9 OPERATING DATA REPORT DOCKET NO. 50-334 DATE 1/6/81 COMPLETED BY D.
R.
Tiiko TELEPHONE. 41' 441-9308 OPERATING STATUS
- 1. Unit Name: Beaver Valley Power Station, Unit #1 Notes October 1980
- 2. Reporting Period:
j
- 3. t le===d Thennal Power (MWt):
NO
- 4. Namepiste Rating (Gross MWe):
923 852
- 5. Design Electncal Racing (Net MWe):
845
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
None
- 10. Reasons For Restnctions,1f Any:
N/A This Month Yr.-to-Dete Cumulative 745 7320 39,487
!!. Hours In Reporting Period 0
0 13,744.71
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
0 4,482.8
- 14. Hours Generator On-l.ine 0
0 13,105.07 IS. Unit Reserve Shutdown Hours 0
0 0
0 0
26,974.253.33
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 0 0
8,277,940
- 18. Net Electrical Energy Generated (MWH)
-10,014
-10,014 7,560,729
- 19. Unit Service Factor 0
0 33.9
- 20. Unit Availability Factor 0
0 33.9 0
0 h.a
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity FactoriUsing DER Net) 0 0
25.2
- 23. Unit Forced Outage Rate 0
0 46.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration o' Eacht:
2S. If Shus Down At End Of Report Period. Estimated Date of Startup:
- 26. Units la Test Status iPrior to Commercial Operationi:
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A CCMMERCIAL OPERATION N/A N/A Bi101160 M (at77)
.