Text
Inspection / Activity Plan Page 1 of 2 03/04/2009 07:08:21 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Crystal River EB1-MODS
- MODIFICATIONS-10CFR50.59 4
3 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 03/09/2009 03/13/2009 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
3 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 05/04/2009 05/08/2009 3
IP Alert and Notification System Testing 7111402 05/04/2009 05/08/2009 3
IP Emergency Response Organization Augmentation Testing 7111403 05/04/2009 05/08/2009 3
IP Emergency Action Level and Emergency Plan Changes 7111404 05/04/2009 05/08/2009 3
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/04/2009 05/08/2009 3
IP Performance Indicator Verification 71151 05/04/2009 05/08/2009 LI
- LICENSE RENEWAL INSPECTION 8
3 IP License Renewal Inspection 71002 07/27/2009 07/31/2009 OL EXAM
- INITIAL EXAM - PREP 3
3 CRYSTAL RIVER/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23305 08/03/2009 08/07/2009 LI
- LICENSE RENEWAL INSPECTION 8
3 IP License Renewal Inspection 71002 08/10/2009 08/14/2009 OL EXAM
- INITIAL EXAM - WEEK 1 3
3 CRYSTAL RIVER/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23305 08/31/2009 09/04/2009 OL EXAM
- INITIAL EXAM - WEEK 2 2
3 CRYSTAL RIVER/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23305 09/14/2009 09/18/2009 EB3SGR
- STEAM GENERATOR REPLACEMENT 4
3 IP Steam Generator Replacement Inspection 50001 09/26/2009 11/26/2009 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK 1 (OUTAGE) 3 3
IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 09/28/2009 10/02/2009 3
IP Access Control to Radiologically Significant Areas 7112101 09/28/2009 10/02/2009 3
IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 09/28/2009 10/02/2009 3
IP Radioactive Material Processing and Transportation 7112202 09/28/2009 10/02/2009 3
IP Performance Indicator Verification 71151 09/28/2009 10/02/2009 EB3ISI
- INSERVICE INSPECTION 1
3 IP Inservice Inspection Activities - PWR 7111108P 10/05/2009 10/09/2009 EB3TI172
3 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/05/2009 10/09/2009 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK 2 (OUTAGE) 2 3
IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 11/30/2009 12/04/2009 3
IP Access Control to Radiologically Significant Areas 7112101 11/30/2009 12/04/2009 3
IP ALARA Planning and Controls 7112102 11/30/2009 12/04/2009 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/04/2009 07:08:21 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Crystal River PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK 2 (OUTAGE) 2 3
IP Radioactive Material Processing and Transportation 7112202 11/30/2009 12/04/2009 3
IP Performance Indicator Verification 71151 11/30/2009 12/04/2009 OL RQ
- REQUAL INSPECTION 2
3 IP Licensed Operator Requalification Program 7111111B 02/01/2010 02/05/2010 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
3 IP Exercise Evaluation 7111401 04/26/2010 04/30/2010 3
IP Emergency Action Level and Emergency Plan Changes 7111404 04/26/2010 04/30/2010 3
IP Performance Indicator Verification 71151 04/26/2010 04/30/2010 EB1-CDBI
- COMPONENT DESIGN BASES INSPECTION 8
3 IP Component Design Bases Inspection 7111121 05/10/2010 05/14/2010 3
IP Component Design Bases Inspection 7111121 05/24/2010 05/28/2010 3
IP Component Design Bases Inspection 7111121 06/07/2010 06/11/2010 3
IP Component Design Bases Inspection 7111121 06/21/2010 06/25/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure