Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18151A193 | 4 May 1998 | Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. | Boric Acid Stroke time Incorporated by reference Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding |
ML18150A466 | 16 December 1997 | ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 | VT-2 Liquid penetrant |
ML18150A464 | 27 October 1997 | Risk-Informed ISI (RI-ISI) Pilot Program Submittal. | |
ML18151A391 | 16 October 1997 | Rev 8 to VPAP-2103, Odcm. | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML18151A723 | 7 August 1997 | Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. | VT-2 Severe Accident Management Guideline |
ML18150A444 | 9 June 1997 | Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. | VT-2 |
ML20134J986 | 30 July 1996 | /Unit 2 Fuel Assembly Insp Program | |
ML18151A642 | 1 August 1995 | Change 3 to Rev 0 to Third Interval IST Program | Safe Shutdown Stroke time Cold shutdown justification Power-Operated Valves |
ML20076F834 | 4 August 1994 | Rev 0,Change 1 to Surry Unit 2 Third Interval IST Program | Boric Acid Cold shutdown justification |
ML18151A245 | 31 July 1994 | ISI Program,Interval 3,940510-040509, for Surry Power Station,Unit 2,rev 1 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML18151A210 | 31 July 1994 | ISI Program,Interval 3,931014-031013, Rev 1 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Through-Wall Leak |
ML18151A901 | 3 March 1994 | ISI Program Interval 3,940510- 040509, Rev 0 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Scaffolding |
ML18151A165 | 30 April 1993 | Rev 0 to Surry Power Station Unit 1 ISI Program Interval 3 931014-031013. | Boric Acid Hydrostatic Nondestructive Examination VT-2 |
ML18151A641 | 19 March 1992 | Rev 5 to Surry Power Station,Unit 1,Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. | Boric Acid Stroke time Cold shutdown justification |
ML18151A371 | 19 March 1992 | Rev 3 to Surry Power Station,Unit 2 Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. | Boric Acid Grab sample Stroke time Cold shutdown justification Power Operated Valves |
ML20079L209 | 22 September 1991 | Rev 2 to Station Administrative Procedure VPAP-0805, MOV Program, Upgrading Procedure to Acup Format | Stroke time Weak link |
ML20092M906 | 1 September 1991 | Rev 2 to VPAP-2103, Odcm | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |
ML18151A412 | 1 September 1991 | Rev 2 to VPAP-2103, Odcm. | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |
ML18151A655 | 14 November 1990 | Revised Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0,CPIP-3.1 & CPIP-3.2 | Minimum staff |
ML20006C057 | 18 January 1990 | Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. | |
ML16152A895 | 2 January 1990 | Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations. | |
ML15264A157 | 2 January 1990 | Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21 | Health Physics Network |
ML20012A380 | 1 January 1990 | Rev 28 to, Offsite Dose Calculation Manual,Oconee,Mcguire & Catawba Nuclear Stations. | Offsite Dose Calculation Manual |
ML20012A379 | 1 January 1990 | Rev 27 to, Offsite Dose Calculation Manual,Oconee Nuclear Station. | Offsite Dose Calculation Manual |
ML20012A377 | 1 January 1990 | Rev 26 to, Offsite Dose Calculation Manual McGuire Nuclear Station. | Boric Acid Offsite Dose Calculation Manual |
ML20012A375 | 1 January 1990 | Rev 25 to, Offsite Dose Calculation Manual,Cawtaba Nuclear Station. | Offsite Dose Calculation Manual |
ML20012A369 | 5 December 1989 | Rev 8 to, Process Control Program,Mcguire Nuclear Station. | Process Control Program |
ML20011D244 | 1 December 1989 | Crisis Mgt Implementing Procedures. | |
ML20012A372 | 27 November 1989 | Rev 4 to, Process Control Program,Cawtaba Nuclear Station. | Boric Acid Process Control Program |
ML20012A373 | 15 November 1989 | Rev 4 to, Process Control Program Oconee Nuclear Station. | Process Control Program |
ML19332C845 | 1 November 1989 | Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8,Rev 31 to CMIP-9 & Rev 19 to CMIP-13 | Health Physics Network |
ML19325F193 | 1 November 1989 | Public Version of Rev 32 to, Crisis Mgt Plan for Nuclear Stations. | Safe Shutdown |
ML20247H337 | 15 September 1989 | Revised Corporate Organization for Nuclear Incidents (Coni) Procedure Manual Including Rev 15 to CONI-1.01, Preparation,Issuance & Control Procedures, Rev 30 to CONI-1.02, Coni & Rev 19 to CONI-1.03, Alerting .. | Boric Acid Earthquake Fatality |
ML20245L765 | 7 August 1989 | Rev 0 to Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20247M792 | 31 July 1989 | Rev 6 to PWR Operations Guideline Number 12 Simulator Testing Program. Simulator Transient Test Review Data Encl | Boric Acid Stroke time |
ML20247M915 | 27 July 1989 | Procedure Generation Package | |
ML20247N042 | 19 June 1989 | Rev 5 to SS-1, Braidwood Simulator Steady State Performance Test | |
ML20247M786 | 26 May 1989 | Rev 0 to SV-1, Braidwood Simulator Surveillance Testing | Shutdown Margin |
ML20247M758 | 26 May 1989 | Rev 0 to Test NO-1, Braidwood Simulator Normal Operations Testing | Shutdown Margin |
ML18152A523 | 19 April 1989 | Rev 0 to Motor-Operated Valve Action Plan. | Safe Shutdown |
ML20245C254 | 5 April 1989 | Public Version of Rev 29 to Duke Power Co Crisis Mgt Plan for Nuclear Stations | |
ML20247M780 | 4 April 1989 | Rev 0 to ST-1 Re Simulators safety-related Valves Stroke W/ Acceptable Time Period Required by ANSI/ANS-3.5-1985 | Stroke time |
ML20247M874 | 1 February 1989 | Rev 1 to 2BEP-0, Reactor Trip or Injection Unit 2 | Power change |
ML20247M866 | 1 February 1989 | Rev to 1BEP-0, Reactor Trip or Safety Injection Unit 1 | Power change |
ML20247M820 | 1 February 1989 | Rev 1 to 2BWEP-0, Reactor Trip or Safety Injection Unit 2 | Power change |
ML20247M801 | 1 February 1989 | Rev 1 to 1BWEP-0, Reactor Trip or Safety Injection Unit 1 | Power change |
ML18152A291 | 19 October 1988 | Major Milestones Description of Issue Approach to Resolution. | Reserve Station Service Transformer Biofouling |
ML20204J139 | 7 September 1988 | Temporary Procedure Change 88-504 to Rev 4 to Procedure E-0, Reactor Trip or Safety Injection | |
ML20204J039 | 23 August 1988 | Rev 4 to Emergency Operating Procedure EOP 3.1-28, Turbine Overspeed | |
ML20205A665 | 3 August 1988 | Rev 3 to Emergency Operating Procedure EOP 2540D, Functional Recovery of Heat Removal |