ML19312D898: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 19: Line 19:
{{#Wiki_filter:,,,,,                                                                                                                                                                                  . . - . . .      .
{{#Wiki_filter:,,,,,                                                                                                                                                                                  . . - . . .      .
LICENSEE EVENT REPORT
LICENSEE EVENT REPORT
                  ,              ,
                                                                                                                                                                           $005050                    333' CON N O.SLOCK: l I
                                                                                                                                                                           $005050                    333'
* CON N O.SLOCK: l I
l      l      l    l  l 6
l      l      l    l  l 6
lh                      (PLEASE PRINT oR TYPE ALL RdQUIREO INFORMATI*N) lo l t3l 9l Al Li. ;f'.3fi      Jl MlCO3i      Fl 1l@[      14    0 l 0 l -l 0 l 0LICENSE lb l0l0          l 0 l - l 0 l 0 l@l NUVdER                    22 4 l 1LICENSE 26 l 1 l 1TYPE      l 1JOl@l51 LAI l
lh                      (PLEASE PRINT oR TYPE ALL RdQUIREO INFORMATI*N) lo l t3l 9l Al Li. ;f'.3fi      Jl MlCO3i      Fl 1l@[      14    0 l 0 l -l 0 l 0LICENSE lb l0l0          l 0 l - l 0 l 0 l@l NUVdER                    22 4 l 1LICENSE 26 l 1 l 1TYPE      l 1JOl@l51 LAI l
58 l@
58 l@
:3 cT I:Iil$"."';ILl@l 01 5 l 0l 0 l 0 l 3 l 4 l 8 l@l 0 l 3 l 2 l 9 l 8 l 0 l@l 0 l 4 l 2 l 8 l 8 l 0 l@
:3 cT I:Iil$"."';ILl@l 01 5 l 0l 0 l 0 l 3 l 4 l 8 l@l 0 l 3 l 2 l 9 l 8 l 0 l@l 0 l 4 l 2 l 8 l 8 l 0 l@
      '
d                ' '' SJ                      61              DOCKET NUMeE R                  68      b9      EVENT OATE              74      75        REPORT OATE        80 Evs . :3s:=lPTION AND PROBABLE CONSEQUENCES h ITTri I At 1.00 on 3-29-80, the Boron Injection Tank (BIT) was declared inoperable due to no l
d                ' '' SJ                      61              DOCKET NUMeE R                  68      b9      EVENT OATE              74      75        REPORT OATE        80 Evs . :3s:=lPTION AND PROBABLE CONSEQUENCES h ITTri I At 1.00 on 3-29-80, the Boron Injection Tank (BIT) was declared inoperable due to no l
[a,3; ; recirculation flow through the BIT. Technical Specification 3.5.4.1 requires the BIT l
[a,3; ; recirculation flow through the BIT. Technical Specification 3.5.4.1 requires the BIT l
Line 41: Line 38:
42                  43              44 cAusz 3Es RIPTION AND CORRECTIVE ACTIONS h I1    i o I [Lhp lack of recirculation flow was due to boron crvse,1 fn - erinn in rhn RTn voetron- l lation pump 1A suction line. The BIT surge tank was inadvertently drained through two liIl l l a -, "                    1,1 o n e        nn rhn a 4 = cit,rg o nf ehe A nTT ranfrent,* inn                                        nn-,-          Ub f l o neemorine en                      I recover the surge tank level, the BIT recirculation pump suction line clogged due to lt 121 l c-s-                  n1117,rinn nf Enric Acid.
42                  43              44 cAusz 3Es RIPTION AND CORRECTIVE ACTIONS h I1    i o I [Lhp lack of recirculation flow was due to boron crvse,1 fn - erinn in rhn RTn voetron- l lation pump 1A suction line. The BIT surge tank was inadvertently drained through two liIl l l a -, "                    1,1 o n e        nn rhn a 4 = cit,rg o nf ehe A nTT ranfrent,* inn                                        nn-,-          Ub f l o neemorine en                      I recover the surge tank level, the BIT recirculation pump suction line clogged due to lt 121 l c-s-                  n1117,rinn nf Enric Acid.
Tn nrder en enmniv ulch Tech. Snec. 3 . 5. 4.1. the olantl was iiiall -..placed                    .v in Hot Standby by 2045 on 3-29-80. The line was cleared and the BIT was en 2 n r1. f c n ,e n')a ? nn % ,n-an.
Tn nrder en enmniv ulch Tech. Snec. 3 . 5. 4.1. the olantl was iiiall -..placed                    .v in Hot Standby by 2045 on 3-29-80. The line was cleared and the BIT was en 2 n r1. f c n ,e n')a ? nn % ,n-an.
I t;e4 l I
I t;e4 l I I
    -
d 9 80 IT$b                          7&.*.'E R                        OTHER STA TUS                  l$    ' HY                          OtSCOVERY DESCRIPTION
I d 9 80 IT$b                          7&.*.'E R                        OTHER STA TUS                  l$    ' HY                          OtSCOVERY DESCRIPTION
   . l ; i 3 l l E l.8 l 1 l 0 l 0 l@l                                        NA                          l        lAl@lOperatorobservation                                                                  l 8 . ], , . ,,
   . l ; i 3 l l E l.8 l 1 l 0 l 0 l@l                                        NA                          l        lAl@lOperatorobservation                                                                  l 8 . ], , . ,,
_ g_gy                12        11                              44        4S        46                                                                          80 er.ta:.: :: =I E            . ASE                  A'.?OUNT OF AC TIVI TY                                                        LOCA TION OF RELE ASE NA
_ g_gy                12        11                              44        4S        46                                                                          80 er.ta:.: :: =I E            . ASE                  A'.?OUNT OF AC TIVI TY                                                        LOCA TION OF RELE ASE NA
[- l s l [z] '-] l Zl@lin            .                                                            44 l              l 45 NA                                                                          l
[- l s l [z] '-] l Zl@lin            .                                                            44 l              l 45 NA                                                                          l
                             '!'        ' . E spOSMES                                                                                                                                                    so TYPE            OiSCHtPTION 1 l > ! l 0; S Oj@l z l@l                                                NA l
                             '!'        ' . E spOSMES                                                                                                                                                    so TYPE            OiSCHtPTION 1 l > ! l 0; S Oj@l z l@l                                                NA l
                                                                ''
1
1
                                       . . ci tS                                                                                                                                                        So a
                                       . . ci tS                                                                                                                                                        So a
Line 56: Line 51:
* 1 I"I I Z li,!                                  5A l
* 1 I"I I Z li,!                                  5A l
80
80
,
_ .                _        . . ....^
_ .                _        . . ....^
                                                   ..  @                                                                                                                          NHc tu oNt v                .,
                                                   ..  @                                                                                                                          NHc tu oNt v                .,
Line 63: Line 57:
l e.s l I I l lli t i I 1115 r.9                            so ;;
l e.s l I I l lli t i I 1115 r.9                            so ;;
e a p:.granen                  t,' . G . Hairston, III pggyg            (205) 899-5156
e a p:.granen                  t,' . G . Hairston, III pggyg            (205) 899-5156
* __-
* I ALABAMA POWER COMPANT JOSEPH M. FARLEY NUCLEAR PLANT DOCKET NO. 50-348 ATTACHMENT TO LER 80-023/03L-0 Facility:                Joseph M. Farley Unit 1 Report Date:              4/28/80 Event Date:              3/29/80 Identification of Event At 1400 on 3-29-80, the Boron Injection Tank (BIT) was declared inoperable due to no recirculation flow through the BIT.
I
        .
      .
ALABAMA POWER COMPANT JOSEPH M. FARLEY NUCLEAR PLANT DOCKET NO. 50-348 ATTACHMENT TO LER 80-023/03L-0 Facility:                Joseph M. Farley Unit 1 Report Date:              4/28/80 Event Date:              3/29/80 Identification of Event At 1400 on 3-29-80, the Boron Injection Tank (BIT) was declared inoperable due to no recirculation flow through the BIT.
Conditions Prior to Event The unit was in Mode 1.
Conditions Prior to Event The unit was in Mode 1.
Description of Event At 1400 on 3-29-80, the BIT was declared inoperable due to no recirculation flow through the BIT. Tech. Spec. 3.5.4.1 requires the BIT to be operable.
Description of Event At 1400 on 3-29-80, the BIT was declared inoperable due to no recirculation flow through the BIT. Tech. Spec. 3.5.4.1 requires the BIT to be operable.
Tech. Spec. 3.5.4.1 action statement require =ents are net. Health and
Tech. Spec. 3.5.4.1 action statement require =ents are net. Health and safety of the public were not affected.
,
safety of the public were not affected.
Designation of Apparent Cause                                                -
Designation of Apparent Cause                                                -
The inadvertent draining of the BIT surge tank and the subsequent addition of demineralized water to the surge tank caused boron crystal formation in the BIT recirculation pump 1A suction line.
The inadvertent draining of the BIT surge tank and the subsequent addition of demineralized water to the surge tank caused boron crystal formation in the BIT recirculation pump 1A suction line.
Line 80: Line 68:
Also, the second drain valve (double valve isolation) was apparently not fully seated due to boron crystals being lodged under the valve seat. The partially open drain valves were then fully closed. The APO began filling the BIT surge tank af ter noting that the surge tank Icvel indicators were reading low.
Also, the second drain valve (double valve isolation) was apparently not fully seated due to boron crystals being lodged under the valve seat. The partially open drain valves were then fully closed. The APO began filling the BIT surge tank af ter noting that the surge tank Icvel indicators were reading low.
l l
l l
      . .
    -
  .
: 3. Af ter filling the surge tank to 68%, an unsuccessful attempt was made to establish BIT recirculation flow. At 1400 on 3-29-80, the BIT was declared inoperable in accordance with the requirements of Tech. Spec. 3.5.4.1. Also, in order to comply with Tech. Spec.
: 3. Af ter filling the surge tank to 68%, an unsuccessful attempt was made to establish BIT recirculation flow. At 1400 on 3-29-80, the BIT was declared inoperable in accordance with the requirements of Tech. Spec. 3.5.4.1. Also, in order to comply with Tech. Spec.
3.5.4.1 action state =ent requirements, the plant was placed in Hot Standby by 2045 on 3-29-80.
3.5.4.1 action state =ent requirements, the plant was placed in Hot Standby by 2045 on 3-29-80.
Line 92: Line 76:
;              brought to the required Tech. Spec. concentration and the system was declared operable at 0242 on 3-30-80.
;              brought to the required Tech. Spec. concentration and the system was declared operable at 0242 on 3-30-80.
: 2. The incident will be discussed with Maintenance and Operations personnel.
: 2. The incident will be discussed with Maintenance and Operations personnel.
Failure Data None
Failure Data None l
:
l l
l l
l l
l I
I
                                                                                    .
_-          -
                                                   .}}
                                                   .}}

Latest revision as of 09:31, 1 February 2020

LER 80-023/03L-0:on 800329,boron Injection Tank Declared Inoperable Due to Lack of Recirculation Flow.Caused by Boron Crystal Formation in Recirculation Pump 1A Suction Line. Line Was Cleared.Tank Was Returned to Svc
ML19312D898
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/28/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19312D895 List:
References
LER-80-023-03L, LER-80-23-3L, NUDOCS 8005050333
Download: ML19312D898 (3)


Text

,,,,, . . - . . . .

LICENSEE EVENT REPORT

$005050 333' CON N O.SLOCK: l I

l l l l l 6

lh (PLEASE PRINT oR TYPE ALL RdQUIREO INFORMATI*N) lo l t3l 9l Al Li. ;f'.3fi Jl MlCO3i Fl 1l@[ 14 0 l 0 l -l 0 l 0LICENSE lb l0l0 l 0 l - l 0 l 0 l@l NUVdER 22 4 l 1LICENSE 26 l 1 l 1TYPE l 1JOl@l51 LAI l

58 l@

3 cT I:Iil$"."';ILl@l 01 5 l 0l 0 l 0 l 3 l 4 l 8 l@l 0 l 3 l 2 l 9 l 8 l 0 l@l 0 l 4 l 2 l 8 l 8 l 0 l@

d ' SJ 61 DOCKET NUMeE R 68 b9 EVENT OATE 74 75 REPORT OATE 80 Evs . :3s:=lPTION AND PROBABLE CONSEQUENCES h ITTri I At 1.00 on 3-29-80, the Boron Injection Tank (BIT) was declared inoperable due to no l

[a,3; ; recirculation flow through the BIT. Technical Specification 3.5.4.1 requires the BIT l

[ .3 , 4 ; ; to be operable. Technical Specification 3.5.4.1 action statement requirements were l l0#3; j met. The health and safety of the public were not affected. I la le l I l 13!71 I I la isi i I T S 9 80 SYST E *.t CAUSE CAUSE CODE CO *.* *. VALVE CODE SUSCODE COS.1PONENT CODE SU3C335 SUBCODE

!oioI 9 i Si rl@ W@ lz l@ Iz l zl z! zi zl zi@

9 10 ii 12 13 la l zl@ LzJ @

13 20 SEQU EN TI AL o0CURRENCE PIzORT REVIStoN

.2 EVENT YE AR R EPOR T NO. CO3E *TPE No.

@.2- ~~;f la lo I l-j l of 21 si VI Inlal LrJ- 1-J Lo.J

_ 21 21 2J 24 26 27 23 23 00 34 32 ACT.T .?.2E EFFECT SHUTOOWN A TTACH*.t!NT PsPAC4 PR t'.:ECOMP.

TM i' a ; T. ON PLA*;T METHOD HOURS COMPONENT SUBMITT E D FoR M hJ3. S'JPPLI E H MANUFACTURER I03 a 15L7J@ Ja laj@

32 LA.JO 36 I 01011 I t I 31 40 l.r_J@

41 L1J@ lzl@ Iz 19 19 1947I@

42 43 44 cAusz 3Es RIPTION AND CORRECTIVE ACTIONS h I1 i o I [Lhp lack of recirculation flow was due to boron crvse,1 fn - erinn in rhn RTn voetron- l lation pump 1A suction line. The BIT surge tank was inadvertently drained through two liIl l l a -, " 1,1 o n e nn rhn a 4 = cit,rg o nf ehe A nTT ranfrent,* inn nn-,- Ub f l o neemorine en I recover the surge tank level, the BIT recirculation pump suction line clogged due to lt 121 l c-s- n1117,rinn nf Enric Acid.

Tn nrder en enmniv ulch Tech. Snec. 3 . 5. 4.1. the olantl was iiiall -..placed .v in Hot Standby by 2045 on 3-29-80. The line was cleared and the BIT was en 2 n r1. f c n ,e n')a ? nn % ,n-an.

I t;e4 l I I

d 9 80 IT$b 7&.*.'E R OTHER STA TUS l$ ' HY OtSCOVERY DESCRIPTION

. l ; i 3 l l E l.8 l 1 l 0 l 0 l@l NA l lAl@lOperatorobservation l 8 . ], , . ,,

_ g_gy 12 11 44 4S 46 80 er.ta:.: :: =I E . ASE A'.?OUNT OF AC TIVI TY LOCA TION OF RELE ASE NA

[- l s l [z] '-] l Zl@lin . 44 l l 45 NA l

'!' ' . E spOSMES so TYPE OiSCHtPTION 1 l > ! l 0; S Oj@l z l@l NA l

1

. . ci tS So a

. Osw <.. .@ .

fIlloi3icl@l NA MfhVFh a ra n o nn.. , , l

[ i. ., -j. y'p:c ~g @ M MffOd $ g

  • 1 I"I I Z li,! 5A l

80

_ . _ . . ....^

.. @ NHc tu oNt v .,

L I ! LEj _ '

i- .

l e.s l I I l lli t i I 1115 r.9 so ;;

e a p:.granen t,' . G . Hairston, III pggyg (205) 899-5156

  • I ALABAMA POWER COMPANT JOSEPH M. FARLEY NUCLEAR PLANT DOCKET NO. 50-348 ATTACHMENT TO LER 80-023/03L-0 Facility: Joseph M. Farley Unit 1 Report Date: 4/28/80 Event Date: 3/29/80 Identification of Event At 1400 on 3-29-80, the Boron Injection Tank (BIT) was declared inoperable due to no recirculation flow through the BIT.

Conditions Prior to Event The unit was in Mode 1.

Description of Event At 1400 on 3-29-80, the BIT was declared inoperable due to no recirculation flow through the BIT. Tech. Spec. 3.5.4.1 requires the BIT to be operable.

Tech. Spec. 3.5.4.1 action statement require =ents are net. Health and safety of the public were not affected.

Designation of Apparent Cause -

The inadvertent draining of the BIT surge tank and the subsequent addition of demineralized water to the surge tank caused boron crystal formation in the BIT recirculation pump 1A suction line.

Analysis of Event An investigation of this incident revealed the following sequence of events:

1. On 3-29-80, a maintenance work request was issued to clear the drain line on the BIT recirculation pump 1A. Af ter attempting to remove the obstruction throughout the morning, the mechanics secured the valves, verified no flow, and left the area.
2. Shortly thereaf ter, an Assistant Plant Operator (APO) noted water draining from the EIT recirculation pump 1A drain line. The drain line valve closest to the recirculation line was not fully closed due to the valve handle striking the packing gland bolts that were protruding.

Also, the second drain valve (double valve isolation) was apparently not fully seated due to boron crystals being lodged under the valve seat. The partially open drain valves were then fully closed. The APO began filling the BIT surge tank af ter noting that the surge tank Icvel indicators were reading low.

l l

3. Af ter filling the surge tank to 68%, an unsuccessful attempt was made to establish BIT recirculation flow. At 1400 on 3-29-80, the BIT was declared inoperable in accordance with the requirements of Tech. Spec. 3.5.4.1. Also, in order to comply with Tech. Spec.

3.5.4.1 action state =ent requirements, the plant was placed in Hot Standby by 2045 on 3-29-80.

4. An investigation revealed a partial blockage of the BIT recirculation pump 1A suction line. The line was cleared at 2300 on 3-29-80. The i system was declared operable at 0242 on 3-30-80 following re-establishment of recirculation flow and BIT boron concentration.
5. The cause of the partial blockage was crystalized boron formation due to the addition of cold demineralized water to the pump suction piping.

Corrective Action

1. The blockage was removed, recirculation flow established BIT boron
brought to the required Tech. Spec. concentration and the system was declared operable at 0242 on 3-30-80.
2. The incident will be discussed with Maintenance and Operations personnel.