline Inspections 05/19/2008 05/23/2008 3
7111401 IP Exercise Evaluation Baseline Inspections 05/19/2008 05/23/2008 3
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 05/19/2008 05/23/2008 3
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 05/19/2008 05/23/2008 3
71151-EP02 IP ERO Drill Participation Baseline Inspections 05/19/2008 05/23/2008 3
71151-EP03 IP Alert & Notification System 1
EB3-HS
- HEAT SINK Baseline Inspections 06/02/2008 06/06/2008 3
7111107B IP Heat Sink Performance 2
EB3 - MR
- MAINT RULE Baseline Inspections 06/23/2008 06/27/2008 3
7111112B IP Maintenance Effectiveness 1
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 10/27/2008 10/29/2008 3
7112101 IP Access Control to Radiologically Significant Areas 4
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 11/03/2008 11/07/2008 3
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 11/03/2008 11/07/2008 3
7111117B IP Permanent Plant Modifications 4
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 12/01/2008 12/05/2008 3
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/01/2008 12/05/2008 3
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 12/01/2008 12/05/2008 3
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 12/01/2008 12/05/2008 3
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 12/01/2008 12/05/2008 3
71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 12/01/2008 12/05/2008 3
71151-PR01 IP RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.