ML19340E997

From kanterella
Jump to navigation Jump to search
Revised Operating Data Rept Sheet for Oct 1980
ML19340E997
Person / Time
Site: Beaver Valley
Issue date: 01/06/1981
From: Timko D
DUQUESNE LIGHT CO.
To:
Shared Package
ML19340E994 List:
References
NUDOCS 8101160467
Download: ML19340E997 (1)


Text

9 OPERATING DATA REPORT DOCKET NO. 50-334 DATE 1/6/81 COMPLETED BY D.

R.

Tiiko TELEPHONE. 41' 441-9308 OPERATING STATUS

1. Unit Name: Beaver Valley Power Station, Unit #1 Notes October 1980
2. Reporting Period:

j

3. t le===d Thennal Power (MWt):

NO

4. Namepiste Rating (Gross MWe):

923 852

5. Design Electncal Racing (Net MWe):

845

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

810

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):

None

10. Reasons For Restnctions,1f Any:

N/A This Month Yr.-to-Dete Cumulative 745 7320 39,487

!!. Hours In Reporting Period 0

0 13,744.71

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 4,482.8

14. Hours Generator On-l.ine 0

0 13,105.07 IS. Unit Reserve Shutdown Hours 0

0 0

0 0

26,974.253.33

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 0 0

8,277,940

18. Net Electrical Energy Generated (MWH)

-10,014

-10,014 7,560,729

19. Unit Service Factor 0

0 33.9

20. Unit Availability Factor 0

0 33.9 0

0 h.a

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity FactoriUsing DER Net) 0 0

25.2

23. Unit Forced Outage Rate 0

0 46.4

24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration o' Eacht:

2S. If Shus Down At End Of Report Period. Estimated Date of Startup:

26. Units la Test Status iPrior to Commercial Operationi:

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A CCMMERCIAL OPERATION N/A N/A Bi101160 M (at77)

.