Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08
ML062430410
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/2006
From: Casto C
Division Reactor Projects II
To: Young D
Progress Energy Florida
Shared Package
ML062430397 List:
References
Download: ML062430410 (2)


Text

Page 1 of 2 Crystal River 08/30/2006 16:10:47 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3-HS - HEAT SINK 1 3 IP 7111107B Heat Sink Performance 07/09/2006 09/30/2006 Baseline Inspections 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 3 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues PSB1-RP - RP PUBLIC PRE-INSP VISIT 1 3 IP 7112101 Access Control to Radiologically Significant Areas 11/13/2006 11/15/2006 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59 4 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 12/04/2006 12/08/2006 Baseline Inspections 3 IP 7111117B Permanent Plant Modifications 12/04/2006 12/08/2006 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE 4 3 IP 7112101 Access Control to Radiologically Significant Areas 12/04/2006 12/08/2006 Baseline Inspections 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/04/2006 12/08/2006 Baseline Inspections 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/04/2006 12/08/2006 Baseline Inspections 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 12/04/2006 12/08/2006 Baseline Inspections 3 IP 71151 Performance Indicator Verification 12/04/2006 12/08/2006 Baseline Inspections PS2-EP - EP INSP 1 3 IP 7111402 Alert and Notification System Testing 04/23/2007 04/27/2007 Baseline Inspections 3 IP 7111403 Emergency Response Organization Augmentation Testing 04/23/2007 04/27/2007 Baseline Inspections 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/23/2007 04/27/2007 Baseline Inspections 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/23/2007 04/27/2007 Baseline Inspections 3 IP 71151 Performance Indicator Verification 04/23/2007 04/27/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 5 3 IP 7111121 Component Design Bases Inspection 08/13/2007 08/17/2007 Baseline Inspections 3 IP 7111121 Component Design Bases Inspection 08/27/2007 08/31/2007 Baseline Inspections 3 IP 7111121 Component Design Bases Inspection 09/10/2007 09/14/2007 Baseline Inspections 3 IP 7111121 Component Design Bases Inspection 09/24/2007 09/28/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 3 IP 7112101 Access Control to Radiologically Significant Areas 09/04/2007 09/06/2007 Baseline Inspections INITPREP - INITIAL EXAM PREP 2 3 V23272 CRYSTAL RIVER/OCTOBER 2007 EXAM AT POWER FACILITIES 10/01/2007 10/05/2007 Not Applicable PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK 1 2 3 IP 7112101 Access Control to Radiologically Significant Areas 10/01/2007 10/05/2007 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 10/01/2007 10/05/2007 Baseline Inspections 3 IP 7112202 Radioactive Material Processing and Transportation 10/01/2007 10/05/2007 Baseline Inspections 3 IP 71151 Performance Indicator Verification 10/01/2007 10/05/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Crystal River 08/30/2006 16:10:47 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK 2 2 3 IP 7112101 Access Control to Radiologically Significant Areas 10/15/2007 10/19/2007 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 10/15/2007 10/19/2007 Baseline Inspections 3 IP 7112202 Radioactive Material Processing and Transportation 10/15/2007 10/19/2007 Baseline Inspections 3 IP 71151 Performance Indicator Verification 10/15/2007 10/19/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-3) 1 3 IP 93812 Special Inspection 10/21/2007 10/26/2007 Event Response Insp OL EXAM - INITIAL EXAM 2 3 V23272 CRYSTAL RIVER/OCTOBER 2007 EXAM AT POWER FACILITIES 10/22/2007 11/02/2007 Not Applicable EB3-ISI - U3 INSERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 11/12/2007 11/16/2007 Baseline Inspections EB3SGISI - U3 STEAM GENERATOR ISI 1 3 IP 7111108P Inservice Inspection Activities - PWR 11/18/2007 11/22/2007 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION 5 3 IP 7111105T Fire Protection [Triennial] 01/08/2008 01/10/2008 Baseline Inspections 3 IP 7111105T Fire Protection [Triennial] 01/28/2008 02/01/2008 Baseline Inspections 3 IP 7111105T Fire Protection [Triennial] 02/11/2008 02/15/2008 Baseline Inspections OL RQ - REQUALIFICATION INSPECTION 2 3 IP 7111111B Licensed Operator Requalification Program 02/04/2008 02/08/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.