ML19312D895

From kanterella
Jump to navigation Jump to search
Forwards LER 80-023/03L-0
Date released: 11/22/2019 Download: ML19312D895


LER 80-023/03L-0:on 800329,boron Injection Tank Declared Inoperable Due to Lack of Recirculation Flow.Caused by Boron Crystal Formation in Recirculation Pump 1A Suction Line. Line Was Cleared.Tank Was Returned to Svc
ML19312D898
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/28/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312D898 (3)
Forwards LER 80-023/03L-0
ML19312D894
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/28/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312D894 (1)