ML19312C244: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.      .-                                        .
{{#Wiki_filter:.      .-                                        .
          .
NOV 0 3 576 d
NOV 0 3 576 d
PLANT SYSTEMS SPRAY AND/OR S;RINKLER SYSTEMS _
PLANT SYSTEMS SPRAY AND/OR S;RINKLER SYSTEMS _
Line 24: Line 23:
areas shall be OPERABLE:
areas shall be OPERABLE:
a.
a.
                                                                                            -
: b.                      (Plantdependent) c.
: b.                      (Plantdependent) c.
APPLICABILITY: All modes ACTIONS:
APPLICABILITY: All modes ACTIONS:
Line 36: Line 34:
verifying that the aut:matic valves in the flow path          l actuate to their correct positions.
verifying that the aut:matic valves in the flow path          l actuate to their correct positions.
27TinspectToE'of sorav headers to verify their integrity
27TinspectToE'of sorav headers to verify their integrity
                                                                              ,
  .
: 3. By inspection of each nozzle to verify no blockage.
: 3. By inspection of each nozzle to verify no blockage.
: c. At least once per 5 years by an air flow test of the open head spray and/or sorinkler system.
: c. At least once per 5 years by an air flow test of the open head spray and/or sorinkler system.
    --
7912110f36            _
7912110f36            _
                                                                                                   .}}
                                                                                                   .}}

Latest revision as of 09:54, 1 February 2020

Tech Specs 4.7.11.2 for Spray & Sprinkler Sys & Surveillance Requirements
ML19312C244
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/03/1976
From:
DUKE POWER CO.
To:
Shared Package
ML19312C243 List:
References
NUDOCS 7912110836
Download: ML19312C244 (1)


Text

. .- .

NOV 0 3 576 d

PLANT SYSTEMS SPRAY AND/OR S;RINKLER SYSTEMS _

LIMITING CONDITION FOR OPERATION 3.7.11.2 The spray and/or sprinkler systems located in the following .

areas shall be OPERABLE:

a.

b. (Plantdependent) c.

APPLICABILITY: All modes ACTIONS:

With a spray and/or sprinkler system inoperable establish a continuous fire watch with backup fire suppression equipment in the unprotectedarea(s),and

1. In MODES 1, 2., 3 or 4 restore the system to OPERABLE status within 7' days or be in at least HOT STANCBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
2. In MODES 5 or 6 restore the system to OPERABLE status within 7 days or prepare and' submit a Special Report to the Comission pursuant to Specification 6.9.2 within the next 10 days outlining the cause of ino;:erability and the plans for restoring the system to OPERABLE status.

. SURVEILLANCE REOUIREMENTS The spray and/or spinkler systems sftall be demonstrated to be 4.7.11.2 OPERABLE:

a. At least once per 92 days by cycling each testable valve through one complete cycle. ,
b. At least once per 12 months:
1. By performing a system functional test which includes simulated automatic actuation of the system and ,

verifying that the aut:matic valves in the flow path l actuate to their correct positions.

27TinspectToE'of sorav headers to verify their integrity

3. By inspection of each nozzle to verify no blockage.
c. At least once per 5 years by an air flow test of the open head spray and/or sorinkler system.

7912110f36 _

.