ML19340E997: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:9 . | {{#Wiki_filter:9 . | ||
OPERATING DATA REPORT DOCKET NO. 50-334 DATE 1/6/81 COMPLETED BY D. R. Tiiko l | OPERATING DATA REPORT DOCKET NO. 50-334 DATE 1/6/81 COMPLETED BY D. R. Tiiko l | ||
TELEPHONE. 41' 441-9308 OPERATING STATUS | TELEPHONE. 41' 441-9308 OPERATING STATUS | ||
: 1. Unit Name: Beaver Valley Power Station, Unit #1 Notes | : 1. Unit Name: Beaver Valley Power Station, Unit #1 Notes | ||
: 2. Reporting Period: October 1980 j | : 2. Reporting Period: October 1980 j | ||
: 3. t le===d Thennal Power (MWt): NO | : 3. t le===d Thennal Power (MWt): NO | ||
Line 34: | Line 29: | ||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | ||
: 9. Power Level To Which Restricted. If Any (Net MWe): None | : 9. Power Level To Which Restricted. If Any (Net MWe): None | ||
: 10. Reasons For Restnctions,1f Any: N/A | : 10. Reasons For Restnctions,1f Any: N/A This Month Yr.-to-Dete Cumulative 745 7320 39,487 | ||
This Month Yr.-to-Dete Cumulative 745 7320 39,487 | |||
!!. Hours In Reporting Period | !!. Hours In Reporting Period | ||
: 12. Number Of Hours Reactor Was Critical 0 0 13,744.71 | : 12. Number Of Hours Reactor Was Critical 0 0 13,744.71 |
Latest revision as of 10:11, 31 January 2020
ML19340E997 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 01/06/1981 |
From: | Timko D DUQUESNE LIGHT CO. |
To: | |
Shared Package | |
ML19340E994 | List: |
References | |
NUDOCS 8101160467 | |
Download: ML19340E997 (1) | |
Text
9 .
OPERATING DATA REPORT DOCKET NO. 50-334 DATE 1/6/81 COMPLETED BY D. R. Tiiko l
TELEPHONE. 41' 441-9308 OPERATING STATUS
- 1. Unit Name: Beaver Valley Power Station, Unit #1 Notes
- 2. Reporting Period: October 1980 j
- 3. t le===d Thennal Power (MWt): NO
- 4. Namepiste Rating (Gross MWe): 923
- 5. Design Electncal Racing (Net MWe): 852
- 6. Maximum Dependable Capacity (Gross MWe): 845
- 7. Maximum Dependable Capacity (Net MWe): 810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe): None
- 10. Reasons For Restnctions,1f Any: N/A This Month Yr.-to-Dete Cumulative 745 7320 39,487
!!. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0 0 13,744.71
- 13. Reactor Reserve Shutdown Hours 0 0 4,482.8
- 14. Hours Generator On-l.ine 0 0 13,105.07 IS. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0 26,974.253.33
- 17. Gross Electrical Energy Generated (MWH) 0 ,_,
0 8,277,940
- 18. Net Electrical Energy Generated (MWH) -10,014 -10,014 7,560,729
- 19. Unit Service Factor 0 0 33.9
- 20. Unit Availability Factor 0 0 33.9
- 21. Unit Capacity Factor (Using MDC Net) 0 0 h.a
- 22. Unit Capacity FactoriUsing DER Net) 0 0 25.2
- 23. Unit Forced Outage Rate 0 0 46.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration o' Eacht:
2S. If Shus Down At End Of Report Period. Estimated Date of Startup:
- 26. Units la Test Status iPrior to Commercial Operationi: Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A CCMMERCIAL OPERATION N/A N/A Bi101160 M (at77)
.__.._ _ ._ .