Mid Cycle Report 22, Inspection/ Activity Plan 09/01/2009 - 12/31/2010
ML092440366
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Florida Power Corp
Shared Package
ML092440351 List:
References
Download: ML092440366 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 08:11:50 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Crystal River OL EXAM

- INITIAL EXAM - WEEK 1 3

3 CRYSTAL RIVER/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23305 08/31/2009 09/04/2009 EB3SGR

- SGR HEAVY LOAD PREP AND REVIEW 1

3 IP Steam Generator Replacement Inspection 50001 09/14/2009 09/18/2009 EB3SGR

- SGR SG & ASSOCIATED MOD & DESIGN REVIE 1

3 IP Steam Generator Replacement Inspection 50001 09/14/2009 09/18/2009 OL EXAM

- INITIAL EXAM - WEEK 2 2

3 CRYSTAL RIVER/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23305 09/14/2009 09/18/2009 PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK 1 (OUTAGE) 3 3

IP Access Control to Radiologically Significant Areas 7112101 09/28/2009 10/02/2009 3

IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 09/28/2009 10/02/2009 3

IP Radioactive Material Processing and Transportation 7112202 09/28/2009 10/02/2009 3

IP Performance Indicator Verification 71151 09/28/2009 10/02/2009 EB3ISI

- INSERVICE INSPECTION 1

3 IP Inservice Inspection Activities - PWR 7111108P 10/05/2009 10/09/2009 EB3SGR

- SGR SG & ASSOCIATED MOD & DESIGN REVIEW 1

3 IP Steam Generator Replacement Inspection 50001 10/05/2009 10/09/2009 EB3SGR

- SGR FIELD MOD & OSG CUTOFF REVIEW 1

3 IP Steam Generator Replacement Inspection 50001 10/05/2009 10/09/2009 EB3SGR

- SGR RSG MAN MATL, PROC, TEST & ECT DATA 1

3 IP Steam Generator Replacement Inspection 50001 10/05/2009 10/09/2009 EB3TI172

- TI-172 RCS DM BUTT WELDS 1

3 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/05/2009 10/09/2009 EB3SGR

- SGR OBSERVE OSG MOVE OUT & TRANSPORT 1

3 IP Steam Generator Replacement Inspection 50001 10/12/2009 10/16/2009 EB3SGR

- SGR OBSERVE RSG TRANSPORT, MOVE IN & INS 1

3 IP Steam Generator Replacement Inspection 50001 10/19/2009 10/23/2009 EB3SGR

- SGR CONT REBAR INST REVIEW & CONC POUR 1

3 IP Steam Generator Replacement Inspection 50001 11/16/2009 11/20/2009 EB3SGR

- SGR REVIEW WELDING & NDE FOR H/L & C/L 1

3 IP Steam Generator Replacement Inspection 50001 11/16/2009 11/20/2009 EB3SGR

- SGR FINAL MOD, TESTING AND DOC REVIEW 1

3 IP Steam Generator Replacement Inspection 50001 11/30/2009 12/04/2009 PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK 2 (OUTAGE) 4 3

IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 11/30/2009 12/04/2009 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2009 08:11:50 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Crystal River PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK 2 (OUTAGE) 4 3

IP Access Control to Radiologically Significant Areas 7112101 11/30/2009 12/04/2009 3

IP ALARA Planning and Controls 7112102 11/30/2009 12/04/2009 3

IP Radioactive Material Processing and Transportation 7112202 11/30/2009 12/04/2009 3

IP Performance Indicator Verification 71151 11/30/2009 12/04/2009 OL RQ

- REQUAL INSPECTION 4

3 IP Licensed Operator Requalification Program 7111111B 02/01/2010 02/05/2010 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

3 IP Identification and Resolution of Problems 71152B 04/05/2010 04/09/2010 3

IP Identification and Resolution of Problems 71152B 04/19/2010 04/23/2010 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

3 IP Exercise Evaluation 7111401 04/26/2010 04/30/2010 3

IP Emergency Action Level and Emergency Plan Changes 7111404 04/26/2010 04/30/2010 3

IP Performance Indicator Verification 71151 04/26/2010 04/30/2010 EB1-CDBI

- COMPONENT DESIGN BASES INSPECTION 7

3 IP Component Design Bases Inspection 7111121 05/10/2010 05/14/2010 3

IP Component Design Bases Inspection 7111121 05/24/2010 05/28/2010 3

IP Component Design Bases Inspection 7111121 06/07/2010 06/11/2010 3

IP Component Design Bases Inspection 7111121 06/21/2010 06/25/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure