Page 1 of 2 Crystal River 03/03/2010 07:27:45 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB3CR - CONT DELAM DETENSION 1 3 03/04/2010 03/11/2010 IP 50001 Steam Generator Replacement Inspection EB3CR - CONT DELAM CONCRETE REMOVAL 1 3 03/15/2010 03/19/2010 IP 50001 Steam Generator Replacement Inspection PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 3 04/05/2010 04/09/2010 IP 71152B Identification and Resolution of Problems 3 04/19/2010 04/23/2010 IP 71152B Identification and Resolution of Problems EB3CR - CONT DELAM CONCRETE FORM POUR 1 3 04/05/2010 04/30/2010 IP 50001 Steam Generator Replacement Inspection EB3CR - CONT DELAM RETENSION 1 3 05/10/2010 05/14/2010 IP 50001 Steam Generator Replacement Inspection EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 7 3 05/10/2010 05/14/2010 IP 7111121 Component Design Bases Inspection 3 05/24/2010 05/28/2010 IP 7111121 Component Design Bases Inspection 3 06/07/2010 06/11/2010 IP 7111121 Component Design Bases Inspection 3 06/21/2010 06/25/2010 IP 7111121 Component Design Bases Inspection EB3CR - CONT DELAM RETENSION & DOC REVIEW 1 3 05/31/2010 06/04/2010 IP 50001 Steam Generator Replacement Inspection EB3CR - CONT DELAM CONCRETE SCAN BORING 1 3 06/07/2010 06/09/2010 IP 50001 Steam Generator Replacement Inspection EB3LR - EB3 LICENSE RENEWAL FOLLOWUP 2 3 06/07/2010 06/11/2010 IP 71002 License Renewal Inspection PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 3 10/04/2010 10/08/2010 IP 7111401 Exercise Evaluation 3 10/04/2010 10/08/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 10/04/2010 10/08/2010 IP 71151 Performance Indicator Verification TI-177 - GASEOUS INTRUSION 3 3 10/25/2010 10/29/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System PSB1-RP - RP PUBLIC RADIATION PROTECTION 4 3 12/06/2010 12/10/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 12/06/2010 12/10/2010 IP 71124.04 Occupational Dose Assessment 3 12/06/2010 12/10/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3 12/06/2010 12/10/2010 IP 71124.07 Public Radiation Safety 3 12/06/2010 12/10/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3 12/06/2010 12/10/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Crystal River 03/03/2010 07:27:45 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TFPI - 805 TFPI 1 3 04/04/2011 04/08/2011 IP 7111105T Fire Protection [Triennial]

3 04/18/2011 04/22/2011 IP 7111105T Fire Protection [Triennial]

EB3HS - HEAT SINK 1 3 06/20/2011 06/24/2011 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.