ML12248A211

From kanterella
Jump to navigation Jump to search
Mid Cycle Assessment Letter Crystal River 2012
ML12248A211
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/04/2012
From: Rich D
NRC/RGN-II/DRP/RPB3
To: Franke J
Progress Energy Florida
References
IR-12-006
Download: ML12248A211 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 4, 2012 Mr. Jon A. Franke, Vice President Crystal River Nuclear Plant (NA1B)

Supervisor, Licensing &

Regulatory Programs 15760 West Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR CRYSTAL RIVER NUCLEAR PLANT UNIT 3 (NRC INSPECTION REPORT 05000302/2012006)

Dear Mr. Franke:

On August 15, 2012, the NRC completed its mid-cycle review of the Crystal River Nuclear Plant Unit 3. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Crystal River Unit 3 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP)

Action Matrix due to one White finding in the Emergency Preparedness Cornerstone. This finding was closed in Inspection Report 05000302/2012503 dated June 14, 2012, (ML12166A522). Crystal River Unit 3 transitioned back to the Licensee Response Column of the Action Matrix on July 1, 2012, as documented in Inspection Report and Assessment Follow-Up Letter 05000302/2012003 dated July 27, 2012, (ML12209A382). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

In order to implement the ROP at Crystal River Unit 3, the NRC implemented Inspection Manual Chapter (IMC) 0351, Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Other Than Significant Performance Problems.

The inspection plan prepared in accordance with IMC 0351 addresses accomplishment of the ROP baseline inspection procedures and also includes observations of the planned structural repairs to the containment building. Inspections will verify acceptable performance of major testing activities including tests associated with steam generator replacement, the containment building structural integrity test, and the containment integrated leak rate test. The inspection plan describes the current status of performance indicators and inspections planned to address

J. Franke 2 invalid performance indicators. As plant repairs and testing near completion, the inspection plan will be amended to focus on readiness for restart, including an Operational Readiness Assessment Inspection. The approved inspection plan is electronically available from the Publicly Available Record (PARS) component of the NRCs document system (ADAMS) under ML112590546.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (404) 997-4721 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72

Enclosure:

Crystal River Nuclear Plant Inspection/Activity Plan (09/01/12 - 12/31/13) cc w/Encl: (See page 3)

_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE SDR /RA/ DWR /RA/

NAME SRose DRich DATE 08/22/2012 08/22/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Franke 3 cc w/encl: William A. Passetti, Chief Kelvin Henderson, General Manager Florida Bureau of Radiation Control Nuclear Fleet Operations Department of Health Progress Energy Electronic Mail Distribution Electronic Mail Distribution Daniel R. Westcott, Supervisor Robert J. Duncan II, Vice President Licensing & Regulatory Programs Nuclear Operations Crystal River Nuclear Plant (NA1B)

Progress Energy Electronic Mail Distribution Electronic Mail Distribution Joseph W. Donahue, Vice President Brian C. McCabe Nuclear Oversight Manager, Nuclear Oversight Progress Energy Shearon Harris Nuclear Power Plant Electronic Mail Distribution Progress Energy Electronic Mail Distribution Jack E. Huegel, Manager, Nuclear Oversight (Acting) Plant General Manager Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution 15760 W. Power Line Street Crystal River, FL 34428-6708 David T. Conley, Senior Counsel Legal Department Stephen J. Cahill Progress Energy Director - Engineering Nuclear Electronic Mail Distribution Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Mark Rigsby Manager, Support Services - Nuclear R. Alexander Glenn, General Counsel Crystal River Nuclear Plant (NA2C)

Progress Energy Electronic Mail Distribution Electronic Mail Distribution Attorney General Jeffrey R. Swartz Department of Legal Affairs Director Site Operations The Capitol PL-01 Crystal River Nuclear Plant Tallahassee, FL 32399-1050 Electronic Mail Distribution Bryan Koon, Director Donna B. Alexander Florida Division of Emergency Management Manager, Nuclear Regulatory Affairs Electronic Mail Distribution (interim)

Progress Energy Chairman Electronic Mail Distribution Board of County Commissioners Citrus County Thomas Sapporito, Consulting Associate 110 N. Apopka Avenue (Public Correspondence Only) Inverness, FL 36250 Post Office Box 8413 Jupiter, FL 33468

J. Franke 4 Letter to Jon A. Franke from Daniel W. Rich dated September 4, 2012

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR CRYSTAL RIVER NUCLEAR PLANT UNIT 3 (NRC INSPECTION REPORT 05000302/2012006)

Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Crystal River 09/04/2012 08:16:53 Inspection / Activity Plan Report 22 09/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 4 3 11/12/2012 11/16/2012 IP 7111401 Exercise Evaluation 3 11/12/2012 11/16/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 11/12/2012 11/16/2012 IP 71151 Performance Indicator Verification PSB1-RP - PUBLIC RADIATION PROTECTION BASELINE 4 3 11/26/2012 11/30/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 11/26/2012 11/30/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3 11/26/2012 11/30/2012 IP 71124.07 Radiological Environmental Monitoring Program 3 11/26/2012 11/30/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3 11/26/2012 11/30/2012 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 2 3 04/08/2013 04/12/2013 IP 7111111B Licensed Operator Requalification Program CDBI - COMPONENT DESIGN BASES INSPECTION 9 3 04/15/2013 04/19/2013 IP 7111121 Component Design Bases Inspection 3 05/06/2013 05/10/2013 IP 7111121 Component Design Bases Inspection 3 05/20/2013 05/24/2013 IP 7111121 Component Design Bases Inspection 3 06/03/2013 06/07/2013 IP 7111121 Component Design Bases Inspection EP - EMERGENCY PREPAREDNESS INSPECTION 1 3 10/14/2013 10/18/2013 IP 7111402 Alert and Notification System Testing 3 10/14/2013 10/18/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3 10/14/2013 10/18/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3 10/14/2013 10/18/2013 IP 71151 Performance Indicator Verification MODS - PERM MODS 50.59 INSPECTION 5 3 11/04/2013 11/08/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3 11/18/2013 11/22/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications PSB1-RP - RP OCCUPATIONAL BASELINE 3 3 11/18/2013 11/22/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 11/18/2013 11/22/2013 IP 71124.02 Occupational ALARA Planning and Controls 3 11/18/2013 11/22/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3 11/18/2013 11/22/2013 IP 71124.04 Occupational Dose Assessment 3 11/18/2013 11/22/2013 IP 71124.05 Radiation Monitoring Instrumentation 3 11/18/2013 11/22/2013 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL BASELINE WEEK2 3 3 12/02/2013 12/06/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Crystal River 09/04/2012 08:16:53 Inspection / Activity Plan Report 22 09/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL BASELINE WEEK2 3 3 12/02/2013 12/06/2013 IP 71124.02 Occupational ALARA Planning and Controls 3 12/02/2013 12/06/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3 12/02/2013 12/06/2013 IP 71124.04 Occupational Dose Assessment 3 12/02/2013 12/06/2013 IP 71124.05 Radiation Monitoring Instrumentation 3 12/02/2013 12/06/2013 IP 71151 Performance Indicator Verification Comments:

This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.