NOV 0 3 576 d
PLANT SYSTEMS SPRAY AND/OR S;RINKLER SYSTEMS _
LIMITING CONDITION FOR OPERATION The spray and/or sprinkler systems located in the following 3.7.11.2 areas shall be OPERABLE:
a.
(Plantdependent) b.
c.
APPLICABILITY: All modes ACTIONS:
With a spray and/or sprinkler system inoperable establish a continuous fire watch with backup fire suppression equipment in the unprotectedarea(s),and In MODES 1, 2., 3 or 4 restore the system to OPERABLE 1.
status within 7' days or be in at least HOT STANCBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
In MODES 5 or 6 restore the system to OPERABLE status 2.
within 7 days or prepare and' submit a Special Report to the Comission pursuant to Specification 6.9.2 within the next 10 days outlining the cause of ino;:erability and the plans for restoring the system to OPERABLE status.
. SURVEILLANCE REOUIREMENTS The spray and/or spinkler systems sftall be demonstrated to be 4.7.11.2 OPERABLE:
At least once per 92 days by cycling each testable a.
valve through one complete cycle.
b.
At least once per 12 months:
By performing a system functional test which includes 1.
simulated automatic actuation of the system and verifying that the aut:matic valves in the flow path actuate to their correct positions.
27TinspectToE'of sorav headers to verify their integrity 3.
By inspection of each nozzle to verify no blockage.
At least once per 5 years by an air flow test of the open c.
head spray and/or sorinkler system.