Inspection/Activity Plan for 03/01/2003 - 03/30/2004
ML030660097
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/03/2003
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Young D
Florida Power Corp
Shared Package
ML030660066 List:
References
Download: ML030660097 (3)


Text

Page 1 of 3 Crystal River 02/20/2003 14:47:31 Inspection / Activity Plan Report 22 03/01/2003 - 03/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 3 IP 7111121 Safety System Design and Performance Capability 03/31/2003 04/04/2003 Baseline Inspections Comments:

OL EP - EP INSPECTION 1 3 IP 7111402 Alert and Notification System Testing 04/14/2003 04/18/2003 Baseline Inspections 3 IP 7111403 Emergency Response Organization Augmentation Testing 04/14/2003 04/18/2003 Baseline Inspections 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/14/2003 04/18/2003 Baseline Inspections 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/14/2003 04/18/2003 Baseline Inspections 3 IP 71151 Performance Indicator Verification 04/14/2003 04/18/2003 Baseline Inspections Comments:

PS-SEC - SECURITY - TI/ICM 3 3 IP 2515/148 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures 04/15/2003 04/18/2003 Safety Issues Comments:

EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI 6 3 IP 7111121 Safety System Design and Performance Capability 05/05/2003 05/09/2003 Baseline Inspections 3 IP 7111121 Safety System Design and Performance Capability 05/19/2003 05/23/2003 Baseline Inspections Comments:

OL PREP - INITIAL EXAM PREP 3 3 V23186 CRYSTAL RIVER/EXAMS AT POWER FACILITIES 08/04/2003 08/08/2003 Not Applicable Comments:

OL EXAM - INITIAL EXAM 3 3 V23186 CRYSTAL RIVER/EXAMS AT POWER FACILITIES 08/25/2003 08/29/2003 Not Applicable Comments:

PS-RP - RADIATION PROTECTION 3 3 IP 7112101 Access Control to Radiologically Significant Areas 10/06/2003 10/10/2003 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 10/06/2003 10/10/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Crystal River 02/20/2003 14:47:31 Inspection / Activity Plan Report 22 03/01/2003 - 03/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RADIATION PROTECTION 3 3 IP 7112202 Radioactive Material Processing and Transportation 10/06/2003 10/10/2003 Baseline Inspections 3 IP 71151 Performance Indicator Verification 10/06/2003 10/10/2003 Baseline Inspections Comments:

EB2-ISI - INSERVICE INSPECTION-U3 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/13/2003 10/17/2003 Baseline Inspections Comments:

EB2 - REACTOR HEAD REPLACEMENT 1 3 IP 93812 Special Inspection 10/14/2003 10/17/2003 Event Response Insp Comments:

PS-RP - RADIATION PROTECTION 2 3 IP 7112101 Access Control to Radiologically Significant Areas 10/20/2003 10/24/2003 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 10/20/2003 10/24/2003 Baseline Inspections 3 IP 7112202 Radioactive Material Processing and Transportation 10/20/2003 10/24/2003 Baseline Inspections 3 IP 71151 Performance Indicator Verification 10/20/2003 10/24/2003 Baseline Inspections Comments:

S/G-ISI - S/G INSERVICE INSPECTION-U3 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/21/2003 10/23/2003 Baseline Inspections Comments:

OL RQ - REQUAL INSPECTION 2 3 IP 7111111B Licensed Operator Requalification 11/10/2003 11/14/2003 Baseline Inspections Comments:

EB2-MODS - MODIFICATIONS/10CFR50.59 5 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 12/15/2003 12/19/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Crystal River 02/20/2003 14:47:31 Inspection / Activity Plan Report 22 03/01/2003 - 03/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-MODS - MODIFICATIONS/10CFR50.59 5 3 IP 7111117B Permanent Plant Modifications 12/15/2003 12/19/2003 Baseline Inspections Comments:

EB2-HS - HEAT SINK 1 3 IP 7111107B Heat Sink Performance 03/01/2004 03/05/2004 Baseline Inspections Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.