EOC Report 22
ML120650203
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/05/2012
From:
NRC/RGN-II
To:
Shared Package
ML120650169 List:
References
Download: ML120650203 (1)


Text

Page 1 of 1 Crystal River 03/05/2012 07:42:41 Inspection / Activity Plan Report 22 03/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 95001 - CR3 95001 SUPPLEMENTAL INSPECTION 1 3 04/30/2012 05/04/2012 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area TI-182 - TI-182 BURIED PIPING/TANK - PHASE 1 1 3 07/09/2012 07/13/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping MOD - MODIFICATION INSPECTION 5 3 08/27/2012 08/31/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3 09/10/2012 09/14/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 4 3 11/12/2012 11/16/2012 IP 7111401 Exercise Evaluation 3 11/12/2012 11/16/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 11/12/2012 11/16/2012 IP 71151 Performance Indicator Verification PSB1-RP - PUBLIC RADIATION PROTECTION BASELINE 4 3 11/26/2012 11/30/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 11/26/2012 11/30/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3 11/26/2012 11/30/2012 IP 71124.07 Radiological Environmental Monitoring Program 3 11/26/2012 11/30/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3 11/26/2012 11/30/2012 IP 71151 Performance Indicator Verification ISFSI - ISFSI FIRST LOADING CAMPAIGN 2 3 03/04/2013 03/08/2013 IP 2690/008 Inspec Add Security Measures for Dry Cask Storage at ISFSIs Located Within Protected Area of Op Rctr OL EXAM - INITIAL EXAM PREP 6 3 03/04/2013 03/08/2013 V23379 CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 3 03/25/2013 03/29/2013 V23379 CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 3 04/01/2013 04/05/2013 V23379 CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 7 3 05/06/2013 05/10/2013 IP 7111121 Component Design Bases Inspection 3 05/20/2013 05/24/2013 IP 7111121 Component Design Bases Inspection 3 06/03/2013 06/07/2013 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure