Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML18151A6641999-08-0606 August 1999 Rev 0 to Surry Unit 2 Cycle 16 Startup Physics Tests Rept. ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18151A5511999-02-10010 February 1999 to NE-1187, Surry Unit 1,Cycle 16 Startup Physics Tests Rept. ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML20249B9911998-05-0606 May 1998 Analysis of Capsule X Virginia Power Surry Unit 1 Reactor Vessel Matl Surveillance Program. W/Evaluation of Surry Unit 1 Surveillance Capsule X Results & Response to NRC RAI Re GL 92-01,rev 1,suppl 1 ML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20199B0711998-01-0505 January 1998 Rev 0 to NE-1148, Surry Unit 2,Cycle 15 Startup Physics Test Rept ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML20210J5031997-07-31031 July 1997 Rev 0 to NE-1132, Surry Unit 1,Cycle 15 Startup Physics Tests Rept ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML18151A9761996-08-13013 August 1996 Cycle 14 Startup Physics Test Rept. W/960830 Ltr ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18152A4701996-06-13013 June 1996 Cycle 13 Control Rod Performance Test Results. ML18153A6901996-04-15015 April 1996 Proposed Tech Specs,Clarifying Applicability of Quadrant Power Tilt Ration Requirements ML18153A5391996-03-21021 March 1996 Proposed Tech Specs Re Charcoal Filter Testing Clarification ML18153A5271996-03-14014 March 1996 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML18153A5801996-01-30030 January 1996 Proposed Tech Specs Re Reactor Coolant Sys Liquid Sampling ML18152A0571995-12-20020 December 1995 Startup Physics Test Rept,Surry Unit 1,Cycle 14. W/960111 Ltr ML18153A6761995-11-20020 November 1995 Proposed Tech Specs Re App J Option B,performance-based Containment Leakage Rate Testing ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML18153A7141995-07-20020 July 1995 Proposed Tech Specs Establishing New Setpoint Limit for SG high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6991995-07-14014 July 1995 Proposed Tech Specs,Providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing SI Accumulators in Lieu of Accumulator Isolation ML18153A8371995-06-0808 June 1995 Proposed Tech Specs,Incorporating Revised Pressure/Temp Limits & Associated Ltops Setpoint That Will Be Valid to end-of-license ML20083C9951995-05-0808 May 1995 Rev 0 to Surry Unit 2,Cycle 13 Startup Physics Tests Rept ML18153B2301995-02-14014 February 1995 Proposed Tech Specs Re App J Testing Requirements ML18153B2131995-01-24024 January 1995 Proposed Tech Specs,Modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1621994-11-29029 November 1994 Proposed Tech Specs Implementing Zirlo Fuel Cladding ML18153B1581994-11-22022 November 1994 Proposed Tech Specs,Deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1501994-11-10010 November 1994 Proposed Tech Specs Re Changes to TS Will Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0941994-10-11011 October 1994 Proposed Tech Specs Surveillance Frequencies for Hydrogen Analyzers ML18152A5061994-09-0606 September 1994 Proposed Tech Specs Re Mgt Safety Review Committee & Station Nuclear Safety & Operating Committee Responsibilities ML18152A1191994-08-30030 August 1994 Proposed Tech Specs to Accomodate Core Uprating 1999-08-06
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML20076F8341994-08-0404 August 1994 Rev 0,Change 1 to Surry Unit 2 Third Interval IST Program ML18151A2451994-07-31031 July 1994 ISI Program,Interval 3,940510-040509, for Surry Power Station,Unit 2,rev 1 ML18151A2101994-07-31031 July 1994 ISI Program,Interval 3,931014-031013, Rev 1 ML18151A9011994-03-0303 March 1994 ISI Program Interval 3,940510- 040509, Rev 0 ML18151A1651993-04-30030 April 1993 Rev 0 to Surry Power Station Unit 1 ISI Program Interval 3 931014-031013. ML18151A6411992-03-19019 March 1992 Rev 5 to Surry Power Station,Unit 1,Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. ML18151A3711992-03-19019 March 1992 Rev 3 to Surry Power Station,Unit 2 Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. ML20079L2091991-09-22022 September 1991 Rev 2 to Station Administrative Procedure VPAP-0805, MOV Program, Upgrading Procedure to Acup Format ML20092M9061991-09-0101 September 1991 Rev 2 to VPAP-2103, Odcm ML18151A4121991-09-0101 September 1991 Rev 2 to VPAP-2103, Odcm. ML18151A6551990-11-14014 November 1990 Revised Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0,CPIP-3.1 & CPIP-3.2 ML20006C0571990-01-18018 January 1990 Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. ML15264A1571990-01-0202 January 1990 Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21 ML16152A8951990-01-0202 January 1990 Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations. ML20012A3751990-01-0101 January 1990 Rev 25 to, Offsite Dose Calculation Manual,Cawtaba Nuclear Station. ML20012A3771990-01-0101 January 1990 Rev 26 to, Offsite Dose Calculation Manual McGuire Nuclear Station. ML20012A3791990-01-0101 January 1990 Rev 27 to, Offsite Dose Calculation Manual,Oconee Nuclear Station. ML20012A3801990-01-0101 January 1990 Rev 28 to, Offsite Dose Calculation Manual,Oconee,Mcguire & Catawba Nuclear Stations. ML20012A3691989-12-0505 December 1989 Rev 8 to, Process Control Program,Mcguire Nuclear Station. ML20011D2441989-12-0101 December 1989 Crisis Mgt Implementing Procedures. ML20012A3721989-11-27027 November 1989 Rev 4 to, Process Control Program,Cawtaba Nuclear Station. ML20012A3731989-11-15015 November 1989 Rev 4 to, Process Control Program Oconee Nuclear Station. ML19325F1931989-11-0101 November 1989 Public Version of Rev 32 to, Crisis Mgt Plan for Nuclear Stations. ML19332C8451989-11-0101 November 1989 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8,Rev 31 to CMIP-9 & Rev 19 to CMIP-13 ML20247H3371989-09-15015 September 1989 Revised Corporate Organization for Nuclear Incidents (Coni) Procedure Manual Including Rev 15 to CONI-1.01, Preparation,Issuance & Control Procedures, Rev 30 to CONI-1.02, Coni & Rev 19 to CONI-1.03, Alerting .. ML20245L7651989-08-0707 August 1989 Rev 0 to Offsite Dose Calculation Manual ML20247M7921989-07-31031 July 1989 Rev 6 to PWR Operations Guideline Number 12 Simulator Testing Program. Simulator Transient Test Review Data Encl ML20247M9151989-07-27027 July 1989 Procedure Generation Package ML20247N0421989-06-19019 June 1989 Rev 5 to SS-1, Braidwood Simulator Steady State Performance Test ML20247M7861989-05-26026 May 1989 Rev 0 to SV-1, Braidwood Simulator Surveillance Testing ML20247M7581989-05-26026 May 1989 Rev 0 to Test NO-1, Braidwood Simulator Normal Operations Testing ML18152A5231989-04-19019 April 1989 Rev 0 to Motor-Operated Valve Action Plan. ML20245C2541989-04-0505 April 1989 Public Version of Rev 29 to Duke Power Co Crisis Mgt Plan for Nuclear Stations ML20247M7801989-04-0404 April 1989 Rev 0 to ST-1 Re Simulators safety-related Valves Stroke W/ Acceptable Time Period Required by ANSI/ANS-3.5-1985 ML20247M8741989-02-0101 February 1989 Rev 1 to 2BEP-0, Reactor Trip or Injection Unit 2 ML20247M8661989-02-0101 February 1989 Rev to 1BEP-0, Reactor Trip or Safety Injection Unit 1 ML20247M8201989-02-0101 February 1989 Rev 1 to 2BWEP-0, Reactor Trip or Safety Injection Unit 2 ML20247M8011989-02-0101 February 1989 Rev 1 to 1BWEP-0, Reactor Trip or Safety Injection Unit 1 ML18152A2911988-10-19019 October 1988 Major Milestones Description of Issue Approach to Resolution. ML20204J1391988-09-0707 September 1988 Temporary Procedure Change 88-504 to Rev 4 to Procedure E-0, Reactor Trip or Safety Injection ML20204J0391988-08-23023 August 1988 Rev 4 to Emergency Operating Procedure EOP 3.1-28, Turbine Overspeed ML20205A3671988-08-0303 August 1988 Rev 4 to Emergency Operating Procedure EOP 2532, Loss of Primary Coolant 1998-05-04
[Table view] |
Text
LTR A B AlidyNE ENOINEl!IIINO COIIPOIIAnON
- REVISIONS ECO DESCRIPTION N/A See DCN N/A See DCN N/A See DCN (~-841.1200405 841105 _____ ---,, , ~DR ADOCK 05000280 PDR SIGNATURE DATE TITLE DATE APPROVED 12-8-80 1-15-81 PROD TEST MC170AD-Q2 (Less Plug-In Cards) .NGINEERING R~-&r.~~ NUMBER r--------l--=-~=----.....,..-----+-'--"~----1 ATP442 QUAL CONTROL ,.,,.,. SHEET 1 OF 9 8626 WILBUR AVENUE
CA 91324 * (213) 886-8488
- Telex No. 65-1303 VEC 304-11/80 REV B
(. -1.0 GENERAL ACCEPTANCE TEST PROCEDURE MC170AD-Q2 (LESS PLUG-IN CARDS) The tests herein will determine the functional integrity of the subject module case wiring, including fan function and insulation.
resistance between isolated circuits.
These tests are performed on Module Cases which are being shipped without plug-in circuit eards. 2.0 EQUIPMENT DESCRIPTION Item Description Mfr/Model Alternate 1 Insulation Resistance General Radio Equivalent Megohmmeter GR 1864 2 Digital Multimeter Data Precision Equivalent DP248 3 Transducer Simulator Validyne (VEC) Equivalent VEC #1528 4 Carrier Demodulator Validyne (VEC) None CD173 (with Relay Cal Option) 5 Power Supply VEC PS171 None 6 Power Supply VEC PS294 None 7 Analog Board VEC AB295 None 8 Digital Board VEC AD296 None 3.0 EXAMINATION OF EQUIPMENT
3.1 Inspection
The Module Case traveler shall be verified for completed in-process inspection sign-offs.
A visual inspection of the completed unit will be made to verify conformance to the applicable engineering drawings.
Verify that the Model I.D. and Serial Number label is installed.
8626 WILBUR AVENUE
- NORTHRIDGE, CA 91324 * (213) 886-8488
- Telex No. 65-1303 ATP 442 Page 2 of 9 Rev. B idyNE ENOINEEIIINO COll~OIIATION
3.1 Inspection
(Continued)
Review that any special purchase order instructions pertinent to the units under inspection have been incorporated.
Perform the tests covered in Section 4.0. 4.0 PERFORMANCE TESTS 4.1 The tests contained herein verify the MD170AD wiring continuity, insulation resistance, and cooling fan operation.
4.1.1 Insulation
Resistance Tests (MC170AD without Plug-ins installed)
Test the insulation resistance using the GR1864 meter, with a test potential of 500 VDC, between the circuits listed. The insulation resistance in every test shall exceed 100 Megohms. a) TBlOl, all pins (1-7) to chassis (one at a time) b) Power Line (HI) ~o Chassis c) Power Line (LO) to Chassis d) Each Channel Input*connector pins A thru G to Chassis. (25 connectors, 7 pins at a time) e) Digital output connector J102, Pin A, B, or C to Chassis 4.1.2 Continuity Tests Use the DP248 DPM to measure the continuity between the points listed. The continuity shall measure 1.0 Ohms or less in every step. a) Power connector JlOl Pin C to Chassis b) Each Channel Input Connector Pin F to TBlOl Pin 3 c) Each Channel Input Connector Pin G to TBlOI Pin 5 8626 WILBUR AVENUE
CA 91324 * (213) 886*8488
- Tele~ No. 65*1303 ATP 442 Page 3 of 9 Rev. :S
( (. 4.1. 3 Fan Test Insert the PS171 Power Supply and connect 115 VAC, 60 Hz using power co!d connected to Jl02. Apply power by sing PS171 power switch. Observe that the fan rotates efficiently and exhausts air out the right side of the Module Case. 4.1.4 Functional Tests Connect the equipment as shown in Figure 1. With the lator and CD173 connected in the Channel 1 position, monitor the DC voltage at the *cD173 DC output test point. Calibrate the CD173 span and zero controls to give O +/-0.005 VDC at 0 mV/V input and+ 9.000 +/-0.005 VDC at+ 9 mV/V input tively. (Use the LO balance range and 4-Arm input mode tion, and 10 mV/V span range of the CD173.) In each channel position the CD173 and simulator shall be connected and the appropriate test point shall be monitored (as listed on the data sheet). Extender card may be used for access to AB295 test points. The first seven channels are to be jumpered at the analog connector using the jumper connector as shown in Figure 1. With these jumpers in.place, outputs will be duplicated in channels 26 thru 32 respectively when inputs are applied at channels 1 thru 7 respectively.
With the simulator set at +9 mV/V, the output of each tored test point shall be within +/-0.030 VDC of the CD173 DC test point value noted in the Channel 1 position (nominal +9.00 VDC). In each channel position, the CAL mode shall be momentarily applied (either via the switch at the front of the DB296 or by jumping TB101-2 to TB101-1. ATP 442 Rev.B Page 4 of 9 8626 WILBUR AVENUE
CA 91324
4.1.4 idyNE
ENOINEEIUNO COIIPOIIATION Functional Tests (Continued)
During the CAL mode, the monitored voltage shall be more tive by approximately one Volt DC from the nominal +9 VDC value observed in the normal mode of operation.
Note that green LED is lit at front of AD296. 4.1.5 Digital Output Connections 4l.5.1Remove power from the MC170AD. Measure continuity of One Ohm maximum between points listed: Jl02 Mother Board A (RED) HI B (BRN) LO C (BLK) D GND D (GND) C GND 4l.5.2 If actess to mother board is obscured by top cover, perform continuity test as listed below. Use AD296 extender card for access to AD296 connector pins. J102-A to AD296-4 J102.:.a to AD296-3 J102-C to AD296-5 J102-D to Chassis 8626 WILBUR AVENUE
- NORTH RIDGE. CA 91324 * (213) 886-8488
- Telex No. 65*1303 ATP 442 Page 5 of 9 Rev. B
(. (. m AtidyNE ENOINEEIIINO CDII .. OIIATION FIGURE ./ -TEsr CONNECT/OHS MC'/70AO TE.Sr PROC*00R£ CIIANNEl 1/'IPUr CONNG'CT0/<1 2--------CI I
si------.RI 0 t-----------+--
J/0.3 THAN.SO{ICc~ I Milt. /:JTOR RI= 49,9K r1% ,ez = /OOA. .:f 1% PINS JI./MPE~ED:
8-25 TO A-/~ A-ZS 7a 8-IZ 8 .. 24 T() ,i-/Z A-24 70 s--11 B--23 Ta A-II A-23 ro s-10 S-22 TO A-/0 \ j/OJ Al >II t.o-) /15 VAC' tl,O#Z s1i-------
POWER INPOr C ' --CONTAINS:
PS294 1 AB29~ Al)Z9t;./
PS/71 8c C()./7.3 (WITH CAt. 1<£t.AY le -CA~ RES = SI. /1(' r.1% 8626 WILBUR AVENUE
- NORTH RIDGE, CA 91324 * (213) 886-8488
- Telex No. 65-1303 _ ATP 442
(. (. Para. TESTED BY AidyNE ENGINEERING COR .. ORATION TEST.DATA SHEET -UNIT UNDER.TEST:
MC170AD~Q2 UNIT SERIAL NO. -------=---
DATE ------------------
3.1 Visual inspection completed and Module Case traveler signed off (Ready for Functional Test) Model I.D & S/N label installed
4.1.1 Insulation
resistance at 500 VDC: (Greater than 100 Megohms) with respect to chassis -a) TB101-1 3 5 7 b) Power Line HI (JlOl-A) c) Power Line LO (JlOl-B) d) Each input CH. connector, Pins A thru G CH-1 CH-11 CH-21 -2* 22 13 4 24 15 6 7 8 9 10 -20. e) J102-A -B -C -~-...8.62.S WII BIJB AVENlJE
.1"'.11. Q1":1?4,-a 1?1'.1.1 RRR.R4RR
- Talav fl.In Ri:..1":ln":I ATP 442 Page 7 of 9 RAV-R" Para. 4.1.2 ** 1.3 C TESTED BY Continuity
= 1.0 Ohms a) JlOI-C to Chassis idyNE ENQINEEIUNQ COll~OIIATION TEST.DATA.SHEET MC170AD-Q2. (WITHOUf.PLUG,;.INS)
UNIT SERIAL NO. DATE Maximum b) Each Input Channel Connector:
CH. NO. PIN F TO TBIOI-3 PING TO TBIOI-5 CH. 1 2 3 4 5 6 7 8 9 10 11 12. 13 14 15 16 17 18 19 20 21 22 23 24 25 Fan rotation satisfactory nc""c IA'II OIID A\/C:l,.IIIC:
,...,, n,.,.,A e 1'11?\ QQC: QAQQ e Tai..,,. P..lo t=!S 1?0? ATP 442 Page 8 of 9 Re,, :a
(. Para. 4.1.4 4.1.5 TEST DATA SHEET MC170AD-Q2 UNIT SERIAL NO. ____ _ TESTED BY DATE -------------------
cm. No. AB295: LO Pass Filter Test Point 1,26 Al-A, A7-B 2,27 Al-B, A7-C 3,28 Al-C, A7-D 4,29 Al-D, AS-A 5,30 A2-A, A8-B 6,31 A2-B, AS-C 7,32 A2-C, AS-D 8 A2-D 9 A3-A 10 A3-B 11 A3-C 12 A3-D 13 A4-A 14 A4-B 15 A4-C 16 A4-D 17 AS-A 18 AS-B 19 AS-C 20 AS-D 21 A6-A 22 A6-B 23 A6-C 24 A6-D 25 A7-A Green LED at DB296 illuminated Voltage (Within +/-.03 VDC of CDl 73 Output ----------
_c_on_t_i_n_u_i
..... ty"--~~--O_O_hm_s 4.1.5.1 J102 A (RED)---~
B (BRN)---~
C (BLK)----,.
D (GRN)----1 Mother Board HI LO D GND C GND 4.1.s.2* (Alternate)
AD296-4 AD296-3 AD296-5 Chassis -1 voe Deviation In CAL Mode ATP 442 Rev. B Page 9 of 9