MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program ML20140G8291997-06-0404 June 1997 Insp Repts 50-295/97-02 & 50-304/97-02 on 970206-0402. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970141997-05-30030 May 1997 Partially Withheld NRC Security Insp Repts 50-295/97-14 & 50-304/97-14 on 970428-0502 (Ref 10CFR73.21(c)(2). No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000295/19970071997-05-21021 May 1997 Insp Repts 50-295/97-07 & 50-304/97-07 on 970312-0428. Violations Noted.Major Areas inspected:follow-up on 970225-0307,AIT Insp of Improper Control Rod Manipulation Event ML20148B7831997-05-0606 May 1997 Insp Repts 50-295/97-09 & 50-304/97-09 on 970324-0414. Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program IR 05000295/19970081997-04-30030 April 1997 Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21. Violations Noted.Major Areas Inspected:Insp Included Review of EP Program,Aspect of Plant Support IR 05000295/19960021997-04-0101 April 1997 Insp Repts 50-295/96-02 & 50-304/96-02 on 961203-970122.No Violations Noted.Major Areas Discussed:Shipment of Radioactive Matls Exceeding Limits of 49CFR173.425 & Inadequately Training Personnel IAW Procedure ML20137J6871997-03-24024 March 1997 Insp Repts 50-295/96-20 & 50-304/96-20 on 961207-970205. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970041997-03-0606 March 1997 Partially Withheld Insp Repts 50-295/97-04 & 50-304/97-04 on 970203-07.No Violations Noted.Details Withheld (Ref 10CFR73.21) ML20134P4881997-02-11011 February 1997 Insp Repts 50-295/96-21 & 50-304/96-21 on 961203-970122. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Radiological Protection & Chemistry Controls IR 05000295/19960171997-02-0303 February 1997 Insp Repts 50-295/96-17 & 50-304/96-17 on 961012-1206. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20134G0481997-01-28028 January 1997 Insp Repts 50-295/96-14 & 50-304/96-14 on 960824-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19960131996-12-23023 December 1996 Insp Repts 50-295/96-13 & 50-304/96-13 on 961001-03,28-30 & 1107.Violations Noted.Major Areas Inspected:Maint. Observed & Reviewed ISI Procedures,Personnel Certifications IR 05000295/19960181996-12-0202 December 1996 Partially Withheld Insp Repts 50-295/96-18 & 50-304/96-18 on 961028-1101 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Corrective Actions,Mgt Support,Effectiveness of Mgt Controls & Security Program Plans ML20135B6851996-11-27027 November 1996 Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee IR 05000295/19960161996-11-21021 November 1996 Insp Repts 50-295/96-16 & 50-304/96-16 on 960923-1024. Violations Noted.Major Areas Insp:Radiation Protection Program ML20129E3401996-10-22022 October 1996 Insp Repts 50-295/96-11 & 50-304/96-11 on 960722-0822. Violations Noted.Major Areas Inspected:Team Insp of Engineering & Technical Support ML20129F1121996-10-22022 October 1996 Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security ML20129F0761996-09-16016 September 1996 Insp Repts 50-295/96-08 & 50-304/96-08 on 960608-0726. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19930241994-01-27027 January 1994 Insp Repts 50-295/93-24 & 50-304/93-24 on 940110-14.No Violations Noted.Major Areas Inspected:Rp Program,Review of Organizational Changes,Audits & Appraisals & External Exposure Controls IR 05000295/19930231994-01-14014 January 1994 Insp Repts 50-295/93-23 & 50-304/93-23 on 931124-940106. Violations Noted.Major Areas Inspected:Outage Activities, Events,Operational Safety,Maintenance & Surveillance IR 05000295/19930181993-12-14014 December 1993 Insp Repts 50-295/93-18 & 50-304/93-18 on 931004-29.No Violations Noted.Major Areas Inspected:Engineering & Technical Support & Related Mgt Activities ML20058H2611993-12-0707 December 1993 Insp Repts 50-295/93-20 & 50-304/93-20 on 931112-1123. Violations Noted.Major Areas Inspected:Resident Insp of Licensee Action on Previous Insp Findings,Summary of Outage Activities & Operational Safety Verification IR 05000295/19930211993-12-0101 December 1993 Insp Repts 50-295/93-21 & 50-304/93-21 on 931115-19.No Violations Noted.Major Areas Inspected:Rp Program,Review of Surveys & Contamination Control 1999-09-01
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program ML20140G8291997-06-0404 June 1997 Insp Repts 50-295/97-02 & 50-304/97-02 on 970206-0402. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970141997-05-30030 May 1997 Partially Withheld NRC Security Insp Repts 50-295/97-14 & 50-304/97-14 on 970428-0502 (Ref 10CFR73.21(c)(2). No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000295/19970071997-05-21021 May 1997 Insp Repts 50-295/97-07 & 50-304/97-07 on 970312-0428. Violations Noted.Major Areas inspected:follow-up on 970225-0307,AIT Insp of Improper Control Rod Manipulation Event ML20148B7831997-05-0606 May 1997 Insp Repts 50-295/97-09 & 50-304/97-09 on 970324-0414. Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program IR 05000295/19970081997-04-30030 April 1997 Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21. Violations Noted.Major Areas Inspected:Insp Included Review of EP Program,Aspect of Plant Support IR 05000295/19960021997-04-0101 April 1997 Insp Repts 50-295/96-02 & 50-304/96-02 on 961203-970122.No Violations Noted.Major Areas Discussed:Shipment of Radioactive Matls Exceeding Limits of 49CFR173.425 & Inadequately Training Personnel IAW Procedure ML20137J6871997-03-24024 March 1997 Insp Repts 50-295/96-20 & 50-304/96-20 on 961207-970205. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970041997-03-0606 March 1997 Partially Withheld Insp Repts 50-295/97-04 & 50-304/97-04 on 970203-07.No Violations Noted.Details Withheld (Ref 10CFR73.21) ML20134P4881997-02-11011 February 1997 Insp Repts 50-295/96-21 & 50-304/96-21 on 961203-970122. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Radiological Protection & Chemistry Controls IR 05000295/19960171997-02-0303 February 1997 Insp Repts 50-295/96-17 & 50-304/96-17 on 961012-1206. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20134G0481997-01-28028 January 1997 Insp Repts 50-295/96-14 & 50-304/96-14 on 960824-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19960131996-12-23023 December 1996 Insp Repts 50-295/96-13 & 50-304/96-13 on 961001-03,28-30 & 1107.Violations Noted.Major Areas Inspected:Maint. Observed & Reviewed ISI Procedures,Personnel Certifications IR 05000295/19960181996-12-0202 December 1996 Partially Withheld Insp Repts 50-295/96-18 & 50-304/96-18 on 961028-1101 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Corrective Actions,Mgt Support,Effectiveness of Mgt Controls & Security Program Plans ML20135B6851996-11-27027 November 1996 Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee IR 05000295/19960161996-11-21021 November 1996 Insp Repts 50-295/96-16 & 50-304/96-16 on 960923-1024. Violations Noted.Major Areas Insp:Radiation Protection Program ML20129E3401996-10-22022 October 1996 Insp Repts 50-295/96-11 & 50-304/96-11 on 960722-0822. Violations Noted.Major Areas Inspected:Team Insp of Engineering & Technical Support ML20129F1121996-10-22022 October 1996 Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security ML20129F0761996-09-16016 September 1996 Insp Repts 50-295/96-08 & 50-304/96-08 on 960608-0726. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19930241994-01-27027 January 1994 Insp Repts 50-295/93-24 & 50-304/93-24 on 940110-14.No Violations Noted.Major Areas Inspected:Rp Program,Review of Organizational Changes,Audits & Appraisals & External Exposure Controls IR 05000295/19930231994-01-14014 January 1994 Insp Repts 50-295/93-23 & 50-304/93-23 on 931124-940106. Violations Noted.Major Areas Inspected:Outage Activities, Events,Operational Safety,Maintenance & Surveillance IR 05000295/19930181993-12-14014 December 1993 Insp Repts 50-295/93-18 & 50-304/93-18 on 931004-29.No Violations Noted.Major Areas Inspected:Engineering & Technical Support & Related Mgt Activities ML20058H2611993-12-0707 December 1993 Insp Repts 50-295/93-20 & 50-304/93-20 on 931112-1123. Violations Noted.Major Areas Inspected:Resident Insp of Licensee Action on Previous Insp Findings,Summary of Outage Activities & Operational Safety Verification IR 05000295/19930211993-12-0101 December 1993 Insp Repts 50-295/93-21 & 50-304/93-21 on 931115-19.No Violations Noted.Major Areas Inspected:Rp Program,Review of Surveys & Contamination Control 1999-09-01
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program ML20140G8291997-06-0404 June 1997 Insp Repts 50-295/97-02 & 50-304/97-02 on 970206-0402. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970141997-05-30030 May 1997 Partially Withheld NRC Security Insp Repts 50-295/97-14 & 50-304/97-14 on 970428-0502 (Ref 10CFR73.21(c)(2). No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000295/19970071997-05-21021 May 1997 Insp Repts 50-295/97-07 & 50-304/97-07 on 970312-0428. Violations Noted.Major Areas inspected:follow-up on 970225-0307,AIT Insp of Improper Control Rod Manipulation Event ML20148B7831997-05-0606 May 1997 Insp Repts 50-295/97-09 & 50-304/97-09 on 970324-0414. Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program IR 05000295/19970081997-04-30030 April 1997 Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21. Violations Noted.Major Areas Inspected:Insp Included Review of EP Program,Aspect of Plant Support IR 05000295/19960021997-04-0101 April 1997 Insp Repts 50-295/96-02 & 50-304/96-02 on 961203-970122.No Violations Noted.Major Areas Discussed:Shipment of Radioactive Matls Exceeding Limits of 49CFR173.425 & Inadequately Training Personnel IAW Procedure ML20137J6871997-03-24024 March 1997 Insp Repts 50-295/96-20 & 50-304/96-20 on 961207-970205. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970041997-03-0606 March 1997 Partially Withheld Insp Repts 50-295/97-04 & 50-304/97-04 on 970203-07.No Violations Noted.Details Withheld (Ref 10CFR73.21) ML20134P4881997-02-11011 February 1997 Insp Repts 50-295/96-21 & 50-304/96-21 on 961203-970122. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Radiological Protection & Chemistry Controls IR 05000295/19960171997-02-0303 February 1997 Insp Repts 50-295/96-17 & 50-304/96-17 on 961012-1206. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20134G0481997-01-28028 January 1997 Insp Repts 50-295/96-14 & 50-304/96-14 on 960824-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19960131996-12-23023 December 1996 Insp Repts 50-295/96-13 & 50-304/96-13 on 961001-03,28-30 & 1107.Violations Noted.Major Areas Inspected:Maint. Observed & Reviewed ISI Procedures,Personnel Certifications IR 05000295/19960181996-12-0202 December 1996 Partially Withheld Insp Repts 50-295/96-18 & 50-304/96-18 on 961028-1101 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Corrective Actions,Mgt Support,Effectiveness of Mgt Controls & Security Program Plans ML20135B6851996-11-27027 November 1996 Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee IR 05000295/19960161996-11-21021 November 1996 Insp Repts 50-295/96-16 & 50-304/96-16 on 960923-1024. Violations Noted.Major Areas Insp:Radiation Protection Program ML20129E3401996-10-22022 October 1996 Insp Repts 50-295/96-11 & 50-304/96-11 on 960722-0822. Violations Noted.Major Areas Inspected:Team Insp of Engineering & Technical Support ML20129F1121996-10-22022 October 1996 Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security ML20129F0761996-09-16016 September 1996 Insp Repts 50-295/96-08 & 50-304/96-08 on 960608-0726. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19930241994-01-27027 January 1994 Insp Repts 50-295/93-24 & 50-304/93-24 on 940110-14.No Violations Noted.Major Areas Inspected:Rp Program,Review of Organizational Changes,Audits & Appraisals & External Exposure Controls IR 05000295/19930231994-01-14014 January 1994 Insp Repts 50-295/93-23 & 50-304/93-23 on 931124-940106. Violations Noted.Major Areas Inspected:Outage Activities, Events,Operational Safety,Maintenance & Surveillance IR 05000295/19930181993-12-14014 December 1993 Insp Repts 50-295/93-18 & 50-304/93-18 on 931004-29.No Violations Noted.Major Areas Inspected:Engineering & Technical Support & Related Mgt Activities ML20058H2611993-12-0707 December 1993 Insp Repts 50-295/93-20 & 50-304/93-20 on 931112-1123. Violations Noted.Major Areas Inspected:Resident Insp of Licensee Action on Previous Insp Findings,Summary of Outage Activities & Operational Safety Verification IR 05000295/19930211993-12-0101 December 1993 Insp Repts 50-295/93-21 & 50-304/93-21 on 931115-19.No Violations Noted.Major Areas Inspected:Rp Program,Review of Surveys & Contamination Control 1999-09-01
[Table view] Category:UTILITY
MONTHYEARIR 05000295/19900261990-11-16016 November 1990 Insp Repts 50-295/90-26 & 50-304/90-28 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Training Concerns & Quality Verification Effectiveness IR 05000295/19900201990-11-0808 November 1990 Insp Repts 50-295/90-20 & 50-304/90-22 on 900910,24-28 & 1018.Violations Noted.Major Areas Inspected:Followup of Licensee Actions on Previously Identified Items IR 05000295/19900211990-11-0202 November 1990 Insp Repts 50-295/90-21 & 50-304/90-23 on 900902-1013.No Violations Noted.Major Areas Inspected:Previous Insp Findings,Summary of Operations,Operational Safety, Surveillance Observation,Maint Observation & LERs IR 05000295/19900221990-10-30030 October 1990 Insp Repts 50-295/90-22 & 50-304/90-24 on 900924-1012. Violations Noted.Major Areas Inspected:Radiation Protection Program IR 05000295/19900191990-10-22022 October 1990 Insp Repts 50-295/90-19 & 50-304/90-21 on 900813-1003.No Violations Noted.Major Areas Inspected:Physical Security Insp Involving Mgt Support,Security Program Plans,Audits, Protected & Vital Area Access Control IR 05000295/19900181990-09-24024 September 1990 Insp Repts 50-295/90-18 & 50-304/90-20 on 900730-0803.No Violations Noted.Major Areas Inspected:Operability of Svc Water Sys IR 05000295/19900151990-09-0505 September 1990 Insp Repts 50-295/90-15 & 50-304/90-17 on 900716-0808. Violations Noted.Major Areas Inspected:Liquid & Solid Radwaste Mgt & Transportation Programs,Including Organizational,Mgt Controls & Training IR 05000295/19900111990-09-0404 September 1990 Insp Repts 50-295/90-11 & 50-304/90-13 on 900424-0508 & 29. Violation Noted.Major Areas Inspected:Work Assignments of Licensee Employee Involved in Unmonitored Discharge of Radwaste IR 05000295/19900121990-08-0202 August 1990 Insp Repts 50-295/90-12 & 50-304/90-14 on 900717-19.No Violations,Deficiencies or Deviations Noted.One Exercise Weakness Identified.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000295/19900161990-07-30030 July 1990 Insp Repts 50-295/90-16 & 50-304/90-18 on 900702-06,16 & 20. No Violations or Deviations Noted.Major Areas Inspected: Chemistry Program,Procedures,Organization & Training IR 05000304/19900121990-06-29029 June 1990 Insp Rept 50-304/90-12 on 900430-0510.Major Areas Inspected: Inservice Insp Related Activities,Steam Generator Indications,Mods,Erosion/Corrosion & Pipe Supports IR 05000295/19900071990-06-22022 June 1990 Insp Repts 50-295/90-07 & 50-304/90-07 on 900414-0602.No Violations Noted.Major Areas Inspected:Summary of Operations,Operational Safety Verification & ESF Sys Walkdown,Surveillance/Maint Observation & Technical Support IR 05000295/19890231989-09-14014 September 1989 Insp Repts 50-295/89-23 & 50-304/89-21 on 890717-21 & 0811. Violations Noted.Major Areas Inspected:Implementation of Licensee Fire Protection Program,Including Actions on Previous Insp Findings IR 05000295/19890251989-09-14014 September 1989 Insp Repts 50-295/89-25 & 50-304/89-23 on 890209-0807.No Violations Noted.Major Areas Inspected:Applicable Portions of Plant Security Program Re Alleged Inadequate Performance & Mgt Practices within Licensee Security Organization IR 05000295/19890241989-09-0808 September 1989 Insp Repts 50-295/89-24 & 50-304/89-22 on 890731-0829.No Violations Noted.Major Areas Inspected:Confirmatory Measurements & Radiological Environ Monitoring Including Review of Open Items Audits & Appraisals IR 05000295/19890181989-08-30030 August 1989 Insp Repts 50-295/89-18 & 50-304/89-17 on 890619-23 & 0717-21 & 24.Violations Noted.Major Areas Inspected:Maint, Support of Maint & Related Mgt Activities ML20246K9781989-08-25025 August 1989 Enforcement Conference Repts 50-295/89-26 & 50-304/89-24. Major Areas Discussed:Enforcement Options,Circumstances Surrounding & Corrective Actions in Response to Potential Violations of Security Plan IR 05000295/19890201989-07-28028 July 1989 Insp Repts 50-295/89-20 & 50-304/89-18 on 890619-0714.No Violations Noted.Major Areas Inspected:Liquid & Solid Radwaste Mgt & Transportation Programs,Including Organization & Mgt Controls & Compliance w/10CFR61 IR 05000295/19890151989-07-24024 July 1989 Safety Insp Repts 50-295/89-15 & 50-304/89-15 on 890509-0629.Violations Noted.Major Areas Inspected:Action on Previous Insp Findings,Summary of Operations & 890508 Unplanned Gas Release Due to Personnel Error IR 05000295/19890191989-06-16016 June 1989 Insp Rept 50-295/89-19 on 890331.No Violations Noted. Major Areas Discussed:Containment Spray Valve 1 MOV CS-0049 Being Inoperable & Rendering One Train of Containment Spray Sys Unable to Function in Recirculation Mode IR 05000295/19890161989-06-16016 June 1989 Insp Repts 50-295/89-16 & 50-304/89-16 on 890515-31.No Violations or Deviations Noted.Major Areas Inspected: Previously Identified Findings Re Environ Qualification of Electrical Equipment IR 05000295/19890121989-05-17017 May 1989 Insp Repts 50-295/89-12 & 50-304/89-12 on 890420 & 0502-05. No Violations,Deviations or Deficiencies Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000295/19890081989-04-10010 April 1989 Insp Repts 50-295/89-08 & 50-304/89-08 on 890210-0323. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Summary Operations & 890219 Shutdown of Unit 2 to Repair Failed Control Rod IR 05000295/19890021989-03-0808 March 1989 Insp Repts 50-295/89-02 & 50-304/89-02 on 890104-0217. Violations Noted.Major Areas Inspected:Insp of Licensee Action on Previous Insp Findings,Summary of Operations & 890115 Unit 1 Shutdown for Steam Generator Tube Leakage IR 05000295/19890061989-03-0303 March 1989 Insp Repts 50-295/89-06 & 50-304/89-06 on 890214-17.Major Areas Inspected:Emergency Preparedness Program,Licensee Action on Previously Identified Items,Emergency Plan Activations & Operational Status of Program IR 05000295/19890071989-02-24024 February 1989 Enforcement Conference Repts 50-295/89-07 & 50-304/89-07 on 890216.Major Areas Discussed:Radioactive Matl Transport & Safeguards Events,Apparent Violations Associated W/Events & Licensee Perspective & Corrective Actions IR 05000295/19880251989-02-23023 February 1989 Insp Repts 50-295/88-25 & 50-304/88-25 on 881215-890104.No Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Organization & Mgt Controls,Changes in Organization,Personnel,Facilities,Equipment & Procedures IR 05000295/19880041988-11-28028 November 1988 Addendum to Insp Repts 50-295/88-04 & 50-304/88-05, Consisting of Comparisons of Results of Liquid Spike Sent to Plant & Criteria for Comparing Analytical Measurements IR 05000295/19880191988-11-25025 November 1988 Insp Repts 50-295/88-19 & 50-304/88-19 on 880824-1110. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Summary of Operations,Unit 2 Trip on 881008 & 12 & 881019 Unit 2 Valve Block Slippage IR 05000295/19880241988-11-22022 November 1988 Insp Repts 50-295/88-24 & 50-304/88-24 on 881024-28.No Violations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization & Training & Primary & Secondary Sys Water QC Programs IR 05000295/19880181988-10-20020 October 1988 Insp Repts 50-295/88-18 & 50-304/88-18 on 880927-29 & 1014. No Violations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise.Four Exercise Weaknesses Identified Which Will Require Corrective Action IR 05000295/19880201988-09-27027 September 1988 Insp Repts 50-295/88-20 & 50-304/88-20 on 880831-0902. Violations Noted.Major Areas Inspected:Liquid & Solid Radwaste Program,Including Organization & Mgt Controls, Effluent Releases & Records/Repts of Releases IR 05000295/19880161988-09-0909 September 1988 Insp Repts 50-295/88-16 & 50-304/88-16 on 880720-0823.No Violations Noted.Major Areas Inspected:Operational Safety Verification & Engineered Safety Feature Sys Walkdown, Surveillance Observation & Maint Observation IR 05000295/19880031988-08-12012 August 1988 Safety Sys Outage Mod Insp Rept 50-295/88-03 on 880329-0602. Violations Noted.Major Areas Inspected:Design,Installation & Testing of Several Mods to Be Performed During Outage & Util Corrective Action Program IR 05000295/19880151988-08-11011 August 1988 Insp Rept 50-295/88-15 on 880628-30 & 0803.Open Item Re Bench Testing of Crosby Valves Noted.Major Areas Inspected: LER 88-012 Re Test Methods of Main Steam Safety Valves Exceeding High Setpoint Tolerance When Tested by Steam IR 05000295/19880131988-08-0808 August 1988 Insp Repts 50-295/88-13 & 50-304/88-14 on 880526-0719.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Findings,Summary of Operations & Main Steam Safety Valves Set Nonconservatively IR 05000295/19880121988-06-22022 June 1988 Insp Repts 50-295/88-12 & 50-304/88-13 on 880414-0603. Violations Noted.Major Areas Inspected:Licensee Action on Previous Findings,Summary of Operations,Unit 1 Startup from Refueling & Testing of Accumulator Backup Check Valves IR 05000295/19880021988-06-0202 June 1988 Insp Repts 50-295/88-02 & 50-304/88-03 on 871124-880407.No Violations Noted.Major Areas Inspected:Review of Allegations Received by Region Iii,Including Drug Use by Personnel Employed at Plant & Harassment Re Safety Concerns IR 05000295/19880111988-05-26026 May 1988 Insp Repts 50-295/88-11 & 50-304/88-12 on 880418-29.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program During Refueling/Maint Outage, Including,Organization & Mgt Controls IR 05000295/19880101988-05-24024 May 1988 Insp Repts 50-295/88-10 & 50-304/88-11 on 880405-21. Violations Noted.Major Areas Inspected:Previous Insp Findings,Lers & Snubber Surveillance & Functional Testing IR 05000295/19880091988-04-27027 April 1988 Insp Repts 50-295/88-09 & 50-304/88-10 on 880225-0413. Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Summary of Operations & Erroneous Setting of Main Steam Safety Valve Lift Setpoints on 880329 ML20148R7111988-04-0707 April 1988 Insp Repts 50-295/87-34 & 50-304/87-35 on 871116-880314. Violations Noted.Major Areas Inspected:Assessment of Compliance w/10CFR50,App R & Review of Fire Protection Program Requirements IR 05000295/19880051988-03-25025 March 1988 Insp Repts 50-295/88-05 & 50-304/88-06 on 880115-0224.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Insp Findings,Summary of Operations,Operational Safety Verification,Lers & IE Bulletins IR 05000295/19880071988-03-15015 March 1988 Safety Insp Repts 50-295/88-07 & 50-304/88-08 on 880302-04. No Violations or Deviations Noted.Major Areas Inspected: Containment Leak Rate Test (Cilrt) Procedure & Performance Witnessing & Review of Cilrt Results IR 05000295/19880081988-03-0202 March 1988 Partially Withheld Insp Repts 50-295/88-08 & 50-304/88-09 on 880201-19.Violation Noted.Major Areas Inspected: Circumstances Surrounding Inadequate Search of Package Matl Observed on 880201 IR 05000295/19880061988-02-23023 February 1988 Insp Repts 50-295/88-06 & 50-304/88-07 on 880208-11.No Violations Noted.Major Areas Inspected:Emergency Preparedness Program,Including Licensee Action on Previously Identified Areas & Emergency Plan Activations ML20149F8991988-02-10010 February 1988 Insp Repts 50-295/88-04 & 50-304/88-05 on 880112-15 & 19.No Violations Noted.Major Areas Inspected:Qa & Confirmatory Measures for in-plant Radiochemical Analyses & Action on Open Items Previously Identified ML20150C3281988-02-0909 February 1988 Insp Repts 50-295/87-24 & 50-304/87-25 on 870914-18.One Open Item Noted.Major Areas Inspected:Check Valve Testing Program,Check Valve Location,Check Valve Maint & Failure History & Response to INPO Event Rept 86-3 IR 05000295/19870361988-01-27027 January 1988 Insp Repts 50-295/87-36 & 50-304/87-37 on 871120-880114. Violation Noted.Major Areas Inspected:Operational Safety Verification & ESF Sys Walkdown & Inspector Followup of IE Bulletin 87-002 IR 05000295/19870381988-01-0707 January 1988 Insp Repts 50-295/87-38 & 50-304/87-39 on 871207-17. Violation Noted.Major Areas Inspected:Licensee Actions Re IE Bulletin 84-02 & Licensee Implementation of Generic Ltr 83-28 in Areas Including Equipment Classification 1990-09-05
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety ML20210C3781999-07-20020 July 1999 Notice of Violation from Insp on 990318.Violations Noted: on 980224,individual Attempted to Enter Protected Area of Plant with Firearm.Search Equipment Operator Failed to Failed to Secure Item & Prevent Access ML20210C4301999-07-20020 July 1999 Notice of Violation from Investigation on 990318.Violation Noted:On 980224,recipient Caused Util to Be in Violation of Section 2.C.6 of Licenses DPR-39 & DPR-48.Recipient Attempted to Enter Protected Area of Station with Handgun IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety ML20205P2211999-04-0909 April 1999 Notice of Violation from Insp & Investigation Completed on 981112.Violation Noted:From Approx July,1997 to 980122,SGI Was Not Stored in Locked Storage Container While Unattended IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-III-98-030, on 980517,armed Security Guard on Patrol in Owner Controlled Area Reported to Security Person Lying Near Road.Guard Subsequently Reported Being Shot.No Intruder Found.Guard Admitted Shooting Himself in Foot1998-05-18018 May 1998 PNO-III-98-030:on 980517,armed Security Guard on Patrol in Owner Controlled Area Reported to Security Person Lying Near Road.Guard Subsequently Reported Being Shot.No Intruder Found.Guard Admitted Shooting Himself in Foot IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20203H8601998-02-25025 February 1998 Notice of Violation from Insp on 971217-980202.Violation Noted:Licensee Returned to Svc Valves 2FW0038 & 2FW0042 in Locked Position Instead of Locked Closed Position ML20202D7291998-02-0606 February 1998 Notice of Violation from Insp on 970120-23.Violation Noted: on 980115,radiation Protection Technician Performed Calibration of Auxiliary Bldg Exit Personnel Contamination Monitor & Failed to Reset Monitor to Initial Setting ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199G3271998-01-27027 January 1998 Notice of Violation from Insp on 970908-1216.Violation Noted:As of 970724,licensee Failed to Ensure That Training Provided to Selected Contractor Craft & Quality Control Insp Personnel Performing Raychem Splice Applications ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 07100011/20120161998-01-21021 January 1998 Notice of Violation from Insp on 971011-1216.Violations Noted:Procedures Were Not Appropriate to Circumstances in Listed Instances PNO-III-98-006, on 980115,licensee Announced Permanent Shut Down of Station.Util Plans to Maintain Plant in Safstor Decommissioning Mode Until Approx 20141998-01-15015 January 1998 PNO-III-98-006:on 980115,licensee Announced Permanent Shut Down of Station.Util Plans to Maintain Plant in Safstor Decommissioning Mode Until Approx 2014 ML20198P5561998-01-15015 January 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000.Violations Noted:Three FFD Trained Supervisors Failed to Require for-cause Test for Employee W/Smell of Alcohol in Protected Area ML20216D7411998-01-12012 January 1998 EN-98-002:on 980115,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problem Involving Implementation of fitness-for-duty Program at Zion Station IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan ML20203E5111997-12-0505 December 1997 Notice of Violation from Insp on 971027-31.Violation Noted:On 971017-18,entrance to Truck Bay of Radioactive High Level Waste Area Was Not Locked & Personnel Did Not Have Direct Oversight IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9291997-11-28028 November 1997 Notice of Violation from Insp on 970830-1010.Violation Noted:On 970910,while Returning QA Fire Pump Breaker to Svc IAW out-of-svc Number 970009297,non-licensed Operator Did Not Close Control Power Knife Switch as Required ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering ML20211J7991997-10-0202 October 1997 Notice of Violation from Insp on 970409-0730.Violation Noted:Zion Station Measures to Control Matls Were Inadequate & Did Not Prevent Installation of Following,From 1992 to 1997,high Efficiency Particulate Air Filters ML20217F0861997-09-30030 September 1997 Notice of Violation from Insp on 970719-0829.Violation Noted:On 970827,engineering Contractor Operated 2C Svc Water Pump Lower Bearing Suppl Isolation valve,2SW0624,w/o Authorization from Operations Dept IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20217A3371997-09-12012 September 1997 Notice of Violation from Insp on 961207-970527.Violation Noted:During 1996 Unit 2 Refueling Outage,Irradiated Fuel Was Moved & Fuel Was Stored in Pool W/Less than 60 Days Decay Time & Fuel Bldg Exhaust Sys Was Operating PNO-III-97-071, on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes1997-09-0303 September 1997 PNO-III-97-071:on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes ML20217R2441997-09-0202 September 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $330,000.Violation Noted:Primary Nso Did Not Establish Power at or Less than Point of Adding Heat IAW GOP-4,step 5.21.f IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering ML20216C4801997-08-28028 August 1997 Notice of Violation from Insp on 970530-0718.Violation Noted:On 970510,during Performance of OSP 97-012,section 5.58,licensee Failed to Close 3L Kiene Valve ML20211C9071997-08-27027 August 1997 EN-97-080:on 970902,notice of Proposed Imposition of Civil Penalty in Amount of $330,000 Issued to Licensee.Action Based on Three Severity Level III Violations Pertaining to Reactivity Mgt Problems & Command/Control Problems IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program ML20217R3411997-08-26026 August 1997 Notice of Violation from Insp on 970728-0801.Violation Noted:High Radiation Area W/Radiation Levels Greater than 1000 Mrem/Hr Was Not Locked & Personnel Did Not Have Direct Oversight of & Positive Control Over Each Entry Into Area IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20217P9661997-08-15015 August 1997 Notice of Violation from Insp on 970404-0529.Violations Noted:Fire Resulted When Mechanical Maint Personnel Did Not Ensure That Adequate Natural or Mechanical Ventilation Was Established While Applying Flammable Lubricant to Rv Holes ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149G6341997-07-17017 July 1997 Notice of Violation from Insp on 970311-0425.Violation Noted:On 970311,licensee Identified That Procedure Did Not Exist for Responding to Loss of Offsite Power That Resulted When Unit 1 Sys Auxiliary Transformer Tripped ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program 1999-09-01
[Table view] |
See also: IR 05000295/1986002
Text
.
. U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-295/86002(DRP); 50-304/86002(DRP)
Dccket Nos. 50-295; 50-304 License Nos. DPR-39;DPR-48
Licensee: Commonwealth Edison Company
P. O. Box 767
Chicago, IL 60690
Facility Name: Zion Nuclear Power Station, Units 1 and 2
Inspection At: Zion, IL
Inspection Conducted: January 4 through February 14, 1986
Inspectors: M. M. Holzmer
L. E. Kanter
J. N. Kish
Approved By: Hehl, Chief
Reactor Projects Section 2A
3//
Da'te
Inspection Summary
Inspection on January 4 through February 14, 1986
(Reports No. 50-295/86002(DRP); 50-304/86002(DRP))
Areas Inspected: Routine, unannounced resident inspection of auxiliary
electrical rooms; control rod drive motor generator rooms; review of
electrical distribution prints for reactor trip breaker modifications;
Unit 2 containment tour prior to its closure; operational safety and
engineered safety feature (ESF) system walkdown; surveillance; maintenance;
and licensee event reports (LERs). The inspection involved a total of 274
inspector-hours onsite, including 57 inspector-hours onsite during off-shifts.
Results: Of the eight areas inspected, one violation was identified in one
area. This violation, the inoperability of 18 Auxiliary Feedwater Pump, was
referred to a Region III enforcement board to determine whether escalated
enforcement is appropriate.
G603210164 e60317
PDR ADOCK 05000295
o PDR
.. - - . . .
__- . . -- ,.
! . DETAILS
1. Persons Contacted
.
l *G. Plim1, Station Manager
i *E. Fuerst, Superintendent, Production
- T. Rieck, Superintendent, Services
R. Johnson, Assistant Station Superintendent, Maintenance
L. Pruett, Unit 1 Operating Engineer
,
J. Gilmore, Unit 2 Operating Engineer
N. Valos, Rad Waste Operating Engineer
R. Budowle, Assistant Superintendent, Technical Services
- M. Carnahan, Training Supervisor
, R. Cascarano, Technical Staff Supervisor
i .A. Ockert, Assistant Technical Staff Supervisor
- *C. Schultz, Regulatory Assurance Administrator
- R. Aker, Station Health Physicist
J. Ballard, Quality Control Supervisor
'
. D. Kaley, Quality Control Engineer
- W. Stone, Quality Assurance Supervisor
D. McHenamin, Quality Assurance Engineer
- T. Printz, Assistant Technical Staff Supervisor
- W. Kurth, Assistant Superintendent Operating
- Indicates persons present at exit interview.
. 2. Summary of Operations
1
- Unit 1
- The unit operated at power levels up to 100% throughout the inspection
period.
Unit 2
j The unit remained shutdown for refueling and the 10 year in-service
- inspection for the first part of the reporting period,
t
On January 1,1986, Safeguards Bus 248 was deenergized due to the loss of
i
the normal supply from non-vital Bus 243. This resulted in an automatic
start of the 2A diesel generator. Paragraph 3 contains further details
on this event.
I
'
On January 22, 1986, the licensee was performing PT-5 and 5A (Reactor
Protection Logic Tests) when the Train B Reactor Trip Breaker opened.
Paragraph 5 contains further details on this event.
- Initial criticality for the cycle was achieved at 9
- 55 p.m. on January 26,
,
1986, and the unit was tied to the grid at 5:30 a.m. on February 4, 1986,
i and operated at power levels up to 60%.
2
,
_ _ . .
- - __ . . _ _ _
(
.
. 3. Bus Drop
On January 17, 1986 at about 8:05 a.m., with Unit 2 in cold shutdown
a (Mode 5), Safeguards Bus 248 was deenergized due to the loss of the
normal supply from non-vital Bus 243. The event resulted in an automatic
start of the 2A diesel generator (DG) which functioned as designed.
Bus 243 was supplied from the system auxiliary transformer through 4160
volt breaker 2432. The alternate supply, from the unit auxiliary
transformer, through breaker 2431 was not available because the unit was
i
shutdown. Breaker 2432 opened during naintenance on the red " breaker
'
closed" indication light socket on the main control board. The apparent
cause was the defective socket. When breaker 2432 opened, the bus tie
between Bus 243 and Bus 248 opened on undervoltage, deenergizing Bus 248.
- The normal breaker alignment was restored at 9
- 00 a.m. the same day.
'
The bus drop resulted in the temporary loss of the 28 RHR pump, the 2B
service water pump, and the A reactor containment fan cooler. Four con-
tainment isolation valves also stroked. The necessary NRC notifications
were made pursuant to 10CFR 50.72.
4. Inoperability of IB Auxiliary Feedwater Pump
1 On December 21, 1985, a service water system hydrostatic test was being
conducted during the Unit 2 outage. The valve lineup for the test shut
ISW 0660, a manual valve which normally supplies the 18 auxiliary
feedwater (AFW) pump lube oil cooler from the Unit 2 side of the service
water (SW) system. The valve lineup neglected to open 1SW 0659, which
would have supplied the IB AFW pump from the Unit 1 side of the SW system.
As a result, SW to the IB AFW pump oil cooler was isolated, rendering the
pump inoperable.
On December 28, 1985, as part of the Unit 2 outage, work on 2MOV-SW101,
which supplies service water to the 2B AFW pump suction, had been
attempted, but the licensee was unable to get the header drained so that
repairs could proceed. The shift engineer directed the radwaste foreman
on shift to connect a hose to the flange between the SW header and
2SW 0656 to help drain the header. This was done, and after observing
the drainage flow, the foreman felt that there was pump head somewhere
. on the header. In an attempt to determine the source, he closed ISW 0656.
He stated that he felt that this valve was allowing SW flow from the Unit 1
side to be cross connected to the Unit 2 side, thus preventing the SW
header from draining. At this time, both valve 1SW 0656 and valve 1SW 0660
were cut of position (closed) isolating normal SW to the 1B AFW pump oil
cooler.
!
When his shift had ended,-the radwaste foreman told the oncoming shift
engineer that he isolated the cross connect from Unit 1 to Unit 2. The
i oncoming shift engineer understood this to mean a SW crossconnect, and
felt that there would not be any impact on Unit 1, being unaware that
i
! 3
l
l
- __ . . - . .
'
. Unit 2 SW was the normal supply to the IB AFW pump lube oil cooler. He
also thought, as a result of his turnover with the off going shift
engineer, that the 2MOV SW101 maintenance team would be requesting
operator assistance later in the shift, and he would then send the shift
foreman to ensure that the lineup was correct. In addition, he assumed
that the hydrostatic test return to service valve lineup or the startup
valve lineup would assure that the cross connect valve would get to the
correct position before it was needed for Unit 2 operations. As a result,
he did not initiate a "non-routine valve line-up" sheet.
Non-routine valve line-up sheets, as stated in Zion Administrative
Procedure (ZAP) 3-51-4B, " Procedure for Non-routine Valve Line-ups" are
applicable for " changes made in valve line-ups of safety related systems,
that are not covered in the out of service (005) card system and last for
a duration greater than one shift, which differ from the routine valve
line-ups as stated in the Zion Station System Operating Instructions."
On January 6, 1986, the Unit 2 hydrostatic test return to service valve
line-up was completed, and ISW 0660 was opened. The valve may have been
opened earlier, but this cannot be conclusively shown from the valve
line-up. The sheet only shows that the valve line-up was completed on
i January, 6, 1986. Since manual valve ISW CC55 had been closed as
- described above and was not addressed on the hydrostatic test valve
line-up, SW to the 18 AFW pump oil cooler remained isolated.
1 On January 12, 1986, with Unit 2 still in cold shutdown, a B-operator on
j' normal rounds identified the need to remove the header drain hose which
had been connected to facilitate repair of valve 2MOV SW101. In the
process of determining how to go about disconnecting and removing the
a hose, it was discovered that both valves ISW 0656 and ISW 0659 were
closed. ISW 0656 was immediately opened, restoring the IB AFW pump to
operability.
l Root Cause Analysis
The following root causes or contributors to this event were identified:
-
An error in the Unit 2 SW hydrostatic test procedure valve line-up
caused the isolation of the IB AFW pump oil cooler. (1SW 0660 was
shut without opening ISW 0659)
-
The radwaste foreman shut ISW 0656, and neither he nor the oncoming
shift engineer initiated a non routine valve line-up sheet to track
or document this activity.
-
Communications between the radwaste foreman and the oncoming shift '
engineer were vague, and unspecific. This probably contributed to
the feelings of the shift engineer that there was no urgency
associated with the repositioning of ISW 0656.
,
1
4
-
,
- _ . ._ . _ _ _ _
T
-
Some shift engineers were unaware of the normal line-up for the AFW
, lube oil coolers, which is that some components are normally
supplied from the opposite unit. This apparently contributed to the
misconception that shutting "a crosstie" would not normally affect
the other unit.
-
The procedure for non-routine valve line-ups has not been consistently
applied, and is in need of review and possible revision.
-
During the review of the event, it was discovered that the Unit 1 SW
hydrostatic test procedure which had been used earlier that year
also isolated the 28 AFW pump oil cooler in a similar manner to that
described above. However, the error was immediately identified and
- corrected by a temporary procedure change initiated during the Unit 1
j SW hydro. This change was not made permanent.
!
Immediate Corrective Actions
-
ISW 0656 was opened immediately after identification.
-
The shift engineer immediately ordered a verification of the line-up
of the SW valves supplying all Unit 1 AFW pump oil coolers. The
same valves on Unit 2 were also checked, although there was no
immediate need to do so
-
Performance tests were performed on all 3 unit 1 AFW pumps on the
shift following discovery, as these tests were previously scheduled
for performance during that time period.
-
Long Term Corrective Actions
-
The SW hydrostatic test procedure will be corrected to ensure that
SW is provided to both motor driven AFW pumps on the operating unit
the next time the procedure is used.
1
-
A copy of the Potentially Significant Event notification which was
- given to the corporate office will be routed to all personnel
l involved in hydrostatic test package review. A memo will accompany '
l the event description, to caution reviewers to give appropriate
t
attention to detail during their reviews.
1
-
A change to the ZAP will be initiated to require that all procedure
i changes clearly state the reason for the change. Training will be
provided for this ZAP change.
-
The procedure for non-routine valve line-ups will be reviewed and
revised if necessary.
1 -
Valve line-up checklists will be reviewed relative to components
supplied with SW from the opposite unit and changed as appropriate.
,
5
'
.
d
- -
_ .
. _ _ _ - _ _ - - - - _ _ _ _ - _ _ _ _ _ . - . _ . - _ _ . - - _ _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _
.
l
.
-
There will be a review to determine whether it is necessary for one
unit's components to be normally supplied by SW from the opposite
unit.
-
Alert all shift supervisors by memo that these cross connected
conditions exist and may potentially exist in other support
systems.
-
Training will be provided to radwaste foremen on ZAP's which pertain
to operations. The training will emphasize procedure adherance.
-
Off going maintenance supervisors will be required to provide a
status update to the shift engineer for jobs which were in progress.
This is to be done before leaving for the night.
! -
The radwaste foremen's desk will be moved to the shift engineer's
office, and radwaste foremen will be required to turnover there.
Safety Significance
FSAR section 6.7.1, AFW design basis, states, "One of the two motor-driven
auxiliary feedwater pumps supplying two of the four steam generators will
provide enough feedwater to safely cool the unit down to the temperature
, at which the residual heat removal system can be utilized. The single
'
turbine-driven auxiliary feedwater pump has twice the capacity of either
j motor-driven pump." The 1A (turbine-driven) and the IC (motor-driven) AFW
f pumps and their associated support systems and power supplies were operable
while the IB AFW pump was out of service. The 1B AFW pump could have run
j for approximately 20 minutes with its lube oil cooler isolated, according
to the results of a test on the 1A AFW pump run several years ago.
The licensee performed about 58 hydrostatic tests in the last Unit I and
- 2 outages, and this is the only known example of a valve line-up error
which wasn't detected during the review process. As a result, this
appears to be an isolated case.
The licensee was slow to realize the significance of this event, in that
- it was discovered on January 12, 1986, and was processed as a routine
deviation report (DVR) until approximately January 27, 1986, when the
Operating Assistant Superintendent determined that this event could have
represented a significant reduction in the margin of safety, and informed
the NRC resident inspector. The licensee usually informs the resident
j office immediately when significant events occur. The fact that the
licensee informed the resident inspector indicates that they were
beginning to treat this as a more serious matter.
Technical Specification (TS) 3.7.2.a precludes reactor operation in
- Mode 1 for more than seven days with one motor-driven AFW pump inoperable.
Operation of Unit 1 in Mode 1 from December 21, 1985 until January 12,
j 1986, a period of approximately 22 days, with the IB motor-driven AFW
pump inoperable is a violation of TS 3.7.2.a. (295/86002-01)
!
6
i
__ _ _ _ - . __ __ _ _ ,__
.
,
. 5. Reactor Trip Breaker Opening
On January 22, 1986, at 11:31 a.m., with the unit in the hot shutdown
mode, the licensee was performing Periodic Test (PT) 5 and SA when the
Train B reactor trip breaker opened. The PT was being utilized as a
check to ensure proper installation of recently completed modifications
(Ring Bus and Shunt Trip) as well as for Generating Operating Procedure
(GOP) startup testing for the nearly concluded refueling outage. As part
l of its investigation, the licensee physically traced the conduit runs and
found them to be connected to the wrong trains (i.e., A to B and B to A).
'
A review of the same modification performed on Unit 1 during testing
refueling outage did not identify similar concerns. Later the same day,
,
4
j the conduits were installed correctly and PT-5 was rerun and successfully
!
,
completed at 3:20 a.m. on January 23, 1986.
'
The licensee is presently looking into the possibility of an additional
verification test prior to performing their post modification check for
proper installation. (Note: this is just being considered since their
post modification test did perform its intended function.) This matter
. will be considered an Open Item pending further review by the resident
} inspectors into the root cause of the event (304/85002-01).
No violation or deviations were identified. One Open Item was identified.
- 6. Followuo of Region III Requests
!
! In a memorandum from E. G. Greenman dated November 7, 1985, all resident
I inspector offices were directed to provide information concerning the use
'
of Licensed Reactor Operators in supervisory positions. In accordance
with the above request, the inspectors reviewed the appropriate Zion
Administrative Procedures (ZAP). A discussion with the operating
engineer on the subject was also conducted. Their procedures showed
compliance with requirements of 10CFR 50.54(m)(2) 111, 10 CFR 55.4(d) and
10 CFR55.4(e).
No violations or deviations were identified.
7. Followup of NRR Requests
In a maintenance questionaire from Harold R. Booher, all resident
, inspector offices were directed to obtain plant-specific primary data as
- part of NRR's Maintenance and Surveillance Program. The survey is being
utilized to assist in the characterization of maintenance programs and
practices at each specific plant. In accordance with the above request
- the questionaire was filled out without assistance from the licensee.
l The results of this survey will be presented in a report to the Executive
Director for Operations (EDO) in the spring of 1986.
l
l 8. Emergency Preparedness Exercise
l The licensee conducted an emergency preparedness exercise on February 10,
j 1986, involving various federal and state agencies. The licensee
- utilized Emergency Operating Procedures to mitigate the consequences of
i
i
f 7
.
e
,n , ,-- o. , - - , , - , --,,-r-,, - , ,cg--ww,y,-,
-
-y--p-- ,,43--+-n,.,-e---,w,4s,--,-,,,-e, - - - - - , --re.wy-w-.--nn,,,,.+,,,,.u- .- ,.mo p----p:me--- g -~ -eem-,-,-,-y-,,-, 4 .w.,w-+.w m r =
--
.
. the simulated event. Details of the exercise and evaluations thereof are
contained in Inspection Reports No. 295/86001(DRSS) and No. 304/86001(DRSS).
The resident inspector attended the exit for the exercise on February 11,
1986.
No violations or deviations were identified.
9. Operational Safety Verification and Engineered Safety Features
System Walkdown
The inspectors observed control room operations, reviewed applicable logs
and conducted discussions with control room operators from January 4,1986
through February 14, 1986. During these discussions and observations,
the inspectors ascertained that the operators were alert, fully cognizant
of plant conditions, attentive to changes in those conditions, and took
prompt action when appropriate. The inspectors verified the operability
of selected emergency systems, reviewed tagout records and verified
proper return to service of affected components. Tours of the auxiliary
and turbine buildings were conducted to observe plant equipment conditions,
including potential fire hazards, fluid leaks, and excessive vibrations
and to verify that maintenance requests had been initiated for equipment
in need of maintenance.
The inspectors, by observation and direct interview, verified that the
physical security activities were being implemented in accordance with
the station security plan.
The inspectors observed plant housekeeping / cleanliness conditions and
verified implementation of radiation protection controls. From January 4
to February 14, 1986, the inspectors walked down the accessible portions
, of the auxiliary feedwater system, component cooling system, and auxiliary
electrical and control rod drive motor generator rooms to verify
operability. The inspectors also witnessed portions of the radioactive
waste system controls associated with radwaste shipments and barreling.
These reviews and observations were conducted to verify that facility
operations were in conformance with the requirements established under
Technical Specifications, 10 CFR and administrative procedures.
No violations or deviations were identified.
,
10. Monthly Surveillance Operation
The inspector observed Technical Specifications required surveillance
testing on the containment spray system and verified that testing was
performed in accordance with adequate procedures, that test instrumen-
tation was calibrated, that limiting conditions for operation were met,
that removal and restoration of the affected components were accomplished,
that test results conformed with technical specifications and procedure
requirements and were reviewed by personnel other than the individual
8
!
t
.
. directing the test, and that any deficiencies identified during the
testing were properly reviewed and resolved by appropriate management
persor.nel.
The inspector also witnessed or reviewed portions of the following test
activities:
PT-6 Containment Spray Tests and Checks
PT-7B Auxiliary Feedwater Pump Service Water Valves Operability Check
(Last Two Months' Tests)
PT-27 Refueling Outage Miscellaneous Valve Tests
No violations or deviations were identified.
11. Monthly
o Maintenance Operation
Station maintenance activities on safety related systems and components
listed below were observed or reviewed to ascertain whether they were
conducted in accordance with approved procedures, regulatory guides,
industry codes or standards, and in conformance with Technical
Specifications.
The following items were considered during this review: the limiting
conditions for operation were met while components or systems were
removed from service; approvals were obtained prior to initiating the
work; activities were accomplished using approved procedures and were
inspected as applicable; functional testing and/or calibrations were
performed prior to returning components or systems to service; quality
control records were maintained; activities were accomplished by qualified
personnel; parts and materials used were properly certified; radiological
controls were implemented; and fire prevention controls were implemented.
Work requests were reviewed to determine status of outstanding jobs and
to assure that priority is assigned to safety related equipment maintenance
which may affect system performance.
The following maintenance activities were observed or reviewed:
20 Main Steam Isolation Valve Maintenance (MSIV)
Unit 2 Source Range Channel Maintenance
Unit 2 Intermediate Range Channel Maintenance
Review of Unit 1 and Unit 2 modification package for installation of an
annunciator in the control room for iodine sampling af ter a 15% power
change
9
i
._. __ _. . _ ___ _ _ . . _. _. - _ _ _ _ _ _ _ . _
.
'
i
i
!. Review of Unit I and Unit 2 Shunt Trip Modification
I
l No violations or deviations were identified.
!
12. Licensee Event Reports (LER) Followup
1
l Through direct observations, discussions with licensee personnel, and
! review of records, the following event reports were reviewed to determine
! that reportability requirements were fulfilled, immediate corrective
action was accomplished, and corrective action to prevent recurrence had
i been accomplished in accordance with Technical Specifications. The LERs
- listed below are considered closed
Unit 1
LER No. Description
!
j 85-40 Automatic Start of Penetration Pressurization Air Compressors
!
1 85-43 Automatic Start of Penetration Pressurization Air Compressors
f 85-44 Inadvertent Reactor Trip Due to Steam Flow Transmitter 1FT-512
,
85-46 Failure of Both Source Range Channels Following Reactor Trip
!
85-47 Missed Surveillance for Reactor Coolant Iodine Following 15%
Power Range
l Unit 2
i Ler No. Description
i
85-29 Purge Isolation Due to Low Temperature and High Radiation
l Signal
86-001 Inadvertent Operation of the Pressurizer Power Operated
i
Relief Valves
i
!
Regarding LER's 295/85040 and 295/85-43, " Automatic Start of Penetration
Pressurization (PP) Air Compressors," the LER's will be closed. A
j
'
naintenance program is being tracked by the station. The events were
reported per 10CFR50.72. Due to heightened emphasis on ESF actuation
l reporting requirements, it is most probable that these will not be
i
reported in future occurrences per 50.72 since the PP air system is
- started by a process signal. This decision was arrived at as a result of
i a meeting between the licensee and Region III personnel January 16, 1986.
j Regarding LER 295/85-44, " Inadvertent Reactor Trip Due to Steam Flow
j Transmitter 1FT-512," the LER will be closed. The trip was caused by
j a steam flow transmitter drifting out of tolerance (00T). The flow
i
i
I
J
! 10
t _I
_ . - . - .-. ---.-_- . . . . _ - - - -. . -. - - - - . - - -. . . ._. _
!
1
L
, *
2
j , transmitter was a Fisher-Porter type and has had a history of drifting
4 00T. This type of transmitter will be replaced under a station modif t- ,
4 cation. For details on the trip refer to inspection report 50-295/85042; f
i 50-304/85043.
- Regarding LER 295/85-047, " Missed Surveillance for Reactor Coolant Iodine
'
Following 15% Power Change". This item is considered a licensee identified
} violation for which no citation will be given (50-295/86002-02).
An event of similar nature occurred on Unit 2 in August 1984. During this
! event, Radiation Protection (RP) was not notified of the 15% power change !
l and corrective action included revision to the appropriate start-up ,
l procedures. In this present event, notification was made to RP but :
! misunderstood. Corrective action will include a description of this event
i in the operators' required reading package and will also be distributed to
} RP personnel. In addition, a modification package which was initiated
i after the last event is being processed for both Unit 1 and Unit 2 to
t install an annunciator in the control room so in the future, iodine
j sampling will be performed in accordance with Technical Specifications.
l
l Regarding LER 304/85-029, " Purge Isolation Due to Low Temperature and ,
High Radiation Signal," the LER will be closed. However, an Open Item
j will be issued pending further investigation into the root cause of the
j event (304/86002-02).
!
j No violations or deviations were identified. One licensee identified
- violation and one Open Item were identified.
!
j 13. Open Items
i
! Open Items are matters which have been discussed with the licensee, which
l will be reviewed further by the inspector, and which involve some action
l
on the part of the NRC or licensee or both. Two Open Items disclosed
- during this inspection are discussed in paragraphs 5 and 12,
i
I
I 14. Exit Interview
l *
I
The inspectors met with licensee representatives (denoted in Paragraph 1) I
throughout the inspection period and at the conclusion of the inspection
3
on January 4 through February 4,1986 to summarize the scope and findings
- of the inspection activities. The licensee acknowledged the inspectors'
! comments. The inspectors also discussed the likely informational content
l of the inspection report with regard to documents or processes reviewed
! by the inspectors during the inspection. The licensee did not identify
- any such documents or processes as proprietary. l
l
!
1
I
l
1
,
I
!
!
l 11
!-
1 .
-_-