LER 89-016-00:on 891228,discovered That Required Surveillance for Plant Vent Stack Radioactive Gas Monitor Not Performed.Caused by Personnel Improperly Scheduling Surveillance for Time Later than Due date.W/900123 Ltr
ML19354E334
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/23/1990
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-89-016, LER-89-16, NUDOCS 9001310010
Download: ML19354E334 (4)


Text

.-. . ..

g . 1 t g,_

4 Alabama Power Comp:ny "

~ 4.0 inverness C;nt:r Parkway J

~ Fbst Office Box 1295 Dirmingham, Alabama 35201.

)

4 .

Telephone POS 868 5581 W. G. Hairston,111 i Senior Vice President Nuclear Operationa Alabama FDwcr ,

the southem ekctresystem January 23, 1990 10CFR50.73 1

Docket No. 50-364 *-

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Dear Sir:

l Joseph M. Farley Nuclear Plant - Unit 2 i l Licensee Event Report No. LER 89-016-00 '

I Joseph M. Farley Nuclear Plant, Unit.2 Licensee ~ Event Report No. LER

89-016-00 is being submitted in accordance with 10CFR50.73.

If you have any questions, please advise.

Respectfully submitted, '

W4 lLW

\

V.-G. Hairston, III WGH,III/JARimd 8.64 Enclosure i

cci Mr. S. D. Ebneter Mr. G. F. Maxwell l-b00CkbS$ob3s4 $h PDC L

t..C f J 3ee U.S. NUCLE 12 GCEdVLA70AY COMMISSION APH40VED OMB NO.3160-0104 M8I EMPIRES 4/30/92

  • istlMAf 2D BURDEN FER RESPONSE TO COM?t Y WTH THIS LICENSEE EVENT REPORT (LERI c"/JMiNT 'UOTdOE'f3#N Es'T,'M#E'TM*HE RE$#Tii

' "^ '

'"!u"Ja"Rv's'MM#a"=5"a'N aM.""?JJ'"

E?un'Ao*in uit?eEr.'2CcMun'lhll"c' FLCILITV NAME til DOCKET NUheBf R (2) PAGE(38 Joseph M. Farley - Unit 2 o l s I o l o l 0 l 3l 6 l4 ijopl0;3 1 fl1LE 141 l Surveillance Not Performed On Radiation Monitor RE-14 Due To Personnel Error EVENT DATE Ill LER NUMSEP (66 REPOR? DATE 176 OTHER 7 ACILITIES INVOLVED tel

~

DOCKET NUMBERt$p MONTH DAY YEAR YEAR -

II, (A L ]I 'I[b MONTH day ygAR f ACILtiv N AMES 0151010 l c i i l

~ -

1\ 2 2l 8j E 9 8l9 0l1 l 6 0l 0 0 l1 2l3 9l0 0 istojoici l l OPE R ATING THIS REPORT 48 St'BMITTED PURSUANT TO THE Rh0VIREMENTS OF 10 CFR $ tenece e.e e, more et rae fo4a.ngs till MODE m 20 402tti 1 20 settet to.73ts'12H wi 73.71160 POWER 20 405(eH1H6) 50.3Etall1) to 73tsH2Hel 73.714el 10 { gj n 20 4054eH1Het 50.38(elitt 90 73(aH2bivell OTHER is,ec/fy in A6 street 20 4064eH14elu 60,73te H2H61 60 F3teH2HvitiHAl 5Al 20 405teH1H6vl 80 73:eH2Hel 60.73teH211966i'Is t 20.4064al " Het 50.73teH2ities) 50 73tsH2Hal LICENSEE CONTACT FOR TH18 LER (12)

NAME TELEPHONE huMSER ARE A CODE D- N. Morey, Geneyal Manager-Nuclear Plant 3 l0 3S199-i p146 COOPLETE NE LINE FOR E ACH COMPONENT F AILURE DESCftl$FO IN THit REPORT t13)

MA oOp\A C. R E MA CAUSE SYST E M COMPON E NT CAU55 SYSTEM COMPONENT C- R ORfA E  :

pp I I i i I l l 1 I I I I i 1 1 1 I I I I I I I I I I i i

$UPPLEMENT AL REPORT EXPECTED ti4i MONTH DAY YEAR SU6 MISSION TES 09 yee com,iene EXPECTED sussitSSION DA TEI NO testRA:t m , ,m .,e,e l l l i e . .,,,..,me-, a,r.o. .,e .ce er,e-,,e. . , n el At approximately 1300 ca 12-28-89, it was discovered that the required surveillance for plant vent stack radioactive gas monitor RE-14 had not been performed. The due date for the surveillance had been calculated incorrectly when the surveillance schedules were updated in June 1989. The surveillance had not been performed because of the incorrect due date. The surveillance had actually been due on 09-24-89 and the maximum allevable extension of the surveillance interval was 10-17-89.

This event was caused by cognitive personnel error. The individual who had updated the surveillance schedule in June 1989 improperly scheduled the surveill-ance for a time later than its actual due date.

The actions required by Technical Specification 4.0.3 vere performed. This event has been discussed with the individual who incorrectly updated the surveillance schedule. Personnel responsible for updating the surveillance schedule have been i re-instructed concerning the importance of accurate scheduling of surveillance tests.

Also, a program has been established to provide an independent check of )

the updated surveillance schedule.

'l l

d li NRC Form 39616491 !l l

k n a

C OM4130SA U.S. NUCLEAA LE4ULa. TORY WBBSION I%)lRES 4/30&2 .

.. UCENSEE EVENT REPORT (LER) lSgt'*Eo'fi8'"/e',1l;'5;ovN5 ',,' .cMoy igo".'"'i TEXT CONTlWUATION ign'."Jo' "!".'"$$ $"n" 18lC'"','jM",5 0!Nf!

  • 1 P APE R.O R$ U TION J 3 04 O I Of MANAGEMENT AND BUDGET,WA$HINGTON, DC 30603.

F ACILITY NAmt 40 DOCll4T NUMD6R (3)

LER NUMBER 14) PAOt (3) vsaa " =P. "'#?:

Farhy Nuclear Plant - Unit 2 nmn , . -

o l5 lo lo lo l l 6l4 -

E4 9 0l1[6 -

0l0 0l2 or 0l 3 I, ,#w e ,.,,,,,,m, nn Plant and System Identification Vestinghouse - Pressurized Vater Reactor -

t Energy Industry Identification System codes are identified in the text as [XX].

r Summary of Event At approximately 1300 on 12-28-89, it was discovered that the required surveillance for plant vent stack radioactive gas monitor RE-14 [IL] had not been performed.

The due date for the surveillance had been calculated incorrectly when the surveill-ance schedules were updeted in June 1989. The surveillance had not been performed because of the incorrect due date. The surveillance had actually_been due on 9-24-89 and the maximum allowable extension of the surveillance interval was 10-17-89.

Description of Event i At approximately 1300 on 12-28-89, the individual who was performing the monthly update of the surveillance schedules discovered that the due date for FNP-2-STP-227.4B (Vent Stack Gas Monitor N2D11RE0014 Functional Test) had-been miscalculated when the schedule was updated in June 1989. FNP-2-STP-227.4B had not been performed because of the scheduling error.

The due date for FNP-2-STP-227.4B was erroneously calculated as if the procedure was required to be performed once per 18 months. The previous due date for the surveillance was 6-24-89. Thus, the due date was calculated to be 12-24-90.- Since the procedure was actually required to be performed quarterly, the correct due date ,

vas 9-24-89 and the maximum allowable extension of the surveillance interval was 10-17-89.

Upon discovery, the actions required by Technical Specification 4.0.3 were '

performed. RE-14 met the requirements of the surveillance procedure. The surveillance was completed at 1446 on 12-28-89.

Cause of Event This event was caused by cognitive personnel error. The individual who had updated the surveillance schedule in June 1989 improperly scheduled FNP-2-STP-227.4B for a time later than its actual due date.

i i

NRC 7e,m 308A (649) i

pgOm A ouocum.1omo., coMM .o.,

IXPCES 4/30/92 u

',. LICENSEE EVENT REPORT (LER) Waf#lo'oggg,g,gtgo,N3,vo,, copy,g,ag.;lg

  • TEXT CONTINUATION f""4"45.%S'"C"Oj3E"fy43'c'"^,'!# L"' Ocin

, M

  • 1 P APE RWO RE T I'ON J 4 0 1 OF MANAGEMENT AND DUDGET,W ASHINGTON.DC 20603.

F ACILITY hAME Hi DocutiNUMOS.(21 ggn ,yggg, ggi ,Agt (3)

TEAR M[, '

kEggN Farley Nuclear Plant - Unit 2 o p;o;o;o; }f6 q9 __

0; 1l 6 __ 0; O 0; 3 or j3 l rexTrim., N w .asswmm %asimnn Reportability Analysis and Safety Assessment The event is reportable because surveillance which was required by Technical Specifications was not performed within the required time interval.

Although the surveillance on RE-14 was approximately 72 days overdue, the radiation monitor met the requirements of the surveillance procedure proving that it had remained operable during this period.- There was no effect on plant operation. The l

health and safety of the public were not affected by this event.  !

Co_rrective Action This event has been discussed with the individual who incorrectly updated the surveillance schedule. Personnel responsible for updating the surveillance.  ;

schedule have been re-instructed concerning the importance of accurate i scheduling of surveillance tests.

j i

Also, a program has been established to provide an independent check of the updated surveillance schedule. 1 Additional Information No similar LERs have been submitted by Farley Nuclear Plant.

No component failures occurred during this event.

The unit was available for power operation during the period from 10-18-89 through 12-28-89.

This event vould not have been more severe if it had occurred under different operating conditions.

1 1