IR 05000482/1985022: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20212H112
| number = ML20206H062
| issue date = 08/02/1985
| issue date = 10/15/1985
| title = Forwards Insp Rept 50-482/85-22 on 850423-25.No Violations or Deviations Noted.W/O Rept
| title = Allegation Review Data Sheet for Case 4-85-A-045 Re Inadequate Handling/Installation Procedures for Equipment, Vendor Control Programs & Spare Parts.Based on Insp Rept 50-482/85-22,case Closed
| author name = Denise R
| author name = Denise R
| author affiliation = NRC
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name = Koester G
| addressee name =  
| addressee affiliation = KANSAS GAS & ELECTRIC CO.
| addressee affiliation =  
| docket = 05000000, 05000482
| docket = 05000000, 05000482
| license number =  
| license number =  
| contact person =  
| contact person =  
| case reference number = FOIA-85-594
| case reference number = FOIA-85-594
| document report number = NUDOCS 8608130661
| document report number = NUDOCS 8606250510
| package number = ML20212G491
| package number = ML20206G744
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = NRC TECHNICAL REPORT, TEXT-SAFETY REPORT
| page count = 2
| page count = 1
}}
}}


Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:c . .. .. ,. . . . .:.- ..  ..
{{#Wiki_filter:'
* . . ;p '' - ~    *  *
Y-15- /1 -qg N u)/ N <r ALLEGATION REVIEW Date: 10/15/85 CASE NUMBER 4-85-A-045 DATE OPENED 03/07/85 FACILITY NAME Wolf Creek 50-482 SUBJECT  Inadequate / improper installation of equipment and electrical SOURCE OF ALLEGATION Former contractor
_
-
    ,
employee NUMBER OF ALLE ASSIGNED TO RPS B CROSS REF. N ACTION SCHEDULED Closed FIRST/LAST NAME R. Denise DATE ASSIGNED 03/11/85 REPORT NUMBER 1st:
      .y..gg-(1 -t45~
2nd:
, .
Lst:
AUG 02 C In Reply Refer To:
FTS NUMBER  8-728-8245 DUE DATE ALLEGATION SUBSTANT N ENFORCEMENT ACTION SORT CODE  X DATE CLOSED  10/15/85 ACTION OFFICE RIV MAN HOURS REPORT PREPARATION ASSIST DETAILS: Concerns were in the areas of Department of Labor complaint (more expeditious job reinstatement), inadequate handling / installation procedures for equipment (generic), vendor control programs and spare parts reviews, QC inspectors were not properly trained or did not follow procedures, misrouting and termination of electrical cables within cabinets / improper cable terminations lugs. To be resolved prior to full power licensing. IR 50-482/85-22 completed. D0L still open. Memo dated 9/4/85 from L. Martin .-
r i\YOf J
closes cas ggg62lgo86061s STEPHEN 85-594 PDR    )
Docket: STN 50-482/85-22  !/$ g
       ;
      /
l B- 93 E2 1D 7 e
I6 t Kansas Gas and Electric Company ATTN: Glenn L. Koester Vice President - Nucicar P. O. Box 206 Wichita, Kansas 67201    ,
      '
Ge,ntlemen:
This refers to the inspection conducted by Messrs. L. E. Martin, L. E11ershaw, and G. L. Madsen of this office during the period April 23-25, 1985, of activities authorized by NRC Construction Permit CPPR-147 for the Wolf Creek Generating Station, and to the discussion of our findings with Mr. W. Rudolph, and other members of your staff at the conclusion of the inspectio Areas examined during the inspection included followup on allegations. Within this area, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by the inspectors. These findings are documented in the enclosed inspection repor Within the scope of the inspection, no violations or deviations were  .
identifie Should you have any questions concerning this inspection, we will be pleased t to discuss them with yo
 
Sincerely, Ori;inal S:c : 4 Sy:
R:a'ud .=. ;hnb
  '
R. P. Denise, Director Wolf Creek Task Force
    ,
Enclosure:      !
Appendix - NRC Inspection Report 50-482/85-22     ,
cc: (see page 2)
l
    -
      .. l l
l
    ~
  '
8608130661 860723    l PDR FOIA
STEPHEN 85-594 PDR l A RAL _ . . _ . . . . . . . _  ~ ,___. - ._ . c. . .c;.
      -1
     -
k-bk-$ $[  7 /R-
      '
f 4 -d3  fp
  .
*
  .
M N as -
_
"ea we W w  pwm
_
.
D se g, h .
m-n) m'
    , /. -
       -
    -
DC F &~  .
  %
  .
8 ge c-4 9 c -  -
      . , , .
}}
}}

Revision as of 10:08, 6 December 2021

Allegation Review Data Sheet for Case 4-85-A-045 Re Inadequate Handling/Installation Procedures for Equipment, Vendor Control Programs & Spare Parts.Based on Insp Rept 50-482/85-22,case Closed
ML20206H062
Person / Time
Site: Wolf Creek, 05000000
Issue date: 10/15/1985
From: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20206G744 List: ... further results
References
FOIA-85-594 NUDOCS 8606250510
Download: ML20206H062 (1)


Text

'

Y-15- /1 -qg N u)/ N <r ALLEGATION REVIEW Date: 10/15/85 CASE NUMBER 4-85-A-045 DATE OPENED 03/07/85 FACILITY NAME Wolf Creek 50-482 SUBJECT Inadequate / improper installation of equipment and electrical SOURCE OF ALLEGATION Former contractor

-

employee NUMBER OF ALLE ASSIGNED TO RPS B CROSS REF. N ACTION SCHEDULED Closed FIRST/LAST NAME R. Denise DATE ASSIGNED 03/11/85 REPORT NUMBER 1st:

2nd:

Lst:

FTS NUMBER 8-728-8245 DUE DATE ALLEGATION SUBSTANT N ENFORCEMENT ACTION SORT CODE X DATE CLOSED 10/15/85 ACTION OFFICE RIV MAN HOURS REPORT PREPARATION ASSIST DETAILS: Concerns were in the areas of Department of Labor complaint (more expeditious job reinstatement), inadequate handling / installation procedures for equipment (generic), vendor control programs and spare parts reviews, QC inspectors were not properly trained or did not follow procedures, misrouting and termination of electrical cables within cabinets / improper cable terminations lugs. To be resolved prior to full power licensing. IR 50-482/85-22 completed. D0L still open. Memo dated 9/4/85 from L. Martin .-

closes cas ggg62lgo86061s STEPHEN 85-594 PDR )

l B- 93 E2 1D 7 e