Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08
ML062430410
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/2006
From: Casto C
Division Reactor Projects II
To: Young D
Progress Energy Florida
Shared Package
ML062430397 List:
References
Download: ML062430410 (2)


Text

Crystal River Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 16:10:47 Report 22 1

EB3-HS

- HEAT SINK Baseline Inspections 07/09/2006 09/30/2006 3

7111107B IP Heat Sink Performance 1

2515/169

- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 3

2515/169 IP Mitigating Systems Performance Index Verification 1

PSB1-RP

- RP PUBLIC PRE-INSP VISIT Baseline Inspections 11/13/2006 11/15/2006 3

7112101 IP Access Control to Radiologically Significant Areas 4

EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 12/04/2006 12/08/2006 3

7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 12/04/2006 12/08/2006 3

7111117B IP Permanent Plant Modifications 4

PSB1-RP

- RP PUBLIC BASELINE Baseline Inspections 12/04/2006 12/08/2006 3

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/04/2006 12/08/2006 3

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 12/04/2006 12/08/2006 3

7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 12/04/2006 12/08/2006 3

7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 12/04/2006 12/08/2006 3

71151 IP Performance Indicator Verification 1

PS2-EP

- EP INSP Baseline Inspections 04/23/2007 04/27/2007 3

7111402 IP Alert and Notification System Testing Baseline Inspections 04/23/2007 04/27/2007 3

7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 04/23/2007 04/27/2007 3

7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/23/2007 04/27/2007 3

7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 04/23/2007 04/27/2007 3

71151 IP Performance Indicator Verification 5

EB1-CDB

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 08/13/2007 08/17/2007 3

7111121 IP Component Design Bases Inspection Baseline Inspections 08/27/2007 08/31/2007 3

7111121 IP Component Design Bases Inspection Baseline Inspections 09/10/2007 09/14/2007 3

7111121 IP Component Design Bases Inspection Baseline Inspections 09/24/2007 09/28/2007 3

7111121 IP Component Design Bases Inspection 1

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 09/04/2007 09/06/2007 3

7112101 IP Access Control to Radiologically Significant Areas 2

INITPREP

- INITIAL EXAM PREP Not Applicable 10/01/2007 10/05/2007 3

V23272 CRYSTAL RIVER/OCTOBER 2007 EXAM AT POWER FACILITIES 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK 1 Baseline Inspections 10/01/2007 10/05/2007 3

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/01/2007 10/05/2007 3

7112102 IP ALARA Planning and Controls Baseline Inspections 10/01/2007 10/05/2007 3

7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/01/2007 10/05/2007 3

71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Crystal River Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 16:10:47 Report 22 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK 2 Baseline Inspections 10/15/2007 10/19/2007 3

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/15/2007 10/19/2007 3

7112102 IP ALARA Planning and Controls Baseline Inspections 10/15/2007 10/19/2007 3

7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/15/2007 10/19/2007 3

71151 IP Performance Indicator Verification 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-3)

Event Response Insp 10/21/2007 10/26/2007 3

93812 IP Special Inspection 2

OL EXAM

- INITIAL EXAM Not Applicable 10/22/2007 11/02/2007 3

V23272 CRYSTAL RIVER/OCTOBER 2007 EXAM AT POWER FACILITIES 1

EB3-ISI

- U3 INSERVICE INSPECTION Baseline Inspections 11/12/2007 11/16/2007 3

7111108P IP Inservice Inspection Activities - PWR 1

EB3SGISI

- U3 STEAM GENERATOR ISI Baseline Inspections 11/18/2007 11/22/2007 3

7111108P IP Inservice Inspection Activities - PWR 5

EB2-TFP

- TRIENNIAL FIRE PROTECTION Baseline Inspections 01/08/2008 01/10/2008 3

7111105T IP Fire Protection [Triennial]

Baseline Inspections 01/28/2008 02/01/2008 3

7111105T IP Fire Protection [Triennial]

Baseline Inspections 02/11/2008 02/15/2008 3

7111105T IP Fire Protection [Triennial]

2 OL RQ

- REQUALIFICATION INSPECTION Baseline Inspections 02/04/2008 02/08/2008 3

7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.