Forwards Request for Addl Info Re Util 971014 Request for Changes to James a Fitzpatrick Nuclear Power Plant TSs to Increase Capacity of Sf Pool.Response Requested within 30 Days of Date of Ltr
ML20202C187
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/26/1999
From: Williams J
NRC (Affiliation Not Assigned)
To: James Knubel
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
TAC-M99824, NUDOCS 9901290325
Download: ML20202C187 (6)


Text

, ,

{ f* Cthq

k UNITED STATES

.t j

2 NUCLEAR REGULATORY COMMISSION p, pg WASHINGTON, D.C. 3068H001 I

January 26, 1999 Mr. James Knubel Chief Nuclear Officer Power Authority of the Stete of New York 123 Main Street White Plains, NY 10601

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT- REQUEST FOR ADDITIONAL INFORMATiON REGARDING PROPOSED INCREASE IN SPENT FUEL POOL CAPACITY (TAC NO. M99824)

Dear Mr. Knubel:

On October 14,1997, on behalf of the New York Power Authority (NYPA, also known as the Power Authority of the State of New York), you requested changes to the James A. FitzPatrick Nuclear Power Plant Technical Specifications to increase the capacity of the spent fuel pool.

Due to problems encountered with the installation of a spent fuel rack, on December 3,1998, you provided a revision to this request, reflecting a reduction in the spent fuel pool capacity.

During the initial NRC revicw of this revision, questions have arisen associated with a change to Table 5.6.1, which provides minimum time to boiling and required coolant makeup rates for 2 loss of spent fuel pool cooling scenarios. Specifically, the time to boil for Case 2 decreased, while the required makeup flow increased. Such a change was not expected, since the slight reduction in spent fuel capacity would tend to increase time to boil, and reduce required makeup flow. In discussions with your staff, it was stated that the changes resulted from errors in the application of the TBOIL computer program used by your contractor, Holtec intemational, for this cc'culation.

Since this change was not described in your Dacember 3,1998, submittal, or in the attached Holtec report, the NRC is requesting additional information in order to complete its review of your application. The specific information requested is described in the enclosure to this letter.

The NRC staff finds that the failure to discuss the changes to Table 5.6.1 represents an avoidable failure to provide adequate information to support review of the proposed ,

amendment. The staff believes that since the nature of the changes is counter-intuitive (i.e., I shorter vs. longer time to boil for reduced pool capacity), it is obvious that some discussion of the reason for the changes is required. The staff believes that this information should have f

been provided by Holtec directly or in response to inquiries from your staff, or provided by your p f d staff independent of Holtec. You should also be aware that the revisions to the Holtec report provided in your December 3,1998, submittal did not clearly identify changes from the original October 14,1997, submittal.

9901290325 990126 PDR P

ADOCK 05000333 PDR

.901dO

^

g gr ~O 7

, I -

l t

2 To support timely NRC review of this proposed amendment, you are requested to provide the requested information within 30 days of the date of this letter. The information to be provided and this schedule was discussed with Mr. Art Zaremba of your staff on January 20,1998, and found to be acceptable.

If you have any questions regarding this matter, please contact me at (301) 415-1470.

Sincerely, ,

Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation l Docket No. 50-333

Enclosure:

As stated cc w/ encl: See next page l

l l

l l

l

  • January 26, 1999
1. p.

! l To support timely NRC review of this proposed amendment, you are requested to provide the requested information within 30 days of the date of this letter. The information to be provided and this schedule was discussed with Mr. Art Zaremba of your staff on January 20,1998, and found to be acceptable.

If you have any questions regarding this matter, please contact me at (301) 415-1470.

Sincerely, Original signed by:

Joseph F. Williams, Project Manager Project Directorate 1-1 i Division of Reactor Projects - t/11 i Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosure:

As stated l cc w/ encl: See next page DISTRIBUTION:

Docket File PUBLIC PDI-1 R/F J. Zwolinski S. Bajwa S. Little J. Williams G. Hubbard G. Cwalina OGC ACRS R. Blough, Region i DOCUMENT NAME: G:\FITZ\M99824Q2.WPD To ricalve a copy of this document, indicate in the bcx: "C" = Copy without attachment / enclosure "E" = Copy with ett chment/enetosure "N" a No copy n DFFICE PM:PDI 1 //2g/ l LA:PDI1dQ l l D PDI-1 ,,,1 l L NAME JWittisms:lec /f# SLitt.l V SBajwa / P R DATE 01/4.h/99 /V 01/J W 99 01/)h/99 01/ /99 i OFFICIAL RECORD COPY

l January 26, 1999 To support timely NRC review of this proposed amendment, you are requested to provide the requested information within 30 days of the date of this letter. The information to be provided and this schedule was discussed with Mr. Art Zaremba of your staff on January 20,1998, and found to be acceptable.

If you have any questions regarding this matter, please contact me at (301) 415-1470.

Sincerely, Original signed by:

Joseph F. Williams, Project Manager Project Directorate I-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosure:

As stated cc w/ encl: See next page DISTRIBUTION:

M2 PUBLIC PDI-1 R/F -

J. Zwolinski S. Bajwa S. Little J. Williams G. Hubbard G. Cwalina OGC ACRS R. Blough, Region i DOCUMENT NAME: G:\FITZ\M99824Q2.WPD To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with rttechment/enetosure "N" = No copy a -

0FFICE PM:PDI 1 M/ l LA:PDI*1dQ l D:PDI 1 m i l {

NAME JWilliamstlec /// 7 SLitt.t V SBajwa P R DATE 01/ % 99 /V 01/MW99 01/ M /99 01/ /99 OFFICIAL RECORD COPY

y James Knubel James A. FitzPatrick Nucl ear Power Authority of the State Power Plant of NewYork cc:

Mr. Gerald C. Goldstein Regional Administrator, Region i Assistant General Counsel . U.S. Nuclear Regulatory Commission Power Authority of the State 475 Allendale Road of New York King of Prussia, PA 19406 1633 Broadway

. New York, NY 10019 Mr. F. William Valentino, President New York State Energy, Research, Resident inspector's Office and Development Authority U. S. Nuclear Regulatory Commission Corporate Plaza West P.O. Box 136 286 Washington Avenue Extension Lycoming, NY 13093 Albany, NY 12203-6399 Mr. Harry P. Salmon, Jr. Mr. Richard L. Patch, Director Vice President- Engineering Quality Assurance Power Authority of the State Power Authority of the State of New York of New York 123 Main Street 123 Main Street White Plains, NY 10601 White Plains, NY 10601 Ms. Charlene D. Faison Mr. Gerard Goering Director Nuclear Licensing 28112 Bayview Drive Power Authority of the State Red Wing, MN 55066 of New York 123 Main Street -

Mr. James Gagliardo White Plains, NY 10601 Sofety Review Committee 700 Castlewood Avenue Supervisor Artitigton,TX 76012 Town of Scriba Route 8, Box 382 Mr. AithurZaremba, Licensing Manager Oswego, NY 13126 James A. FitzPatrick Nuclear Power Plant Mr. Eugene W. Zeitmann P.O. Boa 41 President and Chief Operating Lycoming, NY 13093 Officer Power Authority of the State Mr. Paul Et.tdy of New York New York State Dept. of 99 Washington Ave., Suite No. 2005 Public Servr:e Albany, NY 12210-2820 3 Empire Stato Plaza,10th Floor Albany, NY 12223 Charles Donaidson, Esquire Assistant Attorney General Michael J. Colomb New York Department of Law Site Executive Oft lcer 120 Broadway James A. FitzPatrick Nuclear Power Plant New York, NY 10271 P.O. Box 41 Lycoming, NY 13091

l ... r l

, l

, 4 l'

REQUEST FOR ADDITIONAL INFORMATION PROPOSED INCREASED SPENT FUEL POOL CAPACITY f JAMES A. FITZPATRICK NUCLEAR POWER PLANT

1. Provide a brief description of the TBOIL computer program, including a discussion of the calculation  ;

method and key assumptions. j

2. Provide a description of the TBOIL error which led to the changes in Table 5.6.1. Discuss why this error affected Case 2, but not Case 1.

l 3. Discuss how NYPA has confirmed that the values provided in Table 5.6.1 are now correct.

I

4. For Cases 1 and 2, provide the foliowing:

- decay heat load

- mass of water available for heating

-initial conditions

- descriptions of any heat sinks other than the spent fuel pool water that are assumed to be available, such as heat absort>ed by the fuel and pool structures, or heat transfer via evaporation or conduction

5. Provide a discussion of the assessment NYPA and Holtec have completed to assess whether the TBOIL problem should be reported pursuant to 10 CFR Part 21. This assessment should include a discussion of whether revisions are required for other spent fuel pool capacity submittals which rely upon Holtec analyses.

-)

l l

I a

i l i

1 Enclosure  ;