Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept
ML18153A523
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/24/1997
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18153A522 List:
References
NUDOCS 9704290292
Download: ML18153A523 (2)


Text

7.

DELETED

  • TS 6.1-3
8. DELETED
9. The health physics technician requirement of Specification 6.1.B.5 may not be met for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate an unexpected absence provided immediate action is taken to fill the required position.
10. Procedures will be established to insure that NRC policy statement guidelines regarding working hours established for employees are followed. In addition, procedures will provide for documentation of authorized deviations from those guidelines and that the documentation is available for NRC review.

9704290292 970424 Amendment Nos.

PDR ADOCK 05000280 P PDR

    • I--~

9.

Deleted.

  • TS 6.1-8
10. Deleted.
11. Review of every unplanned onsite release of radioactive material to the environs exceeding the limits of Specification 3 .11, including the preparation of reports covering evaluation, recommendations and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the Vice President - Nuclear Operations and to the Management Safety Review Committee.
12. Review of changes to the Process Control Program and the Offsite Dose Calculation Manual.
13. Review of the Fire Protection Program and implementing procedures and shall submit recommended changes to the Station Manager.
g. Authority The SNSOC shall:
1. Provide written approval or disapproval of items considered under ( 1) through (3) above. SNSOC approval shall be certified in writing by an Assistant Station Manager.
2. Render determinations in writing with regard to whether or not each item considered under (1) through (5) above constitutes an unreviewed safety question.
3. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Vice President -

Nuclear Operations and to the Management Safety Review Committee of disagreement between SNSOC and the Station Manager; however, the Station Manager shall have responsibility for resolution of such disagreements pursuant to 6.1.A above.

h. Records The SNSOC shall maintain written minutes of each meeting and copies shall be provided to the Vice President - Nuclear Operations and to the Management Safety Review Committee.

Amendment Nos.