|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML18151A6641999-08-0606 August 1999 Rev 0 to Surry Unit 2 Cycle 16 Startup Physics Tests Rept. ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18151A5511999-02-10010 February 1999 to NE-1187, Surry Unit 1,Cycle 16 Startup Physics Tests Rept. ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML20249B9911998-05-0606 May 1998 Analysis of Capsule X Virginia Power Surry Unit 1 Reactor Vessel Matl Surveillance Program. W/Evaluation of Surry Unit 1 Surveillance Capsule X Results & Response to NRC RAI Re GL 92-01,rev 1,suppl 1 ML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20199B0711998-01-0505 January 1998 Rev 0 to NE-1148, Surry Unit 2,Cycle 15 Startup Physics Test Rept ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML20210J5031997-07-31031 July 1997 Rev 0 to NE-1132, Surry Unit 1,Cycle 15 Startup Physics Tests Rept ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML18151A9761996-08-13013 August 1996 Cycle 14 Startup Physics Test Rept. W/960830 Ltr ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18152A4701996-06-13013 June 1996 Cycle 13 Control Rod Performance Test Results. ML18153A6901996-04-15015 April 1996 Proposed Tech Specs,Clarifying Applicability of Quadrant Power Tilt Ration Requirements ML18153A5391996-03-21021 March 1996 Proposed Tech Specs Re Charcoal Filter Testing Clarification ML18153A5271996-03-14014 March 1996 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML18153A5801996-01-30030 January 1996 Proposed Tech Specs Re Reactor Coolant Sys Liquid Sampling ML18152A0571995-12-20020 December 1995 Startup Physics Test Rept,Surry Unit 1,Cycle 14. W/960111 Ltr ML18153A6761995-11-20020 November 1995 Proposed Tech Specs Re App J Option B,performance-based Containment Leakage Rate Testing ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML18153A7141995-07-20020 July 1995 Proposed Tech Specs Establishing New Setpoint Limit for SG high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6991995-07-14014 July 1995 Proposed Tech Specs,Providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing SI Accumulators in Lieu of Accumulator Isolation ML18153A8371995-06-0808 June 1995 Proposed Tech Specs,Incorporating Revised Pressure/Temp Limits & Associated Ltops Setpoint That Will Be Valid to end-of-license ML20083C9951995-05-0808 May 1995 Rev 0 to Surry Unit 2,Cycle 13 Startup Physics Tests Rept ML18153B2301995-02-14014 February 1995 Proposed Tech Specs Re App J Testing Requirements ML18153B2131995-01-24024 January 1995 Proposed Tech Specs,Modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1621994-11-29029 November 1994 Proposed Tech Specs Implementing Zirlo Fuel Cladding ML18153B1581994-11-22022 November 1994 Proposed Tech Specs,Deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1501994-11-10010 November 1994 Proposed Tech Specs Re Changes to TS Will Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0941994-10-11011 October 1994 Proposed Tech Specs Surveillance Frequencies for Hydrogen Analyzers ML18152A5061994-09-0606 September 1994 Proposed Tech Specs Re Mgt Safety Review Committee & Station Nuclear Safety & Operating Committee Responsibilities ML18152A1191994-08-30030 August 1994 Proposed Tech Specs to Accomodate Core Uprating 1999-08-06
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML20076F8341994-08-0404 August 1994 Rev 0,Change 1 to Surry Unit 2 Third Interval IST Program ML18151A2451994-07-31031 July 1994 ISI Program,Interval 3,940510-040509, for Surry Power Station,Unit 2,rev 1 ML18151A2101994-07-31031 July 1994 ISI Program,Interval 3,931014-031013, Rev 1 ML18151A9011994-03-0303 March 1994 ISI Program Interval 3,940510- 040509, Rev 0 ML18151A1651993-04-30030 April 1993 Rev 0 to Surry Power Station Unit 1 ISI Program Interval 3 931014-031013. ML18151A6411992-03-19019 March 1992 Rev 5 to Surry Power Station,Unit 1,Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. ML18151A3711992-03-19019 March 1992 Rev 3 to Surry Power Station,Unit 2 Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. ML20079L2091991-09-22022 September 1991 Rev 2 to Station Administrative Procedure VPAP-0805, MOV Program, Upgrading Procedure to Acup Format ML20092M9061991-09-0101 September 1991 Rev 2 to VPAP-2103, Odcm ML18151A4121991-09-0101 September 1991 Rev 2 to VPAP-2103, Odcm. ML18151A6551990-11-14014 November 1990 Revised Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0,CPIP-3.1 & CPIP-3.2 ML20006C0571990-01-18018 January 1990 Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. ML15264A1571990-01-0202 January 1990 Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21 ML16152A8951990-01-0202 January 1990 Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations. ML20012A3751990-01-0101 January 1990 Rev 25 to, Offsite Dose Calculation Manual,Cawtaba Nuclear Station. ML20012A3771990-01-0101 January 1990 Rev 26 to, Offsite Dose Calculation Manual McGuire Nuclear Station. ML20012A3791990-01-0101 January 1990 Rev 27 to, Offsite Dose Calculation Manual,Oconee Nuclear Station. ML20012A3801990-01-0101 January 1990 Rev 28 to, Offsite Dose Calculation Manual,Oconee,Mcguire & Catawba Nuclear Stations. ML20012A3691989-12-0505 December 1989 Rev 8 to, Process Control Program,Mcguire Nuclear Station. ML20011D2441989-12-0101 December 1989 Crisis Mgt Implementing Procedures. ML20012A3721989-11-27027 November 1989 Rev 4 to, Process Control Program,Cawtaba Nuclear Station. ML20012A3731989-11-15015 November 1989 Rev 4 to, Process Control Program Oconee Nuclear Station. ML19325F1931989-11-0101 November 1989 Public Version of Rev 32 to, Crisis Mgt Plan for Nuclear Stations. ML19332C8451989-11-0101 November 1989 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8,Rev 31 to CMIP-9 & Rev 19 to CMIP-13 ML20247H3371989-09-15015 September 1989 Revised Corporate Organization for Nuclear Incidents (Coni) Procedure Manual Including Rev 15 to CONI-1.01, Preparation,Issuance & Control Procedures, Rev 30 to CONI-1.02, Coni & Rev 19 to CONI-1.03, Alerting .. ML20245L7651989-08-0707 August 1989 Rev 0 to Offsite Dose Calculation Manual ML20247M7921989-07-31031 July 1989 Rev 6 to PWR Operations Guideline Number 12 Simulator Testing Program. Simulator Transient Test Review Data Encl ML20247M9151989-07-27027 July 1989 Procedure Generation Package ML20247N0421989-06-19019 June 1989 Rev 5 to SS-1, Braidwood Simulator Steady State Performance Test ML20247M7861989-05-26026 May 1989 Rev 0 to SV-1, Braidwood Simulator Surveillance Testing ML20247M7581989-05-26026 May 1989 Rev 0 to Test NO-1, Braidwood Simulator Normal Operations Testing ML18152A5231989-04-19019 April 1989 Rev 0 to Motor-Operated Valve Action Plan. ML20245C2541989-04-0505 April 1989 Public Version of Rev 29 to Duke Power Co Crisis Mgt Plan for Nuclear Stations ML20247M7801989-04-0404 April 1989 Rev 0 to ST-1 Re Simulators safety-related Valves Stroke W/ Acceptable Time Period Required by ANSI/ANS-3.5-1985 ML20247M8741989-02-0101 February 1989 Rev 1 to 2BEP-0, Reactor Trip or Injection Unit 2 ML20247M8661989-02-0101 February 1989 Rev to 1BEP-0, Reactor Trip or Safety Injection Unit 1 ML20247M8201989-02-0101 February 1989 Rev 1 to 2BWEP-0, Reactor Trip or Safety Injection Unit 2 ML20247M8011989-02-0101 February 1989 Rev 1 to 1BWEP-0, Reactor Trip or Safety Injection Unit 1 ML18152A2911988-10-19019 October 1988 Major Milestones Description of Issue Approach to Resolution. ML20204J1391988-09-0707 September 1988 Temporary Procedure Change 88-504 to Rev 4 to Procedure E-0, Reactor Trip or Safety Injection ML20204J0391988-08-23023 August 1988 Rev 4 to Emergency Operating Procedure EOP 3.1-28, Turbine Overspeed ML20205A3671988-08-0303 August 1988 Rev 4 to Emergency Operating Procedure EOP 2532, Loss of Primary Coolant 1998-05-04
[Table view] |
Text
(
ACCEPTANCE TEST PllOCEDU!E 444-2 PT174-2-Q2
(~eaistance Thermometer Signal Conditioner)
I Controlled Distribution I.on Black Luis Flores Taj IC.itaji Lynda lCamerman 841105 941120043 3 05000200 pDR AD0Cl( *pDR.
F
(
REVISIONS LTR ECO DESCRIPTION DATE APPROVED A SEE DCN 4/13/81 TITLE PT174-2-02 Resistance Thermometer Signal Conditioner GI NEERING NUMBER REV QUAL CONTROL ATP444- 2 B SHEET 1 OF 10 8626 WILBUR AVENUE
- NORTHRIDGE. CA 91324 * (213) 886-8488
- Telex No. 65*1303 VEC 304-11/80
A(idyNE ENGINEEIIING COllll'OIIATION
(
1.0 SCOPE This document defines the Acceptance Test Procedure (ATP) for the PT174-2-Q2 Resistance Thermometer Signal Conditioner. The ATP performs functional tests of operating characteristics. A sample. of the Test Report to be used with this ATP is contained in Appendix A.
2.0 EQUIPMENT REQUIRED Table 1 lists the test equipment required to perform the ATP.
Table 1. Equipment Required for ATP Part No.
Description Manufacturer or Model Alternate MCl (Test)
Extender Card (MC1-MC170)
Validyne
, Validyne
-- None None PT174-2 Tester Validyne Tl096 None Digital Multimeter (DMM) Data Precision 245 Commercial Equivalent Oscilloscope B &K 1470 Commercial Equivalent Function Generator Interstate F47 Commercial Equivalent Frequency Counter Hewlett Packard 5314A Commercial Equivalent 3.0 PRELIMINARY PROCEDURE
- 3.1 Plug extender card into front panel connector on MCl.
3.2 Refer to figure 1 and set 3W/4W switch SlA/SlB to 4W; ensure resistors Rl and R7 are the correct value for the customer specified probe (nickel or platinum).
3.3 Plug Ptl74-2-Q2 into extender card cable connector.
3.4 Using tester cable, connect PT174-2 tester to input connector.on rear of MCI; set the 3W/4W.switch on PT174-2 tester to 4W.
3.5 If necessary, connect MCl to 115 Vac and press MCl power switch; observe that power-on indicator lights.
3~ 6 Set PTl 74-.2 tester FUNCTION switch to LINEARITY.
NUMBER REV ATP444-2 B SH 2 10
C
~
~ ~-i ~[3 C
~
I-R25 SPAN ~
z 0
C I I 0 C, u ~
@o d R14 IZERO N 1,g O 1,-1
4 A El ES E9 El O E6 . 6 5 El * *
\a\ 12 11 I I 14 1J
~ I I llr---m * £2 I
I 16 15 I1a 11 20 19 22 21 I24 23 26 25
~-~,0[:J 28 27 Em
- l,O ,-i
- '
JO 29
@ II rrm I I m ffl z
Cl
.il'I z:
~:!! -
C: i~
==
CD m
- a jz I i Ill
~,
en
- z:
~
t"d
.i:-,
,i:...
~
WI I
C I "'
"Tl 0
~ <
Figure 1. PT174-2-Q2 Parts Locations
AlidyNE ENGINEERING COllll"OIIATlON
(
4.0 INITIAL TEST SETUP 4.1 Connect DMM to MCl as shown in figure 2; set DMM to read DC voltage.
MCl (TEST)
PT174-2 TESTER
[r'!0 TESTER CABLE (
D
-- EXTENDER CARD
,. - PT174-2-Q2 L
-~ """"
I OUTPUT AI BLACK? o RED
!COM! J OHI DMM NOTE: BOXED CALLOUT 1xxx1 INDICATES PANEL MARKINGS Figure 2. Initial Test Setup NOTE: Unless otherwise indicated, controls referred to in the ATP procedures that follow are located on the PT174-2-Q2; see figure 1 for locations.
NUMBER REV ATP444 -2 B SHEET 4 OF 10
AlidyNE INGINalllll- COIIP'O-TION C
5.0 FUNCTIONAL TESTS The nominal resistance and type of probe (nickel or platinum) to be used with each PT174-2-Q2 is specified by the customer. Perform all tests and in order given. See Table 3 for the resistance versus temperature for platinum probe used in standard PT174-2-Q2.
5.1 4-Wire/3-Wire Zero Setting 5.1.1 Set PT174-2 tester °F switch to O (-17.8°C); adjust ZERO control Rl4 for 0.000 (+/-0.002)V DC on DMM.
5 .1.2 Set PT174-2 tester °F switch to 1000 (538°C); adjust SPAN control R25 for
+10.000 (+/-0.002) V DC on DMM.
5.1.3 Repeat steps 5.1.1 and 5.1.2 as necessary to obtain desired_ readings.
5 *. 1.4 Set. PT174- 2 tester °F switch to 0, and 3W/4W switch to 3W.
5.1.5 On PT174-2 set 3W/4W switch S1A/S1B to 3W.
5.L6 Adjust potentiometer R33 for 0.000 (+/-0.002) V DC on DMM.
5.1. 7 On PT174-2 set 3W/4W switch SlA/SlB to 4W; on PT174-2 tester, set the 3W/4W switch to 4W.
Adjust ZERO control R14 for 0.000 (+/-0.002) V DC on DMM.
- Repeat steps 5.1.4 thru 5.1.8 as necessary to obtain desired readings.
Output Noise 5.2.1 Set DMM to read AC millivolts.*
5.2.2 Set PT174-2 tester °F switch to 1000; the output indication on the DMM should be 10 mV AC maximum. Indicate acceptance on test report with checkmark.
5.2.3 On PT174-2-Q2, set 3W/4W switch S1A/S1B to 3W; *set PT174-2 tester 3W/4W switch to 3W. The output indicati_on on the DMM should be 10 mV/ AC maxi-mum. Indicate acceptance on test report with checkmark.
5.3 Linearity 5.3.1 On PT174-2-Q2, set 3W/4W switch SlA/SlB to 4W; set PT174-2 tester 3W/4W switch to 4W.
5.3.2 Set DMM to read DC volts.
5.3.3 Perform the steps in Table 2 to check the linearity of the PT174-2-Q2;.
for each step set the PT174-2 tester °F switch as indicated, and indicate acceptance on test report with checkmark.
NUMBER REV ATP444-2 B SHEET 5 OF 10
A(idyNE
!j!NOINEl!IIINO COIIPOIIATION
(
Table 2. Linearity Check PT174-2-02 Tester Output Specification Step ~F Switch on DMM (VDC) 1 .-300 (-184 °C) -3.000+/-0.015 2 0 (-17.8°C) 0.000+/-0.002 3 500 (260° C) +5.000+/-0.012 4 1000 (538° C) +10.000+/-0.002 5.3.4 On PT174-2-02, set 3W/4W switch S1A/S1B to 3W: set PT174-2 tester 3W/4W switch to 3W. Adjust, if necessary, the SPAN potentiometer for 10.000 +/-
0.002 Vdc on DMM.
5.3.5 Repeat step 5.3.3.
5.4 *Filter 5.4.1 Connect function generator, frequency counter, and oscilloscope as shown in figure 3.
5.4.2 Set PT174-2 tester FUNCTION switch to FILTER CHECK.
5.4.3. Set function generator output to 1. 0 Hz,. as indicated on the frequency counter; set oscilloscope for DC coupling~~
PT174-2 MCl(TEST)
TESTER EXTENDER *PTl 74-2-02 CARD fSIGl REDu-+----.
Ll!Ll !DMM I BLACK RED BLACKn-.-~
OUTPUT
@}]
I INPUT
- ISYNCI OUT @JJ FREQUENCY FUNCTION COUNTER GENERATOR
- OSCILLOSCOPE NOTE: BOXED CALLOUT jxxxl INDICATES PANEL MARKINGS Figure 3. Filter Test Setup NUMBER REV ATP444-2 B SHEET 6 OF 10
AlidyNE IINGINEEIH- COIIPO-T10N 5.4.4 Adjust the amplitude of the function generator output for a 16V peak-to-peak display on CH 1 of oscilloscope; note amplitude of display on CH 2 of oscilloscope.
5.4.5 Raise the frequency of the function generator until! the display is 11.3V peak-to-peak on CH 1 of oscilloscope. (Make sure amplitude on CH 2 is the same as in step 5.4.4) this should occur at 10+/-2.5Hz. Indicate acceptance on test report with checkma.rk.
5.4.6 Set function genera.tor output to 30 Hz, as indicated on the frequency counter; adjust the amplitude of the function genera.tor output until the CH 2 display on oscilloscope is the same as noted in 5.4.4., and observe that the display on CH 1 of oscilloscope is 930 +/- 300 mV peak-to-peak.-*
Indicate acceptance on test report with checkma.rk.
5.5 Remote Calibration Ci~cuit 5.5.1 Connect DMM to MCI OUTPUT A and set DMM to read DC volts.
5.5.2 On PT174-2-Q2, connect pin 28 of connector (Figure 1) to signal ground (Pin 24); the output indication on DMM should be 5.884+/-0.220V. Indicate acceptance on test report with checkma.rk.
5.5.3 Remove Ground from pin 28 of PT174-2-Q2 connector.
5.6 Current Consumption 5.6.1 Connect the.DMM leads to the MCI +15V current and voltage test jacks
- (Figure 5); set DMM to read DC mA.
5.6.2 Set the MCI +15V I TEST switch (Figure 5) to +15; the DMM indication should not exceed 22 mA. Indicate acceptance with checkmark on test report.
5.6.3 Set the MCl +15V I TEST switch to the unmarked position; disconnect the DMM leads from the MCl.
5.6.4 Connect the DMM leads to the MCl -15V current and voltage test jacks (Figure 5).
5.6.5 Set the MCl -15V I TEST switch (Figure 5) to -15; the DMM indication should not exceed 22 mA. Indicate acceptance with checkmark on test report.
5.6.6 Set the MCl -15V I TEST switch to the unmarked position; disconnect the DMM leads from the MCl.
5.6.7 Unplug PT174-2-Q2 from extender card cable connector.
NUMBER REV ATP444-2 B SHEET OF 10
A(idyNE ENGINEERING COllll'OIIATION MCl(TEST)
EXTENDER CARD PT174-2 R CAL TESTER I OUTPUT A PT174-2-02 BL*_K RED HI DMM NOTE: BOXED CALLOUT lxxxl INDICATES PANEL MARKINGS Figure 4. Remote Calibration Circuit Test Setup mvAlidyNE OUTPUT
-15V VOLTAGE TEST jACK .
- NOTE :
~ 0
- MCl TEST CONNECT DMM COM LEAD TO CURRENT TEST JACK AND HI LEAD TO VOLTAGE TEST JACK Figure 5. MCl (Test) +/-15V Current Test Switch and Jack Locations NUMBER REV ATP444-2 B SHEET 8 OF 10
AlidyNE l!NGINaaRING CORll'ORAT10N TABLE 3 Platinum Resistance Versus Temperature in °F International -DIN 43760(0.0038SQ/n/°C)
Temperature °F Ohms
-300 25.21
-250 36.94
-200 48.46
-150 59.79
-100 70.98
- 50 82.06 0 93.03 32 100.00 so 103. 90 .
100 114. 68 150 125.37 200 135.97 250 146.48 300 156.90 350 167.23 400 177.47 450 187.62 500 197.69 550 207.66 600 217.55 650 227.36 700 237.07 750 246.70 800 256.23 850 265.68 900 275.04 950 284.31 1000 293.49
(
NUMBER REV ATP444 -2 B SHEET 9 OF 10 oc.,c. \A/II C::IIIC /'l\/CF\IIIC A ~ll""'ICTUC1n.r~ rA ,., * .,.,A
AlidyNE ENOINEEIIINO COlll"OIIAT10N APPENDIX A SAMPLE TEST REPORT NUMBER REV ATP444-2 B SHEET 10 OF 10
PT174-2-02 Resistance ASSY Thermomet"er Signal Conditioner S/0 CUSTOMER W/0 SERIAL NO.
TESTED BY DATE Paragraph/Step Accepted Specification 5.2 Output Noise 5.2.2 DMM Indication 10 mV AC max.
5.2.3 DMM Indication 10 mV AC max.
5.3 Linearity 5.3.3 Table 2 Step Indication 1 DMM -3.000(+/-0.0lS)V 2 DMM 0.000(+/-0.002)V 3 DMM +5.000(+/-0.012)V 4 DMM +10.000(+/-0.002)V 5.3.5 Table 2 Step Indication 1 DMM -3.000(+/-0.0lS)V 2 DMM 0.000(+/-0.002)V 3 DMM +5.000(+/-0.012)V 4 DMM +10.000(+/-0.002)V 5.4 Filter 5.4.5 3 dB frequency 10+/-2.5Hz 5.4.6 Output at 30Hz 930 +/- 300 mV P-J)
NUMBER REV ATP444-2 B QC SHEET 1 OF 2 L e 1?1 ?\ OPS RAAP e Tela .,, SE 1 ?O?
PT174-2-Q2 Resistance ASSY Thermometer Signal Conditioner S/0 CUSTOMER W/0 SERIAL NO.
TESTED BY DATE Paragraph/Step Accepted Specification 5.5 Remote Calibration Circuit 5.5.Z DMM Indication +S.884(+/-0.220)V 5.6 Current Consumption 5 .. 6.2 DMM Indication 22 mA max.
- DMM Indication 22 mA max.
NUMBER REV ATP444 -2 B QC SHEET 2 OF 2 8626 WILBUR AVENUE
- NORTH RIDGE. CA 91324 * (213) 886-8488