Revised Operating Data Rept Sheet for Oct 1980
ML19340E997
Person / Time
Site: Beaver Valley
Issue date: 01/06/1981
From: Timko D
DUQUESNE LIGHT CO.
To:
Shared Package
ML19340E994 List:
References
NUDOCS 8101160467
Download: ML19340E997 (1)


Text

9 .

OPERATING DATA REPORT DOCKET NO. 50-334 DATE 1/6/81 COMPLETED BY D. R. Tiiko l

TELEPHONE. 41' 441-9308 OPERATING STATUS

1. Unit Name: Beaver Valley Power Station, Unit #1 Notes
2. Reporting Period: October 1980 j
3. t le===d Thennal Power (MWt): NO
4. Namepiste Rating (Gross MWe): 923
5. Design Electncal Racing (Net MWe): 852
6. Maximum Dependable Capacity (Gross MWe): 845
7. Maximum Dependable Capacity (Net MWe): 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe): None
10. Reasons For Restnctions,1f Any: N/A This Month Yr.-to-Dete Cumulative 745 7320 39,487

!!. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 0 0 13,744.71
13. Reactor Reserve Shutdown Hours 0 0 4,482.8
14. Hours Generator On-l.ine 0 0 13,105.07 IS. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 0 26,974.253.33
17. Gross Electrical Energy Generated (MWH) 0 ,_,

0 8,277,940

18. Net Electrical Energy Generated (MWH) -10,014 -10,014 7,560,729
19. Unit Service Factor 0 0 33.9
20. Unit Availability Factor 0 0 33.9
21. Unit Capacity Factor (Using MDC Net) 0 0 h.a
22. Unit Capacity FactoriUsing DER Net) 0 0 25.2
23. Unit Forced Outage Rate 0 0 46.4
24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration o' Eacht:

2S. If Shus Down At End Of Report Period. Estimated Date of Startup:

26. Units la Test Status iPrior to Commercial Operationi: Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A CCMMERCIAL OPERATION N/A N/A Bi101160 M (at77)

.__.._ _ ._ .