05000348/LER-1982-056-03, /03L-0:on 820927,control Rod Bank D Declared Inoperable When Rods Would Not Move in Manual Control.Caused by Bank Select Relay Sticking,Causing Control Banks B & D to Be Selected Simultaneously.Relay Inspected & Reinstalled

From kanterella
(Redirected from ML20027D345)
Jump to navigation Jump to search
/03L-0:on 820927,control Rod Bank D Declared Inoperable When Rods Would Not Move in Manual Control.Caused by Bank Select Relay Sticking,Causing Control Banks B & D to Be Selected Simultaneously.Relay Inspected & Reinstalled
ML20027D345
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/26/1982
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20027D344 List:
References
LER-82-056-03L, LER-82-56-3L, NUDOCS 8211040174
Download: ML20027D345 (1)


LER-1982-056, /03L-0:on 820927,control Rod Bank D Declared Inoperable When Rods Would Not Move in Manual Control.Caused by Bank Select Relay Sticking,Causing Control Banks B & D to Be Selected Simultaneously.Relay Inspected & Reinstalled
Event date:
Report date:
3481982056R03 - NRC Website

text

_

(777)

LICENSEE EVENT REPORT CONTROL BLOOK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL RECutRED INFORMATIO.*?)

1 6

10 l i l I ^ lL lJ l M l F l 1 gl150 l0 l-l 0 l0 l0 l0 l0 l-l0 l0 l@[ 4l 1l 1l 1l 1l@l l

[g 3 0 LICE.3EE CUDE 14 LICEt:SE NUMSCH 20 26 e M.\\5E 1YPE JO bi LA: $3 T

of1 3[,c l L l@l 015 l 010 l 0 l 3 l 4 l 8 l@l 019 l 2 17 18 12 l@l1l0l2l6IRl?lh i

6 Gw G1 DOCKET NU'/t EH G8 h3 EVENT OATE 74 h. REPORT OATt 60 EVENT OESCRIPTION AND PROBABLE CONSEQUENCES h l 012 l l At 1230 on 9/27/82, Control Rod Bank D was declared inoperable when the rods would i

10 t s i l n t move in manual control. Tech. Spec. 3.1.3.1 requires all full length ro'ds to l

go;,,3l be operable and positioned within +- 12 steps of their group step counter demand l

go,gi ; position. Tech. Spec. 3.1.3.1 action statemen*. requirements were implemented until l

g o,3 ; g 1348 at which time a reactor trip occurred and mode 3 was entered rendering the action l

o g y; l statement requirements inapplicable. Health / Safety of the public was not affected.

j iOtaIl I

33 7

&9 E

OE SUSCO E COMPONENT CODE SUE dE SU E

l 0.l 91 l R l B l@. Wh W h l C lO lN l R l 0 l D lh lZ lh lZ l h 7

9 to 11 12 13 18 IS 23 SECUENTIAL OCCUR R E NCE REPORT REVISION (go RO EVENT YEAR REPORT NO.

CODE TYPE N O.

@ fgg I 8l 21 l-l 1015161 l-l l0 l3 l It I l-l 10 l

_ 21 22 23 24 26 27 28 23 M

31 32 A

ATO O!PLA T METH HOURS SS i FOR1 5 S P LIE MA FA h c!E (N

(

)

lBl@lAl(g l35Zj@

lZ l@

l 0l 0l 0l 0l l Nl@

lNl@

lNl@

lWl1l2I 0l@

k 23 34 36 37 40 41 42 43 44 47 CAL'SE DESCRIPTION AND CORRECTIVE ACTIONS h l i i O l l This event was caused by the bank select relay sticking which caused control banks l

lilil lB and D to be selected simultaneously. The relay was inspected and reinstalled and i

3,,.,; j the problem did not recur.

Control rod bank D was declared operable at 2235 on I

r-l q l 9/27/82.

]

i tai 1 7

8 9 30 STA 5

% POWER QTHER STATUS 015 O RY OISCOVERY OESCRIPTION lt l 5 ) l Elh l1 l 0 l0 lhl NA

'l l A l@l Operational Event l

CO# TENT ACTiviTv stELEASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE I

li Ic i I zl @ 17 l@l NA I

l NA T

4 9 10 t1 44 45 SJ PERSONNEL EXPOSURES NUMBER TYPE OESCRIPTION li l 71 1010 l 01@l Z l@l NA PERSO*JNE L NWRICS NU???fR DESCRIPfiON NA li t a l I 0101 O l@l 7

a 9 11 12 SJ LOSS ob GR 04..'3 AGE To FACILITY T (PE DE SLH9 t ION I 7lhI 8211040174 821026 l

7 io i'OR ADOCK 05000348 av 4

PDR NRC USC ONLY Pt t;L t'.lTY tSTUED OCRCRIPTION l

ll l!!!I!II !

l2 l

NA G8 63 33 ;

it

10 E,

NAME OF PHFPAllET W.

G.

Hairston. TIT PHONE.

(20'O 899-5156