ML20247M786

From kanterella
Jump to navigation Jump to search
Rev 0 to SV-1, Braidwood Simulator Surveillance Testing
ML20247M786
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 05/26/1989
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20247M747 List:
References
SV-1, NUDOCS 8908020229
Download: ML20247M786 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ -

d'  ?: :Tcat Number: SV-1 Revisi n number /Dste: s/26/89 MTMW 4 Frequrney: 1.nnual BRAIDWOOD SIMULATOR

~ [m' -

SURVEILLANCE TESTING A. PURPOSE The purpose of this procedure is to:  %

1. . Verify that operator conducted surveillance testing on safety-related equipment or systems can be conducted as required by ANSI /ANS-3.5-1985.
2. Verify that the simulator's computed values of selected surveillance parameters .

shall agree within i10% of the Braidwood plant's surveillance parameters as required by ANSI /ANS-3.5-1985.

B. REFERENCES

1. ANSI /ANS-3.5-1985: Nuclear Power Plant Simulators for Use in Operator Training.
2. Braidwood Unit One Surveillance Procedures.
3. PWR Operations Guideline #12: Simulator Testing Program.

C. SURVEILLANCE SELECTION CRITERIA

1. The selection criteria used to meet ANSI /ANS-3.5-1985, section 3.1.1(10) p requirements (simulator surveillance testing) are:
a. Surveillance is safety-related.
b. Surveillance frequency is monthly or less.
c. Surveillance contains centrol room indications and requires control board manipulations.

D. INITIAL CONDITIONS

1. Use the BOL, 100% power, equilibrium xenon initial condition (IC) unless a loser power level is noted in the surveillance procedure.

E. DATA COLLECTION

1. The Control Room data required by each surveillance procedure shall be collec t.td .
2. Data that is obtained from outside the Control R m;a shall be obtained, if avallatle, frca the simulator data poci variables. If the data is not ai/ailable, mark that step N/A.

I f l\ 885M/1 5/89 l

8908020229 890727 PDR ADOCK 05000454 p FDC L _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ . _ . _ . _ _ _ _l

o. 2 Tcct Numbrrt SV-1

, RIvicion Numbor/Date: 0._p5/26/89 Frequ ncy: Annual i

1 BRAIDWOOD SIMULATOR

[}

v SURVEILLANCE TESTING F. TEST INSTRUCTIONS

1. Ensure that the simulator meets the initial conditions as specified in Section D.
                              • w***************************************
  • NOTE *  ;
  • The simulator has the capability to conduct the *
  • shiftly/ daily surveillance, various channel check *
  • surveillance and the system lineup surveillance, *
  • however, these surveillance do not meet the *
  • surveillance acceptance criteria and will not be *
  • performed.
                                      • n***********************************
  • NOTE *
  • Plant surveillance requiring data comparison to *
  • the simulator are identified by an asterisk next *
  • to the surveillance, number. Obtain a copy of the *
  • applicable plant surveillance data for comparison *

,- s

  • to the simulator data.

) ***ce**************w***********************************

' (G

2. Using the 1stest revision of the Breidwood Unit One Surveillance (BwCS's),

perform the following procedures:

a. 1Bw0S 1.1.1.1.e-1: Shutdown Margin Surveillance l
b. 1BwCS 1.1.4.a-1: RCS Minimum Temperature for Criticality Surveillance
c. 1Bw05 1.3.1.2-1: Movable Control Assemblics Monthly surveillance
d. 1Bw0S 1.3.5-1: Shutdown Rod Insertion Limit Doring Approach to i

Criticality SurveilJr.nce l

l e. 1BwoS 7. 4.1.a~1: Quadrant Power Tilt Ratio Surveillance

f. IBw0S 3.1.1-2: Calorimetric Calculation Daily Surveillance l

I g. 1BwoS 3.4.2.a-1: Turbine Throttle, Governor, Rehtst and Intercept l

Valve Monthly Surveillance

  • h. 1BwCS 4.6.2.1.c-1: RCS Controlled Leakage Monthly Surveillance
i. 1BeOS 4.6.2.1.d-1: RCS Watez Inventorf Balance 72 Hour Surveillance l *j. 1BwC3 6.2.3.s-1 Reactor Containment Fan Cooler Monthly Surveillance
  • k. IBwCS 7.3.1-1: CC System Valve Lineup to Safety Related Equipeent Montbly Surveillance
  • 1. 1BwoS 7.3.2.a-1: CC Pump Operability Monthly Surveillance l *m. iBwC3 8.1.1.2.a-1: 1A D/G Operability Monthly Surveillance
  • n. IBw0S 8.1.1.2.a-2: IB D/G Operability Monthly Surveillance
  • o. 1BwoS 8,2.1.1-J: DC Bue Train Operability Weekly Surveillance ,

( '

885M/2 5/89 L - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Ls; . to Test Number: SV-1 Revision Number /Date: 0. 05/26/89 L Frequtney: Annual BRAIDWOOD SIMULATOR

[p SURVEILLANCE TESTING

%)

G. ACCEPTANCE CRITERIA

1. Each surveillance can be performed satisfactorily using installed control board instrumentation or variables available in the simulator data pool and meets the acceptance criteria given in the surveillance.
2. The simulator's surveillance data shall not deviate from the Braidwood plant's surveillance data by more than 110% for the following data:
a. 1BwCS 4.6.2.1.c-1: RCP seal injection flows.
b. 1Bw0S 6.2.3.a-1: RCFC SX flows.
c. IBw0S 7.3.1-1: CC to RH HX flows.
d. 1BwCS 7.3.2'a-1:

. CC pump current and discharge pressure.

e. 1Bw0S 8.1.1.2.a-1: D/G starting time, voltage, and frequency.
f. 1BwCS 8.1.1.2.a-2: D/G starting time, voltage, and frequency.
g. 1BwCS 8.2.1.1-1: DC bus 111 and 112 voltage.

H. DOCUMENTATION

1. Retain the surveillance procedures along with the copies of the selected plant surveillance data used for comparison.

O 1

r' 885M/3 5/89

- _ = _ _ _ _ - . _ _ _ - _ _ _ - _ - _ _ _ - _ _ _ _ _____ - _ _ _ - - _ _ _