Text
Crystal River Inspection / Activity Plan 03/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2004 08:59:21 Report 22 2
2515/154
- TI 2515/154 - SPENT FUEL MC&A Safety Issues 01/01/2004 03/26/2004 Spent Fuel Material Control and Accounting at Nuclear Power Plants IP 2515/154 3
2 2515/153
- TI 2515/153 RPV CONTAINMT SUMP BLOCKAGE Safety Issues 01/01/2004 03/26/2004 Reactor Containment Sump Blockage (NRC Bulletin 2003-01)
3 PS-SEC
- SECURITY Baseline Inspections 03/22/2004 03/26/2004 Access Authorization IP 7113001 3
Baseline Inspections 03/22/2004 03/26/2004 Access Control IP 7113002 3
Baseline Inspections 03/22/2004 03/26/2004 Performance Indicator Verification IP 71151 3
- EMERGENCY EXERCISE Baseline Inspections 05/10/2004 05/14/2004 Exercise Evaluation IP 7111401 3
Baseline Inspections 05/10/2004 05/14/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 3
Baseline Inspections 05/10/2004 05/14/2004 Performance Indicator Verification IP 71151 3
3 DRP/BR3
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 06/14/2004 06/18/2004 Identification and Resolution of Problems IP 71152B 3
Baseline Inspections 06/28/2004 07/02/2004 Identification and Resolution of Problems IP 71152B 3
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 06/21/2004 06/25/2004 Access Control to Radiologically Significant Areas IP 7112101 3
Baseline Inspections 06/21/2004 06/25/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 3
Baseline Inspections 06/21/2004 06/25/2004 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 3
Baseline Inspections 06/21/2004 06/25/2004 Radiological Environmental Monitoring Program IP 7112203 3
Baseline Inspections 06/21/2004 06/25/2004 Performance Indicator Verification IP 71151 3
4 EB1-TFP
- TRIENNIAL FIRE PROTECTION PRE-INSP VISIT Baseline Inspections 12/13/2004 12/17/2004 Fire Protection IP 7111105T 3
4 EB1-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 01/10/2005 01/14/2005 Fire Protection IP 7111105T 3
Baseline Inspections 01/24/2005 01/29/2005 Fire Protection IP 7111105T 3
2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 03/28/2005 04/01/2005 Safety System Design and Performance Capability IP 7111121 3
- EMERGENCY PREPAREDNESS Baseline Inspections 04/25/2005 04/29/2005 Alert and Notification System Testing IP 7111402 3
Baseline Inspections 04/25/2005 04/29/2005 Emergency Response Organization Augmentation Testing IP 7111403 3
Baseline Inspections 04/25/2005 04/29/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 3
Baseline Inspections 04/25/2005 04/29/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 3
Baseline Inspections 04/25/2005 04/29/2005 Performance Indicator Verification IP 71151 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Crystal River Inspection / Activity Plan 03/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2004 08:59:21 Report 22 5
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 04/25/2005 04/29/2005 Safety System Design and Performance Capability IP 7111121 3
Baseline Inspections 05/09/2005 05/13/2005 Safety System Design and Performance Capability IP 7111121 3
1 EB2-MR
- MAINTENANCE EFFECTIVENESS Baseline Inspections 06/06/2005 06/10/2005 Maintenance Effectiveness IP 7111112B 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.