ML102440791

From kanterella
Jump to navigation Jump to search
Report 22 - 2010 Mid Cycle - Inspection/Activity Plan (09/01/2010 - 12/31/2011)
ML102440791
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/2010
From:
NRC/RGN-II
To:
Progress Energy Florida
Shared Package
ML102440782 List:
References
Download: ML102440791 (2)


Text

Page 1 of 2 Crystal River 09/01/2010 08:29:43 Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site DRSEB3 - SPECIAL INSPECTION - CONTAINMENT EVAL 1 3 01/01/2010 09/01/2010 IP 93812 Special Inspection DRP/BR3 - S/G REPLACEMENT/CONTAINMENT SIT INSP. 2 3 09/01/2010 12/31/2010 IP 50001 Steam Generator Replacement Inspection EB3LR - EB3 LICENSE RENEWAL FOLLOWUP 2 3 09/13/2010 09/17/2010 IP 71002 License Renewal Inspection LIC REN - LICENSE RENEWAL COMPLETION 2 3 10/04/2010 10/08/2010 IP 71002 License Renewal Inspection PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 3 10/04/2010 10/08/2010 IP 7111401 Exercise Evaluation 3 10/04/2010 10/08/2010 IP 71151 Performance Indicator Verification TI-177 - GASEOUS INTRUSION 3 3 10/25/2010 10/29/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System OL RQ - FOCUSED TRAINING INSPECTION 2 3 10/25/2010 10/29/2010 IP 41500 Training And Qualification Effectiveness PSB1-RP - RP PUBLIC RADIATION PROTECTION 4 3 12/06/2010 12/10/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 12/06/2010 12/10/2010 IP 71124.04 Occupational Dose Assessment 3 12/06/2010 12/10/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3 12/06/2010 12/10/2010 IP 71124.07 Radiological Environmental Monitoring Program 3 12/06/2010 12/10/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3 12/06/2010 12/10/2010 IP 71151 Performance Indicator Verification PSB1-TI - TI-179 NSTS VERIFICATION 4 3 12/06/2010 12/10/2010 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS TFPI - 805 TFPI 6 3 04/04/2011 04/08/2011 IP 7111105T Fire Protection [Triennial]

3 04/18/2011 04/22/2011 IP 7111105T Fire Protection [Triennial]

EB3HS - HEAT SINK 1 3 06/20/2011 06/24/2011 IP 7111107T Heat Sink Performance OL EXAM - INIITIAL EXAM PREP 3 3 08/22/2011 08/26/2011 V23355 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INIITIAL EXAM - WEEK 1 3 3 09/12/2011 09/16/2011 V23355 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 3 09/12/2011 09/16/2011 IP 7111402 Alert and Notification System Testing This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Crystal River 09/01/2010 08:29:43 Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 3 09/12/2011 09/16/2011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3 09/12/2011 09/16/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 09/12/2011 09/16/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3 09/12/2011 09/16/2011 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM - WEEK 2 3 3 09/19/2011 09/23/2011 V23355 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL WEEK 1 3 3 10/31/2011 11/04/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 10/31/2011 11/04/2011 IP 71124.02 Occupational ALARA Planning and Controls 3 10/31/2011 11/04/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3 10/31/2011 11/04/2011 IP 71124.05 Radiation Monitoring Instrumentation 3 10/31/2011 11/04/2011 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL WEEK 2 3 3 11/14/2011 11/18/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 11/14/2011 11/18/2011 IP 71124.02 Occupational ALARA Planning and Controls 3 11/14/2011 11/18/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3 11/14/2011 11/18/2011 IP 71124.05 Radiation Monitoring Instrumentation 3 11/14/2011 11/18/2011 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure