Mid Cycle Report 22, Inspection/ Activity Plan 09/01/2009 - 12/31/2010
ML092440366
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Florida Power Corp
Shared Package
ML092440351 List:
References
Download: ML092440366 (2)


Text

Page 1 of 2 Crystal River 09/01/2009 08:11:50 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM - WEEK 1 3 3 08/31/2009 09/04/2009 V23305 CRYSTAL RIVER/SEPTEMBER 2009 EXAM AT POWER FACILITIES EB3SGR - SGR HEAVY LOAD PREP AND REVIEW 1 3 09/14/2009 09/18/2009 IP 50001 Steam Generator Replacement Inspection EB3SGR - SGR SG & ASSOCIATED MOD & DESIGN REVIE 1 3 09/14/2009 09/18/2009 IP 50001 Steam Generator Replacement Inspection OL EXAM - INITIAL EXAM - WEEK 2 2 3 09/14/2009 09/18/2009 V23305 CRYSTAL RIVER/SEPTEMBER 2009 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 1 (OUTAGE) 3 3 09/28/2009 10/02/2009 IP 7112101 Access Control to Radiologically Significant Areas 3 09/28/2009 10/02/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 3 09/28/2009 10/02/2009 IP 7112202 Radioactive Material Processing and Transportation 3 09/28/2009 10/02/2009 IP 71151 Performance Indicator Verification EB3ISI - INSERVICE INSPECTION 1 3 10/05/2009 10/09/2009 IP 7111108P Inservice Inspection Activities - PWR EB3SGR - SGR SG & ASSOCIATED MOD & DESIGN REVIEW 1 3 10/05/2009 10/09/2009 IP 50001 Steam Generator Replacement Inspection EB3SGR - SGR FIELD MOD & OSG CUTOFF REVIEW 1 3 10/05/2009 10/09/2009 IP 50001 Steam Generator Replacement Inspection EB3SGR - SGR RSG MAN MATL, PROC, TEST & ECT DATA 1 3 10/05/2009 10/09/2009 IP 50001 Steam Generator Replacement Inspection EB3TI172 - TI-172 RCS DM BUTT WELDS 1 3 10/05/2009 10/09/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds EB3SGR - SGR OBSERVE OSG MOVE OUT & TRANSPORT 1 3 10/12/2009 10/16/2009 IP 50001 Steam Generator Replacement Inspection EB3SGR - SGR OBSERVE RSG TRANSPORT, MOVE IN & INS 1 3 10/19/2009 10/23/2009 IP 50001 Steam Generator Replacement Inspection EB3SGR - SGR CONT REBAR INST REVIEW & CONC POUR 1 3 11/16/2009 11/20/2009 IP 50001 Steam Generator Replacement Inspection EB3SGR - SGR REVIEW WELDING & NDE FOR H/L & C/L 1 3 11/16/2009 11/20/2009 IP 50001 Steam Generator Replacement Inspection EB3SGR - SGR FINAL MOD, TESTING AND DOC REVIEW 1 3 11/30/2009 12/04/2009 IP 50001 Steam Generator Replacement Inspection PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 (OUTAGE) 4 3 11/30/2009 12/04/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Crystal River 09/01/2009 08:11:50 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 (OUTAGE) 4 3 11/30/2009 12/04/2009 IP 7112101 Access Control to Radiologically Significant Areas 3 11/30/2009 12/04/2009 IP 7112102 ALARA Planning and Controls 3 11/30/2009 12/04/2009 IP 7112202 Radioactive Material Processing and Transportation 3 11/30/2009 12/04/2009 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 4 3 02/01/2010 02/05/2010 IP 7111111B Licensed Operator Requalification Program PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 3 04/05/2010 04/09/2010 IP 71152B Identification and Resolution of Problems 3 04/19/2010 04/23/2010 IP 71152B Identification and Resolution of Problems PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 3 04/26/2010 04/30/2010 IP 7111401 Exercise Evaluation 3 04/26/2010 04/30/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 04/26/2010 04/30/2010 IP 71151 Performance Indicator Verification EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 7 3 05/10/2010 05/14/2010 IP 7111121 Component Design Bases Inspection 3 05/24/2010 05/28/2010 IP 7111121 Component Design Bases Inspection 3 06/07/2010 06/11/2010 IP 7111121 Component Design Bases Inspection 3 06/21/2010 06/25/2010 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure