ML12346A011: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 2
| page count = 2
| project = TAC:ME0274
| project = TAC:ME0274
| stage =  
| stage = Other
}}
}}



Revision as of 23:58, 1 April 2018

Crystal River, Unit 3 - License Renewal Application 10 CFR Part 54.21(b) Annual Update
ML12346A011
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/04/2012
From: Franke J A
Duke Energy Corp, Florida Power Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F1212-01, TAC ME0274
Download: ML12346A011 (2)


Text

PDukeEnergyCrystal River Nuclear PlantDocket No. 50-302Operating License No. DPR-72Ref: 10 CFR 54December 4, 20123F1212-01U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555-0001Subject: Crystal River Unit 3 -License Renewal Application 10 CFR Part 54.21(b) AnnualUpdate (TAC NO. ME0274)References: (1) CR-3 to NRC letter, dated December 16, 2008, "Crystal River Unit 3 -Application for Renewal of Operating License"(2) CR-3 to NRC letter, dated December 8, 2011, "Crystal River Unit 3 -License Renewal Application 10 CFR Part 54.21(b)'Annual Update (TACNO. ME0274)"Dear Sir:On December 16, 2008, Florida Power Corporation (FPC) requested renewal of the operatinglicense for Crystal River Unit 3 (CR-3) to extend the term of its operating license an additional20 years beyond the current expiration date (Reference 1).Annually during the NRC staff review of the License Renewal Application (LRA) and at leastthree months before the completion of the review, FPC is required by 10 CFR 54.21(b) toamend the LRA by identifying any change to the CR-3 Current Licensing Basis (CLB) thatmaterially affects the contents of the LRA.FPC has completed a review of CLB changes that have occurred since the previous annualupdate letter (Reference 2) was submitted and has identified no changes to the CLB thatmaterially affect the contents of the LRA, including the Final Safety Analysis Report supplement.Pending changes were identified that are associated with Extended Power Uprate (EPU),Steam Generator Replacement (SGR), and related activities that are being implemented duringthe current outage. These changes are not incorporated into the CLB as of this update period.This letter does not contain any new or revised regulatory commitments.If you have any questions regarding this submittal, please contact Mr. Daniel Westcott,Superintendent, Licensing and Regulatory Programs, at (352) 563-4796.iSin rely,Jo Fran ece PresidentCrystal River Unit 3JAF/dwhxc: NRC CR-3 Project ManagerNRC License Renewal Project ManagerNRC Regional Administrator, Region IISenior Resident InspectorCrystal River Nuclear Plant A q'15760 W. Power Line StreetCrystal River, FL 34428 U. S. Nuclear Regulatory Commission Page 2 of 23F1212-01STATE OF FLORIDACOUNTY OF CITRUSJon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for FloridaPower Corporation; that he is authorized on the part of said company to sign and file with theNuclear Regulatory Commission the information attached hereto; and that all such statementsmade and matters set forth therein are true and correct to the best of his knowledge,information, and belief. 2 Z/ýeA. FrankeVice PresidentCrystal River Nuclear PlantThe foregoing document was acknowledged before me this day of-- ___( ____- ____ ,2012, by Jon A. Franke.Signature of Notary PublicState of Florida'""".CAROLYNE. PORTMANN.Commission # DD937553Expires March 1, 2014Bwd MTmy Fainbiwaice MUMS8-7019(Print, type, or stamp CommissionedName of Notary Public)Personally I/ ProducedKnown V -OR- Identification